Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PV siting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Community Planning for Solar: Defining Realistic Solar Development Options

This guide is designed to aid in assessing community preferences for solar development and financing alternatives. To evaluate community preferences regarding solar, it is necessary to define the range of realistic options for solar development possible in a community, including potential future targets for solar capacity, the mixes of development possible based on the solar resources available, and potential community benefits and solar ownership structures. This guide can help community officials, volunteers, and regional planning agency staff in constructing a realistic suite of options for solar development, based on existing state and local laws, available solar resources and infrastructure, and economic and financial considerations.

14 SOLAR ENERGY↗

Assessing Community Preferences Regarding Solar Development

Preparing a plan regarding solar development in your community requires bringing together people from a variety of backgrounds and perspectives, who often have strong feelings and preferences about the amount and location of local solar PV projects developed in their community. The planning process should be designed in an inclusive way, where meaningful community engagement is prioritized. With a topic such as solar development, which can elicit strong reactions among community members, proactive community engagement that is perceived as fair will likely lead to more favorable outcomes. Whether your community hosts large tracts of forest, brownfields, residential neighborhoods, and/or large buildings and parking lots, there are a variety of ways community members might envision growth of solar energy. The engagement process can help clarify how and where solar is preferred, so that local government can respond to future solar development requests or to initiate solar projects that are preferred by the community.

14 SOLAR ENERGY↗

Community Planning for Solar: Conducting Focus Groups for Solar Planning

This guide is designed to assist community officials, volunteers, and regional planning agency staff in conducting preliminary community meetings to learn about attitudes towards solar energy in your community. The guide will provide the key steps, timelines, facilitators' guide, and tips for hosting successful focus groups. Focus groups are meetings with a small group that represent a diversity of perspectives in your community. These differ from an open meeting in that focus groups include very specific questions that are prepared in advance, and all participants are given time to respond and understand various perspectives about solar energy. The guide concludes with a suggested template for reporting the results of your focus group or community meeting to your community more broadly. Holding community focus groups is part of assessing community preferences, as part of the Community Planning for Solar toolkit (ag.umass.edu/solarplanning). This guide is designed to help municipalities in Massachusetts and other states proactively plan for solar development in their communities. For more information, visit the UMass Clean Energy Extension (CEE) website (ag.umass.edu/clean-energy).

14 SOLAR ENERGY↗

Community Planning for Solar: Conducting a Community Solar Survey

This guide is designed to assist community officials, volunteers, and regional planning agency staff in conducting a survey of residents to learn about attitudes and development preferences towards solar energy within the community. The guide will provide the key steps, timelines, distribution options, ethics, and considerations that should be made in developing a survey distribution strategy. The guide also contains an overview of various question types and response categories, with considerations for the type of data that are needed for the study. The guide concludes with recommendations for managing data and databases, data visualization, and reporting results. The appendix includes samples of materials used in a solar energy survey, from invitation letters to the survey. This document is intended to provide a practical guide for implementing a survey in communities that are proactively planning for solar development. The guide offers a practical “how-to” plan for conducting a survey. It may be advantageous to consult with an expert in survey development who will be familiar with any methods and techniques described in this guide, but this is not necessary. This guide offers basic considerations and examples of questions and analyses to help a community understand preferences of the community.

14 SOLAR ENERGY↗

Community Planning for Solar: Compiling a Community Solar Action Plan

This document provides an annotated outline for a Community Solar Action Plan. This document is designed to assist community officials, volunteers, and regional planning agency staff in preparing a draft Community Solar Action Plan for a municipality, community, or other jurisdiction. Preparing a Community Solar Action Plan is the fifth step in the Community Planning for Solar process (ag.umass.edu/solarplanning). The plan is intended to be the culmination of the planning process. The contents of the plan will include summaries of information gathered as part of foregoing steps in the process, including completion of a Solar Resource and Infrastructure Assessment, administering of a Community Solar Survey, interpretation of survey results, and review of Solar Financing and Ownership Options and tools. Once the Community Solar Action Plan has been drafted, it should be reviewed by municipal board and commission members and presented at an open community forum. Any important comments or revisions can be incorporated before the final Community Solar Action Plan is approved and implemented. The approved Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. The Monitoring, Evaluating, and Updating Your Community Solar Action Plan fact sheet (Step 6, Item a) describes some things to consider when updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Monitoring, Evaluating, and Updating Your Community Solar Action Plan

The Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. This fact sheet describes some things to consider when implementing, monitoring, evaluating, and updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Snohomish County Cathcart Landfill Site in Snohomish County, Washington

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Snohomish County Cathcart Landfill Site in Snohomish County, Washington, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Ft. Hood Military Base Outside Killeen, Texas - A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Chicago, Milwaukee, and St. Paul Rail Yard Company Site in Perry, Iowa - A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chicago, Milwaukee & St. Paul Rail Yard Company site in Perry, Iowa, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

14 SOLAR ENERGY↗

PV Stormwater Management Research and Testing (PV-SMaRT) (Final Technical Report)

The objective of the Photovoltaic Stormwater Management Research and Testing (PV-SMaRT) project was to develop and disseminate research-based, solar-specific resources for estimating stormwater runoff at ground-mounted PV facilities and detail stormwater management and water quality best practices. The intended use of stormwater management and water quality best practices and stormwater runoff estimation resources is to reduce balance of system soft costs associated with stormwater infrastructure requirements and improve water quality through research-tested best practices. Currently, stormwater regulations and guidelines vary by jurisdiction and can lead to regulatory uncertainty and increased compliance costs for managing stormwater runoff at solar sites. To address these concerns, the NREL team and its partners (University of Minnesota, Great Plains Institute, and Fresh Energy) established and engaged an advisory Water Quality Task Force (WQTF); conducted field research on stormwater infiltration and runoff at five ground-mounted PV sites; validated a 3-D hydrologic model to predict water runoff and generate stormwater runoff coefficients for a range of site conditions and PV designs; developed a stormwater management and water quality best practices document; and engaged with local jurisdictions and other stakeholders to disseminate best practices, stormwater runoff coefficients, and other tools. Key outputs of this project were a PV-SMaRT Runoff Calculator developed by University of Minnesota, a webinar detailing project outcomes and how to use the PV-SMaRT runoff calculator, and a document on Best Practices for regulators and developers regarding stormwater runoff at PV sites.

14 SOLAR ENERGY↗

Net Metering and Market Feedback Loops: Exploring the Impact of Retail Rate Design on Distributed PV Deployment

The substantial increase in deployment of customer-sited solar photovoltaics (PV) in the United States has been driven by a combination of steeply declining costs, financing innovations, and supportive policies. Among those supportive policies is net metering, which in most states effectively allows customers to receive compensation for distributed PV generation at the full retail electricity price. The current design of retail electricity rates and the presence of net metering have elicited concerns that the possible under-recovery of fixed utility costs from PV system owners may lead to a feedback loop of increasing retail prices that accelerate PV adoption and further rate increases. However, a separate and opposing feedback loop could offset this effect: increased PV deployment may lead to a shift in the timing of peak-period electricity prices that could reduce the bill savings received under net metering where time-varying retail electricity rates are used, thereby dampening further PV adoption. In this paper, we examine the impacts of these two competing feedback dynamics on U.S. distributed PV deployment through 2050 for both residential and commercial customers, across states. Our results indicate that, at the aggregate national level, the two feedback effects nearly offset one another and therefore produce a modest net effect, although their magnitude and direction vary by customer segment and by state. We also model aggregate PV deployment trends under various rate designs and net-metering rules, accounting for feedback dynamics. Our results demonstrate that future adoption of distributed PV is highly sensitive to retail rate structures. Whereas flat, time-invariant rates with net metering lead to higher aggregate national deployment levels than the current mix of rate structures (+5% in 2050), rate structures with higher monthly fixed customer charges or PV compensation at levels lower than the full retail rate can dramatically erode aggregate customer adoption of PV (from -14% to -61%, depending on the design). Moving towards time-varying rates, on the other hand, may accelerate near- and medium-term deployment (through 2030), but is found to slow adoption in the longer term (-22% in 2050).

14 SOLAR ENERGY↗

Will Solar Panels Help When the Power Goes Out? Planning for PV Resilience

PV systems, like all energy systems, must chart a difficult course in order to improve resilience. They need to simultaneously withstand extreme conditions that cause grid power disruptions, be configured in a way that allows electricity to be delivered to meet the PV user's needs, and overcome disruptions arising from solar resource intermittency. Certain considerations reveal themselves as key to a PV system's resilience benefits. Choice of hardware is critical, as is site selection for the PV array. Voluminous evidence in a hurricane context demonstrates that durable hardware, properly maintained and sited, leads to PV systems surviving extreme weather with their functionality intact. Structurally weak or poorly maintained PV equipment, on the other hand, has demonstrated failures during extreme weather events. PV system stakeholders should ensure that best practices are followed for hardware procurement and siting. It is also important to understand that PV systems are not one-size-fits-all. While incorporating islanding capabilities and energy storage into the system's electrical topology will typically enhance resilience, the user's needs will determine the optimally resilient conformation of any given system. These factors - appropriate hardware, siting, maintenance, and system design - are the primary drivers of PV resilience. PV systems possess high potential for resilient energy generation due to their distributed, abundant, and free fuel supply, but the technology itself does not inherently lead to resilient outcomes. Realizing PV's potential for resilience requires consideration of these determinative factors.

14 SOLAR ENERGY↗

Best Practices for Siting Solar Photovoltaics on Municipal Solid Waste Landfills. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The Environmental Protection Agency and the National Renewable Energy Laboratory developed this best practices document to address common technical challenges for siting solar photovoltaics (PV) on municipal solid waste (MSW) landfills. The purpose of this document is to promote the use of MSW landfills for solar energy systems. Closed landfills and portions of active landfills with closed cellsrepresent thousands of acres of property that may be suitable for siting solar photovoltaics (PV). These closed landfills may be suitable for near-term construction, making these sites strong candidate to take advantage of the 30% Federal Business Energy Investment Tax Credit. It was prepared in response to the increasing interest in siting renewable energy on landfills from solar developers;landfill owners; and federal, state, and local governments. It contains examples of solar PV projects on landfills and technical considerations and best practices that were gathered from examining the implementation of several of these projects.

14 SOLAR ENERGY↗

Solar PV Project Financing: Regulatory and Legislative Challenges for Third-Party PPA System Owners

Residential and commercial end users of electricity who want to generate electricity using on-site solar photovoltaic (PV) systems face challenging initial and O&M costs. The third-party ownership power purchase agreement (PPA) finance model addresses these and other challenges. It allows developers to build and own PV systems on customers? properties and sell power back to customers. However, third-party electricity sales commonly face five regulatory challenges. The first three challenges involve legislative or regulatory definitions of electric utilities, power generation equipment, and providers of electric services. These definitions may compel third-party owners of solar PV systems to comply with regulations that may be cost prohibitive. Third-party owners face an additional challenge if they may not net meter, a practice that provides significant financial incentive to owning solar PV systems. Finally, municipalities and cooperatives worry about the regulatory implications of allowing an entity to sell electricity within their service territories. This paper summarizes these challenges, when they occur, and how they have been addressed in five states. This paper also presents alternative to the third-party ownership PPA finance model, including solar leases, contractual intermediaries, standardized contract language, federal investment tax credits, clean renewable energy bonds, and waived monopoly powers.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Sky Park Landfill Site in Eau Claire, Wisconsin - A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Sky Park Landfill site in Eau Claire, Wisconsin, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kerr McGee Site in Columbus, Mississippi. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Kerr McGee site in Columbus, Mississippi, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the VAG Mine Site in Eden and Lowell, Vermont. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vermont Asbestos Group (VAG) Mine site in Eden, Vermont, and Lowell, Vermont, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tronox Facility in Savannah, Georgia. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tronox Facility site in Savannah, Georgia, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

14 SOLAR ENERGY↗