Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “POWER PLANT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Experiences with Mobile Units for Liquid RAW Management in Slovak and Czech Nuclear Power Plants - 20089

In Nuclear Power Plants VVER 440, Russian type of reactor there was designed auxiliary building where according to basic design all operational liquid radioactive waste (RAW) should be stored in large capacity tanks during the whole operational period. That's why there are in the auxiliary building several types of large storage tanks with different internal volume from 110 m{sup 3}, 460 m{sup 3} to 550 m{sup 3}. Storage tanks are usually situated in rooms with limited access and minimal handling space. Operational waste was here transported by the system of pipes from the reactor building. There is possibility to handle with the waste and set the pipeline in to the chosen storage tanks. Nobody takes care about the quality of waste in the storage tanks and waste waits for the period of decommissioning when it should be treated. The storage capacity was designed for the whole lifetime of nuclear power plant. Currently the life time of Nuclear Power Plant's (NPP) is extended and there is necessity to retrieve and treat the RAW in advance. Another reason why the stakeholder, who operates the NPPs, decides to treat the operational RAW during the operational period of NPP, is that there are still new requirements from safety point of view which need to have free available space for example because of potential accident. So treating the operational RAW during the life time of NPP is present issue. Because in basic design nobody cares how the RAW will be retrieved and treated in the future, there is usually no technology for that in existing NPP. Some of the NPPs build an additional building with suitable technologies for treatment or hire the company which offer mobile technology for retrieving the waste from the storage tanks. Wood Nuclear Slovakia PLC provides all activities within liquid RAW management projects by its own staff including management, design, construction and deployment of equipment, engineering support, as well as all RAW retrieval and solidification activities. We offer RAW management as a service without any significant changes in existing NPP's buildings and technology. It is always a technical challenge to conduct successful retrieval, pumping and treatment of RAW. The complex RAW retrieval system can be designed as tailored solution for any RAW storage according to known boundary conditions and specific needs. These systems are based on years of experience with RAW manipulation, processing and treatment and the whole RAW management knowledge by Wood Nuclear Slovakia LTD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic viability of using thermal energy storage for flexible carbon capture on natural gas power plants

Fossil fuel-based power plants generate 80% of the electricity in the United States and provide a reliable generation source for both base and peak power demands. These plants are expected to adapt to changes in environmental policies that will require carbon management with carbon capture and storage (CCS) representing a possible solution. Current solvent-based CCS has a detrimental impact on a power plant's performance due to large heat loads required for carbon capture solvent regeneration. This parasitic load restricts the power plant's output and operation flexibility. Therefore, this study evaluates the feasibility of using thermal storage technologies for natural gas combined cycle (NGCC) power plants coupled with CCS to minimize the impact of solvent regeneration and enable the plant to operate at peak power output. Thermal storage can minimize the impact of CCS on the power plant by providing the heat load required for solvent regeneration during times of peak demand which will allow the plant to operate unrestricted and at full power. In total, fifteen unique thermal storage configurations were evaluated from three thermal storage categories: Brayton cycle heat pump, vapor compression heat pump, and heat recovery steam generator steam extraction for storage. The viability of these systems was determined by evaluating each configuration on thousands of real-world Locational Marginal Pricing (LMP) profiles from the New York Independent System Operator and California Independent System Operator electricity markets using a techno-economic analysis. Afterwards, results were compared to the performance of a base power plant (NGCC with CCS and no thermal storage) to determine the impact of thermal storage on power plant economics. Overall, six of the thermal storage configurations performed better than base CCS enabled power plant on between 11.5% and 38.7% of the LMP signals evaluated. The best performing configuration was a vapor compression heat pump that used flue gas as the working fluid and had both hot and cold thermal storage units. This configuration performed better than the base CCS power plant on 38.7% of the LMP profiles. The results of this study show thermal storage can mitigate the economic impact of carbon capture solvent regeneration on NGCC power plants. Discussion focuses on the impact of electricity pricing on the optimal thermal storage system, the advantages and disadvantages of the systems evaluated, and identifies limitations with the study.

25 ENERGY STORAGE↗

Optimization under Uncertainty for Water Consumption in a Pulverized Coal Power Plant

Pulverized coal (PC) power plants are widely recognized as major water consumers whose operability has started to be affected by drought conditions across some regions of the country. Water availability will further restrict the retrofitting of existing PC plants with water-expensive carbon capture technologies. Therefore, national efforts to reduce water withdrawal and consumption have been intensified. Water consumption in PC plants is strongly associated to losses from the cooling water cycle, particularly water evaporation from cooling towers. Accurate estimation of these water losses requires realistic cooling tower models, as well as the inclusion of uncertainties arising from atmospheric conditions. In this work, the cooling tower for a supercritical PC power plant was modeled as a humidification operation and used for optimization under uncertainty. Characterization of the uncertainty (air temperature and humidity) was based on available weather data. Process characteristics including boiler conditions, reactant ratios, and pressure ratios in turbines were calculated to obtain the minimum water consumption under the above mentioned uncertainties. In this study, the calculated conditions predicted up to 12% in reduction in the average water consumption for a 548 MW supercritical PC power plant simulated using Aspen Plus. Optimization under uncertainty for these large-scale PC plants cannot be solved with conventional stochastic programming algorithms because of the computational expenses involved. In this work, we discuss the use of a novel better optimization of nonlinear uncertain systems (BONUS) algorithm which dramatically decreases the computational requirements of the stochastic optimization.

01 COAL, LIGNITE, AND PEAT↗

Optimization Under Uncertainty for Water Consumption in a Pulverized Coal Power Plant

Pulverized coal (PC) power plants are widely recognized as major water consumers whose operability has started to be affected by drought conditions across some regions of the country. Water availability will further restrict the retrofitting of existing PC plants with water-expensive carbon capture technologies. Therefore, national efforts to reduce water withdrawal and consumption have been intensified. Water consumption in PC plants is strongly associated to losses from the cooling water cycle, particularly water evaporation from cooling towers. Accurate estimation of these water losses requires realistic cooling tower models, as well as the inclusion of uncertainties arising from atmospheric conditions. In this work, the cooling tower for a supercritical PC power plant was modeled as a humidification operation and used for optimization under uncertainty. Characterization of the uncertainty (air temperature and humidity) was based on available weather data. Process characteristics including boiler conditions, reactant ratios, and pressure ratios in turbines were calculated to obtain the minimum water consumption under the above mentioned uncertainties. In this study, the calculated conditions predicted up to 12% in reduction in the average water consumption for a 548 MW supercritical PC power plant simulated using Aspen Plus. Optimization under uncertainty for these large-scale PC plants cannot be solved with conventional stochastic programming algorithms because of the computational expenses involved. In this work, we discuss the use of a novel better optimization of nonlinear uncertain systems (BONUS) algorithm which dramatically decreases the computational requirements of the stochastic optimization.

01 COAL, LIGNITE, AND PEAT↗

Coupling of CTF and RELAP5-3D Within an Enhanced Fidelity Nuclear Power Plant Simulator

A robust and accurate multiphysics engineering simulator is being developed to model the core behavior and system response of pressurized water reactors. This simulator relies on the NESTLE and CTF computer codes to model the neutronics and thermal hydraulics (TH), respectively, inside the core on a nodal scale and on the Reactor Excursion and Leak Analysis Program—Three Dimensional (RELAP5-3D) to model the entire nuclear steam supply system. The RELAP5-3D model includes highly detailed nodalization and multidimensional flow modeling throughout the vessel. Previously, pin-resolved data generated via the Virtual Environment for Reactor Analysis core simulator were used to improve the accuracy of the NESTLE core predictions. The engineering simulator being developed as part of this work uses the 3KEYMASTER platform to couple the enhanced NESTLE model to a nodal-fidelity CTF model to balance run time with accuracy; NESTLE provides node-dependent powers to CTF, and CTF provides node-dependent coolant densities and fuel temperatures to NESTLE.An overlapping domain approach is used for the core TH in which RELAP5-3D provides core boundary conditions based on the system response and CTF provides a node-dependent coolant heating rate to the RELAP5-3D core solution. In the preliminary TH demonstration discussed in this paper, CTF and RELAP5-3D provided similar steady-state core predictions, indicating the hydraulic compatibility between the codes, as well as reasonable and expected behavior under hypothetical transient conditions. This provides an initial step in ongoing efforts toward a robust, multiscale TH/neutronics engineering simulator capability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulating wind power forecast error distributions for spatially aggregated wind power plants

Dispersion and aggregation of wind power plants lower the uncertainty of wind power by reducing wind power forecasting errors. Using quantitative methods, this paper studies the dispersion's impact on the uncertainty of the aggregated wind power production. A method to simulate day-ahead forecast error distributions at different dispersion and forecasting skill scenarios is presented. The proposed method models the uncertainty of wind power forecasting on an annual basis and at different levels of production. As a result, the uncertainty in the forecasting of spatially dispersed wind power plants is modelled using two continuous distributions: Laplace and beta distribution. The analysis shows that even the production level uncertainty can be modelled in various dispersion and forecasting skill scenarios. The model for aggregated forecast error distributions requires only four variables: capacity-weighted distance of the total wind power plant fleet, mean of the site-specific mean absolute errors (MAEs), number of aggregated wind power plants, and the mean variability of the elevations from the proximities of the aggregated wind power plants. Here, the results are especially promising when the number of aggregated wind power plants exceeds five, the terrain complexity is low or moderate, and the aggregation region is large. This is demonstrated through a case study for Texas, United States.

17 WIND ENERGY↗

Acciona Power Plant Hydrogen Mitigation Project

In 2014, Acciona Solar Power and the National Renewable Energy Laboratory initiated discussions to identify a method to solve a long-standing efficiency loss problem at parabolic trough power plants. Parabolic trough power plants begin to show lost thermal efficiency after six years of operation, due to the presence of trace concentrations of hydrogen in the heat transfer fluid that circulates in the power plant. Trace levels of hydrogen infiltrate the collector field receivers, increasing their heat loss, and decreasing the power plants’ thermal efficiency. At the time, Acciona’s Nevada Solar One power plant in Boulder City, Nevada was starting to show this efficiency loss. After several discussions, APS and NREL agreed to a collaborative effort (CRADA) to develop and implement a method to reduce hydrogen levels in the circulating HTF at the NSO power plant. The project was planned as a three-year effort, and work started in June 2015. The CRADA’s goal was to solve the long-standing lost efficiency problem caused by the buildup of hydrogen in the HTF, which significantly impacts the efficiency, electricity generation, and revenue from parabolic trough power plants.

08 HYDROGEN↗

Parametric study of potential early commercial MHD power plants

Three different reference power plant configurations were considered with parametric variations of the various design parameters for each plant. Two of the reference plant designs were based on the use of high temperature regenerative air preheaters separately fired by a low Btu gas produced from a coal gasifier which was integrated with the power plant. The third reference plant design was based on the use of oxygen enriched combustion air preheated to a more moderate temperature in a tubular type metallic recuperative heat exchanger which is part of the bottoming plant heat recovery system. Comparative information was developed on plant performance and economics. The highest net plant efficiency of about 45 percent was attained by the reference plant design with the use of a high temperature air preheater separately fired with the advanced entrained bed gasifier. The use of oxygen enrichment of the combustion air yielded the lowest cost of generating electricity at a slightly lower plant efficiency. Both of these two reference plant designs are identified as potentially attractive for early MHD power plant applications.

Hals, F. A.↗

Risk and Cost Analysis of Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plant (NPP) operators in USA have announced to close their plants despite there are remaining years on their operating licenses. The cause of these closures is because the plant operators suffer financial losses. Approximately 80% of USA NPPs would have undergone financial losses if they were situated in a deregulated electricity market. In a deregulated market, electricity generators are independent entities separate from the transmission companies and Independent System Operator (ISO) which manages the market. NPPs in this market are termed merchant NPPs, and their profitability is determined solely from electricity generation revenues. Meanwhile, regulated and public power nuclear units’ profitability is determined by the regulatory process in place for each unit. Due to the complexity of differentiating each regulated and public power NPP’s regulations 36 NPPs are at an immediate risk of retiring early to stop losses, while 27 units will likely to follow in the long run. Today, cost is well-recognized and important factor in NPP decision-making that cannot be ignored. Therefore, it is essential to consider risk and cost together in decision-making to strengthen the position of the nuclear industry in an economically challenging energy market. With operational and maintenance (O&M) cost at 70% of the total operating expenditure of an NPP and some plants closing prematurely despite excellent safety record, there is an urgent need to address the high O&M cost. One of the novel entities that provide additional safety resulting in reduced risk of nuclear power plants is Flex equipment. Flex strategies were postulated by the US NRC in the wake of Fukushima Dai-chi accident to address beyond design-basis accidents and improve plant flexibility. Flex strategy comprise both onsite and off-site component storage for the provision of additional materials and equipment. This work explored innovative ways of utilizing the onsite Flex equipment during regular plant operation, for purposes in addition to the intended use of beyond design basis accidents. This report describes the risk and cost analysis of using Flex equipment during regular or unplanned maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Automatic ultrasonic inspection system for wear determination in calandria tubes of Embalse Nuclear Power Plant

Embalse Nuclear Power Plant (CNE) (CANDU design) is reaching its end of life and due to elapsed operating time the problem of deformation by accelerated creep occurs in the pressure tubes (PT), leading to a possible contact between calandria tubes (CT), concentric to the PT, and some Liquid Injection Shutdown System (LISS) nozzles that pass underneath them. With determination of CT wear, after the predicted contact occurs, the wear rate of the TC could be determined and thus take less conservative measures over the remaining life of the component. This paper presents the development of an ultrasonic technique for measuring wear in CT, with nominal thickness of 1.34 mm. Because the only access is through the interior of PT, to perform this measurement it is necessary to pass through three different interfaces.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Multi-modular power plant with dedicated electrical grid

A multi-modular power plant includes a plurality of on-site nuclear power modules that generate a power plant output, and a number of power plant systems which operate using electricity associated with a house load of the power plant. A switchyard associated with the power plant may electrically connect the power plant to a distributed electrical grid. The distributed electrical grid may be configured to service a plurality of geographically distributed consumers. Additionally, the switchyard may electrically connect the power plant to a dedicated electrical grid. The dedicated electrical grid may provide electricity generated from the power plant output to a dedicated service load, and the power plant output may be equal to or greater than a combined load of the dedicated service load and the house load. At least a portion of the power plant output may be distributed to both the power plant systems and the dedicated electrical grid.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodology for Scaling Fusion Power Plant Availability

Normally in the U.S. fusion power plant conceptual design studies, the development of the plant availability and the plant capital and operating costs makes the implicit assumption that the plant is a 10th of a kind fusion power plant. This is in keeping with the DOE guidelines published in the 1970s, the PNL report1, "Fusion Reactor Design Studies - Standard Accounts for Cost Estimates. This assumption specifically defines the level of the industry and technology maturity and eliminates the need to define the necessary research and development efforts and costs to construct a one of a kind or the first of a kind power plant. It also assumes all the "teething" problems have been solved and the plant can operate in the manner intended. The plant availability analysis assumes all maintenance actions have been refined and optimized by the operation of the prior nine or so plants. The actions are defined to be as quick and efficient as possible. This study will present a methodology to enable estimation of the availability of the one of a kind (one OAK) plant or first of a kind (1st OAK) plant. To clarify, one of the OAK facilities might be the pilot plant or the demo plant that is prototypical of the next generation power plant, but it is not a full-scale fusion power plant with all fully validated "mature" subsystems. The first OAK facility is truly the first commercial plant of a common design that represents the next generation plant design. However, its subsystems, maintenance equipment and procedures will continue to be refined to achieve the goals for the 10th OAK power plant.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗