Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating Reserves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Measuring cryogenic-refrigerator cooling capacity

Temperature-sensing bridge determines liquid reserve level in low-temperature heat exchanger. Device should be of interest to manufacturers of cryogenic refrigerators as well as to those who use them in conjunction with operation of electronic equipment like masers or Josephson junctions.

Wiebe, E. R.↗

ISS Regenerative Life Support: Challenges and Success in the Quest for Long-Term Habitability in Space

This presentation will discuss the International Space Station s (ISS) Regenerative Environmental Control and Life Support System (ECLSS) operations with discussion of the on-orbit lessons learned, specifically regarding the challenges that have been faced as the system has expanded with a growing ISS crew. Over the 10 year history of the ISS, there have been numerous challenges, failures, and triumphs in the quest to keep the crew alive and comfortable. Successful operation of the ECLSS not only requires maintenance of the hardware, but also management of the station resources in case of hardware failure or missed re-supply. This involves effective communication between the primary International Partners (NASA and Roskosmos) and the secondary partners (JAXA and ESA) in order to keep a reserve of the contingency consumables and allow for re-supply of failed hardware. The ISS ECLSS utilizes consumables storage for contingency usage as well as longer-term regenerative systems, which allow for conservation of the expensive resources brought up by re-supply vehicles. This long-term hardware, and the interactions with software, was a challenge for Systems Engineers when they were designed and require multiple operational workarounds in order to function continuously. On a day-to-day basis, the ECLSS provides big challenges to the on console controllers. Main challenges involve the utilization of the resources that have been brought up by the visiting vehicles prior to undocking, balance of contributions between the International Partners for both systems and resources, and maintaining balance between the many interdependent systems, which includes providing the resources they need when they need it. The current biggest challenge for ECLSS is the Regenerative ECLSS system, which continuously recycles urine and condensate water into drinking water and oxygen. These systems were brought to full functionality on STS-126 (ULF-2) mission. Through system failures and recovery, the ECLSS console has learned how to balance the water within the systems, store and use water for contingencies, and continue to work with the International Partners for short-term failures. Through these challenges and the system failures, the most important lesson learned has been the importance of redundancy and operational workarounds. It is only because of the flexibility of the hardware and the software that flight controllers have the opportunity to continue operating the system as a whole for mission success.

Bazley, Jesse A.↗

Distributed reservation control protocols for random access broadcasting channels

Attention is given to a communication network consisting of an arbitrary number of nodes which can communicate with each other via a time-division multiple access (TDMA) broadcast channel. The reported investigation is concerned with the development of efficient distributed multiple access protocols for traffic consisting primarily of single packet messages in a datagram mode of operation. The motivation for the design of the protocols came from the consideration of efficient multiple access utilization of moderate to high bandwidth (4-40 Mbit/s capacity) communication satellite channels used for the transmission of short (1000-10,000 bits) fixed length packets. Under these circumstances, the ratio of roundtrip propagation time to packet transmission time is between 100 to 10,000. It is shown how a TDMA channel can be adaptively shared by datagram traffic and constant bandwidth users such as in digital voice applications. The distributed reservation control protocols described are a hybrid between contention and reservation protocols.

Greene, E. P.↗

Determining the Relative Criticality of Diverse Exploration Risks in NASA's Human Research Program

The mission of NASA s Human Research Program (HRP) is to understand and reduce the risk to crew health and performance in exploration missions. The HRP addresses 27 specific risks, primarily in the context of Continuous Risk Management. Each risk is evaluated in terms of two missions (a six month stay on the Moon and a thirty month round trip to Mars) and three types of consequences (in-mission crew health, post-mission crew health, and in-mission performance). The lack of a common metric between the three consequence scales, such as financial costs or quality adjusted life years lost, makes it difficult to compare the relative criticality of the risks. We are, therefore, exploring the use of a ternary scale of criticality based on the common metric of influencing an operational decision. The three levels correspond to the level of concern the risk generates for a "go/no-go" decision to launch a mission: 1) no-go; 2) go with significant reservations; 3) go. The criticality of each of the 27 risks is scored for the three types of consequence in both types of mission. The scores are combined to produce an overall criticality rating for each risk. The overall criticality rating can then be used to guide the prioritization of resources to affect the greatest amount of risk reduction.

Kundrot, Craig E.↗

San Diego Water Resources: Monitoring Pollution Plumes due to Storm and Wastewater Runoff in the San Diego Bay and Tijuana River Estuary to Inform Water Quality Management

Stormwater and wastewater runoff are a large source of pollutant discharge along the southern California coast and are a major concern to the health of local communities and ecosystems. In partnership with the Tijuana River National Estuarine Research Reserve and the California Department of Environmental Quality, NASA DEVELOP utilized satellite imagery to visualize and analyze the water quality of the Tijuana Estuary and southern California coast after major storm and wastewater events. Using Landsat 8 Operational Land Imager (OLI) and Sentinel-2 Multispectral Instrument (MSI), we estimated the extent and severity of plumes released from the Tijuana River Estuary. We used remotely sensed turbidity to map the extent of plumes, and used remotely sensed turbidity, Chlorophyll-a (chl-a), and colored dissolved organic matter (CDOM) to quantify and visualize stormwater, wastewater, and mixed plumes from 2013 to 2022. Furthermore, remotely sensed CDOM, turbidity, and chl-a were validated with in-situ data from NOAA and the San Diego Public Utilities in the San Diego coastal area to evaluate the accuracy of water quality data derived from satellite imagery. End products of this project include maps of stormwater, wastewater, and mixed plumes, tables illustrating the average area, CDOM, turbidity, and chl-a of each plume type, and validation graphs between satellite and in-situ data sources. These end products informed the environmental management of the Tijuana River National Estuarine Research Reserve and the public beaches in San Diego.

Ethan Gates↗

Drilling on the Moon and Mars: Developing the Science Approach for Subsurface Exploration with Human Crews

DOMEX (Drilling on the Moon and Mars in Human Exploration) is using analog missions to develop the approach for using human crews to perform science activities on the Moon and Mars involving exploration and sampling of the subsurface. Subsurface science is an important activity that may be uniquely enabled by human crews. DOMEX provides an opportunity to plan and execute planetary mission science activities without the expense and overhead of a planetary mission. Objectives: The objective of this first in a series of DOMEX missions were to 1) explore the regional area to understand the geologic context and determine stratigraphy and geologic history of various geologic units in the area. 2) Explore for and characterize sites for deploying a deep (10 m depth) drilling system in a subsequent field season. 3) Perform GPR on candidate drill sites. 4) Select sites that represent different geological units deposited in different epochs and collect soil cores using sterile procedures for mineralogical, organic and biological analysis. 5) Operate the MUM in 3 different sites representing different geological units and soil characteristics. 6) Collect rock and soil samples of sites visited and analyze them at the habitat. Results: At mission start the crew performed a regional survey to identify major geologic units that were correlated to recognized stratigraphy and regional geologic maps. Several candidate drill sites were identified. During the rest of the mission, successful GPR surveys were conducted in four locations. Soil cores were collected in 5 locations representing soils from 4 different geologic units, to depths up to 1m. Soil cores from two locations were analyzed with PCR in the laboratory. The remainder were reserved for subsequent analysis. XRD analysis was performed in the habitat and in the field on 39 samples, to assist with sample characterization, conservation, and archiving. MUM was deployed at 3 field locations and 1 test location (outside the habitat) where it operated autonomously for 2-4 hours at each site. Depths achieved ranged from 15 to 70 cm depending on the soil compressive strength and the presence and depth of subsurface indurated layers. Subsurface samples weighing 0.5 to 1 g were collected at the deepest depth encountered at each of the sites using the MUM automated sample collection system, and subsequently analyzed with XRD. Downhole inspection of holes produced by MUM with the Raman spectrometer was acquired on two of the holes and spectral features associated with selenite were identified in specific soil layers. Previously unreported fossilized remains of vertebrate fauna from the Jurassic era were discovered during our mission. Analysis of mineral biomarkers associated with this discovery are underway.

Stoker, C. R.↗

Journal of Air Transportation, Volume 9, No. 1

The articles in this issue include: 1) Are Four Year Universities Better than Two-Year Colleges at Preparing Students to Pass the FAA Aircraft Mechanic Certification Written Examinations? 2) Assessing Perceived Risk of Consumers in Internet Airline Reservations Services; 3) Perceptions of Communication Training Among Collegiate Flight Educators; 4) Ethics Education in University Aviation Management Programs in the U.S.: Part Three - Qualitative Analysis and Recommendations; 5) Airline Flight Operations Internships Perspectives; 6) Applying Data Mining Techniques to Forecast Number of Airline Passengers in Saudi Arabia (Domestic and International Travels).

Bowen, Brent D.↗

Environmental Control and Life Support Integration Strategy for 6-Crew Operations

The International Space Station (ISS) crew compliment will be increasing in size from 3 to 6 crew members in the summer of 2009. In order to support this increase in crew on ISS, the United States on-orbit Segment (USOS) has been outfitted with a suite of regenerative Environmental Control and Life Support (ECLS) hardware including an Oxygen Generation System(OGS), Waste and Hygiene Compartment (WHC), and a Water Recovery System (WRS). The WRS includes the Urine Processor Assembly (UPA) and the Water Processor Assembly (WPA). A critical step in advancing to a 6Crew support capability on ISS is a full checkedout and verification of the Regenerative ECLS hardware. With a successful checkout, the ISS will achieve full redundancy in its onorbit life support system between the USOS and Russian Segment (RS). The additional redundancy created by the Regenerative ECLS hardware creates the opportunity for independent support capabilities between segments, and for the first time since the start of ISS, the necessity to revise Life Support strategy agreements. Independent operating strategies coupled with the loss of the Space Shuttle supply and return capabilities in 2010 offers additional challenges. These challenges create the need for a higher level of onorbit consumables reserve to ensure crewmember life support during a system failure. This paper will discuss the evolution of the ISS Life Support hardware strategy in support of 6Crew on ISS, as well as the continued work which will be necessary to ensure the support of crew and ISS Program objectives through the life of station.

FROM↗

Transient Optimization of an Electrified Gas Turbine Engine Using Machine Learning

Gas turbine engines are designed with sufficient margin to prevent stall under normal operating conditions throughout their life. This compromise ensures that during rapid accelerations, compressor operation remains stable, but at the cost of efficiency and thrust responsiveness. The design margin encompasses multiple sources of uncertainty and systematic deviances from the operating line, the largest of which is the transient allowance. This set-aside accounts for the temporary incoordination of the engine spools during an acceleration while still enabling it to meet the certification requirement to accelerate from low to high power within a specified time, and without experiencing overtemperature, surge, stall, or other detrimental factors. Electrification of the powertrain provides the opportunity to address this reserve and truly optimize the design. The addition of electric machines inherent in hybrid propulsion concepts offers a means to interact with the engine shafts such that the necessary margin can be reduced, which can positively impact the engine design. By adjusting the amount of power extracted from or injected to the engine spools by the electric machines during transient operation, excursions from the operating line can be minimized. Past work using a dynamic engine model has shown that optimization of the fuel flow schedule during acceleration can reduce the required margin while still meeting the time requirement, and results are further improved when combined with power injection and extraction. The current work uses machine learning through a genetic algorithm to address the problem holistically by concurrently optimizing the electric machine power command and fuel flow acceleration schedule using an updated, higher fidelity version of the original engine model.

Stall Margin↗

Transient Optimization of an Electrified Gas Turbine Engine Using Machine Learning

Gas turbine engines are designed with sufficient margin to prevent stall under normal operating conditions throughout their life. This compromise ensures that during rapid accelerations, compressor operation remains stable, but at the cost of efficiency and thrust responsiveness. The design margin encompasses multiple sources of uncertainty and systematic deviances from the operating line, the largest of which is the transient allowance. This set-aside accounts for the temporary incoordination of the engine spools during an acceleration while still enabling it to meet the certification requirement to accelerate from low to high power within a specified time, and without experiencing overtemperature, surge, stall, or other detrimental factors. Electrification of the powertrain provides the opportunity to address this reserve and truly optimize the design. The addition of electric machines inherent in hybrid propulsion concepts offers a means to interact with the engine shafts such that the necessary margin can be reduced, which can positively impact the engine design. By adjusting the amount of power extracted from or injected to the engine spools by the electric machines during transient operation, excursions from the operating line can be minimized. Past work using a dynamic engine model has shown that optimization of the fuel flow schedule during acceleration can reduce the required margin while still meeting the time requirement, and results are further improved when combined with power injection and extraction. The current work uses machine learning through a genetic algorithm to address the problem holistically by concurrently optimizing the electric machine power command and fuel flow acceleration schedule using an updated, higher fidelity version of the original engine model.

Stall Margin↗

Transient Optimization of an Electrified Gas Turbine Engine Using Machine Learning

Gas turbine engines are designed with sufficient margin to prevent stall under normal operating conditions throughout their life. This compromise ensures that during rapid accelerations, compressor operation remains stable, but at the cost of efficiency and thrust responsiveness. The design margin encompasses multiple sources of uncertainty and systematic deviances from the operating line, the largest of which is the transient allowance. This set-aside accounts for the temporary incoordination of the engine spools during an acceleration while still enabling it to meet the certification requirement to accelerate from low to high power within a specified time, and without experiencing overtemperature, surge, stall, or other detrimental factors. Electrification of the powertrain provides the opportunity to address this reserve and truly optimize the design. The addition of electric machines inherent in hybrid propulsion concepts offers a means to interact with the engine shafts such that the necessary margin can be reduced, which can positively impact the engine design. By adjusting the amount of power extracted from or injected to the engine spools by the electric machines during transient operation, excursions from the operating line can be minimized. Past work using a dynamic engine model has shown that optimization of the fuel flow schedule during acceleration can reduce the required margin while still meeting the time requirement, and results are further improved when combined with power injection and extraction. The current work uses machine learning through a genetic algorithm to address the problem holistically by concurrently optimizing the electric machine power command and fuel flow acceleration schedule using an updated, higher fidelity version of the original engine model.

Stall Margin↗

Carotid baroreflex responsiveness in heat-stressed humans

The effects of whole body heating on human baroreflex function are relatively unknown. The purpose of this project was to identify whether whole body heating reduces the maximal slope of the carotid baroreflex. In 12 subjects, carotid-vasomotor and carotid-cardiac baroreflex responsiveness were assessed in normothermia and during whole body heating. Whole body heating increased sublingual temperature (from 36.4 +/- 0.1 to 37.4 +/- 0.1 degrees C, P < 0.01) and increased heart rate (from 59 +/- 3 to 83 +/- 3 beats/min, P < 0. 01), whereas mean arterial blood pressure (MAP) was slightly decreased (from 88 +/- 2 to 83 +/- 2 mmHg, P < 0.01). Carotid-vasomotor and carotid-cardiac responsiveness were assessed by identifying the maximal gain of MAP and heart rate to R wave-triggered changes in carotid sinus transmural pressure. Whole body heating significantly decreased the responsiveness of the carotid-vasomotor baroreflex (from -0.20 +/- 0.02 to -0.13 +/- 0.02 mmHg/mmHg, P < 0.01) without altering the responsiveness of the carotid-cardiac baroreflex (from -0.40 +/- 0.05 to -0.36 +/- 0.02 beats x min(-1) x mmHg(-1), P = 0.21). Carotid-vasomotor and carotid-cardiac baroreflex curves were shifted downward and upward, respectively, to accommodate the decrease in blood pressure and increase in heart rate that accompanied the heat stress. Moreover, the operating point of the carotid-cardiac baroreflex was shifted closer to threshold (P = 0.02) by the heat stress. Reduced carotid-vasomotor baroreflex responsiveness, coupled with a reduction in the functional reserve for the carotid baroreflex to increase heart rate during a hypotensive challenge, may contribute to increased susceptibility to orthostatic intolerance during a heat stress.

NASA Discipline Cardiopulmonary↗

Mechanical cooler-to-Dewar interfacing in a long-lifetime, hybrid stored cryogen system

The means for making efficient use of mechanical coolers to limit the parasitic heating into the Dewar are addressed. Thermal efficiency is achieved by minimizing the parasitic heating and thermal impedance of the cooler-to-Dewar interface within the mechanical constraints. The important issues related to compatibility with the instrument system are also briefly discussed. Parasitic heating from the nonoperating (reserved or failed) cooler pair can be reduced with an active thermal switch that isolates the cooler cold tips from the cold finger. An analysis was performed to determine the optimal switch-operating characteristics for this application. Requirements associated with the use of the coolers, analyses performed, and the interface design concept are discussed.

Hopkins, R. A.↗

An Overview of the Lunar Water ISRU Measurement Study (LWIMS)

NASA announced plans for the Artemis program, which would send crewed missions to the Moon by 2024 and achieve a sustainable lunar presence by 2028 [1]. To carry out sustained crewed surface operations, In-Situ Resource Utilization (ISRU), which would use lunar resources to produce mission consumables, will be critical. Water-bearing materials have been identified at both lunar poles and are often associated with Permanently Shadowed Regions (PSRs). These constitute a geological resource that may or may not be convertible to reserves with additional exploration. This water could provide both fuel and oxygen for refueling vehicles as well as life support consumables. However, the nature and extent of this resource is not well understood. Detection of water alone is not adequate for ISRU planning. For this reason, NASA chartered the Lunar Water ISRU Measurement Study (LWIMS). The goal of this study was to assess and define the type, amount, and fidelity of the measurements needed to select mining locations for lunar water ISRU and to define resource-related requirements for ISRU hardware development and architectures (mining operations, hardware emplacement, concept of operations).

Julie Kleinhenz↗

Cloud Governance at Scale

Operating and maintaining a large multi-tenant ecosystem in the cloud requires scalable solutions to unique technical and process challenges. The Cloud Computing model grants significant permissions to development teams that traditionally were reserved for Data-Center Administrators and Supply-Chain Managers. Earthdata Cloud has worked to re-cast traditional data-center management into a sensible cloud-first model. This talk discusses some of our challenges, solutions, and way ahead.

financial controls↗

The NASA IRTF: Solar System Observations and Mission Support

This report covers the period from 1 July 2002 through 30 June 2003. The NASA Infrared Telescope Facility (IRTF) is a 3.0 m infrared telescope located at an altitude of 4.2 km on the summit of Mauna Kea in Hawaii. It was established by NASA in 1979 primarily to provide infrared observations in support of NASA's programs. The IRTF is managed and operated by the University of Hawaii (UH) Institute for Astronomy (IfA) under a five-year cooperative agreement between NASA and UH that started in February 2001. NASA provides the costs of operation, and NSF provides support for new focal plane instrumentation based on grant applications from IRTF support astronomers. Observing time is open to the entire astronomical community, and 50% of the IRTF observing time is reserved for studies of solar system objects.

Kudritzki, Rolf-Peter↗

Reverse Engineering Crosswind Limits - A New Flight Test Technique?

During modification of a Gulfstream III test bed aircraft for an experimental flap project, all roll spoiler hardware had to be removed to accommodate the test article. In addition to evaluating the effects on performance and flying qualities resulting from the modification, the test team had to determine crosswind limits for an airplane previously certified with roll spoilers. Predictions for the modified aircraft indicated the maximum amount of steady state sideslip available during the approach and landing phase would be limited by aileron authority rather than by rudder. Operating out of a location that tends to be very windy, an arbitrary and conservative wind limit would have either been overly restrictive or potentially unsafe if chosen poorly. When determining a crosswind limit, how much reserve roll authority was necessary? Would the aircraft, as configured, have suitable handling qualities for long-term use as a flying test bed? To answer these questions, the test team combined two typical flight test techniques into a new maneuver called the sideslip-to-bank maneuver, and was able to gather flying qualities data, evaluate aircraft response and measure trends for various crosswind scenarios. This paper will describe the research conducted, the maneuver, flight conditions, predictions, and results from this in-flight evaluation of crosswind capability.

sideslip↗