Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ORBITAL LAUNCH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

The Impact of Traffic Prioritization on Deep Space Network Mission Traffic

A select number of missions supported by NASA's Deep Space Network (DSN) are demanding very high data rates. For example, the Kepler Mission was launched March 7, 2009 and at that time required the highest data rate of any NASA mission, with maximum rates of 4.33 Mb/s being provided via Ka band downlinks. The James Webb Space Telescope will require a maximum 28 Mb/s science downlink data rate also using Ka band links; as of this writing the launch is scheduled for a June 2014 launch. The Lunar Reconnaissance Orbiter, launched June 18, 2009, has demonstrated data rates at 100 Mb/s at lunar-Earth distances using NASA's Near Earth Network (NEN) and K-band. As further advances are made in high data rate space telecommunications, particularly with emerging optical systems, it is expected that large surges in demand on the supporting ground systems will ensue. A performance analysis of the impact of high variance in demand has been conducted using our Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) simulation tool. A comparison is made regarding the incorporation of Quality of Service (QoS) mechanisms and the resulting ground-to-ground Wide Area Network (WAN) bandwidth necessary to meet latency requirements across different user missions. It is shown that substantial reduction in WAN bandwidth may be realized through QoS techniques when low data rate users with low-latency needs are mixed with high data rate users having delay-tolerant traffic.

prioritization↗

The Impact of Traffic Prioritization on Deep Space Network Mission Traffic

A select number of missions supported by NASA's Deep Space Network (DSN) are demanding very high data rates. For example, the Kepler Mission was launched March 7, 2009 and at that time required the highest data rate of any NASA mission, with maximum rates of 4.33 Mb/s being provided via Ka band downlinks. The James Webb Space Telescope will require a maximum 28 Mb/s science downlink data rate also using Ka band links; as of this writing the launch is scheduled for a June 2014 launch. The Lunar Reconnaissance Orbiter, launched June 18, 2009, has demonstrated data rates at 100 Mb/s at lunar-Earth distances using NASA's Near Earth Network (NEN) and K-band. As further advances are made in high data rate space telecommunications, particularly with emerging optical systems, it is expected that large surges in demand on the supporting ground systems will ensue. A performance analysis of the impact of high variance in demand has been conducted using our Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) simulation tool. A comparison is made regarding the incorporation of Quality of Service (QoS) mechanisms and the resulting ground-to-ground Wide Area Network (WAN) bandwidth necessary to meet latency requirements across different user missions. It is shown that substantial reduction in WAN bandwidth may be realized through QoS techniques when low data rate users with low-latency needs are mixed with high data rate users having delay-tolerant traffic.

quality of service↗

Sequencing to Station in 12 Months (Targeting Orbital 5 Launch, March 30th)

The Biomolecule Sequencer is a Commercial Off-The-Shelf device developed by Oxford Nanopore Technologies and implements a method of DNA sequencing unlike any other current sequencers. The device measures changes in electrical current through a nanopore depending on the sequence of the DNA strand that is passing through it. Since the technology is built on nanometer-scale ion pores, the hardware itself is exceptionally small (3 x 1 x 58 inches), lightweight (less than 120 grams with USB cable), and powered only by a USB connection. The sequencing device is permanent, while the flow cells, to which the samples are added, are periodically replaced. The goal of our upcoming technology demonstration on ISS is to provide evidence that DNA sequencing in space is possible, which holds the exciting potential to enable the identification of microorganisms, monitor changes in microbes and humans in response to spaceflight, and possibly aid in the detection of DNA-based life elsewhere in the universe.

microorganisms↗

Space Shuttle Orbiter - Countdown

The status of Orbiter launch planning is reviewed, with consideration given to major structure elements, subsystem and component development, readiness for launch, and follow-on Orbiters. It is noted that timelines in the completion of each increment of development of the first Orbital Flight Vehicle become increasingly crucial as the scheduled launch date approaches. Concurrent with the testing and finalization of this vehicle's software and hardware construction are the preliminary developmental stages of future Shuttle Orbiters.

Cohen, A.↗

Project Antares: A low cost modular launch vehicle for the future

The single stage to orbit launch vehicle Antares is based upon the revolutionary concept of modularity, enabling the Antares to efficiently launch communications satellites, as well as heavy payloads, into Earth's orbit and beyond. The basic unit of the modular system, a single Antares vehicle, is aimed at launching approximately 10,000 kg into low Earth orbit (LEO). When coupled with a Centaur upper stage it is capable of placing 3500 kg into geostationary orbit. The Antares incorporates a reusable engine, the Dual Mixture Ratio Engine (DMRE), as its propulsive device. This enables Antares to compete and excel in the satellite launch market by dramatically reducing launch costs. Antares' projected launch costs are $1340 per kg to LEO which offers a tremendous savings over launch vehicles available today. Inherent in the design is the capability to attach several of these vehicles together to provide heavy lift capability. Any number of these vehicles, up to seven, can be attached depending on the payload and mission requirements. With a seven vehicle configuration Antares's modular concept provides a heavy lift capability of approximately 70,000 kg to LEO. This expandability allows for a wider range of payload options such as large Earth satellites, Space Station Freedom support, and interplanetary spacecraft, and also offers a significant cost savings over a mixed fleet based on different launch vehicles.

Aarnio, Steve↗

Orbit Determination for the James Webb Space Telescope During Launch and Early Orbit

The NASA James Webb Space Telescope (JWST) mission successfully launched on December 25, 2021, at 12:20 UTC. This paper details several novel challenges encountered in the orbit determination (OD) of JWST during the launch and early orbit. The first OD solution used only 6.5 hours of tracking data, much less than the 24 hours of data usually required for libration orbiters on an outbound trajectory. In addition, the observatory area exposed to solar radiation pressure changed through a series of sunshield deployments while concurrent momentum unloads and attitude telemetry outages occurred. This paper covers how the Flight Dynamics Team (FDT) prepared for these challenges, how these challenges were handled on-orbit, and the performance of the resulting OD solutions.

Orbit Determination↗

Orbit Determination For The James Webb Space Telescope During Launch And Early Orbit

The NASA James Webb Space Telescope (JWST) mission successfully launched on December 25, 2021, at 12:20 UTC. This paper details several novel challenges encountered in the orbit determination (OD) of JWST during the launch and early orbit. The first OD solution used only 6.5 hours of tracking data, much less than the 24 hours of data usually required for libration orbiters on an outbound trajectory. In addition, the observatory area exposed to solar radiation pressure changed through a series of sunshield deployments while concurrent momentum unloads and attitude telemetry outages occurred. This paper covers how the Flight Dynamics Team (FDT) prepared for these challenges, how these challenges were handled on-orbit, and the performance of the resulting OD solutions.

Orbit Determination↗

Global Geospace Science/Polar Plasma Laboratory: POLAR

The Global Geospace Science (GGS) Project is discussed as part of the International Solar-Terrestrial Physics (ISTP) Science Initiative. The objectives of Polar Plasma Laboratory (POLAR), one of the two spacecraft to be used by the Project to fill critical gaps in the scientific understanding of solar and plasma physics, are outlined. POLAR Laboratory is described, along with POLAR instrumentation, support subsystems, and orbits. Launch vehicle and injection into orbit are also addressed.

Source record↗

Analysis of the Laser Lightcraft Vehicle

Advanced propulsion research and technology concepts require launch and space flight technologies, which can drastically reduce mission costs. Laser propulsion is a concept in which energy of a thrust producing reaction mass is supplied via beamed energy from an off-board power source. A variety of laser beamed energy concepts were theoretically and experimentally investigated since the early 1970's. During the 1980's the Strategic Defense Initiative (SDIO) research lead to the invention of the Laser Lightcraft concept. Based upon the Laser Lightcraft concept, the propulsion research center, TD 40, within the Space Transportation Directorate of NASA MSFC has set out to develop technologies required for launching small payloads into Earth Orbit for a cost of $1.0M or $1000/lb to $100/lb. The near term objectives are to demonstrate technologies and capabilities essential for a future earth to orbit launch capability. Laser propulsion offers the advantages of both high thrust and good specific impulse, I(sp) in excess of 1000 s(exp -1). Other advantages are the simplicity and reliability of the engine because of few moving parts; simplistic propellant feed system, and low specific fuel consumption as a result of high specific impulse. Major limitations of this approach are the laser power available, absorption and distortion of the pulsed laser beam through the atmosphere, and coupling laser power into thrust throughout the flight envelope. This summer's effort focused on performance of the laser engine, which included 1) optical ray tracing and 2), a time dependent calculation of the optically induced blast wave.

Feikema, Douglas A.↗

Antares: A low cost modular launch vehicle for the future

The single-stage-to-orbit launch vehicle Antares is a revolutionary concept based on identical modular units, enabling the Antares to efficiently launch communications satellites, as well as heavy payloads, into Earth orbit and beyond. The basic unit of the modular system, a single Antares vehicle, is aimed at launching approximately 10,000 kg (22,000 lb) into low Earth orbit (LEO). When coupled with a standard Centaur upper stage, it is capable of placing 4000 kg (8800 lb) into geosynchronous Earth orbit (GE0). The Antares incorporates a reusable engine, the Dual Mixture Ratio Engine (DMRE), as its propulsive device. This enables Antares to compete and excel in the satellite launch market by dramatically reducing launch costs. Inherent in the design is the capability to attach several of these vehicles together to provide heavy lift capability. Any number of these vehicles can be attached depending on the payload and mission requirements. With a seven-vehicle configuration, the Antares' modular concept provides a heavy lift capability of approximately 70,000 kg (154,000 lb) to LEO. This expandability allows for a wide range of payload options, such as large Earth satellites, Space Station Freedom material, and interplanetary spacecraft, and also offers a significant cost savings over a mixed fleet based on different launch vehicles.

Source record↗

Mars surface-to-orbit vehicles for sample return missions

Review of the results of a Mars surface-to-orbit launch vehicle study using an upgraded atmospheric density profile and an ascent trajectory optimization program. Orbit insertion was achieved with velocity losses less than those found in an earlier study. Values of thrust-to-mass ratio which minimize velocity losses for dual-burn vehicles were found to be significantly greater than the values of thrust-to-launch-mass ratio for the minimum-velocity-loss continuous-burn vehicle. The use of a two-stage solid-propellant vehicle employing a spin-stabilized second stage offers an attractive design option for a Mars surface-to-orbit launch vehicle.

Weaver, W. L.↗

Technology requirements for future Earth-to-geosynchronous orbit transportation systems. Volume 2: Technical results

Technologies either critical to performance of offering cost advantages compared to the investment required to bring them to usable confidence levels are identified. A total transportation system is used as an evaluation yardstick. Vehicles included in the system are a single stage to orbit launch vehicle used in a priority cargo role, a matching orbit transfer vehicle, a heavy lift launch vehicle with a low Earth orbit delivery capability of 226, 575 kg, and a matching solar electric cargo orbit transfer vehicle. The system and its reference technology level are consistent with an initial operational capability in 1990. The 15 year mission scenario is based on early space industrialization leading to the deployment of large systems such as power satellites. Life cycle cost benefits in discounted and undiscounted dollars for each vehicle, technology advancement, and the integrated transportation system are calculated. A preliminary functional analysis was made of the operational support requirements for ground based and space based chemical propulsion orbit transfer vehicles.

Caluori, V. A.↗