Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NSLS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

NSLS-II Storage Ring Injection Using a Nonlinear Injection Kicker

The NSLS-II has been operating successfully with top off injection since September 2015. Measurements of the stored beam show a transient of 200 μm in the long straight sections during top off injections. This transient is not desirable for some users, particularly those who specialized in imaging or are otherwise sensitive to beam motion. Users are provided with a signal with which they can gate their detectors, but it is desirable to reduce or eliminate this motion all together. Studies have been performed to reduce the transients, and it is clear that the power supplies require more tunability in the pulse shape in order to reduce the transient across the entire bunch train. Other light sources have explored the possibility of using pulsed quadrupoles and sextupoles as the injection magnet. The stored beam receives no kick as the on-axis fields in these magnets is zero, but the injected beam would see a kick as it is off-center. One drawback of the pulsed quadrupole is that the stored beam experiences a size oscillation. Another issue with a nonlinear kicker is the gradient seen by the injected beam. The transport line needs to be tuned for this gradient, and depending on the strength of the nonlinearity, this gradient may change greatly with injected beam position. Therefore, other facilities have explored other magnet configurations that are nonlinear but have a gradient with less positional dependence. The prospect of using a sextupole kicker was investigated during the design phase of the NSLS-II. It was decided that the idea would not be pursued for several reasons. In particular, the design that was studied the most in depth was not compatible with the standard four bump injection design and the tolerances required were deemed too tight at the time. Other ideas were discussed as well and ultimately none were accepted into the design. In this report we discuss the possibility of placing a nonlinear kicker in the first straight section after the injection straight instead of using the injection bumps. The design of the kicker is based on a design that has been used successfully at BESSY and MAX IV. Our conceptual kicker design is compatible with the existing ring optics and power supply requirements. We show that the transport line is capable of being matched to the required optics. The design does not have restrictive tolerances and is a viable option for a facility upgrade.

36 MATERIALS SCIENCE↗

Maximum Current of the NSLS-II Linac

The maximum current of the NSLS-II linac is an important operational parameter for determining the safety envelope of the acceleration. In this document we establish the maximum current of the NSLS-II linac. First we establish the maximum current that can be emitted by the gun and the parameters that limit this. Then we show that beam loading in the linac further limits the current available at the exit of the linac. Beam loading also determines the energy spectrum of the beam at the end of the linac. Once the maximum current at the exit of the linac is established, we transport this beam through the linac to booster transport line using the designed optics which will match the beam from the linac into the booster. This will determine the maximum current that can be delivered to the booster accelerator from the linac.

36 MATERIALS SCIENCE↗

NSLS-II 500 MHz Upstream Superconducting Cavity Commissioning

The NSLS-II Storage Ring RF system was designed to be equipped with up to four CESR-B type 500MHz niobium superconducting cavities. The first one has been installed and commissioned with beam at the upstream location of Cell 24 RF straight. Prior to tunnel installation, cryogenic and RF tests had been performed in the blockhouse to ensure that the cavity could provide enough energy gain for electron beam current of 25 mA for commissioning, and up to ~300 mA for early operation depending upon the total energy loss per turn at that time. After the blockhouse test, the cavity was installed in the storage ring tunnel, where it was then cooled down, conditioned, and finally commissioned with up to 50 mA of beam current. The NSLS-II LHe Cryogenic Plant was used to maintain the cavity temperature at 4.5K. The blockhouse interfaces with the cryogenic manifold box via a vacuum jacketed line, while in the tunnel the cryomodule is fed by a valvebox which is supplied by the same manifold box. The helium gas is recovered by the close-loop LHe system, and the nitrogen gas is vented outside of the RF building through a vent line. This report contains three parts describes cryogenic and RF tests in the blockhouse and cavity commissioning in the tunnel. Within the sections, the cryogenic operation is introduced first then the RF test is described. Section 5 describes further studies proposed for the next operation period.

36 MATERIALS SCIENCE↗

Magnetic and Mechanical Center Deviations of NSLS-II Magnets

Ideally Mechanical center coincides with magnetic center for a perfectly manufactured magnet. However, this is not the case in a real world. This requires magnet should be magnetically fiducialized and aligned to reduce the error that caused by this kind of discrepancy. A high-precision and costly vibrating wire system is used in NSLS-II project to align all the magnets in one common girder magnetically with a precision better than ±10 micron. It can be deemed as a ruler to gauge the magnetic and mechanical center deviation for NSLS-II magnets. This information will be useful for future accelerator regarding alignment technique selection.

36 MATERIALS SCIENCE↗

Lessons Learned NSLS-II Storage Magnet Production

This document was compiled in response to the suggestion made by the DOE SC Review of the NSLS-II Project on April 2012, and reiterated at the Review in July, 2013. The main contributors to this document are the SR magnet team A and other in-house participants in the Workshop B referred to below that took place on April 11 th and 12 th 2012 at BNL. The contributions also came from some external participants, including representatives of some of the suppliers who attended the workshop. Manufacturing of the magnets for the NSLS-II storage ring (~850 units of 15 types) took approximately 6 years from the beginning of the conceptual design to completion of manufacturing in October of 2012. The production in the early years did not go smoothly, and a DOE Review Committee expressed concerns in November of 2010 about the potential of significant delays in magnet deliveries. In response, the project undertook three major mitigation steps: 1) enhanced oversight by assignment of one technical representative for each of the seven suppliers, 2) appointment of a senior BNL scientist as the manager of the SR magnet production, and 3) streamlining the decision-making process. These steps led to a successful completion of magnet production and delivery with almost all magnets meeting their stringent specifications (see Appendix 2).

36 MATERIALS SCIENCE↗

NSLS-II Emittance and Lifetime with Damping Wigglers

This paper is focused on the measurements of the major machine parameters under influence of the Damping Wigglers and their comparison with analytic estimates. We present analysis of the impact of the Damping Wigglers on the beam emittance and lifetime in the NSLS-II storage ring. We conclude that these parameters for the NSLS-II follow well-known dependencies as described, for example, by Weidemann and Touschek. Appendices A and B show details of the experiment and the estimates.

36 MATERIALS SCIENCE↗

Heating Issues in NSLS-II Storage Ring Cavity Coupler (Heating issues in coupler for the superconducting cavity)

The superconducting RF cavity that is being adopted for the NSLS-II storage ring is based on the CESR-B cavity designed by Cornell University. The external Quality Factor (Q ext ) for the original Cornell design is 225,000. NSLS-II design requires a Qext of 65,000. The coupler design has been modified to make the Q ext ≈ 65,000 using HFSS. Any possible issues with conductor heating in the coupler region was analyzed using ANSOFT thermal analysis. This document describes the procedure used to perform the analysis and discusses the results.

42 ENGINEERING↗

Magnetic Optimization of the SST-EPU60 for NSLS-II

The SST-EPU60 is a pure permanent magnet Elliptically Polarized Undulator (EPU) APPLE-II* type developed at Advanced Design Consulting (ADC) for the Synchrotron Radiation Center at University of Wisconsin–Madison [1]. This device was selected to be reused for the Spectroscopy Soft and Tender (SST) beamline at the National Synchrotron Light Source II (NSLS-II). However, due to the more stringent performance requirements of the NSLS-II storage ring, magnetic field tuning was necessary to achieve required specification. This paper reports the details of the SST-EPU60 refurbishment activities including the additional magnetic field measurements and the final results of the magnetic adjustment.

36 MATERIALS SCIENCE↗

FOFB-compatible AC Local Bump as a Potential New Operations Mode for NSLS-II

AC local bumps of the beam orbit developed at NSLS-II are successfully used for accelerator physics studies. Recently, AC bumps localized at light-generating insertion devices (ID) are considered by NSLS-II beamline scientists as a possible user operation mode. The AC perturbation of the X-ray beam in a controllable way will provide a possibility to investigate the effects of the source size and temporal evolution on the coherence of the photon beam. It also can be used to average out the spatial non-uniformity of the beam intensity caused by the beamline optics. Before the implementation of the AC orbit bumps into user operations, we must investigate if the electron beam perturbation affects the other beamlines. A proof-of-principle experiment was carried out: an AC bump was created and well localized in the CSX and/or FXI beamline. Transparency of this AC bump to other beamlines has been studied, the results are discussed.

36 MATERIALS SCIENCE↗

Accelerator Physics at NSLS-II: Research Accomplishments in 2019

NSLS-II Accelerator Physics group provides scientific support for user operations, as well as for improvements and developments of the accelerator systems. In parallel to the facility support, the accelerator physicists are working on studies of topical scientific problems: development of novel lattices; studies of collective effects and beaminduced heating; advanced computations including machine learning; ultrafast electron diffraction and microscopy (LDRD). The group also made important contributions to the electron-ion collider project at BNL and to the APS upgrade project (MOUs). Research accomplishments of the NSLS-II Accelerator Physics group achieved in 2019, are summarized in this report.

36 MATERIALS SCIENCE↗

Online Optimization of NSLS-II Dynamic Aperture and Injection Transient (Facility Improvement Project)

The Facility Improvement Project (FIP) “Methods of online optimization of NSLS-II storage ring concurrent with user operations” proposed and approved in 2018 is now complete. The first goal is the online optimization of nonlinear beam dynamics to increase the beam lifetime and injection efficiency. We have developed a model-independent optimization technique using advanced algorithms. Using this technique, we increased the NSLS-II dynamic aperture by 20% and reduced the amplitude-dependent tune shift by a factor of two. We applied sextupole optimization to the new high-chromaticity lattice, which has been developed to improve the beam stability and to increase the single-bunch beam intensity. We were able to double the injection efficiency and exceed 90%. The second goal of this project is to provide the top-off injection with minimized perturbations of the beamline user operations. To achieve the transparent injection, we optimize the matching of four storage ring injection kickers reducing the perturbation of the stored beam orbit. The first application of the online optimization resulted in a reduction of the amplitude of residual beam oscillation by a factor of six, from 1300 μm down to 200 μm. Further improvement was limited by the timing jitter of the trigger boards. Then, we replaced all trigger boards with a new design and reduced the timing jitter by a factor of five, from 5 ns down to 1 ns. This upgrade resulted in the injection transient reduction from 200 μm to 120 μm. To optimize the full set of kicker parameters, including the trigger timing, amplitude, and pulse width, we upgraded all kicker power supplies with the capability of tunable waveform width. As a result, we have reduced the injection transient to the limit of 60 μm.

43 PARTICLE ACCELERATORS↗

Dedicated beam position monitor pair for model-independent lattice characterization at NSLS-II

This paper reports recent lattice characterization results obtained at the National Synchrotron Light Source II (NSLS-II) storage ring, conducted without reliance on a lattice model. A pair of beam position monitors (BPMs) with bunch-by-bunch (B×B) resolution, were recently installed in a section of the storage ring free of magnetic fields. The new BPM pair measured the beam, or bunch’s transverse Poincar´e map precisely after the beam was excited. Linear one-turn-matrices (OTM) were then derived, and from these, the 4-dimensional coupled Twiss parameters were extracted at the locations of the BPM pair. By normalizing beam oscillation amplitudes with the Twiss parameters, the global action-variables were obtained. These action-variables facilitated the measurement of the local Twiss parameters observed by other BPMs independent on lattice model. This method is general, and particularly useful in certain scenarios such as a round beam mode in a diffraction-limited light source ring. We applied it to assess both weakly and strongly coupled lattices at the NSLS-II ring. Through analysis of the strongly coupled lattice, the quadrupole tilt errors were estimated to be less than 400 µrad. Utilizing the BPMs’ B×B resolution, for the first time we observed the variations of the linear lattice along a long bunch-train.

43 PARTICLE ACCELERATORS↗

Accelerator Physics at NSLS-II: Research Accomplishments in 2023

NSLS-II accelerator physicists provided operation support for user operations and machine start-ups, carried out routine lattice characterization, and produced regular reports on beam dynamics. The commissioning of a superconducting wiggler for the HEX beamline is complete, and the wiggler effects on beam dynamics have been studied. A Facility Improvement Project for absolute lattice characterization has been approved and funded. We implemented and tested a new orbit-based technique of lattice characterization and correction. We developed a theory to calculate the beam-induced power in ceramic vacuum chambers and a new convergence map technique for nonlinear lattice characterization. We continued working on the NSLS-II upgrade including lattice development, commissioning a low-energy complex bend prototype, analyzing beam sensitivity to various errors, implementing higher-harmonic RF cavities, studying collective effects, and assessing FEL options. We also supported lattice optimization and beam diagnostics development for the EIC project. Main research accomplishments achieved in 2023, are summarized in this report.

43 PARTICLE ACCELERATORS↗

Exploring New Science Frontiers at NSLS-II

Entering the sixth year of its operations, NSLS-II has aggressively ramped up its scientific facilities and associated user programs, with 28 operating beamlines at the time of this report and 1 additional beamline under construction. More than 1700 distinct researchers have used NSLS-II for their research in 2019, and publications in 2019 have reached the level of one paper per day.

36 MATERIALS SCIENCE↗

Pulsed Magnet Power Systems at NSLS-II

The National Synchrotron Light Source - II (NSLS-II) is a 3 GeV X-ray user facility with 29 beamlines. The NSLS-II pulsed power system consists of an event generator for timely injection and extraction of beam in the transport line from linac to booster at 170 MeV, and from booster to storage ring at 3 GeV. We will discuss current pulsed power systems and the future upgrades/improvements on those systems.

43 PARTICLE ACCELERATORS↗

NSLS-II HIGH LEVEL APPLICATION INFRASTRUCTURE AND CLIENT API DESIGN

The beam commissioning software framework of NSLS-II project adopts a client/server based architecture to replace the more traditional monolithic high level application approach. It is an open structure platform, and we try to provide a narrow API set for client application. With this narrow API, existing applications developed in different language under different architecture could be ported to our platform with small modification. This paper describes system infrastructure design, client API and system integration, and latest progress. As a new 3rd generation synchrotron light source with ultra low emittance, there are new requirements and challenges to control and manipulate the beam. A use case study and a theoretical analysis have been performed to clarify requirements and challenges to the high level applications (HLA) software environment. To satisfy those requirements and challenges, adequate system architecture of the software framework is critical for beam commissioning, study and operation. The existing traditional approaches are self-consistent, and monolithic. Some of them have adopted a concept of middle layer to separate low level hardware processing from numerical algorithm computing, physics modelling, data manipulating, plotting, and error handling. However, none of the existing approaches can satisfy the requirement. A new design has been proposed by introducing service oriented architecture technology. The HLA is combination of tools for accelerator physicists and operators, which is same as traditional approach. In NSLS-II, they include monitoring applications and control routines. Scripting environment is very important for the later part of HLA and both parts are designed based on a common set of APIs. Physicists and operators are users of these APIs, while control system engineers and a few accelerator physicists are the developers of these APIs. With our Client/Server mode based approach, we leave how to retrieve information to the developers of APIs and how to use them to form a physics application to the users. For example, how the channels are related to magnet and what the current real-time setting of a magnet is in physics unit are the internals of APIs. Measuring chromaticities are the users of APIs. All the users of APIs are working with magnet and instrument names in a physics unit. The low level communications in current or voltage unit are minimized. In this paper, we discussed our recent progress of our infrastructure development, and client API.

43 PARTICLE ACCELERATORS↗

SERVER DEVELOPMENT FOR NSLS-II PHYSICS APPLICATIONS AND PERFORMANCE ANALYSIS

The beam commissioning software framework of NSLS-II project adopts a client/server based architecture to replace the more traditional monolithic high level application approach. The server software under development is available via an open source sourceforge project named epics-pvdata, which consists of modules pvData, pvAccess, pvIOC, and pvService. Examples of two services that already exist in the pvService module are itemFinder, and gather. Each service uses pvData to store in-memory transient data, pvService to transfer data over the network, and pvIOC as the service engine. The performance benchmarking for pvAccess and both gather service and item finder service are presented in this paper. The performance comparison between pvAccess and Channel Access are presented also. For an ultra low emittance synchrotron radiation light source like NSLS II, the control system requirements, especially for beam control are tight. To control and manipulate the beam effectively, a use case study has been performed to satisfy the requirement and theoretical evaluation has been performed. The analysis shows that model based control is indispensable for beam commissioning and routine operation. However, there are many challenges such as how to re-use a design model for on-line model based control, and how to combine the numerical methods for modeling of a realistic lattice with the analytical techniques for analysis of its properties. To satisfy the requirements and challenges, adequate system architecture for the software framework for beam commissioning and operation is critical. The existing traditional approaches are self-consistent, and monolithic. Some of them have adopted a concept of middle layer to separate low level hardware processing from numerical algorithm computing, physics modelling, data manipulating and plotting, and error handling. However, none of the existing approaches can satisfy the requirement. A new design has been proposed by introducing service oriented architecture technology, and client interface is undergoing. The design and implementation adopted a new EPICS implementation, namely epics-pvdata [9], which is under active development. The implementation of this project under Java is close to stable, and binding to other language such as C++ and/or Python is undergoing. In this paper, we focus on the performance benchmarking and comparison for pvAccess and Channel Access, the performance evaluation for 2 services, gather and item finder respectively.

43 PARTICLE ACCELERATORS↗

Design of the NSLS-II Linac Front End Test Stand

The NSLS-II operational parameters place very stringent requirements on the injection system. Among these are the charge per bunch train at low emittance that is required from the linac along with the uniformity of the charge per bunch along the train. The NSLS-II linac is a 200 MeV linac produced by Research Instruments Gmbh. Part of the strategy for understanding to operation of the injectors is to test the front end of the linac prior to its installation in the facility. The linac front end consists of a 100 kV electron gun, 500 MHz subharmonic prebuncher, focusing solenoids and a suite of diagnostics. The diagnostics in the front end need to be supplemented with an additional suite of diagnostics to fully characterize the beam. In this paper we discuss the design of a test stand to measure the various properties of the beam generated from this section. In particular, the test stand will measure the charge, transverse emittance, energy, energy spread, and bunching performance of the linac front end under all operating conditions of the front end.

43 PARTICLE ACCELERATORS↗