Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars orbiter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Mid-Latitude versus Polar-Latitude Transitional Impact Craters: Geometric Properties from Mars Orbiter Laser Altimeter (MOLA) Observations and Viking Images

One intriguing aspect of martian impact crater morphology is the change of crater cavity and ejecta characteristics from the mid-latitudes to the polar regions. This is thought to reflect differences in target properties such as an increasing presence of ice in the polar regions. Previous image-based efforts concerning martian crater morphology has documented some aspects of this, but has been hampered by the lack of adequate topography data. Recent Mars Orbiter Laser Altimeter (MOLA) topographic profiles provide a quantitative perspective for interpreting the detailed morphologies of martian crater cavities and ejecta morphology. This study is a preliminary effort to quantify the latitude-dependent differences in morphology with the goal of identifying target-dependent and crater modification effects from the combined of images and MOLA topography. We combine the available MOLA profiles and the corresponding Viking Mars Digital Image Mosaics (MDIMS), and high resolution Viking Orbiter images to focus on two transitional craters; one on the mid-latitudes, and one in the North Polar region. One MOLA pass (MGS Orbit 34) traverses the center of a 15.9 km diameter fresh complex crater located at 12.8degN 83.8degE on the Hesperian ridge plains unit (Hvr). Viking images, as well as MOLA data, show that this crater has well developed wall terraces and a central peak with 429 m of relative relief. Three MOLA passes have been acquired for a second impact crater, which is located at 69.5degN 41degE on the Vastitas Borealis Formation. This fresh rampart crater lacks terraces and central peak structures and it has a depth af 579 m. Correlation between images and MOLA topographic profiles allows us to construct basic facies maps of the craters. Eight main units were identified, four of which are common on both craters.

Matias, A.↗

Viking 1 planetary phase tracking operations: Mars orbit insertion through landing

This article describes tracking operations during the Viking 1 planetary phase. Particular attention is paid to special planning for critical phase tracking operations, and to the degree of success subsequently achieved by these special plans during the actual operations. In-depth coverage is provided for Mars orbit insertion (MOI), periapsis passage tracking, and Lander direct links. The article concludes that on balance, tracking operations during the Viking 1 planetary phase have been effectively implemented and quite successful.

Berman, A. L.↗

The Impact of Mission Duration on a Mars Orbital Mission

Performance alone is insufficient to assess the total impact of changing mission parameters on a space mission concept, architecture, or campaign; the benefit, cost, and risk must also be understood. This paper examines the impact to benefit, cost, and risk of changing the total mission duration of a human Mars orbital mission. The changes in the sizing of the crew habitat, including consumables and spares, was assessed as a function of duration, including trades of different life support strategies; this was used to assess the impact on transportation system requirements. The impact to benefit is minimal, while the impact on cost is dominated by the increases in transportation costs to achieve shorter total durations. The risk is expected to be reduced by decreasing total mission duration; however, large uncertainty exists around the magnitude of that reduction.

Arney, Dale↗

Mars Express Interplanetary Navigation from Launch to Mars Orbit Insertion: The JPL Experience

The National Aeronautics and Space Administration (NASA) Jet Propulsion Laboratory (JPL) played a significant role in supporting the safe arrival of the European Space Agency (ESA) Mars Express (MEX) orbiter to Mars on 25 December 2003. MEX mission is an international collaboration between member nations of the ESA and NASA, where NASA is supporting partner. JPL's involvement included providing commanding and tracking service with JPL's Deep Space Network (DSN), in addition to navigation assurance. The collaborative navigation effort between European Space Operations Centre (ESOC) and JPL is the first since ESA's last deep space mission, Giotto, and began many years before the MEX launch. This paper discusses the navigational experience during the cruise and final approach phase of the mission from JPL's perspective. Topics include technical challenges such as orbit determination using non-DSN tracking data and media calibrations, and modeling of spacecraft physical properties for accurate representation of non-gravitational dynamics. Also mentioned in this paper is preparation and usage of DSN Delta Differential Oneway Range ((Delta)DOR) measurements, a key element to the accuracy of the orbit determination.

Deep Space Network (DSN)↗

Low-Latency Telerobotics from Mars Orbit: The Case for Synergy Between Science and Human Exploration

Initial, science-directed human exploration of Mars will benefit from capabilities in which human explorers remain in orbit to control telerobotic systems on the surface (Figure 1). Low-latency, high-bandwidth telerobotics (LLT) from Mars orbit offers opportunities for what the terrestrial robotics community considers to be high-quality telepresence. Such telepresence would provide high quality sensory perception and situation awareness, and even capabilities for dexterous manipulation as required for adaptive, informed selection of scientific samples [1]. Astronauts on orbit in close communication proximity to a surface exploration site (in order to minimize communication latency) represent a capability that would extend human cognition to Mars (and potentially for other bodies such as asteroids, Venus, the Moon, etc.) without the challenges, expense, and risk of putting those humans on hazardous surfaces or within deep gravity wells. Such a strategy may be consistent with goals for a human space flight program that, are currently being developed within NASA.

Valinia, A.↗

A Mars orbital laser altimeter for rover trafficability: Instrument concept and science potential

Limited information on the types of geologic hazards (boulders, troughs, craters etc.) that will affect rover trafficability on Mars are available for the two Viking Lander sites, and there are no prospects for increasing this knowledge base in the near future. None of the instrument payloads on the upcoming Mars Observer or Soviet PHOBOS missions can directly measure surface obstacles on the scales of concern for rover safety (a few meters). Candidate instruments for the Soviet Mars 92 orbiter/balloon/rover mission such as balloon-borne stereo imaging, rover panoramic imaging, and orbital synthetic aperature imaging (SAR) are under discussion, but data from this mission may not be available for target areas of interest for the U.S. Mars Rover Sample Return (MRSR) mission. In an effort to determine how to directly measure the topography of surface obstacles that could affect rover trafficability on Mars, we are studying how to design a laser altimeter with extremely high spatial and vertical resolution that would be suitable for a future Mars Orbiter spacecraft (MRSR precursor or MRSR orbiter). This report discusses some of the design issues associated with such an instrument, gives examples of laser altimeter data collected for Mars analog terrains on Earth, and outlines the scientific potential of data that could be obtained with the system.

Garvin, J. B.↗

Artificial Gravity in Mars Orbit for Crew Acclimation

NASA’s current baseline plan for a crewed Mars mission anticipates a transit time of up to three hundred days in microgravity and 3-14 days on the Martian surface for gravity acclimation before the crew can safely perform their first Extra-Vehicular Activity (EVA). While there are multiple options for how initial surface operations will be performed, all current designs involve acclimation on the surface, and the impacts on the mission schedule, required supplies, and crew lander systems are significant. This paper proposes an alternative option utilizing artificial gravity, which offers benefits in terms of mission scope, mass savings, crew health, and long-term strategic vision. By moving the acclimation requirement to the orbiting habitat’s existing systems, rather than adding redundant systems to the lander, the Mars Descent Vehicle (MDV) can be a much smaller, simpler, and lighter design. Rather than the lander being designed to support crew for days, it would be mere hours. While ambitious, the concept of pre-acclimation in orbit can be not only safe and feasible, but done with fairly minimal changes to the planned architecture and overall mass requirements. The data used draws on decades of established research and demonstrates how this capability can be not only used for pre-acclimation, but also to support crew during early orbital-only missions, surface abort contingency scenarios, return-to-orbit abort scenarios, and as an early proof of capability into larger and more ambitious artificial gravity designs needed for extended exploration missions in the future.

Rowe, Justin↗

Thermal analysis of a high energy propulsion system /hydrazine and liquid fluorine/ for a rover class Mars Orbiter

Maintaining cryogenic fluorine at a -189 C during the interplanetary cruise period to Mars is a major thermal problem. At this low temperature the heat rejection by radiation is severely limited and the allowable thermal load to the fluorine tank is less than approximately 8 watts. Previous studies generally constrain the spacecraft to an inline tank configuration which tends to maximize the fluorine tank's view and heat rejection to space. With the Inertial Upper Stage, sufficient stack height may not be available on the Shuttle for an inline tank configuration. Therefore, this study addresses the more thermally constraining side by side tank configuration.

Stultz, J. W.↗