Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MSA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Development and Operation of the Microshutter Array System

The microshutter array (MSA) is a key component in the James Webb Space Telescope Near Infrared Spectrometer (NIRSpec) instrument. The James Webb Space Telescope is the next generation of a space-borne astronomy platform that is scheduled to be launched in 2013. However, in order to effectively operate the array and meet the severe operational requirements associated with a space flight mission has placed enormous constraints on the microshutter array subsystem. This paper will present an overview and description of the entire microshutter subsystem including the microshutter array, the hybridized array assembly, the integrated CMOS electronics, mechanical mounting module and the test methodology and performance of the fully assembled microshutter subsystem. The NIRSpec is a European Space Agency (ESA) instrument requiring four fully assembled microshutter arrays, or quads, which are independently addressed to allow for the imaging of selected celestial objects onto the two 4 mega pixel IR detectors. Each microshutter array must have no more than approx.8 shutters which are failed in the open mode (depending on how many are failed closed) out of the 62,415 (365x171) total number of shutters per array. The driving science requirement is to be able to select up to 100 objects at a time to be spectrally imaged at the focal plane. The spectrum is dispersed in the direction of the 171 shutters so if there is an unwanted open shutter in that row the light from an object passing through that failed open shutter will corrupt the spectrum from the intended object.

Jhabvala, M. D.↗

Radiation-Hard SpaceWire/Gigabit Ethernet-Compatible Transponder

A radiation-hard transponder was developed utilizing submicron/nanotechnology from IBM. The device consumes low power and has a low fabrication cost. This device utilizes a Plug-and-Play concept, and can be integrated into intra-satellite networks, supporting SpaceWire and Gigabit Ethernet I/O. A space-qualified, 100-pin package also was developed, allowing space-qualified (class K) transponders to be delivered within a six-month time frame. The novel, optical, radiation-tolerant transponder was implemented as a standalone board, containing the transponder ASIC (application specific integrated circuit) and optical module, with an FPGA (field-programmable gate array) friendly parallel interface. It features improved radiation tolerance; high-data-rate, low-power consumption; and advanced functionality. The transponder utilizes a patented current mode logic library of radiation-hardened-by-architecture cells. The transponder was developed, fabricated, and radhard tested up to 1 MRad. It was fabricated using 90-nm CMOS (complementary metal oxide semiconductor) 9 SF process from IBM, and incorporates full BIT circuitry, allowing a loop back test. The low-speed parallel LVCMOS (lowvoltage complementary metal oxide semiconductor) bus is compatible with Actel FPGA. The output LVDS (low-voltage differential signaling) interface operates up to 1.5 Gb/s. Built-in CDR (clock-data recovery) circuitry provides robust synchronization and incorporates two alarm signals such as synch loss and signal loss. The ultra-linear peak detector scheme allows on-line control of the amplitude of the input signal. Power consumption is less than 300 mW. The developed transponder with a 1.25 Gb/s serial data rate incorporates a 10-to-1 serializer with an internal clock multiplication unit and a 10-1 deserializer with internal clock and data recovery block, which can operate with 8B10B encoded signals. Three loop-back test modes are provided to facilitate the built-in-test functionality. The design is based on a proprietary library of differential current switching logic cells implemented in the standard 90-nm CMOS 9SF technology from IBM. The proprietary low-power LVDS physical interface is fully compatible with the SpaceWire standard, and can be directly connected to the SFP MSA (small form factor pluggable Multiple Source Agreement) optical transponder. The low-speed parallel interfaces are fully compatible with the standard 1.8 V CMOS input/output devices. The utilized proprietary annular CMOS layout structures provide TID tolerance above 1.2 MRad. The complete chip consumes less than 150 mW of power from a single 1.8-V positive supply source.

Katzman, Vladimir↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

GESE: A Small UV Space Telescope to Conduct a Large Spectroscopic Survey of Z-1 Galaxies

One of the key goals of NASA's astrophysics program is to answer the question: How did galaxies evolve into the spirals and elliptical galaxies that we see today? We describe a space mission concept called Galaxy Evolution Spectroscopic Explorer (GESE) to address this question by making a large spectroscopic survey of galaxies at a redshift, z is approximately 1 (look-back time of approximately 8 billion years). GESE is a 1.5-meter space telescope with an ultraviolet (UV) multi-object slit spectrograph that can obtain spectra of hundreds of galaxies per exposure. The spectrograph covers the spectral range, 0.2-0.4 micrometers at a spectral resolving power, R approximately 500. This observed spectral range corresponds to 0.1-0.2 micrometers as emitted by a galaxy at a redshift, z=1. The mission concept takes advantage of two new technological advances: (1) light-weighted, wide-field telescope mirrors, and (2) the Next- Generation MicroShutter Array (NG-MSA) to be used as a slit generator in the multi-object slit spectrograph.

galaxy evolution↗

Design Process of Flight Vehicle Structures for a Common Bulkhead and an MPCV Spacecraft Adapter

Design and manufacturing space flight vehicle structures is a skillset that has grown considerably at NASA during that last several years. Beginning with the Ares program and followed by the Space Launch System (SLS); in‐house designs were produced for both the Upper Stage and the SLS Multipurpose crew vehicle (MPCV) spacecraft adapter. Specifically, critical design review (CDR) level analysis and flight production drawing were produced for the above mentioned hardware. In particular, the experience of this in‐house design work led to increased manufacturing infrastructure for both Marshal Space Flight Center (MSFC) and Michoud Assembly Facility (MAF), improved skillsets in both analysis and design, and hands on experience in building and testing (MSA) full scale hardware. The hardware design and development processes from initiation to CDR and finally flight; resulted in many challenges and experiences that produced valuable lessons. This paper builds on these experiences of NASA in recent years on designing and fabricating flight hardware and examines the design/development processes used, as well as the challenges and lessons learned, i.e. from the initial design, loads estimation and mass constraints to structural optimization/affordability to release of production drawing to hardware manufacturing. While there are many documented design processes which a design engineer can follow, these unique experiences can offer insight into designing hardware in current program environments and present solutions to many of the challenges experienced by the engineering team.

Aggarwal, Pravin↗

A Year of Progress: NASA's Space Launch System Approaches Critical Design Review

NASA's Space Launch System (SLS) made significant progress on the manufacturing floor and on the test stand in 2014 and positioned itself for a successful Critical Design Review in mid-2015. SLS, the world's only exploration-class heavy lift rocket, has the capability to dramatically increase the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique high-value national payloads. Development now is focused on configuration with 70 metric tons (t) of payload to low Earth orbit (LEO), more than double the payload of the retired Space Shuttle program or current operational vehicles. This "Block 1" design will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the Moon and back and the first crewed flight around the Moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has successfully completed its Critical Design Review and now has hardware in production or testing. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. The SLS Program is currently working toward vehicle Critical Design Review in mid-2015. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

NASA's Space Launch System Marks Critical Design Review

With completion of its Critical Design Review (CDR) in 2015, NASA is deep into the manufacturing and testing phases of its new Space Launch System (SLS) for beyond-Earth exploration. This CDR was the first in almost 40 years for a NASA human launch vehicle and marked another successful milestone on the road to the launch of a new era of deep space exploration. The review marked the 90-percent design-complete, a final look at the design and development plan of the integrated vehicle before full-scale fabrications begins and the prelude to the next milestone, design certification. Specifically, the review looked at the first of three increasingly capable configurations planned for SLS. This "Block I" design will stand 98.2 meters (m) (322 feet) tall and provide 39.1 million Newtons (8.8 million pounds) of thrust at liftoff to lift a payload of approximately 70 metric tons (154,000 pounds). This payload is more than double that of the retired space shuttle program or other current launch vehicles. It dramatically increases the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique, high-value national payloads. The Block 1 SLS will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the moon and back and the first crewed flight around the moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has hardware in production or testing, including flight hardware for the Exploration 1 (EM-1) test flight. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Singer, Chris↗

Design and Fabrication of Electrostatically Actuated Silicon Microshutters Arrays

We have developed a new fabrication process to actuate microshutter arrays (MSA) electrostatically at NASA Goddard Space Flight Center. The microshutters are fabricated on silicon with thin silicon nitride membranes. A pixel size of each microshutter is 100 x 200 micrometers 2. The microshutters rotate 90 degrees on torsion bars. The selected microshutters are actuated, held, and addressed electrostatically by applying voltages on the electrodes the front and back sides of the microshutters. The atomic layer deposition (ALD) of aluminum oxide was used to insulate electrodes on the back side of walls; the insulation can withstand over 100 V. The ALD aluminum oxide is dry etched, and then the microshutters are released in vapor HF.

microshutter arrays↗

CARA Status and Upcoming Enhancements

CAS 8.4.3 was deployed to operations on 13 June 2017. Discrepancies Between 3D Pc Estimates and advanced Monte Carlo Equinoctial-Sampling Pc Estimates discovered and discussed at 23 May 2017 Useras (Registered Trademark) Forum. The patch created the Reporting Pc, which is the greater value between the calculated 2D and 3D Pc values This changed the Pc reported in the CDMs to the Reporting Pc This changed the Pc reported on the Summary Report to the Reporting Pc This changed the Pc reported on Maneuver Screening Analysis (MSA) Report to the Reporting Pc. Both the 2D and 3D Pc added to the Summary Report details section The patch also updated the 3D Pc algorithm to eliminate velocity covariance from the Pc calculation This will bring 2D and 3D Pc into close alignment for vast majority of events, particularly for the events in which the 2D/3D discrepancy was found.

conjunction assessmen↗

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin↗

Estimating Alpine Snow Depth by Combining Multi-Frequency Passive Radiance Observations with Ensemble Snowpack Modeling

This paper presents a physically-based snow depth retrieval algorithm adapted for deep mountainous snowpack and airborne multifrequency (10.7, 18.7, 37.0 and 89.0 GHz) passive microwave (PM) radiance observations from a single flight. The algorithm employs a single forecast-analysis cycle of a traditional sequential assimilation scheme. It uses an ensemble of multi-layer snowpack model runs to resolve snow microstructure and melt-refreeze crusts, andmicrowave radiative transfer models to relate snow properties to microwave measurements.Snow depth was retrieved at a 120 m spatial resolution over three 1 km2 Intensive Study Area (ISA) within the Rabbit Ears Meso-Cell Study Area (MSA) from the NASA Cold Land Processes Experiment (CLPX) in Colorado (United States) for one date in February 2003. When evaluated against in situ observations, root mean square error (RMSE) of the snow depth from the assimilation was 13.3 cm for areas with low (<5 %) forest cover, which was a reduction of 48 % in the RMSE compared with the modeled snow depth when the PM observations were not assimilated; indicating a ~5% relative error of the posterior snow depth with respect to the average snow depth (200 cm) measured at these pixels. For pixels with forest cover ranging from 5-15% and 15-30%, results were improved (R2 increased from 0.65 to 0.71 and from 0 to 0.38, respectively) by introducing a forest radiative transfer model during the assimilation.

Airborne Multifrequency↗

TPSAS-NF1676L-31853-DND

Risk that Orion arrives later than Space Launch System (SLS). MSO mitigates this risk by using a mass simulator for SLS’ tests. An Orion simulator for the Integrated Modal Test (IMT) and Umbilical Release and Retraction Tests (URRT) mitigates schedule risk by significant timeframe. A clean sheet alternate being pursued - analysis shows matching modal characteristics unnecessary; rigid simulator is acceptable wrt existing SLS accelerometer locations and shaker placement/size. Key Simulator Requirements: Representative mass, CG, rigid modal characteristics, high fidelity interface at MSA. Pre-test analyses show that MSO vertical CG could be up to 40” low without affecting IMT.

Steve Cutright↗

Concept of Operations for OSIRIS-REx Optical Navigation Image Planning

Optical navigation (OpNav) is a critical subsystem of the OSIRIS-REx asteroid sample return mission, which operated in the vicinity of near-Earth asteroid (101955) Bennu from August 2018 through April 2021. A substantial amount of mission resources across multiple subsystems and institutions is required to ensure that the OpNav data are successfully acquired. The KinetX OpNav team, part of the Flight Dynamics System (FDS), is responsible for performing required analysis to develop the OpNav operations plans; requesting, reviewing and verifying the plans; and ultimately using the image data for critical navigation operations. The FDS team, responsible for the mission navigation, is operated by KinetX Aerospace with management and operations support from NASA’s Goddard Space Flight Center. The Science Processing and Operations Center (SPOC), located at the University of Arizona’s Lunar and Planetary Laboratory, is responsible for generating the planning products for all science and most OpNav data. These plans are integrated into the spacecraft sequences, tested, and commanded by the Mission Support Area (MSA) at Lockheed Martin Space. To ensure mission-critical navigation image data are successfully acquired, the plan is developed through a waterfall of planning cycles over the course of 3 months prior to onboard plan execution. During the initial strategic planning for a mission phase, detailed analysis is performed by the OpNav team to conceptualize the concept of operations (ConOps) for image data collection. This phase OpNav Narrative is included along with other strategic planning documents for the key ground segment stakeholders to review and provide feedback. The detailed OpNav plans get defined in the tactical planning cycle, which spans 8 to 3 weeks before the week-long integrated sequence is executed on-board the spacecraft. During the tactical cycle, the initial OpNav Request is submitted along with the science requests, kicking off development of the science and OpNav plans. Once the initial plan is drafted, interfaces are exercised so that the plan can be reviewed and iterated, if necessary. A rigorous schedule is followed by the planning teams during the implementation cycle, spanning the last 18 days before uplink, to ensure all the necessary integration, testing, and reviewing can occur on time. The development of the OpNav planning ConOps, including responsibilities, interfaces, timelines, and procedures, took extensive collaboration across mission elements and institutions. The process was robust throughout the 137 weeks of continuous Optical Navigation Operations at Bennu, which concluded on April 9th, 2021.

Coralie D. Adam↗

Transforming any Facility for Meeting Strict Cleanliness Requirements

Over the life of the James Webb Space Telescope (JWST), Integration & Test (I&T) has taken place in areas that needed considerable work to make the facility itself and/or the protocols used while working in the rooms suitable to meet JWST percent area coverage (PAC) and molecular accumulation requirements. In addition to normal particulate matter, JWST had a uniquely significant challenge: fibers! Fibers not only cause much higher PAC levels, but they also risk damaging the angstrom sized Near Infrared Spectrometer (NIRSpec) microshutter array (MSA), which is critical to NIRSpec instrument performance. The primary emphasis of this paper is to address particulate and fiber contamination. The success of the JWST mission required effective cleanrooms, protocols, and mitigations in non-cleanroom areas that were pressed into service to house contamination-sensitive optics and scientific instruments. Some presented profound challenges. These included: NASA’s 60-year-old Johnson Space Center (JSC) Chamber A, which had never been used for anything contamination-sensitive, and the European tropical launch facilities, which were designed to meet International Standard Organization (ISO) Class 8 processing for communication satellites. The final challenge for JWST, as if to stare us in the face and say, “I dare you to try and make me clean enough,” was preparing the 4 areas in the Centre Spatial Guyanais (CSG) Final Assembly Building (BAF) located in French Guiana, a building in which one entire side opens for Ariane 5 rocket ingress and egress. This paper will describe our initial evaluation processes and the actual work undertaken to transform even the most challenging areas into first class cleanrooms that met JWST particulate and fiber requirements.

James Webb Space Telescope↗

Measurement System Analysis of a Novel Phase-Based Ultrasonic NDE Technique for Bond Strength Measurement

Fiber reinforced polymer parts have shown tremendous benefits in aerospace structural applications, but their qualification and certification for use in safety critical areas are currently hindered by the lack of a capable non-destructive evaluation (NDE) method or technique for the inspection of these adhesively bonded parts. Conventional NDE methods and techniques typically detect gross bond defects in a qualitative (Pass/Fail) manner. These techniques struggle to detect weak or kissing bonds. Also, there are no widely adopted NDE methods or techniques for measuring interfacial bond strength or detecting kissing bonds. Bond strength is currently ensured by process control and semi-destructive testing. Results from recent research from other authors, including but not limited to mechanical testing, have shown an excellent correlation between interfacial stiffness of an adhesively bonded joint and the adhesive bond strength of that joint. In this paper, a measurement system analysis (MSA) of a novel phase-based ultrasonic NDE Technique, developed at NASA Langley Research Center, is presented for bond strength measurement to assess at an increased level the measurement process and identify components of variation in that measurement process.

Ultrasound↗

Analysis of Electrical Grid Capacity in Major U.S. Metropolitan Areas for Urban Air Mobility

A wide range of challenges must be overcome to conduct Urban Air Mobility (UAM) operations at scale with electric vertical takeoff and landing aircraft as envisioned. This paper documents an analysis of one potential infrastructure challenge for UAM: available electrical grid power capacity. The success of UAM depends on the availability of electricity, which will be increasingly impacted by the proliferation of ground electric vehicles (EVs) over time. Under the worst-case assumption that each U.S. Metropolitan Statistical Area (MSA) can only access and utilize the electricity generated by power plants within its boundaries, it is estimated that the maximum number of UAM aircraft that can charge simultaneously in the 25 most populous MSAs will decrease by about 61% from about 129,000 in the year 2021 to about 51,000 in the year 2050, due to the projected increase in ground EVs. Also, it is estimated that the number of these MSAs that may lack any available electrical grid power capacity for UAM operations will increase from zero MSAs in 2021 to eleven MSAs in 2050—including three MSAs that prospective UAM operators have announced as target markets (Los Angeles, Miami, and Orlando)—unless electricity demand for other purposes is reduced.

electrical grid↗