At least 109 records · Page 6

An Adaptive-Importance-Sampling-Enhanced Bayesian Approach for Topology Estimation in an Unbalanced Power Distribution System

The reliable operation of a power distribution system relies on a good prior knowledge of its topology and its system state. Although crucial, due to the lack of direct monitoring devices on the switch statuses, the topology information is often unavailable or outdated for the distribution system operators for real-time applications. Apart from the limited observability of the power distribution system, other challenges are the nonlinearity of the model, the complicated, unbalanced structure of the distribution system, and the scale of the system. To overcome the above challenges, we, in this paper, propose a Bayesian-inference framework that allows us to simultaneously estimate the topology and the state of a three-phase, unbalanced power distribution system. Specifically, by using the very limited number of measurements available that are associated with the forecast load data, we efficiently recover the full Bayesian posterior distributions of the system topology under both normal and outage operation conditions. This is performed through an adaptive importance sampling procedure that greatly alleviates the computational burden of the traditional Monte-Carlo (MC)-sampling-based approach while maintaining a good estimation accuracy. The simulations conducted on the IEEE 123-bus test system and an unbalanced 1282-bus system reveal the excellent performances of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LLM-Based Adaptive Distribution Voltage Regulation Under Frequent Topology Changes: An In-Context MPC Framework

This paper proposes a large language model (LLM) based adaptive inverter control for distribution voltage regulation under frequent topology changes. We leverage the ability of the LLM to perform in-context learning and create a topology-adaptive surrogate model for power flow calculation. The surrogate model is then integrated with a long short-term memory-based load forecaster and a model predictive control (MPC) scheme to achieve the optimal inverter control that adapts to frequent topology changes. Unlike many existing works that assume fixed-topology grids or require the knowledge of all possible topologies when training a model, the proposed in-context MPC method tackles the distribution voltage control problem under various topologies and adapts to unknown topologies with limited data requirement for fine-tuning. The effectiveness of our method is demonstrated on a modified IEEE 123-bus test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Grid Simulator For Human Factor Research

The developed code simulates real-time monitor and control for west area of IEEE 118-bus system. The 24-hour load profile for each bus is derived by scaling the system’s rated load in the PSSE sav file according to the California Independent System Operator’s Day-ahead load forecast for May 1, 2024. This simulator performs several critical functions: (1) Calculating time-series power flow every 4 seconds; (2) Updating and dispatching AGC signals every minute; (3) Conducting N-1 contingency analysis every 5 minutes. Additionally, the simulator can trip lines and subsequently update and dispatch AGC signals, running power flow analysis after each tripping event.

Huang, Jianqiao [Idaho National Laboratory (INL), ↗

Offshore Wind Project Study (Final Technical Report)

Within the Long Island electric service territory and throughout New York State there is increasing interest in and mandate for increasing clean energy technologies and renewable energy generation while reducing dependency on fossil fuels for electric production with goal of a carbon free system by 2040. This report discusses the implications of the reduction of forecasted load in the Long Island electric service territory and the impact of energy efficiency; increasing reliance of wind and other renewable resources on the transmission system; opportunities for interconnecting these resources; and reductions on the reliance of baseload fossil fueled power facilities over the coming years.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implications of a regional resource adequacy program on utility integrated resource planning: Study for the Western United States

LBNL collaborated with the Western Interstate Energy Board and the University of Texas, Austin to investigate the implications of a regional resource adequacy (RA) program on utility integrated resource planning. This report is focused on an active policy discussion to develop a novel voluntary program to share capacity resource and improve RA in the Western Interconnection. This report identifies two RA components of IRP that will be highly impacted by a regional RA program: resource capacity accreditation and RA targets. There are at least four resources that will require specific attention for their capacity credit calculation: (1) variable renewable resources, (2) demand-side resources, (3) hydropower, and (4) contracts. It will then be necessary to decide on a RA target reliability metric (e.g., a planning reserve margin) that is at least the minimum requirement in IRPs to ensure consistency in RA requirement calculations. The report finds that load forecasting and transmission expansion analyses will be moderately impacted, but that most of IRP components will not be significantly impacted. The report includes (i) a review of traditional resource adequacy practices in IRP; (ii) a case study of an existing regional RA program that interacts with IRP (Southwest Power Pool) and (iii) an overview of the NWPP regional resource adequacy proposal that is the object of this work. This paper does not (1) advocate for or against a regional RA program for the NWPP, (2) make detailed design recommendations for this program, or (3) assess its benefits and costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing changes in peak demand from building and transportation electrification with energy efficiency [Slides]

The Department of Energy funded Berkeley Lab to provide technical assistance to two municipal utilities on how energy efficiency and demand flexibility can mitigate the peak demand impacts of building and transportation electrification. Berkeley Lab worked with these utilities, Sacramento Municipal Utility District (SMUD) and Fort Collins Utilities, to identify research questions that supported their planning needs. For both utilities, Berkeley Lab developed scenario-based load forecasts that considered baseline and high-efficiency building electrification. For SMUD, the forecast also explored the sensitivity of peak demand to extreme weather (a winter cold snap) at the system-level. For Fort Collins Utilities, the forecast addressed the impacts of low, medium, and high levels of building and transportation technology adoption on select distribution feeders. Berkeley Lab is also developing a guidance document for utilities that will draw on lessons learned from the technical assistance and provide a framework for conducting similar analyses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Series FACTS Devices for Increasing Resiliency in Severe Weather Conditions

Severe weather conditions are low-probability, high-impact events that affect grid operations. The majority of power outages are caused by severe weather conditions. Grid resiliency to weather events can be enhanced by decreasing the reliance on its affected sections. One way to do this is to reduce the power flow through lines vulnerable to severe weather. If a line is disconnected, its initial power flow is distributed through the neighbor lines, which may cause congestion in the grid. FACTS devices can be used to control the power flow of lines that have a higher chance of power outages. Most previous works do not consider weather events in power flow control. In this work, a linearized optimal power flow (OPF)–based algorithm is developed to minimize the real power flow of vulnerable lines considering the thermal limits of lines to prevent infeasible solutions; the simulation is fast, making it suitable for large-scale systems. The proposed optimization problem is presented as a mixed-integer linear program (MILP), making it capable of using short-term load forecasting due to its high solution speed. The proposed optimization problem considers multiple lines with different outage probabilities and the uncertainties of the weather forecast. Moreover, it estimates the power reduction in vulnerable lines due to changes in the series FACTS devices. The performance of the proposed optimization problem is tested on IEEE 14-, 30-, and 118-bus systems for several scenarios. The results are validated with the AC power flow results from MATPOWER.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unsupervised Detection of SOC Spoofing in OCPP 2.0.1 EV Charging Communication Protocol Using One-Class SVM

The electric vehicles (EVs) market keeps growing globally; thus, it is critical to secure the EV charging communication protocols in order to guarantee reliable and fair charging operations among the customers. The Open Charge Point Protocol (OCPP) 2.0.1 supports the communication between the Electric Vehicle Supply Equipment (EVSE) and Charging Station Management Systems (CSMSs); therefore, it becomes vulnerable to several types of attacks, which aim to jeopardize smart charging, billing, and energy management. Specifically, OCPP 2.0.1 allows the self-reporting of the State of Charge (SOC) values, which makes it vulnerable to spoofing-based cyberattacks, which target manipulating the scheduling priorities, distorting the load forecasts, and extending the charging sessions in an unfair manner. In this paper, we try to address this type of attack by providing a comprehensive analysis of the SOC spoofing attacks and introducing a novel unsupervised detection framework based on the One-Class Support Vector Machine (OCSVM) algorithm. Specifically, two types of attack scenarios are analyzed (i.e., priority manipulation and session extension) by deriving engineered features that capture the nonlinear relationships under normal charging behavior. Detailed simulation-based results are derived by utilizing the DESL-EPFL Level 3 EV charging dataset. Our results demonstrate high F1-score and recall in identifying spoofed SOC values and that the proposed OCSVM model demonstrates superior performance compared to alternative clustering and deep-learning based detectors.

EV charging↗

Artificial Intelligence Techniques in Smart Grid: A Survey

The smart grid is enabling the collection of massive amounts of high-dimensional and multi-type data about the electric power grid operations, by integrating advanced metering infrastructure, control technologies, and communication technologies. However, the traditional modeling, optimization, and control technologies have many limitations in processing the data; thus, the applications of artificial intelligence (AI) techniques in the smart grid are becoming more apparent. This survey presents a structured review of the existing research into some common AI techniques applied to load forecasting, power grid stability assessment, faults detection, and security problems in the smart grid and power systems. It also provides further research challenges for applying AI technologies to realize truly smart grid systems. Finally, this survey presents opportunities of applying AI to smart grid problems. The paper concludes that the applications of AI techniques can enhance and improve the reliability and resilience of smart grid systems.

energy systems↗

The scheduling of tracking times for interplanetary spacecraft on the Deep Space Network

The Deep Space Network (DSN) is a network of tracking stations, located throughout the globe, used to track spacecraft for NASA's interplanetary missions. This paper describes a computer program, DSNTRAK, which provides an optimum daily tracking schedule for the DSN given the view periods at each station for a mission set of n spacecraft, where n is between 2 and 6. The objective function is specified in terms of relative total daily tracking time requirements between the n spacecraft. Linear programming is used to maximize the total daily tracking time and determine an optimal daily tracking schedule consistent with DSN station capabilities. DSNTRAK is used as part of a procedure to provide DSN load forecasting information for proposed future NASA mission sets.

Webb, W. A.↗

Appropriateness in using LANDSAT in development energy related data bases

The use of automated classification systems in the field of resource management and resource inventory is discussed. Applications of LANDSAT classification are outlined and include: energy load forecasting based upon land use inventories and change analysis, impact analysis of activities related to energy extraction, capability/suitability mapping in support of generation and substation location and transmission line routing, and assessment of solar energy potential in a highly urbanized setting where land values are high. It is found that the use of LANDSAT data is adequate for general inventories where few data categories are required, where resolution of data to around 150 acres minimum is required, and where no other complete imagery set can be obtained.

Harnden, E.↗

Interactive Management and Updating of Spatial Data Bases

The decision making process, whether for power plant siting, load forecasting or energy resource planning, invariably involves a blend of analytical methods and judgement. Management decisions can be improved by the implementation of techniques which permit an increased comprehension of results from analytical models. Even where analytical procedures are not required, decisions can be aided by improving the methods used to examine spatially and temporally variant data. How the use of computer aided planning (CAP) programs and the selection of a predominant data structure, can improve the decision making process is discussed.

French, P.↗

National Aeronautics and Space Administration (NASA) Earth Science Research for Energy Management: Overview of Energy Issues and an Assessment of the Potential for Application of NASA Earth Science Research - Part 1

Effective management of energy resources is critical for the U.S. economy, the environment, and, more broadly, for sustainable development and alleviating poverty worldwide. The scope of energy management is broad, ranging from energy production and end use to emissions monitoring and mitigation and long-term planning. Given the extensive NASA Earth science research on energy and related weather and climate-related parameters, and rapidly advancing energy technologies and applications, there is great potential for increased application of NASA Earth science research to selected energy management issues and decision support tools. The NASA Energy Management Program Element is already involved in a number of projects applying NASA Earth science research to energy management issues, with a focus on solar and wind renewable energy and developing interests in energy modeling, short-term load forecasting, energy efficient building design, and biomass production.

Atmospheric models↗