Improvements in Hanford TRU Program Utilizing Systems Modeling and Analyses
Hanford's Transuranic (TRU) Program is responsible for certifying contact-handled (CH) TRU waste and shipping the certified waste to the Waste Isolation Pilot Plant (WIPP). Hanford's CH TRU waste includes material that is in retrievable storage as well as above ground storage, and newly generated waste. Certifying a typical container entails retrieving and then characterizing it (Non-Destructive Examination [NDE], Non-Destructive Assay [NDA], and Head Space Gas Sampling [HSG]), validating records (data review and reconciliation), and designating the container for a payload. The certified payload is then shipped to WIPP. Systems modeling and analysis techniques were applied to Hanford's TRU Program to help streamline the certification process and increase shipping rates. The modeling and analysis yields several benefits: - Maintains visibility on system performance and predicts downstream consequences of production issues. - Predicts future system performance with higher confidence, based on tracking past performance. - Applies speculation analyses to determine the impact of proposed changes (e.g., apparent shortage of feed should not be used as basis to reassign personnel if more feed is coming in the queue). - Positively identifies the appropriate queue for all containers (e.g., discovered several containers that were not actively being worked because they were in the wrong 'physical' location - method used previously for queuing up containers). - Identifies anomalies with the various data systems used to track inventory (e.g., dimensional differences for Standard Waste Boxes). A model of the TRU Program certification process was created using custom queries of the multiple databases for managing waste containers. The model was developed using a simplified process chart based on the expected path for a typical container. The process chart was augmented with the remediation path for containers that do not meet acceptance criteria for WIPP. Containers are sorted into queues based on their current status in the process. A container can be in only one queue at any given time. Existing data systems are queried to establish the quantity of containers in each queue on any given day. This sets the amount of feed available that is then modeled to be processed according to the daily production plans. The daily production plans were created by identifying the equipment necessary and the staff that performs each process step, and determining the expected production rate for each step. Production performance is monitored on a weekly basis with Project senior staff to establish a total operating efficiency (TOE) for each step (comparing actual performance to production capacity). The unit operations were modeled to be constrained by each day's feed queue plus the performance of the preceding step. The TOE for each unit operation was applied to an integrated model to determine bottlenecks and identify areas for improvement. All of the steps were linked to predict future system performance based on available feed and integrated system-level TOE. It has been determined that at times sub-optimization of a particular unit operation is necessary to ensure the system remains balanced (e.g., having excess capacity in assay does no good if there is no feed available because the real-time radiography [RTR] is working at half capacity). Several recommendations have been provided to the Project management team resulting in improvements in the performance of TRU certification activities by Hanford's TRU Program. (authors)