The EGS Collab project: Outcomes and lessons learned from hydraulic fracture stimulations in crystalline rock at 1.25 and 1.5 km depth

With the goal of better understanding stimulation in crystalline rock for improving enhanced geothermal systems (EGS), the EGS Collab Project performed a series of stimulations and flow tests at 1.25 and 1.5 km depths. The tests were performed in two well-instrumented testbeds in the Sanford Underground Research Facility in Lead, South Dakota, United States. The testbed for Experiment 1 at 1.5 km depth contained two open wells for injection and production and six instrumented monitoring wells surrounding the targeted stimulation zone. Four multi-step stimulation tests targeting hydraulic fracturing and nearly year-long ambient temperature and chilled water flow tests were performed in Experiment 1. The testbed for Experiments 2 and 3 was at 1.25 km depth and contained five open wells in an outwardly fanning five-spot pattern and two fans of well-instrumented monitoring wells surrounding the targeted stimulation zone. Experiment 2 targeted shear stimulation, and Experiment 3 targeted low-flow, high-flow, and oscillating pressure stimulation strategies. Hydraulic fracturing was successful in Experiments 1 and 3 in generating a connected system wherein injected water could be collected. However, the resulting flow was distributed dynamically, and not entirely collected at the anticipated production well. Thermal breakthrough was not observed in the production well, but that could have been masked by the Joule-Thomson effect. Shear stimulation in Experiment 2 did not occur - despite attempting to pressurize the fractures most likely to shear - because of the inability to inject water into a mostly-healed fracture, and the low shear-to-normal stress ratio. The EGS Collab experiments are described to provide a background for lessons learned on topics including induced seismicity, the correlation between seismicity and permeability, distributed and dynamic flow systems, thermoelastic and pressure effects, shear stimulation, local geology, thermal breakthrough, monitoring stimulation, grouting boreholes, modeling, and system management.

15 - GEOTHERMAL ENERGY↗

MPC solution for optimal load shifting for buildings with ON/OFF staged packaged units: Experimental demonstration, and lessons learned

Small and medium-sized commercial buildings (SMCB) are significant demand response resources, and it is important to develop grid-responsive control algorithms that exploit those resources and create financial benefits for building owners and HVAC service providers. Furthermore, unlike large-sized commercial buildings, there is an opportunity to have universally applicable control solutions for many SMCBs since those buildings have a consistent HVAC system configuration: SMCBs are commonly served by multiple-staged air conditioning units controlled by their own thermostats. Despite the demand response potential and scalability, however, very few control solutions are available for SMCBs. Typical model predictive control (MPC) and heuristic control approaches for cooling load shifting that lower thermostat setpoints before an electric price jump are suitable mainly for large-sized commercial buildings where a continuous capacity modulation is possible, e.g., via dampers in variable air volume terminal units. However, those approaches can cause undesired, high peaks for SMCBs due to the nature of ON/OFF unit staging and narrow thermostat deadbands. This could discourage the use of advanced grid-responsive controls for SMCBs due to the concern of high demand charges, and has to be resolved. This paper presents a MPC solution that overcomes this challenge. It has a hierarchical MPC structure where an upper level MPC is responsible for electrical load shifting in response to an electric price signal while a lower level MPC is responsible for coordinating compressor stages to eliminate unnecessary peaks and follows the setpoints determined by the upper level MPC. In this work, two one-month, comprehensive laboratory tests have been carried out to demonstrate load shifting and cost savings for the algorithm. Interesting trade-offs between energy efficiency and load flexibility were observed and are discussed, and lessons learned for applying MPCs for SMCBs are also presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned from the First Year of Property Remediation - 20475

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (LLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The larger of the two PHAI scopes of work - the Port Hope Project - involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from 18 major sites in Port Hope, the construction of an engineered aboveground mound where the waste will be safely contained and the long-term maintenance and monitoring of the facility. Construction of the waste water treatment plant, the first three of four cells in the mound and supporting infrastructure is complete, with construction of the fourth cell in progress. In 2017 with the movement of on-site waste at this facility began and is now complete. Waste excavation and transportation from off-site locations within the community began in 2018; the cleanup of four temporary storage sites is now complete and remediation at several other major sites is underway. The Port Hope Project also includes a survey of the interior and exterior investigation of approximately 4,800 properties, primarily residential, in the urban area of Port Hope for the presence or absence of historic LLRW. The current projection is that approximately 1,250 privately owned residential and commercial properties known as Small-Scale Sites (SSS) will be identified as having waste exceeding the PHAI clean-up criteria. This paper will outline some of the challenges and lessons learned from the first year of SSS remediation including contractual, data and design issues; interaction with and managing expectations of stakeholders; weather, site and structure conditions as well as municipal permitting, resourcing, transportation and remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From Techno-Economic Analysis of Solar Photovoltaics and Battery Energy Storage at a Vietnam Industrial Park

Through the Clean Energy Investment Accelerator (CEIA), engineers from the United States (U.S.) National Renewable Energy Laboratory (NREL) conducted a case study analysis evaluating the techno-economic feasibility of battery energy storage systems (BESS) at an industrial park in Vietnam. The analysis uses NREL's REopt platform, a distributed energy modeling and optimization tool, to identify the cost-optimal system sizing for BESS, in conjunction with onsite renewables such as solar photovoltaics (PV), to reduce electricity costs, increase onsite renewable energy generation utilization, and improve resilience to grid outages.

batteries↗

Lessons Learned—Lithium Silicide Hydration Fire

Alkali metals, such as lithium, sodium, potassium, etc., are highly reactive elements. While researchers generally handle these metals with caution, less caution is taken when these elements have been “reacted”. In this work, a recent incident is examined in which a pair of researchers ignited a lithium silicide alloy sample that was assumed to be fully hydrated to lithium hydroxide and, thereby, no longer water-reactive. However, variations in the original chemical composition of the lithium compounds examined resulted in select mixtures failing to hydrate and react completely to lithium hydroxide in the time frame allowed. This gave rise to residual unreacted, water-sensitive lithium silicide which resulted in a violent exothermic reaction with water and autoignition of the produced hydrogen gas. This Article describes this incident and improvements that can be implemented to prevent similar incidents from occurring.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Radioisotope production at the advanced test reactor: process and lessons learned

The mission of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) focuses on creating irradiation facilities for nuclear materials and fuels research. While radioisotope production is not a core part of the ATR mission, it is important for providing a U.S. domestic source of critical radioisotopes such as cobalt-60 (Co-60). Here, this paper gives an overview for radioisotopes currently being produced in ATR as well as other potential radioisotopes that can be produced in ATR. It also provides guidance on radioisotope production that can be applied to other test reactors.

ATR↗

Emergency vacuum repairs in an aging accelerator: Case studies and lessons learned

Jefferson Lab operates the CEBAF electron accelerator at energies to 12 GeV for the Department of Energy Nuclear Physics program. The CEBAF injector beamline was designed and built in the early 1990s. Although we’ve upgraded and replaced many of the vacuum systems, we still have unique original components installed which operate daily. Over the past 3 years, we have had several vacuum leaks in ageing components leading to emergency repairs on a tight timeline. I’ll discuss the nature of these vacuum component failures, the difficulties in repair due to their ages, the lessons we’ve learned, and how we hope to minimize similar failures going forward.

Stutzman, Marcy [Thomas Jefferson National Acceler↗

Lessons Learned from Three Agrivoltaic Installations in New Jersey

Agrivoltaics is a new technology that has the potential to positively impact commercial farming by combining agricultural practices with the generation of solar energy. While some yield reduction is to be expected, resulting from less sunlight reaching the plant canopy and ground occupied by support structures, the generated electricity provides a low-risk supplemental income to farmers. In order to combine farming with electricity generation, agrivoltaic systems use a lower ground coverage ratio compared to normal solar farms and the PV panels are often mounted higher above the ground in order to facilitate the movement of agricultural equipment and to reduce the contrast between shaded and non-shaded areas. With funding provided from the state of New Jersey and the New Jersey Agricultural Experiment Station (NJAES), we designed and installed three unique agrivoltaic research systems at Rutgers/NJAES farms. These projects were recently completed and are generating electricity that is exported to the grid. This paper discusses the lessons we have learned along the way, including all the steps necessary to see an agrivoltaic project through to completion.

Both, A. J. (ORCID:0000000150845296)↗

Lessons Learned from Three Agrivoltaic Installations in New Jersey

Agrivoltaics is a new technology that has the potential to positively impact commercial farming by combining agricultural practices with the generation of solar energy. While some yield reduction is to be expected, resulting from less sunlight reaching the plant canopy and ground occupied by support structures, the generated electricity provides a low-risk supplemental income to farmers. In order to combine farming with electricity generation, agrivoltaic systems use a lower ground coverage ratio compared to normal solar farms and the PV panels are often mounted higher above the ground in order to facilitate the movement of agricultural equipment and to reduce the contrast between shaded and non-shaded areas. With funding provided from the state of New Jersey and the New Jersey Agricultural Experiment Station (NJAES), we designed and installed three unique agrivoltaic research systems at Rutgers/NJAES farms. These projects were recently completed and are generating electricity that is exported to the grid. This paper discusses the lessons we have learned along the way, including all the steps necessary to see an agrivoltaic project through to completion.

14 SOLAR ENERGY↗

Lessons Learned from Three Agrivoltaic Installations in New Jersey

Agrivoltaics is a new technology that has the potential to positively impact commercial farming by combining agricultural practices with the generation of solar energy. While some yield reduction is to be expected, resulting from less sunlight reaching the plant canopy and ground occupied by support structures, the generated electricity provides a low-risk supplemental income to farmers. In order to combine farming with electricity generation, agrivoltaic systems use a lower ground coverage ratio compared to normal solar farms and the PV panels are often mounted higher above the ground in order to facilitate the movement of agricultural equipment and to reduce the contrast between shaded and non-shaded areas. With funding provided from the state of New Jersey and the New Jersey Agricultural Experiment Station (NJAES), we designed and installed three unique agrivoltaic research systems at Rutgers/NJAES farms. These projects were recently completed and are generating electricity that is exported to the grid. This paper discusses the lessons we have learned along the way, including all the steps necessary to see an agrivoltaic project through to completion.

14 SOLAR ENERGY↗

First Ever Polymer Flood Field Pilot to Enhance the Recovery of Heavy Oils on Alaska North Slope – Producer Responses and Operational Lessons Learned

The US Department of Energy and Hilcorp Alaska, LLC are jointly cosponsoring a field pilot project entitled “First Ever Field Pilot on Alaska’s North Slope to Validate the Use of Polymer Floods for Heavy Oil Enhanced Oil Recovery (EOR).” The objective of this pilot is to perform a field experiment to validate the use of an advanced polymer flooding technology to unlock the vast heavy oil resources on Alaska North Slope (ANS). Two pairs of horizontal injection and production wells have been deployed in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field to conduct a polymer flood pilot which was designed to acquire field performance data to optimize polymer flood design in the Schrader Bluff heavy oil reservoirs on ANS. Hydrolyzed polyacrylamide (HPAM) polymer injection started on August 28, 2018 using a custom made polymer mixing and pumping unit. Polymer solution properties such as concentration, viscosity, and filter ratio, have been closely monitored and adjusted as necessary. Operational procedures have been improved to ensure adequate injectivity and polymer propagation through the formation. Oil and water production is tested frequently to monitor water cut performance, and produced water is sampled and analyzed for polymer content. Tracers were pumped pre and post polymer injection startup to compare polymer flood breakthrough timing and sweep efficiency. Polymer injectivity of the horizontal wells drilled in the Schrader Bluff NB sand is found to be sufficient to replace the reservoir production voidage although there were some declines as high viscosity polymer swept the near wellbore region. Production data show significant reduction in water cut and the oil production rate has stabilized. No polymer production has been confirmed from the two horizontal producers after 22 months of polymer injection into the two supporting horizontal injectors. Tracer data show very low sweep efficiencies with waterflood alone, whereas significant improvement has been achieved with polymer flood. Many operational lessons have been learned and improvements have been made regarding polymer mixing, pumping, and onsite quality control, particularly in a challenging Arctic environment. Adequate polymer injection rate can be achieved with diligent monitoring and quality assurance of the properties of the injected polymer solution.

Ning, Samson↗