Student Session 15/28: Study of the LHC Luminosity at the ATLAS Experiment Using Scintillating Counters
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Abstract Not Provided
N/A
N/A
N/A
Abstract Not Provided
N/A
N/A
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The High-Luminosity LHC (HL-LHC, or Phase-2 LHC) will deliver proton-proton collisions at 5–7.5 times the nominal LHC luminosity, with an expected number of 140–200 pp-interactions per bunch crossing (Pile-up or PU). To maintain the performance of muon triggering and reconstruction under high background, the forward part of the Muon Spectrometer of the CMS experiment will be upgraded with Gas Electron Multipliers (GEM) and improved Resistive Plate Chambers (iRPC) detectors. A first GEM station (GE1/1) was installed during Long Shutdown 2 (LS2, 2019–2021), a 2 nd station (GE2/1) of Triple-GEM detectors will be installed in winter 2023–24 and 2024–25, while a new 6-layer station (ME0) will be installed in the third Long Shutdown (LS3, 2026–2028). GE11 is considered an early Phase-2 upgrade as it will reduce the p T threshold by combining GEM and Cathode Strip Chamber (CSC) hits in the forward muon system at twice the LHC design luminosity ($\mathcal{L}$ = 2 · 10 34 cm -2 s -1 , 50 PU). After a successful start of Run-3 in 2022, with almost 40 fb -1 collected, the commissioning of the GE1/1 detector is nearly complete. Most chambers are operated stably with an efficiency in excess of 95%, next being the demonstration of the combined CSC-GEM trigger in 2023. The lessons learnt with the first large-area GEM station have lead to improvements in detector and electronics design for the Phase 2 detectors GE2/1 and ME0. This proceeding will discuss the progress made since last MPGD Conference (MPGD 2019), discussing the commissioning and early performance of GE1/1; the design improvements and start of construction of GE2/1; and the R&D currently ongoing for ME0.
The luminosity calibration for the ATLAS detector at the LHC during pp collisions at √s = 7 TeV in 2010 and 2011 is presented. Evaluation of the luminosity scale is performed using several luminosity-sensitive detectors, and comparisons are made of the long-term stability and accuracy of this calibration applied to the pp collisions at √s = 7 TeV. A luminosity uncertainty of δL/L= ± 3.5 % is obtained for the 47 pb -1 of data delivered to ATLAS in 2010, and an uncertainty of δL/L= ± 1.8 % is obtained for the 5.5 fb -1 delivered in 2011.
The proposed LHC high luminosity upgrade requires two crabbing systems in increasing the peak luminosity, operating both vertically and horizontally at two interaction points of IP1 and IP5. The required system has tight dimensional constraints and needs to achieve higher operational gradients. A proof-of-principle 400 MHz crabbing cavity design has been successfully tested and has proven to be an ideal candidate for the crabbing system. The cylindrical proof-of-principle rf-dipole design has been adapted in to a square shaped design to further meet the dimensional requirements. The new rf-dipole design has been optimized in meeting the requirements in rf-properties, higher order mode damping, and multipole components. A crabbing system in a cryomodule is expected to be tested on the SPS beam line prior to the test at LHC. The new prototype is required to achieve the mechanical and thermal specifications of the SPS test followed by the test at LHC. This paper discusses the detailed mechanical and thermal analysis in minimizing Lorentz force detuning and sensitivity to liquid He pressure fluctuations.
LHC High Luminosity Upgrade is in need of two crabbing systems that deflects the beam in both horizontal and vertical planes. The 400 MHz rf-dipole crabbing cavity system is capable of crabbing the proton beam in both planes. At present we are focusing our efforts on a complete crabbing system in the horizontal plane. Prior to LHC installation the crabbing system will be installed for beam test at SPS. The crabbing system consists of two rf-dipole cavities in the cryomodule. This paper discusses the electromagnetic design and mechanical properties of the rf-dipole crabbing system for SPS beam test.
As part of the effort towards the development of Nb{sub 3}Sn magnets for future LHC luminosity upgrades, the LHC Accelerator Research Program (LARP) has fabricated and tested the quadrupole magnet LQS01. The magnet implements 3.4 m long Nb{sub 3}Sn coils contained in a support structure characterized by an external aluminum shell segmented in four sections. The room temperature pre-load of the structure is obtained by shimming load keys through bladders, pressurized during the loading operations and removed before cool-down. Temperature compensated strain gauges, mounted on structure components and coil poles, monitor the magnet's mechanical behavior during assembly, cool-down and, excitation. During the first test, LQS01 reached the target gradient of 200 T/m; the gauge data indicated that the aluminum shell was pre-tensioned to the target value estimated by numerical models, but a lack of pre-load was measured in the coil inner layer during ramping. As a result, the test was interrupted and the magnet disassembled, and inspected. A second test (LQS01b) was then carried out following a re-loading of the magnet. The paper reports on the strain gauge results of the first test and the analysis performed to identify corrective actions to improve the coil pre-stress distribution. The mechanical performance of the magnet during the second cool-down and test is then presented and discussed.
A Double Quarter Wave Crab Cavity (DQWCC) was designed for the Large Hadron Collider (LHC) luminosity upgrade. A compact Higher Order Mode (HOM) filter with wide stop band at the deflecting mode is developed for this cavity. Multiphysics finite element simulation results are presented. The integration of this design to the cavity cryomodule is described.