LANSCE Modernization Project (LAMP) Scope Discussion for the Independent Technical Review Committee (ITRC) Kickoff Meeting
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). This brief report summarizes the emittance budget for the LANSCE Modernization Project (LAMP). While the project Key Performance Parameters (KPPs) specify threshold and objective requirements for charge delivered to each experimental area, no upper limits on beam emittances are specified. To maintain low losses in the high-energy section of the LANSCE linac and hands-on maintenance, some upper limits on beam emittance need to be specified for the new LAMP front-end performance. The scope of the LAMP project replaces the injector section and drift-tube linac (DTL) up to 100 MeV of the existing LANSCE linac. This new design replacement will be integrated with the remaining coupled cavity linac (CCL) which makes up most of the accelerator at LANSCE and accelerates the beam to a final energy of 800 MeV. The initial approach that has been used to define an emittance budget for the new LAMP front end is based on recent and historical measured beam emittances at 100 MeV for the three beam types accelerated at LANSCE: H+ (protons for isotope production), LBEG (H- beam for delivery to proton radiography and to the Lujan neutron spallation target, and MPEG (H- beam for delivery to the Weapons Neutron Research facility). The emittance budget (upper limit) for each beam type has been selected to maintain the losses in the CCL to a level approximately equivalent to those observed in present operations to first order. However, the goal of the LAMP project is to improve the quality of the beams injected into the CCL, if possible, thus allowing for higher average current operation while also lowering beam losses and activation at high beam energies. The table below summarizes the beam measurements evaluated and used to establish a conservative emittance budget for LAMP based on known historical beam losses and activation. However, based on estimates of the CCL admittance and the Isotope Production Facility (IPF) beamline acceptance, a more relaxed transverse emittance upper limit of 0.095 π-cm-mrad, rms, normalized may be acceptable at 100 MeV while still meeting the LAMP performance requirements for charge delivery to each LANSCE experimental area and maintaining hands-on maintenance. This upper limit is supported by a recent analysis of operational data. Additionally, the present conceptual LAMP front-end design meets this requirement.
The LANSCE Modernization Project (LAMP) is an essential element of LANSCE sustainment. The LANSCE Front End is a single point-of-failure, long-term facility risk due to obsolescence and unexpected failures. The high-TRL LAMP front end will use modern supply chains to position LANSCE for decades of operation. The existing PSR is a risk to consistent and reliable beam delivery for material science and nuclear physics at Lujan. We have developed several options for the PSR upgrade, each of which builds upon the previous option.
The LANSCE accelerator complex at Los Alamos National Laboratory provides beam to five user facilities: IPF, pRad, UCN, WNR and the Lujan Center. Each user facility receives a beam tailored to its specific requirements, including species (H+ or H- ) and beam pulse format. The capabilities and beam requirements of the LANSCE user facilities are documented elsewhere. The core components of the LANSCE accelerator complex – the beam source area, drift-tube and cavity-coupled linear accelerators – are more than 50 years old; a critical subsystem for beam delivery to the Lujan Center, the proton storage ring (PSR), is approximately 40 years old, with its last major refresh being completed in the late 1990s. The LAMP project is intended to begin a revitalization and update of the LANSCE accelerator complex, starting with the beam source region, drift-tube linac, and PSR.
The Los Alamos Neutron Science Center (LANSCE) is located at Technical Area 53 (TA-53) at Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico. LANSCE is driven by an 800 megaelectronvolt (MeV) proton accelerator that delivered its first beam in 1972. The LANSCE accelerator is unique in that it accelerates both H– (to full energy of 800 MeV) and H+ ions (up to 100 MeV currently but has accelerated high-power H+ beam to 800 MeV in the past) and supports five separate experimental areas that operate simultaneously, with each having different timing and beam current requirements. Many of the LANSCE accelerator front-end components date back to original commissioning in 1972, including the ion sources, Cockcroft-Walton (CW) generators, and the Drift Tube LINAC (DTL), which accelerates the beam up to 100 MeV.
In this paper, we propose an experiment, LANSCE-mQ, aiming to detect fractionally charged and millicharged particles (mCPs) using an 800 MeV proton beam fixed target at the Los Alamos Neutron Science Center (LANSCE) facility at Los Alamos National Laboratory. This search can shed new light on numerous fundamental questions, including charge quantization, the predictions of string theories and grand unification theories, the gauge symmetry of the Standard Model, dark sector models, and the tests of cosmic reheating. We propose to install two-layer scintillation detectors made of plastic (such as EJ-200) or CeBr 3 to search for mCPs. Dedicated geant4 detector simulations and in situ measurements have been conducted to obtain a preliminary determination of the background rate. The dominant backgrounds are beam-induced neutrons and coincident dark current signals from the photomultiplier tubes, while beam-induced high-energy photons ( γ ’s) and cosmic muons are subdominant. We determined that LANSCE-mQ, the dedicated mCP experiment, has the leading mCP sensitivity for mass between ∼ 1 and 300 MeV.
Here, we demonstrate the recent designs of safe extremum seeking (Safe ES) on the 1-km-long charged particle accelerator at the Los Alamos Neutron Science Center (LANSCE). Safe ES is a modification of extremum seeking (ES) which, in addition to minimizing an analytically unknown cost, also employs a safety filter based on an analytically unknown control barrier function (CBF) safety metric. Tuning is necessitated by accelerators being large complex systems, with many drifting parameters due to thermal effects and degradation. At the same time, safe operation (the maintenance of state constraints) is crucial, as damage brings astronomical costs, both financially and in operation downtime. Our measured (but analytically unknown) safety metric is the beam current. We perform multivariable Safe ES on three accelerator applications, in which we adapt 4, 6, and 3 magnet strength parameters, respectively. Two of the three applications are for validated simulation models of beamlines at LANSCE: the first for the proton radiography (pRad) beamline of 800-MeV protons for spot size tuning; the second on a high-performance code, HPSim, for tuning the low-energy beam transport (LEBT) region that contains a beam of 750-keV protons. The third is an experimental tuning of the steering magnets in the LEBT at LANSCE.
A complete redesign of the LANSCE front-end is currently under development for the Los Alamos Modernization Project (LAMP). This includes the replacement of the traditional Cockroft-Walton injection system to the newer radiofrequency quadrupole (RFQ) standard. LANSCE accelerates both H- and H+ beams and therefore requires an unconventional application for RFQ systems. A new facility could consider using an independent RFQ for each beam species. However, with the tight space of the LANSCE injector facility, it would prove difficult to instrument. Our initial studies have shown that a single RFQ could be used. The negatively- and positively-charged direct current (DC) beams are shaped, bunched, and accelerated out of phase to each other, with very little interaction. This would work for all possible H+ beam gates and most H- Beam gates. However, a challenge arises with the Weapons Neutron Research (WNR) beam structure that requires the acceleration of bunched beams at higher charge density per pulse. The Long Bunch Enable Gate (LBEG) used for the Lujan center is the best example of a standard injector beam gate. The beam gate, or Macro-Pulse (MP), is 625-us long, separated by at least 8.3 ms. A chopper is used to dice the MP into 1750 mini-Pulses (mP), which are 290-ns wide. After chopping, the MP contains 100,000 micro-Pulses (uP), which are generated by the linac acceleration structure modulated at 201.25 MHz; that is, the micro-Pulses are separated 5 ns apart from each other. The H+ beam structure will be very similar once a chopper is added to its transport. However, the Multi-Pulse Enable Gate (MPEG) used for WNR is significantly different in structure. In this case, the mP is chopped to be only 35-ns wide. This width is then rotated into a single 201.25 MHz RF bucket using the Low Frequency Buncher (LFB). This is proving difficult for the RFQ design in the LAMP upgrade. We began investigating the amount of current sent to WNR for two reasons. Firstly, we wanted to find a solution to avoid using the Low Frequency Buncher to simplify the LAMP RFQ design. It is simple to inject and accelerate a 35 mA DC beam in the LAMP RFQ (this is done in numerous accelerator facilities). However, injecting a short bunch with a larger current (once compressed to 5 ns to meet the RFQ frequency) may be difficult. Second, we have a technique called PSR2WNR in which we do not employ the Low Frequency Buncher, but rather accumulate 5 LBEG uP (5 ns) in the PSR and deliver the accumulated beam to WNR every 1.8 us. As a result, we could provide to WNR with five accumulated LBEG uPs every shot. The goal here is to create a rapid kicker with a frequency response of 555 kHz. DARHT-II and other accelerator facilities have constructed kickers of this type for other uses, and our engineers consider this technology as feasible.