Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Control Room”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Cognitive consequences of clumsy automation on high workload, high consequence human performance

The growth of computational power has fueled attempts to automate more of the human role in complex problem solving domains, especially those where system faults have high consequences and where periods of high workload may saturate the performance capacity of human operators. Examples of these domains include flightdecks, space stations, air traffic control, nuclear power operation, ground satellite control rooms, and surgical operating rooms. Automation efforts may have unanticipated effects on human performance, particularly if they increase the workload at peak workload times or change the practitioners' strategies for coping with workload. Smooth and effective changes in automation requires detailed understanding of the congnitive tasks confronting the user: it has been called user centered automation. The introduction of a new computerized technology in a group of hospital operating rooms used for heart surgery was observed. The study revealed how automation, especially 'clumsy automation', effects practitioner work patterns and suggest that clumsy automation constrains users in specific and significant ways. Users tailor both the new system and their tasks in order to accommodate the needs of process and production. The study of this tailoring may prove a powerful tool for exposing previously hidden patterns of user data processing, integration, and decision making which may, in turn, be useful in the design of more effective human-machine systems.

Cook, Richard I.↗

Noise-optimal control of HEMT LNA's for compensation of temperature deviations

Noise-optimal control of high-electron mobility transistor low noise amplifier (HEMT LNA) bias voltage and current values was achieved at room temperature. The performance metric maximized was the amplifier gain divided by the amplifier input noise temperature, G/T(sub e). Additionally, the feasibility of automating the initial determination of bias settings was demonstrated in the laboratory. Simulation models of an HEMT were developed from available measurement data, installed on a Sun SPARC 1 workstation, and used in investigating several optimization algorithms. Simple tracking-type algorithms, which follow changes in optimum settings if started at or near the global optimum point, produced the best performance. Implementation of the optimization algorithms was performed using a three-stage Field Effect Transistor (FET) LNA and an existing test apparatus. Software was written to control the bias settings of the first stage of the LNA and to perform noise and gain measurements by using the test apparatus. The optimization control was then integrated with existing test software to create a master test and optimization program for test apparatus use.

Maccarley, C.↗

Permeability and Strength Measurements on Sintered, Porous, Hollow Turbine Blades Made by the American Electro Metal Corporation under Office of Naval Research Contract N-ONR-295 (01)

An experimental investigation was made to determine the permeability and strength characteristics of a number of sintered, porous, hollow turbine rotor blades and to determine the effectiveness of the blade fabrication method on permeability control. The test blades were fabricated by the American Electro Metal Corporation under a contract with the Office of Naval Research, Department of the Navy, and were submitted to the NACA for testing. Of the 22 test blades submitted, ten were sintered but not coined, five were sintered and coined, and seven were sintered and not coined but contained perforated reinforcements integral with the blade shells. Representative samples of each group of blades were tested. Large variations in permeability in both chordwise and spanwise directions were found. Local deviations as large as 155 to -85 percent from prescribed values were found in chordwise permeability. Only one blade, an uncoined one, had a chordwise permeability variations which reasonably approached that specified. Even for this blade, local deviations exceeded 10 percent. Spanwise permeability, specified to be held constant, varied as much as 50 percent from root to tip for both an uncoined and a coined blade. Previous NACA analyses have shown that in order to maintain proper control of blade wall temperatures, permeability variations must not exceed plus or minus 10 percent. Satisfactory control of permeability in either the chordwise or the spanwise direction was not achieved in the blades tested. Spin tests made at room temperature for six blades revealed the highest material rupture strength to be 8926 pounds per square inch. This value is about one third the strength required for rotor blades in present-day turbojet engines. The lowest value of blade strength was 1436 pounds per square inch.

Richards, Hadley T.↗

Inserting New Technologies into Human-Computer Interfaces for Future Lunar and Mars Missions

Plans call for human cislunar operations and lunar surface access, to prepare for eventual Mars missions. NASA will also develop new opportunities in lunar orbit that provide the foundation and act as a gateway for human exploration deeper into the solar system. Current human spaceflight is complex and requires as many as fifty people to support the International Space Station (ISS) Mission Control Center (MCC) in Houston, Texas. These flight controllers in the front and back rooms of the MCC, serve as an extra pair of eyes overseeing the numerous station systems. Deep space missions - to the moon, Mars, and beyond - will be more complex and place challenging mission constraints on the crew. As the round-trip communication delays increase in deep space exploration, more on-board systems autonomy and functionality will be needed to maintain and control the vehicle. These mission constraints will change the Earth-based ground control approach and will demand efficient and effective human-computer interfaces (HCI) to control a highly complex vehicle or habitat system. All of this necessitates a different approach to designing and developing spacecraft and habitats. In the beginning of new human spaceflight programs, focus is typically on launch vehicle and uncrewed spacecraft design and development. The reasoning behind this focus to enable flight testing of an integrated launch vehicle and spacecraft system to ensure it will be safe enough to allow humans on board. This is an essential process for new spacecraft, however, the practical effect is a lack of funding for the spacecraft’s human interfaces development. It can be many years before the human interface development begins, putting it late in the spacecraft lifecycle, when almost all other spacecraft systems and subsystems are already in place. This forces the usage of existing and proven technologies for the HCI interfaces. We posit that putting the human first in a spacecraft design process will yield a more effective spacecraft for exploration and long duration missions. NASA Human Research Program (HRP) has identified inadequate HCI as a risk for future missions. New tools and procedures to aid the crew in operating a complex spacecraft will be required. This paper discusses ongoing activities in the development of the next generation HCI components and systems, and a new approach toward human interfaces for spacecraft.

Salazar, George A.↗

Emergency Communications Console

NASA has applied its communications equipment expertise to development of a communications console that provides, in a compact package only slightly larger than an electric typewriter, all the emergency medical services communications functions needed for a regional hospital. A prototype unit, built by Johnson Space Center, has been installed in the Odessa (Texas) Medical Center Hospital. The hospital is the medical control center for the 17-county Permian Basin Emergency Medical System in west Texas. The console project originated in response to a request to NASA from the Texas governor's office, which sought a better way of providing emergency medical care in rural areas. Because ambulance travel time is frequently long in remote areas of west Texas, it is important that treatment begin at the scene of the emergency rather than at the hospital emergency room. A radio and telephone system linking ambulance emergency technicians and hospital staff makes this possible. But earlier equipment was complex, requiring specialized operators. A highly reliable system was needed to minimize breakdowns and provide controls of utmost simplicity, so that the system could be operated by physicians and nurses rather than by communications specialists. The resulting console has both radio and telephone sections. With the radio equipment, hospital personnel can communicate with ambulance drivers and paramedics, receive incoming electrocardiagrams, consult with other hospitals, page hospital staff and set up a radio-to-telephone "patch." The telephone portion of the system includes a hotline from the Permian Basin Emergency Medical Service's resource control center, an automatic dialer for contacting special care facilities in the Permian Basin network, a hospital intercom terminal and a means of relaying cardioscope displays and other data between hospitals. The integrated system also provides links with local disaster and civil defense organizations and with emergency "Dial 911" control points.

Source record↗

Integrated System Health Management: Pilot Operational Implementation in a Rocket Engine Test Stand

This paper describes a credible implementation of integrated system health management (ISHM) capability, as a pilot operational system. Important core elements that make possible fielding and evolution of ISHM capability have been validated in a rocket engine test stand, encompassing all phases of operation: stand-by, pre-test, test, and post-test. The core elements include an architecture (hardware/software) for ISHM, gateways for streaming real-time data from the data acquisition system into the ISHM system, automated configuration management employing transducer electronic data sheets (TEDS?s) adhering to the IEEE 1451.4 Standard for Smart Sensors and Actuators, broadcasting and capture of sensor measurements and health information adhering to the IEEE 1451.1 Standard for Smart Sensors and Actuators, user interfaces for management of redlines/bluelines, and establishment of a health assessment database system (HADS) and browser for extensive post-test analysis. The ISHM system was installed in the Test Control Room, where test operators were exposed to the capability. All functionalities of the pilot implementation were validated during testing and in post-test data streaming through the ISHM system. The implementation enabled significant improvements in awareness about the status of the test stand, and events and their causes/consequences. The architecture and software elements embody a systems engineering, knowledge-based approach; in conjunction with object-oriented environments. These qualities are permitting systematic augmentation of the capability and scaling to encompass other subsystems.

Figueroa, Fernando↗

Jet Noise Reduction

The Acoustics Branch is responsible for reducing noise levels for jet and fan components on aircraft engines. To do this, data must be measured and calibrated accurately to ensure validity of test results. This noise reduction is accomplished by modifications to hardware such as jet nozzles, and by the use of other experimental hardware such as fluidic chevrons, elliptic cores, and fluidic shields. To insure validity of data calibration, a variety of software is used. This software adjusts the sound amplitude and frequency to be consistent with data taken on another day. Both the software and the hardware help make noise reduction possible. work properly. These software programs were designed to make corrections for atmosphere, shear, attenuation, electronic, and background noise. All data can be converted to a one-foot lossless condition, using the proper software corrections, making a reading independent of weather and distance. Also, data can be transformed from model scale to full scale for noise predictions of a real flight. Other programs included calculations of Over All Sound Pressure Level (OASPL), Effective Perceived Noise Level (EPNL). OASPL is the integration of sound with respect to frequency, and EPNL is weighted for a human s response to different sound frequencies and integrated with respect to time. With the proper software correction, data taken in the NATR are useful in determining ways to reduce noise. display any difference between two or more data files. Using this program and graphs of the data, the actual and predicted data can be compared. This software was tested on data collected at the Aero Acoustic Propulsion Laboratory (AAPL) using a variety of window types and overlaps. Similarly, short scripts were written to test each individual program in the software suite for verification. Each graph displays both the original points and the adjusted points connected with lines. During this summer, data points were taken during a live experiment at the AAPL to measure Nozzle Acoustic Test Rig (NATR) background noise levels. Six condenser microphones were placed in strategic locations around the dome and the inlet tunnel to measure different noise sources. From the control room the jet was monitored with the help of video cameras and other sensors. The data points were recorded, reduced, and plotted, and will be used to plan future modifications to the NATR. The primary goal to create data reduction test programs and provide verification was completed. As a result of the internship, I learned C/C++, UNIX/LINUX, Excel, and acoustic data processing methods. I also recorded data at the AAPL, then processed and plotted it. These data would be useful to compare against existing data. In addition, I adjusted software to work on the Mac OSX platform. And I used the available training resources.

Kenny, Patrick↗

Capabilities of the Materials Contamination Team at Marshall Space Flight Center

The Materials Contamination Team at the Marshall Space Flight Center (MSFC) has been recognized for its contributions supporting the National Aeronautics and Space Administration (NASA) spacecraft development programs. These programs include the Reusable Solid Rocket Motor (RSRM), Chandra X-Ray Observatory, and the International Space Station (ISS). The Environmental Effects Group, with the Materials Contamination Team and the Space Environmental Effects Team has been an integral part of NASA's success by the testing, evaluation, and qualification of materials, hardware, and processes. This paper focuses on the capabilities of the Materials Contamination Team. The Materials Contamination Team's realm of responsibility includes establishing contamination control during all phases of hardware development, including design, manufacturing, assembly, test, transportation, launch site processing, on-orbit exposure, return, and refurbishment. The team continues its mission of reducing the risk of equipment failure due to molecular or particulate contamination. Contamination is a concern in the Space Shuttle with sensitive bond-lines and reactive fluid (liquid oxygen) compatibility as well as for spacecraft with sensitive optics, such as Hubble Space Telescope and Chandra X-ray Observatory. The Materials Contamination Team has a variety of facilities and instrumentation capable of contaminant detection, identification, and monitoring. The team addresses material applications dealing with environments, including production facilities, clean rooms, and on-orbit exposure. The optically stimulated electron emission (OSEE) system, the Ultraviolet (UV) fluorescence (UVF) surface contamination detection, and the Surface Optics Corporation 400 (SOC 400) portable hand-held Fourier Transform Infrared (FTIR) spectrometer are state-of-the-art tools for in-process molecular contamination detection. The team of engineers and technicians also develop contamination calibration standards and evaluate new surface cleanliness inspection technologies. The team utilizes facilities for on-orbit simulation testing of materials for outgassing and molecular film deposition characteristics in the presence of space environmental effects, such as Atomic Oxygen (AO) and UV radiation exposure. The Materials Contamination Team maintains databases for process materials as well as outgassing and optical compatibility test results for specific environments.

Burns, Howard↗

Measurement of the Solar Absorptance and Thermal Emittance of Lunar Simulants

The first comparative study of the reflectance spectra of lunar simulants is presented. All of the simulants except one had a wavelength-dependant reflectivity ( ( )) near 0.10 over the wavelength range of 8 to 25 m, so they are highly emitting at room temperature and lower. The 300 K emittance ( ) of all the lunar simulants except one ranged from 0.884 to 0.906. The 300 K of JSC Mars-1 simulant was 0.927. There was considerably more variation in the lunar simulant reflectance in the solar spectral range (250 to 2500 nm) than in the thermal infrared. Larger particle size simulants reflected much less than those with smaller particle size. As expected, the lunar highlands simulants were more reflective in this wavelength range than the lunar mare simulants. The integrated solar absorptance ( ) of the simulants ranged from 0.413 to 0.817 for those with smaller particles, and 0.669 to 0.906 for those with larger particles. Although spectral differences were observed, the for the simulants appears to be similar to that of lunar soils (0.65 to 0.88). These data are now available to be used in modeling the effects of dust on thermal control surfaces.

Gaier, James R.↗

Measurement of the Solar Absorptance and Thermal Emittance of Lunar Simulants

The first comparative study of the reflectance spectra of lunar simulants is presented. All of the simulants except one had a wavelength-dependent reflectivity, rho(lambda), near 0.10 over the wavelength range of 8 to 25 microns, so they are highly emitting at room temperature and lower. The 300 K emittance, epsilon, of all the lunar simulants except one ranged from 0.884 to 0.906. The 300 K epsilon of JSC Mars-1 simulant was 0.927. There was considerably more variation in the lunar simulant reflectance in the solar spectral range (250 to 2500 nm) than in the thermal infrared. Larger particle size simulants reflected much less than those with smaller particle size. As expected, the lunar highlands simulants were more reflective in this wavelength range than the lunar mare simulants. The alpha of the simulants ranged from 0.413 to 0.817 for those with smaller particles and 0.669 to 0.906 for large particles. Although spectral differences were observed, the total integrated alpha for the simulants appears to be similar to that of lunar soils (0.65 to 0.88). These data are now available to be used in modeling the effects of dust on thermal control surfaces.

Gaier, James R.↗

Fabrication and Probabilistic Fracture Strength Prediction of High-Aspect-Ratio Single Crystal Silicon Carbide Microspecimens With Stress Concentration

Single crystal silicon carbide micro-sized tensile specimens were fabricated with deep reactive ion etching (DRIE) in order to investigate the effect of stress concentration on the room-temperature fracture strength. The fracture strength was defined as the level of stress at the highest stressed location in the structure at the instant of specimen rupture. Specimens with an elliptical hole, a circular hole, and without a hole (and hence with no stress concentration) were made. The average fracture strength of specimens with a higher stress concentration was larger than the average fracture strength of specimens with a lower stress concentration. Average strength of elliptical-hole, circular-hole, and without-hole specimens was 1.53, 1.26, and 0.66 GPa, respectively. Significant scatter in strength was observed with the Weibull modulus ranging between 2 and 6. No fractographic examination was performed but it was assumed that the strength controlling flaws originated from etching grooves along the specimen side-walls. The increase of observed fracture strength with increasing stress concentration was compared to predictions made with the Weibull stress-integral formulation by using the NASA CARES/Life code. In the analysis isotropic material and fracture behavior was assumed - hence it was not a completely rigorous analysis. However, even with these assumptions good correlation was achieved for the circular-hole specimen data when using the specimen data without stress concentration as a baseline. Strength was over predicted for the elliptical-hole specimen data. Significant specimen-to-specimen dimensional variation existed in the elliptical-hole specimens due to variations in the nickel mask used in the etching. To simulate the additional effect of the dimensional variability on the probabilistic strength response for the single crystal specimens the ANSYS Probabilistic Design System (PDS) was used with CARES/Life.

Nemeth, Noel N.↗

The NASA Ames Closed Environmental Research Chamber: Present Status

The Closed Environmental Research Chamber (CERC) at the NASA Ames Research Center was created to investigate both components and complete systems for life support of advanced space exploration missions. This facility includes a Main Chamber, an Airlock, a Sample Transfer Lock, a Vacuum System, an Air Recompression System, a dedicated control room and a pit area for housing supporting and environmental control systems. The Main Chamber provides 310 sq ft of internal working/living space on two levels. It is planned that the CERC will be a human-rated facility for habitation simulation under mass balance closure conditions. The internal pressure will be variable over the range of 14.7 psia to 5 psia with accompanying capability for variation in atmosphere composition to maintain the oxygen partial pressure at 160 mm Hg. The CERC will be provided with a core set of primary life support subsystems for temperature and humidity control, C02 removal and trace contaminant control. Interfacing with external life support technology test b~ds with be provided, along with connection to centralized, microprocessor-based data acquisition and control systems. This paper will discuss the current status of the CERC facility and show how it is being used to address the advanced technology requirements necessary to implement an integrated working and living environment for a planetary habitat. In particular, it will be shown how the CERC, along with a human-powered centrifuge, a planetary terrain simulator and advanced displays and a virtual reality capability will work together to develop and demonstration applicable technologies for future planetary habitats. Artificial intelligence and expert system programming techniques will be used extensively to provide an automated environment for a 4-person crew. There will be several robotic mechanisms performing exploration tasks external to the habitat that will be controlled through the virtual environment to provide representative workloads for the crew. Finally, there will be a discussion of how effective are innovative new multidisciplinary test facilities to the investigation of the wide range of human and machine problems inherent in exploration missions.

Gross, Anthony R.↗

Simpler ISS Flight Control Communications and Log Keeping via Social Tools and Techniques

The heart of flight operations control involves a) communicating effectively in real time with other controllers in the room and/or in remote locations and b) tracking significant events, decisions, and rationale to support the next set of decisions, provide a thorough shift handover, and troubleshoot/improve operations. International Space Station (ISS) flight controllers speak with each other via multiple voice circuits or loops, each with a particular purpose and constituency. Controllers monitor and/or respond to several loops concurrently. The primary tracking tools are console logs, typically kept by a single operator and not visible to others in real-time. Information from telemetry, commanding, and planning systems also plays into decision-making. Email is very secondary/tertiary due to timing and archival considerations. Voice communications and log entries supporting ISS operations have increased by orders of magnitude because the number of control centers, flight crew, and payload operations have grown. This paper explores three developmental ground system concepts under development at Johnson Space Center s (JSC) Mission Control Center Houston (MCC-H) and Marshall Space Flight Center s (MSFC) Payload Operations Integration Center (POIC). These concepts could reduce ISS control center voice traffic and console logging yet increase the efficiency and effectiveness of both. The goal of this paper is to kindle further discussion, exploration, and tool development.

Scott, David W.↗

Large screen display for the Mission Control Center

The Mission Control Center (MCC), located at the Johnson Space Center near Houston, Texas, is the primary point of control and monitoring for National Space Transportation System (NSTS) flight activities. NSTS flight managers monitor and command spacecraft from one of two Flight Control Rooms (FCR). Each FCR is equipped with five large screen displays for group dissemination of spacecraft system status and vehicle position relative to Earth geography. The primary or center screen display is ten feet in height and twenty feet in width. The secondary or side screens are seven and one-hald feet high and ten feet wide. The center screen projection system is exhibiting high maintenance costs and is considered to be in wear-out phase. The replacement of the large center screen displays at the MCC is complicated by the unique requirements of the Flight Controller user. These requirements demand a very high performance, multiple color projection system capable of the display of high resolution text, graphics and images produced in near real time. The current system to be replaced, the replacement system requirements, the efforts necessary to procure the major element of this system (the projector) for the government, and how the new capabilities are to be integrated into the existing MCC operational configuration are discussed.

Skudlarek, Martin J.↗

SEU/SET Tolerant Phase-Locked Loops

The phase-locked loop (PLL) is an old and widely used circuit for frequency and phase demodulation, carrier and clock recovery, and frequency synthesis [1]. Its implementations range from discrete components to fully integrated circuits and even to firmware or software. Often the PLL is a highly critical component of a system, as for example when it is used to derive the on-chip clock, but as of this writing no definitive single-event upset (SET)/single-event transient (SET) tolerant PLL circuit has been described. This chapter hopes to rectify that situation, at least in regard to PLLs that are used to generate clocks. Older literature on fault-tolerant PLLs deals with detection of a hard failure, which is recovered by replacement, repair, or manual restart of discrete component systems. Several patents exist along these lines (6349391, 6272647, and 7089442). A newer approach is to harden the parts of a PLL system, to one degree or another, such as by using a voltage-based charge pump or a triple modular redundant (TMR) voted voltage-controlled oscillator (VCO). A more comprehensive approach is to harden by triplication and voting (TMR) all the digital pieces (primarily the divider) of a frequency synthesis PLL, but this still leaves room for errors in the VCO and the loop filter. Instead of hardening or voting pieces of a system, such as a frequency synthesis system (i.e., clock multiplier), we will show how the entire system can be voted. There are two main ways of doing this, each with advantages and drawbacks. We will show how each has advantages in certain areas, depending on the lock acquisition and tracking characteristics of the PLL. Because of this dependency on PLL characteristics, we will briefly revisit the theory of PLLs. But first we will describe the characteristics of voters and their correct application, as some literature does not follow the voting procedure that guarantees elimination of errors. Additionally, we will find that voting clocks is a bit trickier than voting data where an infallible clock is assumed. It is our job here to produce (or recover) that assumed infallible clock!

Shuler, Robert L., Jr.↗

James Webb Space Telescope: Frequently Asked Questions for Scientists and Engineers

JWST will be tested incrementally during its construction, starting with individual mirrors and instruments (including cameras and spectrometers) and building up to the full observatory. JWST's mirrors and the telescope structure are first each tested individually, including optical testing of the mirrors and alignment testing of the structure inside a cold thermal-vacuum chamber. The mirrors are then installed on the telescope structure in a clean room at Goddard Space Flight Center (GSFC). In parallel to the telescope assembly and alignment, the instruments are being built and tested, again first individually, and then as part of an integrated instrument assembly. The integrated instrument assembly will be tested in a thermal-vacuum chamber at GSFC using an optical simulator of the telescope. This testing makes sure the instruments are properly aligned relative to each other and also provides an independent check of the individual tests. After both the telescope and the integrated instrument module are successfully assembled, the integrated instrument module will be installed onto the telescope, and the combined system will be sent to Johnson Space Flight Center (JSC) where it will be optically tested in one of the JSC chambers. The process includes testing the 18 primary mirror segments acting as a single primary mirror, and testing the end-to-end system. The final system test will assure that the combined telescope and instruments are focused and aligned properly, and that the alignment, once in space, will be within the range of the actively controlled optics. In general, the individual optical tests of instruments and mirrors are the most accurate. The final system tests provide a cost-effective check that no major problem has occurred during assembly. In addition, independent optical checks of earlier tests will be made as the full system is assembled, providing confidence that there are no major problems.

Gardner, Jonathan P.↗

Telerobotic Excavator Designed to Compete in NASA's Lunabotics Mining Competition

The second annual NASA Lunabotics Mining competition is to be held in May 23-28, 2011. The goal of the competition is for teams of university level students to design, build, test and compete with a fully integrated lunar excavator on a simulated lunar surface. Our team, named Lunar Solutions I, will be representing Temple University's College of Engineering in the competition. The team's main goal was to build a robot which is able to compete with other teams, and ultimately win the competition. The main challenge of the competition was to build a wireless robot that can excavate and collect a minimum of 10 kilograms of the regolith material within 15 minutes. The robot must also be designed to operate in conditions similar to those found on the lunar surface. The design of the lunar excavator is constrained by a set of requirements determined by NASA and detailed in the competition's rulebook. The excavator must have the ability to communicate with the "main base" wirelessly, and over a Wi-Fi network. Human operators are located at a remote site approximately 60 meters away from the simulated lunar surface upon which the robot must excavate the lunar regolith surface. During the competition, the robot will operate in a separate area from the control room in an area referred to as the "Lunarena." From the control room, the operators will have to control the robot using visual feedback from cameras placed both within the arena and on the robot. Using this visual feedback the human operators control the robots movement using both keyboard and joystick commands. In order to place in the competition, a minimum of 10 kg of regolith material has to be excavated, collected, and dumped into a specific location. For that reason, the robot must be provided with an effective and powerful excavation system. Our excavator uses tracks for the drive system. After performing extensive research and trade studies, we concluded that tracks would be the most effective method for transporting the excavator. When designing the excavation system, we analyzed several design options from the previous year's competition. We decided to use a front loader to collect the material, rather than a conveyer belt system or auger. Many of the designs from last year's competition used a conveyer belt mechanism to mine regolith and dump it into a temporary storage bin place on the robot. Using the front end loader approach allowed us to combine the scooping system and storage unit, which meant that the excavation system required less space.

Nash, Rodney↗

Reducing Departure Delays for Adjacent Center Airports using Time-Based Flow Management Scheduler: Checkbox On or Off?

The Federal Aviation Administration (FAA) has enhanced the Time-Based Flow Management (TBFM) scheduling tool with a "Checkbox ON" vs. "OFF" function which allows Traffic Management Coordinators (TMCs) to make room in a crowded arrival stream for a departure. When scheduling a departure, having the checkbox ON can delay the Scheduled Times of Arrivals (STAs) of the airborne flights upstream of the TBFM freeze horizons and can compress these flights to their minimum required spacing, thereby creating a slot for a departure. Hence, having the checkbox ON can reduce the frequent ground delays of aircraft departing near high volume airports but can increase delays for airborne arrivals. A Human-in-the-Loop (HITL) simulation compared arrival and departure delays to Newark Airport (EWR) with the checkbox ON vs. OFF as the default position. Three other conditions in this HITL involved various National Airspace System (NAS)-wide approaches for timely delivery of aircraft to the TBFM region. These conditions were: Baseline, using current Mile-in-Trail (MIT) spacing restrictions; Integrated Demand Management (IDM), where all aircraft were given departure times (Expect Departure Clearance Times, or EDCTs), ultimately based on the EWR Airport Arrival Rate; and IDM plus Required Time of Arrival (RTA), a flight deck tool which allowed some aircraft to meet a controlled time of arrival to the TBFM area more precisely. Results showed that the checkbox tool was powerful: with the checkbox ON, departure delays decreased and airborne delays increased, as predicted. However, assuming that the cost ratio of a minute of airborne delay to a minute of departure delay is in the range of 1.2 to 3, as commonly indicated by the literature, checkbox ON and checkbox OFF conditions showed approximately equal total delay costs, i.e., the cost of delays in the air balanced the cost of the delay on the ground. The three scheduling conditions also had approximately equal total delay costs, although a simulation artifact may have reduced the delays in the Baseline condition. In the debrief following the simulation, the TMCs concluded that the checkbox should be used flexibly depending on the current delay situation, and suggested modifications to the checkbox tool which would help them use it in this way, along with enhanced training. The relatively similar total cost of both checkbox default options in this simulation indicates that this might be a fruitful approach, and replace the necessity to have the checkbox rigidly set to either ON or OFF.

departure delay↗