Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Heavy Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Heavy Lift for Exploration: Options and Utilization

Every study of exploration capabilities since the Apollo Program has recommended the renewal of a heavy lift launch capability for the United States. NASA is aggressively pursuing that capability. This paper will discuss several aspects of that effort and the potential uses for that heavy lift capability. The need for heavy lift was cited most recent in the findings of the Review of U.S. Human Space Flight Plans Committee. Combined with considerations of launch availability and on-orbit operations, the Committee finds that exploration will benefit from the availability of a heavy-lift vehicle, the report said. In addition, heavy lift would enable the launching of large scientific observatories and more capable deep-space missions. It may also provide benefit in national security applications. The most recent focus of NASA s heavy lift effort is the Ares V cargo launch vehicle, which is part of the Constellation Program architecture for human exploration beyond low Earth orbit (LEO). The most recent point-of-departure configuration of the Ares V was approved during the Lunar Capabilities concept Review (LCCR) in 2008. The Ares V first stage propulsion system consists of a core stage powered by six commercial liquid hydrogen/liquid oxygen (LH2/LOX) RS-68 engines, flanked by two 5.5-segment solid rocket boosters (SRBs) based on the 5-segment Ares I first stage. The boosters use the same Polybutadiene Acrylonitrile (PBAN) propellant as the Space Shuttle. Atop the core stage is the Earth departure stage (EDS), powered by a single J-2X upper stage engine based on the Ares I upper stage engine. The 33-foot-diameter payload shroud can enclose a lunar lander, scientific instruments, or other payloads. Since LCCR, NASA has continued to refine the design through several successive internal design cycles. In addition, NASA has worked to quantify the broad national consensus for heavy lift in ways that, to the extent possible, meet the needs of the user community.

Creech, Steve

National Zero-Emission Freight Corridor Strategy

The United States has committed to decarbonizing freight transportation by advancing the deployment of commercial zero-emission medium- and heavy-duty vehicles (ZEMHDVs) and infrastructure. It is pursuing this goal by leveraging historic federal and private investments, policies, and partnerships. Through the U.S. National Blueprint for Transportation Decarbonization1 and the Global Memorandum of Understanding for Zero-Emission Medium- and Heavy-Duty Vehicles,2 the United States has committed to identifying viable pathways and implementation actions that promote at least 30% ZE-MHDV sales by 2030, with a goal of 100% by 2040. These actions, along with the investments laid out in the Bipartisan Infrastructure Law and Inflation Reduction Act, put the nation on a path to advancing transportation and infrastructure solutions that are better for freight movement, our communities, the environment, and the economy. Providing ubiquitous and convenient access to electric vehicle (EV) charging and hydrogen refueling along our nation’s freight corridors, and at truck depots within freight hubs, is key to successfully deploying ZE-MHDVs. Consistent with its charge in the Bipartisan Infrastructure Law, 3 the Joint Office of Energy and Transportation (Joint Office), in collaboration with the U.S. Department of Energy (DOE), Department of Transportation, and the Environmental Protection Agency, has developed the National Zero-Emission Freight Corridor Strategy (Strategy). The Strategy guides infrastructure deployment to meet growing market demands; catalyze public and private investment; and support utility and regulatory planning and action at local, state, and regional levels.

33 ADVANCED PROPULSION SYSTEMS

Feasibility study of modern airships, phase 1. Volume 2: Parametric analysis (task 3)

Various types of lighter-than-air vehicles from fully buoyant to semibuoyant hybrids were examined. Geometries were optimized for gross lifting capabilities for ellipsoidal airships, modified delta planform lifting bodies, and a short-haul, heavy-lift vehicle concept. It is indicated that: (1) neutrally buoyant airships employing a conservative update of materials and propulsion technology provide significant improvements in productivity; (2) propulsive lift for VTOL and aerodynamic lift for cruise significantly improve the productivity of low to medium gross weight ellipsoidal airships; and (3) the short-haul, heavy-lift vehicle, consisting of a simple combination of an ellipsoidal airship hull and existing helicopter componentry, provides significant potential for low-cost, near-term applications for ultra-heavy lift missions.

Lancaster, J. W.

Analyzing SCM Grid Benefits from Electric Transportation [Slides]

Increasing adoption of EVs and expanding unmanaged charging loads could increase the cost of transportation energy due to increasing load variability and shrinking infrastructure capacity. The actual cost of transportation energy, such as charging an EV, depends on several factors including energy costs, charging infrastructure costs, and applicable grid upgrades. Based on studies from past DOE projects; RECHARGE, DirectXFC, FUSE and 21st Century Truck Partnership (21CTP) the EV-CENTS project will develop a transportation energy cost metric to better quantify these factors and provide a framework for assessing the value potential of new technology solutions, such as smart charge management (SCM), which could reduce these costs for all stakeholders. The initial assessment will focus on the cost of charging, which will vary across vehicle classes such as light-duty vehicles (LDV) or medium and heavy-duty vehicles (MHDV), as well as across different vocations resulting in many different use cases for this metric. Cost of charging results will be developed for each use case in both uncontrolled and controlled scenarios to understand the value potential of different SCM objective functions and their ability to optimize the cost of energy and delay or eliminate the need for electrical upgrades.

33 ADVANCED PROPULSION SYSTEMS

Space manufacturing III; Proceedings of the Fourth Conference, Princeton University, Princeton, N.J., May 14-17, 1979

Papers are presented on the various technological, political, economic, environmental and social aspects of large manufacturing facilities in space. Specific topics include the potential global market for satellite solar power stations in 2025, the electrostatic separation of lunar soil, methods for extraterrestrial materials processing, the socio-political status of efforts toward the development of space manufacturing facilities, the financing of space industrialization, the optimization of space manufacturing systems, the design and project status of Mass Driver Two, and the use of laser-boosted lighter-than-air-vehicles as heavy-lift launch vehicles. Attention is also given to systems integration in the development of controlled ecological life support systems, the design of a space manufacturing facility to use lunar materials, high performance solar sails, the environmental effects of the satellite power system reference design, the guidance, trajectory and capture of lunar materials ejected from the moon by mass driver, the relative design merits of zero-gravity and one-gravity space environments, consciousness alteration in space and the prospecting and retrieval of asteroids.

Grey, J.

SPS program review transportation perspective

The delivery of cargo and space workers to the SPS construction site requires the development of two different systems, one to handle large cargo deliveries and a smaller system to accommodate crew. The overall scenario of the transportation system is shown. Eight major elements comprise the transportation system: personnel launch vehicle (PLV) or shuttle; personnel orbital transfer vehicle (POTV); the heavy lift launch vehicle (HLLV); the electric orbital transfer vehicle (EOTV); intra orbit transfer vehicle (IOTV); LEO support facility; GEO support facility and a shuttle derived HLLV (SDHLLV) for supporting the early SPS Demonstration Program. The HLLV and EOTV represent the cargo carriers while the PLV and POTV represent the people carriers. The IOTV is utilized to ferry people and cargo modules over short distances in the vicinity of its station.

Wales, W. W., Jr.

Shuttle II - The next generation

A comparative evaluation is conducted for next-generation Space Shuttle-type system configurations, in light of mission and design goals, performance and operational requirements, and technology development needs and opportunities. Cargo vehicle options presently entertained are an unmanned Shuttle Derivative Vehicle and a Heavy Lift Launch Vehicle. Two high priority manned vehicle options are small (35,000-lb payload) and large (150,000-lb payload) fully reusable vehicles. Attention is given to single stage vs. two-stage 'Shuttle II' system performance and economic projections.

Eldred, C. H.

Integrated launch and emergency entry vehicle concept

This paper describes the design of an integrated launch and emergency entry vehicle (EEV) that can satisfy the need for an advanced manned vehicle, a heavy-lift launch vehicle, and the Space Station. It is pointed out that, because only one small entry vehicle would need to be developed, the development costs should be relatively low. The EEV would have reasonable operating costs because its expendable tank would be smaller than that of the Space Shuttle and all expensive parts would be reusable. Schematic diagrams are included.

Martin, James A.

A Decade of Friction Stir Welding R and D at NASA's Marshall Space Flight Center and a Glance into the Future

Welding at NASA's Marshall Space Flight Center (MSFC), Huntsville, Alabama, has taken a new direction through the last 10 years. Fusion welding processes, namely variable polarity plasma arc (VPPA) and tungsten inert gas (TIG) were once the corner stone of welding development in the Space Flight Center's welding laboratories, located in the part of MSFC know as National Center for Advanced Manufacturing (NCM). Developed specifically to support the Shuttle Program's External Tank and later International Space Station manufacturing programs, was viewed as the paragon of welding processes for joining aluminum alloys. Much has changed since 1994, however, when NASA's Jeff Ding brought the FSW process to the NASA agency. Although, at that time, FSW was little more than a "lab curiosity", NASA researchers started investigating where the FSW process would best fit NASA manufacturing programs. A laboratory FSW system was procured and the first welds were made in fall of 1995. The small initial investment NASA made into the first FSW system has certainly paid off for the NASA agency in terms of cost savings, hardware quality and notoriety. FSW is now a part of Shuttle External Tank (ET) production and the preferred weld process for the manufacturing of components for the new Crew Launch Vehicle (CLV) and Heavy Lift Launch Vehicle (HLLV) that will take this country back to the moon. It is one of the solid state welding processes being considered for on-orbit space welding and repair, and is of considerable interest for Department of Defense @OD) manufacturing programs. MSFC involvement in these and other programs makes NASA a driving force in this country's development of FSW and other solid state welding technologies. Now, a decade later, almost the entire on-going welding R&D at MSFC now focuses on FSW and other more advanced solid state welding processes.

Ding, Jeff

Area V: A National Launch Asset for the 21st Century

The goal of this presentation is to present an update on status and development of the Ares V launch vehicle. The Ares V is a heavy lift vehicle that is being designed to launch cargo into Low Earth Orbit and transfer Cargo and crews to the Moon. Slides show the commonalities between the Ares V, and the Ares I, and the Delta IV. The launch profile for a typical Lunar mission is reviewed. A timeline showing the progress from the Exploration Systems Architecture Study (ESAS) to the Lunar Capability Concept Review (LCCR) is presented. Other slides review the payload shroud, the payload vs altitude and inclination, the payload mass vs C3 Energy, projections of the performance for selected trajectories, and the planning calendar.

Sumrall, Phil

The Future of Vehicle Grid Integration: Harnessing the Flexibility of EV Charging

This document lays out a shared vision for a beneficial, EV-integrated future where EVs are safely and securely connected, reliably served, and harmonized with the electric grid. It was developed as part of the U.S. Department of Energy’s (DOE) EVGrid Assist initiative. Stakeholder input was gathered through individual and collective conversations, including eight listening sessions with more than 100 participants representing utilities of different sizes and operating structures, manufacturers of vehicles and chargers, national associations, standards organizations, Tribes, fleet managers, consumer advocates, charging network operators, community-based organizations, utility regulators, consultants, vendors, labor, and environmental justice organizations. This document focuses on the future of electric on-road U.S. transportation, specifically the integration of light-duty vehicles (LDV) and medium- and heavy-duty vehicles (MHDV) and their charging infrastructure with the electric grid. However, many of the insights here may apply to electrifying other transportation modes, as well as other distributed energy resources (DER).

EVGrid Assist initiative, EV-integrated future, el

The Future of Vehicle Grid Integration: Harnessing the Flexibility of EV Charging

This document lays out a shared vision for a beneficial, EV-integrated future where EVs are safely and securely connected, reliably served, and harmonized with the electric grid. It was developed as part of the U.S. Department of Energy’s (DOE) EVGrid Assist initiative. Stakeholder input was gathered through individual and collective conversations, including eight listening sessions with more than 100 participants representing utilities of different sizes and operating structures, manufacturers of vehicles and chargers, national associations, standards organizations, Tribes, fleet managers, consumer advocates, charging network operators, community-based organizations, utility regulators, consultants, vendors, labor, and environmental justice organizations. This document focuses on the future of electric on-road U.S. transportation, specifically the integration of light-duty vehicles (LDV) and medium- and heavy-duty vehicles (MHDV) and their charging infrastructure with the electric grid. However, many of the insights here may apply to electrifying other transportation modes, as well as other distributed energy resources (DER).

EVGrid Assist initiative, EV-integrated future, el

Vehicle concepts and technology requirements for buoyant heavy-lift systems

Several buoyant-vehicle (airship) concepts proposed for short hauls of heavy payloads are described. Numerous studies identified operating cost and payload capacity advantages relative to existing or proposed heavy-lift helicopters for such vehicles. Applications involving payloads of from 15 tons up to 800 tons were identified. The buoyant quad-rotor concept is discussed in detail, including the history of its development, current estimates of performance and economics, currently perceived technology requirements, and recent research and technology development. It is concluded that the buoyant quad-rotor, and possibly other buoyant vehicle concepts, has the potential of satisfying the market for very heavy vertical lift but that additional research and technology development are necessary. Because of uncertainties in analytical prediction methods and small-scale experimental measurements, there is a strong need for large or full-scale experiments in ground test facilities and, ultimately, with a flight research vehicle.

Ardema, M. D.

Evaluation of Dual-Launch Lunar Architectures Using the Mission Assessment Post Processor

The National Aeronautics and Space Administrations (NASA) Constellation Program is currently designing a new transportation system to replace the Space Shuttle, support human missions to both the International Space Station (ISS) and the Moon, and enable the eventual establishment of an outpost on the lunar surface. The present Constellation architecture is designed to meet nominal capability requirements and provide flexibility sufficient for handling a host of contingency scenarios including (but not limited to) launch delays at the Earth. This report summarizes a body of work performed in support of the Review of U.S. Human Space Flight Committee. It analyzes three lunar orbit rendezvous dual-launch architecture options which incorporate differing methodologies for mitigating the effects of launch delays at the Earth. NASA employed the recently-developed Mission Assessment Post Processor (MAPP) tool to quickly evaluate vehicle performance requirements for several candidate approaches for conducting human missions to the Moon. The MAPP tool enabled analysis of Earth perturbation effects and Earth-Moon geometry effects on the integrated vehicle performance as it varies over the 18.6-year lunar nodal cycle. Results are provided summarizing best-case and worst-case vehicle propellant requirements for each architecture option. Additionally, the associated vehicle payload mass requirements at launch are compared between each architecture and against those of the Constellation Program. The current Constellation Program architecture assumes that the Altair lunar lander and Earth Departure Stage (EDS) vehicles are launched on a heavy lift launch vehicle. The Orion Crew Exploration Vehicle (CEV) is separately launched on a smaller man-rated vehicle. This strategy relaxes man-rating requirements for the heavy lift launch vehicle and has the potential to significantly reduce the cost of the overall architecture over the operational lifetime of the program. The crew launch occurs first, four days prior to the optimal trans-lunar injection (TLI) departure window. This is done to allow for launch delays in the Altair/EDS launch. During this time, the Orion vehicle is required to conduct orbit maintenance while loitering in low Earth orbit (LEO). The alternative architectures presented aim to eliminate the need for costly orbit maintenance maneuvers while loitering in LEO. In all of the alternative architectures considered, it is assumed that the Altair and Orion vehicles are nominally launched 90 minutes apart, depart the Earth separately, and complete the rendezvous and docking sequence at the Moon. In this lunar orbit rendezvous (LOR) strategy, both the Altair and Orion vehicles will require separate EDS stages, and each will be required to perform lunar orbit insertion (LOI). This has the effect of balancing payload requirements between the two launch vehicles at the Earth. In this case, the overall payload mass is increased slightly, but the increased mission costs could potentially be offset by requiring the construction of two rockets similar in size and nature, unlike the current Constellation architecture. Three dual-launch architecture options with LOR were evaluated, which incorporate differing methodologies for mitigating the effects of launch delays at the Earth. Benefits and drawbacks of each of the dual-launch architecture options with LOR are discussed and the overall mission performance is compared with that of the existing Constellation Program lunar architecture.

Stewart, Shaun M.

Ares V: Supporting Space Exploration from LEO to Beyond

This slide presentation reviews the development of the Ares V launch vehicle. The Ares V is designed as a heavy lift vehicle to send cargo only or in combination with the Ares I will send crews to the moon. The Ares V vehicle design is evolving and will make the authority to proceed milestone in 2011. The key milestones are given with the first mission flight in Fall of 2018. The Design Reference Mission (DRM) for the Ares V is reviewed, including a table with the events from liftoff through LSAM/CEV separation, in time and altitude. The Ares V will deliver 6 times more mass to orbit than currently launch vehicles can.

Sumrall, Phil

Analysis and Application of Novel and Heritage Acceleration Limiting Algorithms for SLS on Ascent

National Aeronautics and Space Administration (NASA) is currently building the Space Launch System (SLS) Block-1 launch vehicle, to be used as the crewed heavy-lift vehicle for the Artemis series of missions. The SLS Block-1 guidance subsystem utilizes a nonlinear algorithm derived from Shuttle heritage for limiting the vehicle’s induced maximum axial acceleration during ascent flight, known as g-limiting. Even though g-limiting has demonstrated stability and robustness through several design analysis cycles and the extensive Shuttle flight history, there are no available documents that demonstrate that this algorithm has been proven stable through conventional controls stability analysis. This paper highlights the non-linear nature of g-limit, presents an alternative methodology to employ a linear version of this algorithm, performs assessment of selected linear gains using classical stability analysis and, conducts a comparison of both approaches through Six Degrees-of-Freedom (6-DOF) Monte Carlo (MC) simulations.

Jason Everett

Space transportation systems, 1980-2000

An overview of projected space transportation systems for the 1980-2000 period is presented. Methods for meeting the requirements in that area are documented through a description of the Space Shuttle and its current upper stages, reusable transfer vehicles, Shuttle uprating, fully reusable and single-stage transports, heavy lift vehicles, and advanced vehicles for orbital transfer and lunar landing. The structure of the liquid oxygen/liquid hydrogen boosters, cryogenic propellants, whose main propulsion system is a derivative of the RL-10 engine used in the Centaur launch, and mixed mode propulsion engine is also described, as is the flyback booster concept and such related issues as propellants and rocket engines, staging velocity, configuration shape, and whether it should be manned or unmanned. Especially noted are proposed propulsion systems going beyond the present Shuttle such as the nuclear and electric propulsion concepts, the resistojet, using liquid hydrogen, ion thruster, using argon, magnetoplasmadynamic thrusters, solar thermal rocket, and solar sail concept where the basic idea is to use a 'sail' of thin reflective material to generate a net force by reflection of solar radiation.

Cohan, C. J.