Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Health and safety”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Building 438 Drainage Channel Soil Sampling and Analysis Plan (February 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 438 Drainage Channel Project (project) located near Building 438 (B438) in the southern portion, Building 433 (B433) in the middle portion, and Building 543 (B543) in the northern portion (project area as shown on Figure 1). The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (Site 300): Site 300 Roadway Improvements - 836 Complex Soil Sampling and Analysis Plan (May 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 836 Complex (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: Building 843 Corp Yard Redesign Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 843 (B843) Corp Yard Redesign project (project). The purpose of the SAP was to identify chemicals of concern, describe the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows the criteria established in Lawrence Livermore National Laboratory’s (LLNL’s) Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, U.S. DOD 2000). The scope of this SAP is based on the B843 Corp Yard Redesign drawing set dated December 3, 2021.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: S300 Roadway Improvements - 854 Complex Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the Building 854 Complex (project). The purpose of the SAP was to identify chemicals of concern, describe the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2022 (Final Report)

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office (PNSO) oversees PNNL. PNNL prepares this Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, assuring that the public is informed of any PNNL-Richland Campus or PNNL-Sequim Campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur on the PNNL-Richland Campus in Richland, Washington, and at the PNNL-Sequim Campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

Advanced Fuel Cycle Cost Basis Report: Module D1-7 Contact-Handled Pelletized Pressurized Heavy Water (PHWR) UOX Fuel Fabrication (Rev.1)

In addition to literature-based pressurized heavy-water reactor (PHWR) fuel price information in the 2017 AFC-CBR, the what-it-takes (WIT) unit cost data in this update is informed by new analysis and escalation of the 1978 PHWR-UOX fuel life cycle cost (LCC) data from ORNL reports prepared for the 1977–1980 Nonproliferation Alternative Systems Assessment Program (NASAP). (These reports are referenced and summarized in detail in Module D1-PR.) The PHWR fuel fabrication LCC data in these reports is scaled from a bottom-up cost estimate for a reference technology pressurized-water reactor (PWR)—uranium oxide (UOX) fuel fabrication plant by using algorithms that consider the manufacturing process complexity, fuel design complexity, plant floor space requirements, and the radiation and health, safety, and environmental (HS&E) regulatory environment of PHWR-UOX fuel production vis-à-vis light-water reactor (LWR)-UOX production (PWR fuel in this case). The module name has been changed from “Canadian Deuterium Uranium (CANDU)” to the more generic PHWR fuel fabrication in recognition that not all power reactors that might use this fuel type are considered. Unfortunately, the detailed algorithms and their design bases were not archived at the end of the NASAP effort of the commercial CANDU concept specifically developed in the middle of the last century by Atomic Energy of Canada Limited (AECL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Site 300 Roadway Improvements - 834 Complex Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Roadway Improvements Project at the 834 Complex (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Experimental Test Site, Site 300: Soil Study Institutional Review Board #1081 Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) to collect soil quality data at an area located at Lawrence Livermore National Laboratory’s (LLNL’s) Experimental Test Site, Site 300 (Site 300) (project) (Figures 1 and 2). The purpose of the project is to determine the chemical and radiological quality of soil in the project area to support feasibility and design of future improvements. This SAP identifies chemicals of concern and describes the procedures for collection and analysis of environmental samples, and evaluation of analytical data (chemical and radiological) to determine the reuse potential of shallow soil at the project area. This SAP follows the criteria established in LLNL’s Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Equitable Strategies for Residential Building Energy Efficiency and Electrification in San José, California

Hotter summers, heat waves, wildfires, and droughts are already affecting San Jose residents, with historically marginalized communities impacted first and worst. The City of San Jose has ambitious goals to make the city climate-neutral by 2030 and serve as an example for cities to accelerate climate action around the world. Electrifying and decarbonizing residential buildings are important priorities to achieve San Jose's plans to reach carbon neutrality while enabling residents to live the "Good Life 2.0" - a vision that aligns with community-identified priorities of safety, health, freedom, community, and positive experiences. This technical assistance built upon the Electrify San Jose: Framework for Existing Building Electrification to identify actionable strategies to make single- and multi-family buildings both energy-efficient and all-electric. This report is intended to provide the San Jose Climate Smart team and their partners with relevant data, insights, and actionable analysis to aid in-depth and nuanced engagements with key stakeholders. In particular, the findings in this report highlight opportunities and challenges for San Jose City Council, residents, building owners, developers, financial institutions, and utility partners instrumental in building support and earning buy-in for energy efficiency and electrification upgrades in existing buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equitable Strategies for Residential Building Energy Efficiency and Electrification in San José, California [Slides]

Hotter summers, heat waves, wildfires, and droughts are already affecting San Jose residents, with historically marginalized communities impacted first and worst. The City of San Jose has ambitious goals to make the city climate-neutral by 2030 and serve as an example for cities to accelerate climate action around the world. Electrifying and decarbonizing residential buildings are important priorities to achieve San Jose's plans to reach carbon neutrality while enabling residents to live the "Good Life 2.0" - a vision that aligns with community-identified priorities of safety, health, freedom, community, and positive experiences. This technical assistance built upon the Electrify San Jose: Framework for Existing Building Electrification to identify actionable strategies to make single- and multi-family buildings both energy-efficient and all-electric. This report is intended to provide the San Jose Climate Smart team and their partners with relevant data, insights, and actionable analysis to aid in-depth and nuanced engagements with key stakeholders. In particular, the findings in this report highlight opportunities and challenges for San Jose City Council, residents, building owners, developers, financial institutions, and utility partners instrumental in building support and earning buy-in for energy efficiency and electrification upgrades in existing buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Performance Report 2023: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2023, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2023

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office oversees PNNL. PNNL prepares an Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environment, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, thus assuring that the public is informed of any PNNL-Richland campus or PNNL-Sequim campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER report describes Compliance with Federal, State, and Local Laws and Regulations in 2023, Environmental Sustainability, Environmental monitoring and dose assessment, Natural and Cultural Resource Management, and Quality Assurance activities that took place during Calendar Year 2023.

40 CFR 61 Subpart H↗

Environmental Performance Report 2024: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2024, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan, Revision 2

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO). It addresses URs established under the FFACO for releases related to the development, testing, and production of nuclear weapons that are located on the NNSS and that are accessed through the NNSS main gate. FFACO URs are established at sites where contamination remains at levels exceeding final action levels (FALs) or is forecasted to exceed Safe Drinking Water Act (SDWA) maximum contaminant levels (CFR, 2025a) over the next 1,000 years following completion of corrective actions. Administrative URs are established at Industrial Sites and Soils sites where contamination remains at levels exceeding industrial action levels as defined in the Soils RBCA document. All URs stipulate restrictions sufficient to ensure the protection of human health, safety, and the environment.

54 ENVIRONMENTAL SCIENCES↗

LANL Meteorology Program Self-Assessment 2025 Update

The LANL Meteorological (Met) Program has been subject to several external reviews over the past 19 years. The DOE Meteorological Coordinating Council (DMCC) conducted an initial Met Program Site Assist Visit (SAV) in August 2006 (DMCC 2006). A follow-up SAV in August 2015 assessed progress (DMCC 2015), and in June 2023, the DOE Meteorological Subcommittee (DMSC), successor to the DMCC, conducted a second follow-up SAV (DMSC 2023), in which the Met Program was evaluated relative to the following 8 high-level questions: • What is the state of the meteorological services provided to its customers? • What is the quality of meteorological data provided to its customers and is it adequate and available to meet all customer needs? • What is the quality of atmospheric transport and diffusion modeling provided to its customers and is it applicable to complex wind flow patterns at LANL? • Are the current and future meteorological service customers being serviced appropriately? • Are there adequate human resources to meet present and future program customer needs and are they being appropriately leveraged? • Are existing instrumentation, facilities, and systems adequate to meet present and future customer needs? • Are LANL meteorological services conducted in an efficient, cost-effective manner? • Is meteorological data used to ensure safety & health of LANL personnel? More specific evaluations were performed relative to 23 performance objectives extracted from the ANSI/ANS-3.11- 2024 national standard and 14 separate performance objectives associated with consequence assessment and atmospheric transport and diffusion modeling in the consequence assessment element of DOE G 151.1-1B. In 2023, the DMSC SAV Team also reviewed the status of each of the 18 remaining recommendations from its 2015 SAV. Based on this review, DMSC stated in its Exit Briefing that the LANL meteorological program has gotten much stronger and more robust since 2015 and now represents one of the better managed programs within the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Best Practices for Resilience Hub Development and Management

The Carbon League and its community partners in East St. Louis, Illinois, have identified five facilities to serve as resilience hubs. These hubs are intended to support the local community through a range of services and resources during blue-sky (everyday), gray-sky (pre-event), and black-sky (emergency) conditions. Transforming these facilities into fully functional resilience hubs requires a broad operational improvement and programmatic planning roadmap. This memo outlines best practices to guide the development of these resilience hubs in East St. Louis, including recommendations for infrastructure services; safety and physical protection; community services; operational protocols; and a phased implementation strategy aligned with realistic funding and capacity constraints. Infrastructure recommendations include strengthening electric power, communications, water, sanitation, and transportation/logistics capabilities, all of which are essential for hubs that may serve as cooling and warming centers, distribution points, and information hubs during emergencies. Safety recommendations focus on accessibility, emergency action planning, indoor air quality, and secure storage of critical equipment. A phased roadmap provides guidance from immediate, low-cost readiness actions to long-term optimization and community integration. Performance metrics and maintenance protocols ensure continuous improvement and operational readiness. This guidance draws on best practices that can be used to support the development of resilient, community-centered hubs capable of enhancing public safety, health, and well-being during everyday operations and emergencies alike.

99 GENERAL AND MISCELLANEOUS↗