Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fiscal Year 2024”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

105 records · Page 6

DOE’s National Solar Thermal Test Facility Operations and Maintenance

This report details operations and maintenance (O&M) activities performed across Fiscal Years 2022 through 2024 in support of the continued capabilities of the National Solar Thermal Testing Facility (NSTTF) at Sandia National Laboratories. The NSTTF O&M project is funded by the U.S. Department of Energy Solar Energy Technologies Office (SETO) to support research activities and testing on behalf of external customers at the facility under award number CPS 38491. During the project period, the NSTTF made progress in the areas of site metrics, site maintenance and utilization tracking, and customer engagement. The O&M project also supported special initiatives including procurement of a heat exchanger for particle concentrating solar thermal processes and a scoping and cost study for refurbishment and repair of component in the NSTTF heliostat field.

14 SOLAR ENERGY↗

Advanced Materials & Manufacturing Technology (AMMT): Process understanding for qualifying LPBF 316H SS

Investigations were conducted in fiscal years (FY) 2023 and 2024 to gather relevant data sets addressing challenges related to qualifying 316H stainless steel (SS) for use in future nuclear reactors. This work was a collaborative effort involving researchers from Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and Oak Ridge National Laboratory (ORNL). Key outcomes included: • Development of process-structure-property data sets to better understand the relationships between manufacturing processes, material structure, and performance characteristics. • Establishment of an in-situ monitoring system to link these various data sets together. • Detailed characterization of the raw material feedstock to further strengthen the understanding of process-structure and process-property relationships. Building on this foundation, in FY25 there was interest in exploring the behavior of additively manufactured 316H SS under different test conditions to support the overall material qualification process. Los Alamos National Laboratory (LANL) was tasked with providing specimen samples to the collaborating labs, who then conducted a round-robin study examining factors like selective heat treatment, low-cycle fatigue (LCF), and tensile-creep (T-C) properties. Additionally, high-temperature differential scanning calorimetry (DSC) was performed by LANL to better understand how the material's thermal characteristics change as it is heated up to the melting point. This provided a more comprehensive understanding of the material's behavior. The combined results from these investigations could potentially be used to support the inclusion of 316H stainless steel in Section III, Division 5 of the relevant codes and standards, allowing its use in future nuclear reactor applications.

36 MATERIALS SCIENCE↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Annual Summary Report (FY 2025) Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. All the trenches in these burial grounds except two have remained inactive since July 2004. The only active trenches that continue to receive low-level and mixed low-level waste are Trenches 31 and 34 that are located in the southern portion of the 218-W-5 Burial Ground. During this reporting period (fiscal year 2025, from October 1, 2024, through September 30, 2025), waste was disposed in Trench 31 only.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report (FY 2025) Performance Assessment for the Disposal of Low-Level Waste in the 200 East Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low Level Burial Grounds (LLBGs) since September 26, 1988. All trenches in these burial grounds except one have remained inactive since July 2004. Trench 94 located in 218-E-12B Burial Ground is the only active trench, which is dedicated for disposal of U.S. Navy reactor compartments. During this reporting period (fiscal year 2025, from October 1, 2024, through September 30, 2025), two reactor compartments were disposed in Trench 94.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oak Ridge National Laboratory 2025 Site Sustainability Plan With FY 2024 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Office (SPO) issues instruction documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPO is part of the DOE Office of Asset Management. As required by DOE Order 436.1A, Departmental Sustainability, each site develops and commits to an annual site sustainability plan (SSP) that identifies its respective contribution toward meeting DOE’s sustainability goals. SPO collects and compiles information reported by each site to develop an agency-wide sustainability report and implementation plan, which are used to report DOE sustainability progress to the federal government as required by all major federal agencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Summary Report (FY 2025) Performance Assessment for the Environmental Restoration Disposal Facility

Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period, fiscal year (FY) 2025, extending from October 1, 2024, through September 30, 2025, approximately 50,653 metric tons (55,835 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2025, approximately 17.3 million metric tons (19.1 million U.S. tons) of waste has been disposed at ERDF, which equates to consumption of approximately 91.0% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed. In 2023, the Department of Energy approved the construction of supercell 11 to provide additional disposal capacity to meet the cleanup mission at the Hanford Site. The construction of supercell 11 began in FY 2025, and it is expected to take up to two years. Construction of the new cell will not affect ongoing waste disposal activities at ERDF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

United States Nuclear Data Program Work Plan for Fiscal Year 2025

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2025 that begins on October 1, 2024. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

United States Nuclear Data Program Annual Report for Fiscal Year 2025

The US Nuclear Data Program (USNDP) Annual Report for Fiscal Year 2025 summarizes the work of USNDP for the period of October 1, 2024 through September 30, 2025, with respect to the Work Plan for FY 2025 that was prepared in 2024. The Work Plan and Final Report for USNDP are prepared for the DOE Office of Science, Office of Nuclear Physics. The support for the nuclear data activity from sources outside the US Nuclear Data Program is summarized in the staffing table and Appendix A. This leverage amounts to about 22.8 FTE scientific, to be compared with 21.9 FTEs at USNDP units funded by the DOE Office of Science, Office of Nuclear Physics. Since it is often difficult to separate accomplishments funded by various sources, some of the work reported in the present report was accomplished with nuclear data program support leveraged by other funding. FY 2025 was the 25th year in which the USNDP has operated under a Work Plan developed by the program participants. The program continued to carry out important work in support of the DOE mission. The work balances the ongoing collecting, analyzing, and archiving of nuclear physics information critical to basic nuclear research and to the development and improvement of nuclear technologies with the electronic distribution of this information to users in a timely and easily accessible manner. The present section of the report consists of activity summaries for the major components of the USNDP. This is followed by an updated staff level assignment table that reflects the final distribution of effort among the tasks carried out during FY 2025. Then, we continue with the detailed status of work performed during FY 2025.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Fiscal Year 2025 Site Sustainability Plan (Rev. 2)

This document is presented as the Site Sustainability Plan (SSP) for Lawrence Livermore National Laboratory (LLNL), consistent with the instructions provided by the Department of Energy (DOE) received in August 2024 as a deliverable for DOE Order 436.1A Departmental Sustainability requirement. LLNL is certified in Environmental Management System (EMS) (ISO 14001) and aligns sustainability efforts with the EMS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

East Tennessee Technology Park Biological Monitoring and Abatement Program—2025 Fiscal Year Report

In FY 2025, the East Tennessee Technology Park’s (ETTP’s) Biological Monitoring and Abatement Program (BMAP) consisted of two tasks that reflect different but complementary approaches to evaluating the effects of ETTP effluents on the ecological integrity of waters near ETTP. These tasks included (1) fish and clam bioaccumulation monitoring and (2) fish and benthic macroinvertebrate species richness and density monitoring. The sampling and analysis requirements for the ETTP BMAP in FY 2025 are outlined in the sampling and analysis plan (UCOR 2024). Major sampling sites for the BMAP are shown in Figure 1 and Figure 2.

54 ENVIRONMENTAL SCIENCES↗

Weapon Material Program: FY24 Annual Report

The Weapon Material Program (WMP) framework was started in July of Fiscal Year (FY) 2022, along with other Mission Support organizations. The first year was about building the organization with the right people, identifying needs, and developing a vision for expectations. It was also a year to move forward with new equipment and technology for weapon material processes. With numerous improvements, WMP is building world-class systems for production, warehousing, and analytical testing. FY 2023 was a year of development. The WMP was a new organization defining its identity, its focus, and its mission. At the end of FY 2023, WMP evaluated its current position and its immediate needs along with its future goals. The entire organization set out on this FY 2024 journey to success. The lack of funding, staffing, and visibility dramatically impacted weapon material operations, testing, and qualifications. This neglect required numerous areas to be addressed and improvement plans to be developed and implemented. WMP processes, procedures, and overall business operations were dramatically in need of updating, revision, and formal documentation. This included all areas: technology, equipment, facility modifications/upgrades, and testing improvements. To ensure organizational improvement and forward momentum in FY 2024, WMP executed a multi-faceted strategic vision. Action items included the following: • Filling open positions with capable personnel who would contribute to a more robust organization • Establishing more formal operations and problem-solving techniques • Improving departmental procedures to align with expanding scope • Improving training • Establishing collaboration meetings with other departments/organizations • Focusing on the importance of identifying and mitigating concerns with At-Risk Materials (@RM) • Leading modernization eff orts for Blending and Packaging (B&P) We are on the verge of a transformational improvement in all of our processes in support of the mission. The following area achievements outlined in this report reflect the hard work toward achieving the goal of “being the material Subject Matter Experts in the nuclear enterprise”.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Equipment List Comparing Balance of Plant Containing a Heat Pump against a Reference Electricity Generating Plant

Approximately two-thirds of U.S. energy consumption in the industrial and transportation sectors relies on fossil fuels. These sectors require high-quality heat, i.e., thermal energy at very high temperatures, for molecular transformation processes. The Integrated Energy Systems (IES) program aims to assess the economic potential of utilizing nuclear-grade heat from Advanced Reactors (ARs) to meet the high-quality heat demands. By having industrial processes (IPs) supplied with nuclear-generated heat, manufacturers could benefit from more stable and potentially lower energy costs, reducing reliance on volatile fossil fuel markets. The main outcome of the FY24 research was the thermodynamic assessment and gap analysis of steam generation for IP applications. The study completed in June 2024 demonstrated that the required steam temperatures could be achieved by integrating a heat pump into an AR power plant. After identifying the thermal demands of target IPs, multiple balance of plant configurations for the Xe-100 reactor by X-energy, incorporating a heat pump, were analyzed. Their technical feasibilities were assessed, including the design of suitable axial compressors for these applications. Comparative performance analysis showed that thermal efficiency alone is insufficient to evaluate system suitability. To address this, a new indicator (heat factor) was introduced in the report released in September 2024 to quantify the low-quality thermal power needed to produce one unit of high-quality heat for the IP. Results showed that integrating heat pumps into Rankine cycles enables higher steam temperatures, though at the expense of increased thermal energy input. This report builds upon and completes the foundational work previously undertaken. It focuses on the design of two Balance of Plant (BOP) configurations, both based on Rankine energy conversion cycles: “Case 1”, which involves electricity generation only, and “Case 2”, which combines electricity and high-temperature heat generation for industrial use. For each configuration, a comprehensive equipment list was developed, detailing all major components such as turbines, compressors, heat exchangers, pumps, and control systems. These lists will serve as the basis for future comparative cost analyses, with the goal of assessing the number and type of components required to integrate a heat pump into the Rankine cycle and to establish a heat transport system capable of delivering thermal energy from the nuclear plant to an industrial facility. Using the constitutive equations presented in the June 2024 milestone, the operating conditions of all BOP components for both “Case 1” and “Case 2” were evaluated. These parameters—such as temperature, pressure, mass flow rate, and steam quality—served as the basis for calculating the associated thermal and mechanical power flows. The net power required from the heat pump to raise the steam temperature to the target level was also determined. The thermodynamic performance of the configuration was then assessed using the heat factor metric. The key outcome of this analysis is a comparative table that presents the equipment that was used in the “Case 1” and “Case 2” configurations. This study offers a preliminary comparison of the two designs, providing insight into the impact of integrating a heat pump in terms of component requirements and thermal efficiency. This equipment list, together with the evaluated operating conditions, also serves as a foundation for the economic analyses scheduled for the current fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Architectural Survey of the U12G Tunnel Historic District, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to demolish six buildings and three storage areas located at the U12g Tunnel portal area in Area 12 of the Nevada National Security Site (NNSS). The buildings are 12-358 (Signal Vault); 12-201800 (Storage Quonset Hut); 12-202555 (Walker Shack); 12-868 (Pipe Assembly); 12-B100933 (Electrical Shop); 12-B100944 (Conference Room); and Storage Area 1; Storage Area 2; and Storage Area 3. The buildings and storage areas were selected for demolition as part of the DOE’s Real Property Efficiency Plan to reduce the footprint of unused and non-operational facilities on the NNSS. They are all vacant and have no proposed uses for current or upcoming NNSS missions. Demolition activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. Identification efforts began with resources proposed for demolition in federal Fiscal Year (FY) 23. Four buildings were proposed to be demolished in FY23 (12-358, 12-868, 12-201800, and 12-202555). These buildings and the U12g Tunnel Historic District (SHPO No. D444) were recorded in Identification, Evaluation, and Finding of Adverse Effect for the Proposed Demolition of Five Buildings in Area 12, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2023). Identification efforts indicated three buildings (12-358, 12-201800, and 12-868) supported nuclear testing in the U12g Tunnel. The fourth building post-dated the use of U12g Tunnel for nuclear testing activities. The report recommended that three of the four buildings (12-358, 12-201800, 12-868) and the U12g Tunnel Historic District may be eligible for the National Register of Historic Places (NRHP). The report also found that the undertaking would have an adverse effect on the three buildings and on the historic district. The Nevada State Historic Preservation Office (SHPO) concurred with the report’s findings (Reed 2023). The U12g Tunnel was determined eligible as a historic district under the Secretary of the Interior’s (SOI) Significance Criterion A, at the local level, in the context of the Cold War as an underground testing environment for the development of nuclear weapons and to assess the effects of a nuclear explosion on materials and equipment with a period of significance from 1959 to 1971. It was also determined eligible under Significance Criterion C for embodying the distinctive characters of a horizontal tunnel complex used for nuclear testing and as a significant and distinguishable entity. The three buildings were determined to be contributing elements of the district. The undertaking was expanded with the addition of two buildings and three storage areas proposed to be demolished and located within U12g Tunnel Historic District in FY24. These five resources (12-B100933, 12-B100944, and Storage Areas 1, 2, and 3) were recorded in Supplemental Identification, Evaluation, and Finding of Effect for Additional Proposed Demolition at U12g Tunnel, Area 12, Nevada national Security Site, Nye County, Nevada (Brannan et al. 2024). Identification efforts indicated that the two buildings and Storage Area 1 supported nuclear testing in the U12g Tunnel. Storage Area 1 and Storage Area 2 post-dated the nuclear testing activities at U12g Tunnel and were not recommended as contributing elements to the district. The report also found that the undertaking would have an adverse effect on the newly identified buildings and one storage area and on the historic district. The SHPO concurred that the expanded undertaking would result in adverse effects to historic properties (Reed 2025). To resolve these adverse effects, NNSA/NFO, in consultation with the SHPO, is following standard mitigation as stipulated in the 2024 Programmatic Agreement DE-GM58-22NA25554 Among the U.S. Department of Energy and the Nevada State Historic Preservation Officer and the Advisory Council on Historic Preservation Concerning the Protection of Historic Properties on the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the NNSS PA). The standard mitigation measures are outlined in Appendix D of the NNSS PA. As such, this architectural survey has been prepared in accordance with Appendix D of the NNSS PA and follows the report format outlined in Appendix F. It includes a historic context that describes the district’s origin, history, and support functions, its significance in the context of nuclear testing on the NNSS, and identifies contributing and non-contributing elements within the district. The report is accompanied by Architectural Resource Assessment (ARA) forms for individual resources and a Historic District Resource Assessment (HDRA) for the U12g Tunnel Historic District. In total, this architectural report identified 32 primary resources within the district boundary. Six of the primary resources were previously identified as contributing elements. An additional 17 resources are recommended as contributing elements to the district for a total of 23 contributing elements. The other nine resources identified are recommended as non-contributing elements to the district.

12-201800↗