Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fiscal Year 2022”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Idaho National Laboratory Water Assessment

Established in 1949, Idaho National Laboratory (INL) is part of the U.S. Department of Energy’s (DOE) complex of national laboratories. INL performs work in each of the strategic goal areas of the department: energy, national security, science, and environment, and is the nation’s center for nuclear energy research and development. Located in southeastern Idaho, its physical footprint includes 569,180 acres of federally owned land. A water balance for the fiscal year (FY) 2022 year was conducted for INL to identify major water using equipment and calculate the end-use categories. FY 2022 was selected as the evaluation year per the DOE Sustainability Performance Office. This report provides an analysis of facilities on the INL Site operated by Battelle Energy Alliance, LLC (BEA). This water balance report focused on the Advanced Test Reactor (ATR) Complex, Materials and Fuels Complex, Idaho Falls campus, and Central Facilities Area campuses, which consumed 98% of the 540,611 thousand gallons (kGal) of water used by INL in FY 2022. The resulting water balance identified the use categories for 75.3% of the FY 2022 water consumption.

99 GENERAL AND MISCELLANEOUS↗

Corrosion Analysis of 121103072 (SAVY-4000)

A surveillance feedlist for fiscal year (FY) 2022 was developed with the intent to target containers with contents known to generate corrosive gasses. One SAVY-4000 (hereafter “SAVY”) container with a serial number 121103072 was selected due to the reasonable wattage and known molten salt extraction (MSE) material corrosive behavior. The material was measured at 3.08 W with approximately 200 g of material placed inside of the SAVY for 6.07 years. The inner packaging configuration included a ¼ Qt stainless steel slip top inner container and a sPVC bag-out bag enclosing the inner container. Visual observations of the container during retrieval revealed several concerning features on the exterior of the container, notably on the lid. Fig. 1 shows the container lid along with an inset image further magnifying the features of interest. The corroded tamper indicating device (TID) wire and the corroded radioactive material tag wire indicated that corrosive gas species for steel were produced during storage. Although the TID wire and rad tag wire are not the same composition as the SAVY body and lid, these are often used as an indicator of potential corrosion inside of the SAVY container. The oxide residing inside of the filter holes and significant buildup around one hole provided further evidence supporting the presence of corrosive species inside of the container.

36 MATERIALS SCIENCE↗

Weapon Material Program: FY24 Annual Report

The Weapon Material Program (WMP) framework was started in July of Fiscal Year (FY) 2022, along with other Mission Support organizations. The first year was about building the organization with the right people, identifying needs, and developing a vision for expectations. It was also a year to move forward with new equipment and technology for weapon material processes. With numerous improvements, WMP is building world-class systems for production, warehousing, and analytical testing. FY 2023 was a year of development. The WMP was a new organization defining its identity, its focus, and its mission. At the end of FY 2023, WMP evaluated its current position and its immediate needs along with its future goals. The entire organization set out on this FY 2024 journey to success. The lack of funding, staffing, and visibility dramatically impacted weapon material operations, testing, and qualifications. This neglect required numerous areas to be addressed and improvement plans to be developed and implemented. WMP processes, procedures, and overall business operations were dramatically in need of updating, revision, and formal documentation. This included all areas: technology, equipment, facility modifications/upgrades, and testing improvements. To ensure organizational improvement and forward momentum in FY 2024, WMP executed a multi-faceted strategic vision. Action items included the following: • Filling open positions with capable personnel who would contribute to a more robust organization • Establishing more formal operations and problem-solving techniques • Improving departmental procedures to align with expanding scope • Improving training • Establishing collaboration meetings with other departments/organizations • Focusing on the importance of identifying and mitigating concerns with At-Risk Materials (@RM) • Leading modernization eff orts for Blending and Packaging (B&P) We are on the verge of a transformational improvement in all of our processes in support of the mission. The following area achievements outlined in this report reflect the hard work toward achieving the goal of “being the material Subject Matter Experts in the nuclear enterprise”.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

National Electric Vehicle Infrastructure Formula Program (NEVI) Brief for State Public Utility Commissions

The National Electric Vehicle Infrastructure (NEVI) Formula Program (NEVI program) is a funding opportunity for all 50 U.S. states, the District of Columbia, and Puerto Rico, established by the Bipartisan Infrastructure Law (BIL). The NEVI program instructs states to “strategically deploy electric vehicle (EV) charging infrastructure and to establish an interconnected network to facilitate data collection, access, and reliability.” The NEVI program allocates more than $\$$5 billion to states from Fiscal Year (FY) 2022 to 2026 on a formula basis. NEVI funds are available to private entities, including utilities, to build EV Supply Equipment (EVSE)1 and associated EV grid infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

In-Field Alpha Spectrometer Development FY2022 Mid-Year Report

In response to needs identified by the International Atomic Energy Agency (IAEA), Idaho National Laboratory (INL) has developed an In-Field Alpha Spectrometer (IFAS) to allow IAEA safeguards inspectors to collect samples of uranium hexafluoride (UF 6 ) at processing facilities, to perform field assessments to verify uranium enrichment. For sample collection, the IFAS method uses Single-Use Destructive Assay (SUDA) samplers, developed at Pacific Northwest National Laboratory (PNNL), which contain thin zeolite coatings that trap UF6 gas and convert it to the safer, more stable form uranyl fluoride (as a dihydrate, UO 2 F 2 ·2H 2 O). For alpha spectrometry, the IFAS instrument employs a large area silicon semiconductor transducer to detect and record alpha particle energy-deposition events. Over the course of this project INL, PNNL, Oak Ridge National Laboratory worked to optimize the SUDA sample design for alpha spectrometry, to optimize processes for manufacturing, loading, and shipping SUDA samples, and to allow the measurement of loaded SUDA samples. In fiscal year (FY) 2022 INL has bene investigating the reproducibility and measurement precision of IFAS measurements and the associated determination of uranium enrichment.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

UVO to Far-IR Mirror Technology Development: Year 2 Status

UVO to Far-IR (UVO-FIR) mirror technology development project is a multiyear effort initiated in Fiscal Year (FY) 2022 to mature the Technology Readiness Level (TRL) of critical technologies required to enable ultra-stable telescope of the Habitable Worlds Observatory (HWO) mission. 2023/24 accomplishments include: continued investigations into gravity sag by comparing rotation test vs flip test, quantifying gravity sag as a function of temperature and designing mount for mirror whose G-sag with elevation angle is only coma. Significant progress in developing a methodology for specify optical surface microstructure, contamination cleanliness level and allowable micrometeoroid impacts. Support of HWO. And, a parametric cost model for x-ray telescopes and a parametric volume cost model for normal incidence telescopes.

H. Philip Stahl↗

Regulatory Research Planning for Micro-Reactor Development

A limited-scope Regulatory Research Development Plan (RRDP) is being developed to link important advanced non light water nuclear microreactor technology research and development (R&D) activities sponsored by the U.S. Department of Energy’s Office of Nuclear Energy (DOE NE), Science, and Technology to regulatory requirements and critical licensing needs likely to impact the deployment of a domestic commercial microreactor fleet. This document is a precursor to that forthcoming limited scope microreactor RRDP. This report is being published to aid in the identification of key fiscal year (FY) 2022 topical research opportunities (as conveyed to the RRDP development team) by respondent microreactor developers and suppliers in consideration of micro-reactor regulatory needs and challenges noted by industry, DOE, and Nuclear Regulatory Commission (NRC) stakeholders. Although this document does not contain the regulatory effects analysis and R&D recommendations that is expected in the final RRDP, this document is being released now to assist DOE researchers and investigators in FY22 research planning activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Alternative Analysis and Prioritization of Department of Energy “TBD” Materials with No Identified Disposition Pathway

The Department of Energy (DOE) complex manages a significant inventory of excess nuclear materials for which disposition pathways have not been identified, commonly referred to as "To Be Determined" (TBD) items. The Disposition Pathways Program, initiated in FY2018, provides a standardized framework for identifying viable disposition pathways for these materials. In 2023, the program undertook a comprehensive review and systematic analysis of the remaining TBD material groups, updating the assessment from the 2020 TBD Study using the 2022 fiscal year-end Nuclear Material Inventory Assessment (NMIA) as the primary data source. This effort aimed to utilize quantitative analysis to down-select from a wide range of potential disposition options and prioritize the remaining pathways to facilitate informed, risk-based decision-making for future programmatic funding and execution. This paper details the alternative analysis methodology used for screening and prioritization, highlighting the key criteria, ranking process, and resultant recommendations. The study successfully narrowed fifty-two potential disposition options down to nineteen, providing a focused path forward for addressing a longstanding challenge within the DOE complex.

Ramsey, Catherine [Savannah River National Laborat↗

System Analysis Support of Consent-Based Siting Efforts - 23400

To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the Integrated Waste Management (IWM) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate things like the implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed system operation start dates. Some example system analysis results have been published previously. With the passage of the consolidated appropriations acts for fiscal years 2021 and 2022, Congress provided funding and direction for the DOE to move forward with interim storage to support near-term action in managing the nation’s SNF as an important component of an IWMS. Consent-based siting is a phased, adaptive, and collaborative approach to siting facilities that focuses on the needs and concerns of people and communities. Communities participate in the siting process by working carefully through a series of phases and steps with the DOE (as the implementing organization). Each step and phase helps a community determine whether and how hosting a facility to manage SNF is aligned to the community’s goals. By its nature, a consent-based siting process must be transparent, flexible, adaptive, and responsive to community concerns. Thus, the phases and steps are intended to serve as a guide, not a prescriptive set of instructions. System analysis research analysts interface with DOE’s consent-based siting for a federal interim storage program and can perform preliminary system analyses as requested to support various aspects of the consent-based siting team’s work. This paper provides an overview of IWM program’s system analysis activities that support the ongoing consent-based siting process. The questions that decision-makers, planners, communities, and stakeholders might have during the consent-based siting process are similar to questions that have been explored by system analysts previously. Specifically, this paper discusses work that will inform consent-based siting efforts in the areas of community impacts, cost estimates, various SNF acceptance rates by potential facilities, potential consolidated interim storage facility (CISF) capacities and configurations, and the implications of a CISF on the overall waste management system. It is expected that system analysis will continue to be performed to support the consent-based siting process in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Summary Report - FY 23)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. All the trenches in these burial grounds except two have remained inactive since 2005. The only active trenches that continue to receive low-level and mixed low-level waste are Trenches 31 and 34 that are located in the southern portion of the 218-W-5 Burial Ground. During this reporting period (fiscal year 2023, from October 1, 2022, through September 30, 2023), waste was disposed in these two trenches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 East Area Burial Grounds (Annual Summary Report - FY 23)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. All trenches in these burial grounds except one have remained inactive since 2005. Trench 94 located in 218-E-12B Burial Ground is the only active trench that is dedicated for disposal of U.S. Navy reactor compartments. During this reporting period (fiscal year 2023, from October 1, 2022, through September 30, 2023), no reactor compartments were disposed in Trench 94.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Assessment for the Environmental Restoration Disposal Facility (Annual Summary Report - FY 23)

Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period (fiscal year 2023, extending from October 1, 2022, through September 30, 2023), approximately 9.37E+04 metric tons (1.03E+05 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2023, approximately 17.1 million metric tons (18.8 million U.S. tons) of waste has been disposed at ERDF, which equates to consumption of approximately 89.1% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

United States Nuclear Data Program: Work Plan for Fiscal Year 2023

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2023 that begins on October 1, 2022. Previously, 23 work plans have been prepared for the nuclear data program covering FYs 2021-2022. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE). As was done in previous years, the tasks proposed by the various organizations were reviewed internally according to the following criteria, which were developed considering the mission and goals outlined in past review panel reports and oversight committee discussions, and in consultation with the DOE program manager.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

United States Nuclear Data Program Work Plan for FY 24

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2024 that begins on October 1, 2022. Previously, 23 work plans have been prepared for the nuclear data program covering FYs 2021-2022. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗