Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fire Pump”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Performance of the Spacecraft Propulsion Research Facility During Altitude Firing Tests of the Delta 3 Upper Stage

The Spacecraft Propulsion Research Facility at the NASA Lewis Research Center's Plum Brook Station was reactivated in order to conduct flight simulation ground tests of the Delta 3 cryogenic upper stage. The tests were a cooperative effort between The Boeing Company, Pratt and Whitney, and NASA. They included demonstration of tanking and detanking of liquid hydrogen, liquid oxygen and helium pressurant gas as well as 12 engine firings simulating first, second, and third burns at altitude conditions. A key to the success of these tests was the performance of the primary facility systems and their interfaces with the vehicle. These systems included the structural support of the vehicle, propellant supplies, data acquisition, facility control systems, and the altitude exhaust system. While the facility connections to the vehicle umbilical panel simulated the performance of the launch pad systems, additional purge and electrical connections were also required which were unique to ground testing of the vehicle. The altitude exhaust system permitted an approximate simulation of the boost-phase pressure profile by rapidly pumping the test chamber from 13 psia to 0.5 psia as well as maintaining altitude conditions during extended steady-state firings. The performance of the steam driven ejector exhaust system has been correlated with variations in cooling water temperature during these tests. This correlation and comparisons to limited data available from Centaur tests conducted in the facility from 1969-1971 provided insight into optimizing the operation of the exhaust system for future tests. Overall, the facility proved to be robust and flexible for vehicle space simulation engine firings and enabled all test objectives to be successfully completed within the planned schedule.

Meyer, Michael L.↗

Pulse Detonation Engine Test Bed Developed

A detonation is a supersonic combustion wave. A Pulse Detonation Engine (PDE) repetitively creates a series of detonation waves to take advantage of rapid burning and high peak pressures to efficiently produce thrust. NASA Glenn Research Center's Combustion Branch has developed a PDE test bed that can reproduce the operating conditions that might be encountered in an actual engine. It allows the rapid and cost-efficient evaluation of the technical issues and technologies associated with these engines. The test bed is modular in design. It consists of various length sections of both 2- and 2.6- in. internal-diameter combustor tubes. These tubes can be bolted together to create a variety of combustor configurations. A series of bosses allow instrumentation to be inserted on the tubes. Dynamic pressure sensors and heat flux gauges have been used to characterize the performance of the test bed. The PDE test bed is designed to utilize an existing calorimeter (for heat load measurement) and windowed (for optical access) combustor sections. It uses hydrogen as the fuel, and oxygen and nitrogen are mixed to simulate air. An electronic controller is used to open the hydrogen and air valves (or a continuous flow of air is used) and to fire the spark at the appropriate times. Scheduled tests on the test bed include an evaluation of the pumping ability of the train of detonation waves for use in an ejector and an evaluation of the pollutants formed in a PDE combustor. Glenn's Combustion Branch uses the National Combustor Code (NCC) to perform numerical analyses of PDE's as well as to evaluate alternative detonative combustion devices. Pulse Detonation Engine testbed.

Breisacher, Kevin J.↗

Self-powered Heating: Efficiency Analysis

Conventional fuel-fired heating devices such as furnaces, boilers, and water heaters have fuel efficiency less than 100% on the basis of higher heating value. They also require electricity from the electric grid to power parasitic loads such as blowers, pumps, fans, and ignitors. The primary energy efficiency of the device accounts for both fuel used on-site and primary energy used off-site to produce electric power used by the device. This work compares conventional fuel-fired heating devices to two types of self-powered devices. A self-powered device (SPD) integrates a power cycle onboard to eliminate consumption of grid electricity. We assume that all heat rejected by the onboard power cycle is added to the process fluid, so that, compared with a conventional device, the same amount of heat is provided to the process fluid and the same amount of fuel is consumed, but grid electricity consumption is eliminated. The first SPD type is the basic one: exactly the electricity required is generated. The second type considered is the SPD with heat pump (SPD-HP), in which the power cycle generates more electricity than needed for parasitic loads, and the excess electricity is used to power a heat pump. The heat pump extracts additional heat from the ambient to boost efficiency. Both SPD and SPD-HP self-consume all the generated electricity, in contrast to combined heat and power (CHP) systems that export electricity. In this work, equations are derived to express the efficiency of three classes of heating devices: conventional (consuming grid electricity), self-powered (consuming no grid electricity), and self-powered with heat pump. The efficiency of each is derived as a function of up to six factors: (1) the fraction of combustion heat captured, (2) the rate of parasitic power consumption, (3) the fraction of electric energy dissipated as useful heat, (4) the power cycle conversion efficiency, (5) the grid efficiency, when applicable, and (6) the heat pump COP, when applicable. Scenarios are identified in which it is possible to achieve efficiency greater than 100% on a higher heating value basis. Plausible configurations using existing technology options are outlined.

Gluesenkamp, Kyle↗

RLUOB Celebration

Los Alamos National Laboratory's newest facility, the Radiological Laboratory Utility Office Building (RLUOB), is also its first to achieve both the Leadership in Energy and Environmental Design (LEED) status and LEED Gold certification from the U.S. Green Building Council (USGBC). From its robust design to its advanced scientific equipment, RLUOB is essential to the Laboratory's national security mission in support of the National Nuclear Security Administration's (NNSA) nuclear weapons program. At more than 200,000 square feet, this building is the only radiological facility within the Department of Energy to have attained LEED Gold, which contributes to NNSA's achievement towards the high performance sustainable building goals outlined in Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance. 'As we celebrate RLUOB being completed almost one year ahead of schedule and having achieved LEED certification at the Gold level, we approach our plutonium mission at Los Alamos and NNSA with a great sense of achievement,' said Don Cook, NNSA's deputy administrator for defense programs. 'RLUOB adds a major component to NNSA's plutonium support capability and RLUOB demonstrates our commitment in helping to deliver President Obama's nuclear security agenda which includes ensuring the safety, security and effectiveness of the nuclear deterrent without testing.' The facility contains laboratories for analytical chemistry and materials characterization of special nuclear material, along with space for offices, training and emergency operations. Its multi-functional purpose makes RLUOB a unique project for which LEED certification was sought. 'LEED certification was a huge goal and one we sought from the very beginning of this project,' said Laboratory Director Charlie McMillan. 'It's an important step forward, allowing us to advance national security science in modern, safer, more efficient infrastructure.' The Laboratory's project team and its contractor partners, especially in coordination with Jacobs Engineering, focused on green design and construction in LEED categories, such as sustainable sites, water efficiency, energy and atmosphere, materials and resources, indoor environmental quality and innovation in design. RLUOB's features include: (1) Building envelope design (orientation, materials and insulation) yielded a 20 percent improvement in energy performance; (2) Incorporation of building materials with 24 percent recycled content; (3) Diversion of 72 percent of construction-generated materials through reuse, recycle and salvage; (4) Roofing comprised of 93 percent highly-reflective materials to reduce heat island effects; (5) High efficiency, gas-fired hot water boilers, air-cooled chillers, thermal storage systems and variable frequency drives for compressors, fans and pumps; (6) Energy efficient lighting for interiors, exteriors, process glove boxes and fume hoods; (7) Water efficient fixtures resulting in 30 percent reduction in usage; (8) Low emission paints and carpeting for improved indoor air quality; (9) Landscaping that doesn't require permanent irrigation; (10) Enhanced building system commissioning; and (11) Comprehensive transportation alternatives, including public transportation, bicycle storage and changing rooms, and a refueling station for government vehicles using alternative fuels. 'RLUOB's LEED certification demonstrates tremendous leadership in green building,' says Rick Fedrizzi, president and CEO of USGBC. 'The urgency of our mission has challenged the industry to move faster and reach further than ever before, and RLUOB serves as a prime example of just how much we can accomplish.'

25 ENERGY STORAGE↗

PFAS Removal by Ion Exchange Resins: Background and Knowledge Gaps with Respect to the Hanford Site

Per- and polyfluoroalkyl substances (PFAS) have been a rising concern for the past two decades, with the United States Department of Defense and Environmental Protection Agency investing millions of dollars in research into remediation and clean-up technologies. Due to the environmental persistence, toxicity, biological uptake, and ongoing changes in both federal and state regulatory space, understanding the fate and transport of PFAS compounds has been of growing concern to the US Department of Energy (DOE). The DOE’s Hanford Site is investigating historical use of PFAS and will be doing site characterization for PFAS. Thus, PFAS have not yet been identified as a contaminant concern in regulatory documents. Based on historical records that mention the discharge of aqueous film-forming foam containing PFAS and having on-site fire stations (a risk factor for PFAS contamination), it seems likely that environmental releases of PFAS may have occurred. Pump and treat (P&T) remediation is the selected remedy for multiple groundwater contaminant plumes at Hanford. These P&T systems use ion exchange (IX) as a component of aboveground treatment, with the specific resins depending on the target contaminants. There is potential that these IX resins may be able to remove PFAS from groundwater, but investigation is needed to understand affinity/selectivity and removal capacity given the groundwater composition and the operating conditions. This report provides background on PFAS uses and chemistry, then provides a review of IX resin applications for PFAS, identifying knowledge gaps. Recommendations are provided regarding research needed to address knowledge gaps and acquire information needed to propose IX as a future PFAS remediation technology at the Hanford Site, as well as other U.S. Department of Energy sites. Generally, PFAS compounds are fluorinated substances that contain at least one fully fluorinated methyl or methylene carbon – with a few noted exceptions, any chemical with at least a perfluorinated methyl group (–CF3) or a perfluorinated methylene group (–CF2–) is a PFAS. These chemical compounds are characterized as non-biodegradable, non-reactive, non-photolytic, and hydrolysis resistant. This makes them highly recalcitrant within the environment, however polyfluoroalkyl materials are less recalcitrant as the carbon chains contain C–H bonds which are more easily broken than carbon – fluorine (C–F) bonds. The backbone carbon structures are commonly punctuated with a head group, the most well-known of them are perfluorooctanesulfonic acid and perfluorooctanoic acid, which possess a sulfonate and a carboxylate group, respectively. IX resins are marketed for the removal of PFAS from water systems and industrial water, however, the mechanism of removal is not as well understood as for anion or cation removal. A better understanding of the mechanism of removal would enable the development of IX resins that have improved specificity for PFAS removal. Four knowledge gaps were identified: 1) the effect of dissolved ions on the IX resin PFAS removal effectiveness, 2) the effect of additional primary contaminants of concern (PCOCs) or secondary contaminants of concern (SCOCs) on the effectiveness of PFAS via IX resin, 3) the mechanisms of PFAS removal from water, and 4) practical solutions to IX resin regeneration and waste disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of the subatmospheric engine to solar thermal power

The development of a natural gas-fired Brayton engine is discussed. It is intended to be the prime mover for a 10-ton commercial heat pump. This engine has many attractive features that make it an ideal candidate for solar thermal-power generation applications. The unique feature of this engine is its subatmospheric mode of operation. It operates between atmospheric pressure and a partial vacuum. This means that heat is added to the cycle at atmospheric pressure; this permits the receiver to be unpressurized, greatly simplifying its design and cost.

Source record↗

4.5-kW Hall Effect Thruster Evaluated

As part of an Interagency Agreement with the Air Force Research Lab (AFRL), a space simulation test of a Russian SPT 140 Hall Effect Thruster was completed in September 1999 at Vacuum Facility 6 at the NASA Glenn Research Center at Lewis Field. The thruster was subjected to a three-part test sequence that included thrust and performance characterization, electromagnetic interference, and plume contamination. SPT 140 is a 4.5-kW thruster developed under a joint agreement between AFRL, Atlantic Research Corp, and Space Systems/Loral, and was manufactured by the Fakal Experimental Design Bureau of Russia. All objectives were satisfied, and the thruster performed exceptionally well during the 120-hr test program, which comprised 33 engine firings. The Glenn testing provided a critical contribution to the thruster development effort, and the large volume and high pumping speed of this vacuum facility was key to the test s success. The low background pressure (1 10 6 torr) provided a more accurate representation of space vacuum than is possible in most vacuum chambers. The facility had been upgraded recently with new cryogenic pumps and sputter shielding to support the active electric propulsion program at Glenn. The Glenn test team was responsible for all test support equipment, including the thrust stand, power supplies, data acquisition, electromagnetic interference measurement equipment, and the contamination measurement system.

Mason, Lee S.↗

Modeling Analysis for NASA GRC Vacuum Facility 5 Upgrade

A model of the VF5 test facility at NASA Glenn Research Center was developed using the direct simulation Monte Carlo Hypersonic Aerothermodynamics Particle (HAP) code. The model results were compared to several cold flow and thruster hot fire cases. The main uncertainty in the model is the determination of the effective sticking coefficient -- which sets the pumping effectiveness of the cryopanels and oil diffusion pumps including baffle transmission. An effective sticking coefficient of 0.25 was found to provide generally good agreement with the experimental chamber pressure data. The model, which assumes a cold diffuse inflow, also fared satisfactorily in predicting the pressure distribution during thruster operation. The model was used to assess other chamber configurations to improve the local effective pumping speed near the thruster. A new configuration of the existing cryopumps is found to show more than 2x improvement over the current baseline configuration.

cryopumping↗

Mode competition in superradiant scattering of matter waves

Superradiant Rayleigh scattering in a Bose gas released from an optical lattice is analyzed with incident light pumping at the Bragg angle for resonant light diffraction. We show that competition between superradiance scattering into the Bragg mode and into end-fire modes clearly leads to suppression of the latter at even relatively low lattice depths. A quantum light-matter interaction model is proposed for qualitatively explaining this result.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Effect of impurities on supercritical CO2 compatibility

Impurities may affect structural alloy compatibility in both indirect- and direct-fired supercritical CO2 (sCO2) cycles for high efficiency power generation with peak temperatures above 700°C. Using a new multi-pump gas control system, experiments with controlled impurity additions were compared to baseline results in research- or industrial-grade CO2 at 750°C/300 bar. Low level impurities, 50 ppm O2 and 50 ppm H2O, were not found to affect mass change or reaction products after 2,500 h exposures. However, in RG sCO2+1%O2+0.25%H2O, higher reaction rates were observed for both Ni- and Fe-based alloys, but especially Fe-based alloys were strongly affected by these high impurity levels. Analytical TEM was used to characterize the reaction products on alloy 625.

Pint, Bruce↗

Regolith Simulant Preparation and Geotechnical Characterization for Plume Surface Interaction Testing

Descent engine plumes interact with the lunar surface and accelerate regolith particles to potentially high velocities. These ejecta create risks to surface assets that have yet to be fully assessed. To better understand these risks, plume surface interactions can be simulated on the ground by firing a test engine plume into a bin of lunar regolith simulant under vacuum conditions. The dynamics of the resultant ejecta can then be recorded. In this technical memorandum we discuss the processes used in preparing a 150 kg bin of lunar regolith simulant for plume surface interaction ground tests under vacuum conditions for the NASA STMD Plume Surface Interaction project. We present our approach to mitigating regolith simulant eruptions during pump-down, the methods used to fill and reset the regolith simulant bin for each test, and the techniques used to characterize the consistency of regolith simulant geotechnical properties before each new firing. The challenges of preparing a regolith simulant test bin below an ambient pressure of one atmosphere, particularly on the large scale, could largely be overcome with a system that could fill the test bin with simulant inside the chamber and under vacuum conditions.

lunar regolith↗

High Pressure, Earth-storable Rocket Technology

The effect of elevated chamber pressure on combustion efficiency and heat transfer has been determined at the 100 lbf (445 N) thrust level for nitrogen tetroxide propellants. Measurements were made up to 500 psia (3.45 Mpa) with testbed hardware; tests at 100 psia (0.690 MPa) and 250 psia (1.72 MPa) were made with radiation-cooled rhenium chambers. The first task of the program served to determine desirable thruster applications and operating conditions: high total impulse, i.e. communication satellite or spacecraft bus axial engines, at chamber pressures up to 250 psia (1.72 MPa) pressure-fed, or up to 500 psia (3.45 MPa) pump-fed. The hardware modifications and testing required to obtain the data were determined in Task 2, which included design-support hot fire tests; supplemental hardware, including a 250 psia (1.72 MPa) Pc rhenium chamber and a 20% fuel-film cooled platelet injector was fabricated in Task 3. Testing showed that satisfactory operation of Ir-Re radiation chambers is assured at pressures up to 250 psia and may be possible up to 500. The heat transfer data obtained show good correlation with throat Reynolds number and are generally under values given by the simplified Bartz equation; chambers equilibrium temperatures match predicted values. Preliminary optimization of trip configuration and mixture ratio were made; Isp performance from thrust measurements was within 1% of predicted values. Stability, compatibility, and front-end thermal management were determined to be satisfactory.

Jassowski, D. M.↗

High Pressure, Earth-storable Rocket Technology

The effect of elevated chamber pressure on combustion efficiency and heat transfer has been determined at the 100 lbf (445 N) thrust level for nitrogen tetroxide propellants. Measurements were made up to 500 psia (3.45 MPa) with testbed hardware; tests at 100 psia (0.690 MPa) and 250 psia (1.72 MPa) were made with radiation-cooled rhenium chambers. The first task of the program served to determine desirable thruster applications and operating conditions: high total impulse, i.e., communication satellite or spacecraft bus axial engines, at chamber pressures up to 250 psia (1.72 MPa) pressure-fed, or up to 500 psia (3.45 MPa) pump-fed. The hardware modifications and testing required to obtain the data were determined in Task 2, which included design-support hot fire tests; supplemental hardware, including a 250 psia (1.72 MPa) Pc rhenium chamber and a 20% fuel-film cooled platelet injector was fabricated in Task 3. Testing showed that satisfactory operation of Ir-Re radiation chambers is assured at pressures up to 250 psia and may be possible up to 500. The heat transfer data obtained show good correlation with throat Reynolds number and are generally under values given by the simplified Bartz equation; chambers equilibrium temperatures match predicted values. Preliminary optimization of trip configuration and mixture ratio were made; Isp performance from thrust measurements was within 1% of predicted values. Stability, compatibility, and front-end thermal management were determined to be satisfactory.

Jassowski, D. M.↗

High Pressure, Earth-Storable Rocket Technology: Appendices C and D - Volume 3

The effect of elevated chamber pressure on combustion efficiency and heat transfer has been determined at the 100 lbf (445 N) thrust level for nitrogen tetroxide propellants. Measurements were made up to 500 psia (3.45 MPa) with testbed hardware; tests at 100 psia (0.690 MPa) and 250 psia (1.72 MPa) were made with radiation-cooled rhenium chambers. The first task of the program served to determine desirable thruster applications and operating conditions: high total impulse, i.e. communication satellite or spacecraft bus axial engines, at chamber pressures up to 250 psia (1.72 MPa) pressure-fed, or up to 500 psia (3.45 MPa) pump-fed. The hardware modifications and testing required to obtain the data were determined in Task 2, which included design-support hot fire tests; supplemental hardware, including a 250 psia (1.72 MPa) Pc rhenium chamber and a 20% fuel-film cooled platelet injector was fabricated in Task 3. Testing showed that satisfactory operation of Ir-Re radiation chambers is assured at pressures up to 250 psia and may be possible up to 500. The heat transfer data obtained show good correlation with throat Reynolds number and are generally under values given by the simplified Bartz equation; chambers equilibrium temperatures match predicted values. Preliminary optimization of trip configuration and mixture ratio were made; Isp performance from thrust measurements was within 1% of predicted values. Stability, compatibility, and front-end thermal management were determined to be satisfactory.

Jassowski, D. M.↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Start-up and Emergency Shutdown Modeling for a Coal-fired 10MWe sCO₂ Power Plant

As part of a Phase II Front End Engineering Design (FEED) study for the DOE Fossil Fuel Large Scale Pilots program, investigations of novel start-up and emergency shutdown methods for a stoker-fed, coal-fired, 10MWe sCO₂ power plant proposal were performed. These investigations were performed using 1D transient system models of the plant created within the GT-SUITE system modeling platform. The system model components were created using vendor quotation data (heat exchangers), performance maps (turbomachines), or FMU models (fired heater). Previously, Echogen Power Systems (Echogen) has used a sCO₂ power cycle start-up method that fills the system with liquid CO₂ to facilitate easy use of an electrically-driven start pump to transition the system from initial CO₂ fill to turbo-compressor initialization. The novel start-up method presented attempts this transition with a minimal filling of the system with liquid CO₂, to reduce the total CO₂ inventory required. This method leaves the start pump vulnerable to a two phase inlet condition as system pressure is below the CO₂ saturation pressure for the condenser cooling water temperature (Tcw). System model cases at Tcw of 18°C, 26°C, and 32°C, corresponding to cold, design, and hot ambient days, were analyzed to determine if the SP inlet condition could be kept as a subcooled liquid and estimate the CO₂ inventory reduction amount./p> Stoker-fed, coal-fired heaters continue to emit heat for some time even after emergency shutdown from events such as a power failure. This heat emission would lead to a failure of the fired heater, as the metal overheats, if the CO₂ flow is shut off. The emergency shutdown method presented utilizes CO₂ vented by a controllable vent valve (CRV) to provide CO₂ cooling flow to the fired heater. To determine the effectiveness of this method at keeping the fired heater peak tubing metal temperature below the ASME material temperature limit, for pressures below 5 MPa, of 816 °C, system model cases with CRV diameters ranging from 4” to 10”, and an alternative CO₂ vent routing with CRV size of 6”, were investigated./p>

01 COAL, LIGNITE, AND PEAT↗

Breadboard RL10-2B low-thrust operating mode (second iteration) test report

Cryogenic rocket engines requiring a cooling process to thermally condition the engine to operating temperature can be made more efficient if cooling propellants can be burned. Tank head idle and pumped idle modes can be used to burn propellants employed for cooling, thereby providing useful thrust. Such idle modes required the use of a heat exchanger to vaporize oxygen prior to injection into the combustion chamber. During December 1988, Pratt and Whitney conducted a series of engine hot firing demonstrating the operation of two new, previously untested oxidizer heat exchanger designs. The program was a second iteration of previous low thrust testing conducted in 1984, during which a first-generation heat exchanger design was used. Although operation was demonstrated at tank head idle and pumped idle, the engine experienced instability when propellants could not be supplied to the heat exchanger at design conditions.

Kanic, Paul G.↗