Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Measurement and simulations of intensity-dependent effects in the Fermilab Booster Synchrotron

The Fermilab Booster is a nearly 40-year-old proton synchrotron, designed to accelerate injected protons from a kinetic energy of 400 MeV to 8 GeV for extraction into the Main Injector and ultimately the Tevatron. Currently the Booster is operated with a typical intensity of 4.5 x 10 12 particles per beam, roughly twice the value of its design, because of the requirement for high particle flux in various experiments. Its relatively low injection energy provides certain challenges in maintaining beam quality and stability under these increasing intensity demands. An understanding of the effects limiting this intensity could provide enhanced beam stability and reduced downtime due to particle losses and subsequent damage to the accelerator elements. Design of future accelerators can also benefit from a better understanding of intensity effects limiting injection dynamics. Chapter 1 provides a summary of accelerator research during the 20th century leading to the development of the modern synchrotron. Chapter 2 puts forth a working knowledge of the terminology and basic theory used in accelerator physics, and provides a brief description of the Fermilab Booster synchrotron. Synergia, a 3d space-charge modeling framework, is presented, along with some simulation benchmarks relevant to topics herein. Emittance, a commonly used quantity characterizing beam size and quality in a particular plane, is discussed in Chapter 3. Space-charge fields tend to couple the motion among the planes, leading to emittance exchange, and necessitating a simultaneous measurement to obtain a complete emittance description at higher intensities. A measurement is described and results are given. RMS beam emittances are shown to be in keeping with known Booster values at nominal intensities and emittance exchange is observed and accounted for. Unmeasurable correlation terms between the planes are quantified using Synergia, and shown to be at most an 8% effect. Results of studies on the coherent and incoherent shifts of transverse (betatron) frequencies with beam intensity at injection energies are presented. In Chapter 4 the coherent frequency shifts are shown to be due to dipole- and quadrupole-wakefield effects. The asymmetry of the Booster beam chamber through the magnets, as well as the presence of magnet laminations, are responsible for the magnitudes and for the opposing signs of the horizontal and vertical tune shifts caused by these wakefields. Chapter 5 details the procedures for obtaining a linear coherent-tune-shift intensity dependence, yielding -0.009/10 12 in the vertical plane and +0.001/10 12 in the horizontal plane. Data demonstrate a requirement of several hundred turns to accumulate to its maximal value. Two independent studies are compared, corroborating these results. In Chapter 6, a measure of the incoherent tune shift with intensity puts an upper limit on the magnitude of the direct space-charge effect in the Fermilab Booster. A prediction is made for the representative incoherent particle tune shift using a realistic Gaussian distribution, allowing for growth of the beam envelope with intensity, and found to be 0.004/10 12 . The tune-spread dependence obtained by quantification of the resonant stopband width from beam-extinction measurements was measured at 0.005/10 12 , similar to the predicted value. These will be shown to be one order of magnitude smaller than the space-charge term from the Laslett tune shift for a fixed-size, uniform beam.

43 PARTICLE ACCELERATORS↗

White-Rabbit-Disciplined FPGA Readout for Fermilab Timing Events

Fermilab's accelerator timing links broadcast short event codes to thousands of devices at once, but the links themselves carry no absolute notion of time; that comes separately from a White Rabbit reference. This work builds the piece that ties the two together on a single board. On a Xilinx Kria KR260 (Zynq UltraScale+), the programmable logic decodes a real Fermilab TCLK link, stamps every event with an absolute White-Rabbit \{sec, ns\} UTC time, and reads the timestamped stream out over AXI4-Lite; a thin Linux process on the same die publishes each event into a Redis stream on the control network. To exercise the full chain on one board, the decoded events are re-encoded as gigabit ACLK, transmitted out an SFP+ optical port, looped back over a short fiber jumper, and decoded again on the same timeline, and are additionally mirrored as an ACLK-Lite Manchester waveform for benchtop probing. Across sustained, multi-day testing against real Fermilab TCLK, the pipeline has decoded, timestamped, and published hundreds of millions of events with practically zero loss, and folding the timestamped stream on the 60-second accelerator supercycle recovers the machine's periodic structure directly from the published data.

Rossel, Jacob [Fermilab; UC, Berkeley (main)] (ORC↗

Space charge measurements with a high intensity bunch at the Fermilab Main Injector

For Project X, the Fermilab Main Injector will be required to operate with 3 times higher bunch intensity. The plan to study the space charge effects at the injection energy with intense bunches will be discussed. A multi-MW proton facility has been established as a critical need for the U.S. HEP program by HEPAP and P5. Utilization of the Main Injector (MI) as a high intensity proton source capable of delivering in excess of 2 MW beam power will require a factor of three increase in bunch intensity compared to current operations. Instabilities associated with beam loading, space charge, and electron cloud effects are common issues for high intensity proton machines. The MI intensities for current operations and Project X are listed in Table 1. The MI provides proton beams for Fermilab's Tevatron Proton-Antiproton Collider and MINOS neutrino experiments. The proposed 2MW proton facility, Project X, utilizes both the Recycler (RR) and the MI. The RR will be reconfigured as a proton accumulator and injector to realize the factor 3 bunch intensity increase in the MI. Since the energy in the RR and the MI at injection will be 6-8 GeV, which is relatively low, space charge effects will be significant and need to be studied. Studies based on the formation of high intensity bunches in the MI will guide the design and fabrication of the RF cavities and space-charge mitigation devices required for 2 MW operation of the MI. It is possible to create the higher bunch intensities required in the MI using a coalescing technique that has been successfully developed at Fermilab. This paper will discuss a 5 bunch coalescing scheme at 8 GeV which will produce 2.5 x 10{sup 11} protons in one bunch. Bunch stretching will be added to the coalescing process. The required RF parameters were optimized with longitudinal simulations. The beam studies, that have a goal of 85% coalescing efficiency, were started in June 2010.

43 PARTICLE ACCELERATORS↗

A Single-Board Fermilab Timing Pipeline on the Xilinx KR260: Decode, Timestamp, Publish, Mirror

Full-width abstract \renewcommand{\maketitlehookd}{% \begin{abstract} \noindent Fermilab's accelerator timing links broadcast short event codes to thousands of devices at once, but the links themselves carry no absolute notion of time; that comes separately from a White Rabbit reference. This work builds the piece that ties the two together on a single board. On a Xilinx Kria KR260 (Zynq UltraScale+), the programmable logic decodes a real Fermilab TCLK link, stamps every event with an absolute White-Rabbit \{sec, ns\} UTC time, and reads the timestamped stream out over AXI4-Lite; a thin Linux process on the same die publishes each event into a Redis stream on the control network. To exercise the full chain on one board, the decoded events are re-encoded as gigabit ACLK, transmitted out an SFP+ optical port, looped back over a short fiber jumper, and decoded again on the same timeline, and are additionally mirrored as an ACLK-Lite Manchester waveform for benchtop probing. Across sustained, multi-day testing against real Fermilab TCLK, the pipeline has decoded, timestamped, and published hundreds of millions of events with practically zero loss, and folding the timestamped stream on the 60-second accelerator supercycle recovers the machine's periodic structure directly from the published data.

Rossel, Jacob [UC, Berkeley; Fermilab] (ORCID:0009↗

Supporting multiple control systems at Fermilab

The Fermilab control system, ACNET, is used for controlling the Tevatron and all of its pre-accelerators. However, other smaller experiments at Fermilab have been using different controls systems, in particular DOOCS and EPICS. This paper reports some of the steps taken at Fermilab to integrate support for these outside systems. We will describe specific tools that we have built or adapted to facilitate interaction between the architectures. We also examine some of the difficulties that arise from managing this heterogeneous environment. Incompatibilities as well as common elements will be described.

99 GENERAL AND MISCELLANEOUS↗

Ensuring High-Purity Liquid Argon for the LBNF FDC: Collaborative Cryogenics Research Between UNICAMP and Fermilab

Ensuring High-Purity Liquid Argon for the LBNF FDC: Collaborative Cryogenics Research Between UNICAMP and Fermilab R. Doubnik1, M. Adamowski1, F. de M. Blaszczyk1, A. Hahn1, D. Montanari1, R. Mrowca1, Z. West1, C. Adriano2, T. P.M. Alegre2, D. Correia2, A. A. B. Machado2, E. Segreto2, R. G. Gonçalves3, E. M. Assaf6, J. M. Assaf3, D. Cardoso3, M. B. Fontes4, H. Da Motta4, D. Noriler5, P. J. G. Pagliuso2. 1 Fermi National Accelerator Laboratory, PO Box 500, Batavia IL 60510, United States. 2 “Gleb Wataghin” Institute of Physics, UNICAMP, Campinas-SP, 13083-859, Brazil. 3 CPqMAE - Research Center on Advanced Materials and Energy, Federal University of São Carlos (UFSCar), São Carlos, 13565-905, Brazil. 4 The Brazilian Center for Research in Physics (CBPF), Rio de Janeiro-RJ, 22290-180, Brazil. 5 School of Chemical Engineering, UNICAMP, Campinas-SP, 13083-859, Brazil. 6 São Carlos Institute of Chemistry, University of São Paulo, São Carlos-SP, 13566-590, Brazil. Email: rdoubnik@fnal.gov Abstract. The Long-Baseline Neutrino Facility (LBNF) located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, hosts the Deep Underground Neutrino Experiment (DUNE). This experiment employs cryostats containing nearly 70,000 metric tons of high-purity liquid argon (LAr). Ensuring LAr purity is critical for achieving the required electron lifetime, which directly impacts the experiment’s signal-to-noise ratio. The Horizontal Drift (HD) detector demands an electron lifetime exceeding 3 ms within its 3.5 m drift, equivalent to less than 100 parts-per-trillion (ppt) Oxygen contamination, while the Vertical Drift (VD) detector requires over 6 ms electron lifetime within its 6.0 m drift, corresponding to less than 50 ppt Oxygen contamination. To mitigate Nitrogen (N2) quenching of scintillation light, N2 contamination must remain below 1 ppm, as higher levels can result in up to a 20 % loss of light. The Brazil State University of Campinas (UNICAMP) significantly contributes to LBNF FDC through the development of argon purification and regeneration systems for HD and VD cryostats. UNICAMP designed and constructed the Purification Liquid Argon Cryostat (PuLArC), a small-scale test facility holding approximately 90 liters of LAr. Tests using PuLArC demonstrated that 1.2 kg of Li-FAU zeolite could reduce N₂ contamination from 20-50 ppm to 0.1-1.0 ppm within 1-2 hours. Tests at Fermilab’s Iceberg cryostat (2,596 liters) confirmed scalability, with 3 kg of Li-FAU reducing N₂ contamination from ~5 ppm to <1 ppm over 96 hours cycles without active circulation. This presentation will detail the research methods, test setups, and results, showcasing the potential of Li-FAU as an alternative to Molecular Sieve 4A for large-scale LAr systems. This advancement enhances DUNE's precision and demonstrates the impact of international collaboration on cryogenic research.

Doubnik, Roza [Fermilab]↗

Contextual modeling and Bayesian Optimization for Improved Injection at the Fermilab Booster

The Fermilab accelerator complex delivers high-intensity proton beams to serve the lab’s neutrino, muon, and fixed-target programs. A normal-conducting Linac accelerates H− beam to 400 MeV and injects into the Booster rapid cycling synchrotron via charge exchange, which accelerates protons to 8 GeV. Injection from the Linac into the Booster is a critical area for high-power performance of the Fermilab proton complex. The Booster is a high-intensity proton ring with extreme space-charge forces which necessitates precise control over the beam losses through the acceleration cycle. The main challenge for the reliability of Booster performance is compensating for drifting conditions in the beam from the Linac, which can drift daily in energy by up to O(1) MeV w.r.t. design. Drifts in Linac orbit and energy must be corrected to match the Booster, while simultaneously accommodating interdependent drifts in transverse and longitudinal beam quality. Operationally, compensation for these changes is addressed by manual tuning of the Linac output energy and/or Booster acceptance, which can be inefficient and time-consuming. This works describes contextual Bayesian Optimization for injection tuning that takes into account the state of Linac beam via information from instrumentation in the injection line (Beam position monitors (BPMs), beam loss monitors (BLMs), wire scanners for transverse profiles (WSs)), as well as RF cavity setting parameters from the Linac.

Sharankova, R. [Fermilab] (ORCID:000000027014593X)↗

Status of the data acquisition, trigger, and slow control systems of the Mu2e experiment at Fermilab

The Mu2e experiment at the Fermilab will search for a coherent neutrinoless conversion of a muon into an electron in the field of an aluminum nucleus with a sensitivity improvement by a factor of 10,000 over existing limits. In this work, the Mu2e Trigger and Data Acquisition System (TDAQ) uses otsdaq framework as the online Data Acquisition System (DAQ) solution. Developed at Fermilab, otsdaq integrates several framework components — an artdaq-based DAQ, an art-based event processing, and an EPICS-based detector control system (DCS), and provides a uniform multi-user interface to its components through a web browser. Data streams from the Mu2e tracker and calorimeter are handled by the artdaq-based DAQ and processed by a one-level software trigger implemented within the art framework. Events accepted by the trigger have their data combined, post-trigger, with the separately read out data from the Mu2e Cosmic Ray Veto system. Foundation of the Mu2e DCS, EPICS – an Experimental Physics and Industrial Control System – is an open-source platform for monitoring, controlling, alarming, and archiving. A prototype of the TDAQ and the DCS systems has been built and tested over the last three years at Fermilab’s Feynman Computing Center, and now the production system installation is underway. This work presents their status and focus on the installation plans and procedures for racks, workstations, network switches, gateway computers, DAQ hardware, slow controls implementation, and testing.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modernizing Fermilab&#x27;s Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS↗

Light Dark Matter Searches at Fermilab

Accelerator-based dark sector searches present an excellent opportunity to discover the particles that constitute cosmological dark matter in a laboratory setting. At Fermilab, an exciting program of dark sector searches is now underway across a suite of experiments using high intensity, low- and high-energy proton beamlines. Some of these searches are being carried out at neutrino experiments, which bring high luminosity sources of meson decays near large, sensitive detectors and can therefore probe a variety of dark sector models. Additionally, there have been recent studies highlighting the sensitivity of future and proposed experiments to light dark matter and other dark sector models using protons from Fermilab s new PIP-II linac, currently under construction. In this talk, I will give an overview of Fermilab s accelerator-based dark sector search program, highlight recent results, and discuss future prospects.

43 PARTICLE ACCELERATORS↗

Upgrading Fermilab s Accelerator Control System with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

Study of low-energy neutrino factory at the Fermilab to DUSEL baseline

This note constitutes a Letter of Interest to study the physics capabilities of, and to develop an implementation plan for, a neutrino physics program based on a Low-Energy Neutrino Factory at Fermilab providing a {nu} beam to a detector at the Deep Underground Science and Engineering Laboratory. It has been over ten years since the discovery of neutrino oscillations [1] established the existence of neutrino masses and leptonic mixing. Neutrino oscillations thus provide the first evidence of particle physics beyond the Standard Model. Most of the present neutrino oscillation data are well described by the 3{nu} mixing model. While a number of the parameters in this model have already been measured, there are several key parameters that are still unknown, namely, the absolute neutrino mass scale, the precise value of the mixing angles, the CP phase {delta} and hence the presence or absence of observable CP-violation in the neutrino sector. Future measurements of these parameters are crucial to advance our understanding of the origin of neutrino masses and of the nature of flavor in the lepton sector. The ultimate goal of a program to study neutrino oscillations goes beyond a first measurement of parameters, and includes a systematic search for clues about the underlying physics responsible for the tiny neutrino masses, and, hopefully, the origin of the observed flavor structure in the Standard Model, as well as the possible source of the observed matter-antimatter asymmetry in the Universe. To achieve this goal will almost certainly require precision measurements that go well beyond the presently foreseen program. One of the most promising experimental approaches to achieve some of the goals mentioned above is to build a Neutrino Factory and its corresponding detector. The Neutrino Factory produces neutrino beams from muons which have been accelerated to an energy of, for example, 25 GeV. The muons are stored in a race-track shaped decay ring and then decay along the straight sections of the ring. Since the decay of the muon is well understood, the systematic uncertainties associated with a neutrino beam produced in this manner are very small. Beam diagnostics in the decay ring and a specially designed near detector further reduce the systematic uncertainties of the neutrino beam produced at the Neutrino Factory. In addition since the muon (anti-muon) decays produce both muon and anti-electron neutrinos (anti-muon and electron neutrinos), many oscillation channels are accessible from a Neutrino Factory, further extending the reach in the oscillation parameter space. Over the last decade there have been a number of studies [2-5] that have explored the discovery reach of Neutrino Factories in the small mixing angle, {theta}{sub 13}, and its capability to determine the mass hierarchy and determine if CP is violated in leptons through observation of phase parameter, {delta}. The most recent study to be completed [6], the International scoping study of a future Neutrino Factory and super-beam facility (the ISS), studied the physics capabilities of various future neutrino facilities: super-beam, {beta}-Beam and Neutrino Factory and has determined that the Neutrino Factory with an energy of {approx}25 GeV has the best discovery reach for small values of sin{sup 2}2{theta}{sub 13}, reaching an ultimate sensitivity of between 10{sup -5} and 10{sup -4}. However, for larger values of sin{sup 2}2{theta}{sub 13} (> 10{sup -3}), the sensitivity of other experimental approaches is competitive to that of the 25 GeV Neutrino Factory. The wide-band neutrino beam (WBB) produced at Fermilab and directed towards DUSEL [7] is one such competitor. For the case where sin{sup 2}2{theta}{sub 13} (> 10{sup -3}) is large, initial studies have shown that a Low-Energy Neutrino Factory [8-10] with an energy of, for example, 4 GeV, may be both cost-effective and offers exquisite sensitivity. The required baseline for a Low-Energy Neutrino Factory matches Fermilab to DUSEL and, therefore, its physics potential and implementation should be studied in the context of DUSEL along with those for the WBB.

43 PARTICLE ACCELERATORS↗

Status and specifications of a Project X front-end accelerator test facility at Fermilab

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility. Fermilab's future involves new facilities to advance the intensity frontier. In the early 2000's, the vision was a pulsed, superconducting, 8 GeV linac capable of injecting directly into the Fermilab Main Injector. Prototyping the front-end of such a machine started in 2005 under a program named the High Intensity Neutrino Source (HINS). While the HINS test facility was being constructed, the concept of a new, more versatile accelerator for the intensity frontier, now called Project X, was forming. This accelerator comprises a 3 GeV CW superconducting linac with an associated experimental program, followed by a pulsed 8 GeV superconducting linac to feed the Main Injector synchrotron. The CW Project X design is now the model for Fermilab's future intensity frontier program. Although CW operation is incompatible with the original HINS front-end design, the installation remains useful for development and testing many Project X components.

43 PARTICLE ACCELERATORS↗

RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the results of these tests and lessons learned which will have an impact on future module testing at Fermilab. Since November 2010 Cryomodule 1 has been operating at 2 Kelvin. After evaluating each of the eight cavities while individually powered, the entire module has recently been powered and peak operation determined as shown in Figure 4. Several more weeks of measurements are planned before the module is warmed up, removed and replaced with Cryomodule 2 now under assembly at Fermilab.

43 PARTICLE ACCELERATORS↗

A Wire Position Monitor System for the 1.3 FHZ Tesla-Style Cryomodule at the Fermilab New-Muon-Lab Accelerator

The first cryomodule for the beam test facility at the Fermilab New-Muon-Lab building is currently under RF commissioning. Among other diagnostics systems, the transverse position of the helium gas return pipe with the connected 1.3 GHz SRF accelerating cavities is measured along the {approx}15 m long module using a stretched-wire position monitoring system. An overview of the wire position monitor system technology is given, along with preliminary results taken at the initial module cooldown, and during further testing. As the measurement system offers a high resolution, we also discuss options for use as a vibration detector. An electron beam test facility, based on superconducting RF (SRF) TESLA-style cryomodules is currently under construction at the Fermilab New-Muon-Lab (NML) building. The first, so-called type III+, cryomodule (CM-1), equipped with eight 1.3 GHz nine-cell accelerating cavities was recently cooled down to 2 K, and is currently under RF conditioning. The transverse alignment of the cavity string within the cryomodule is crucial for minimizing transverse kick and beam break-up effects, generated by the high-order dipole modes of misaligned accelerating structures. An optimum alignment can only be guaranteed during the assembly of the cavity string, i.e. at room temperatures. The final position of the cavities after cooldown is uncontrollable, and therefore unknown. A wire position monitoring system (WPM) can help to understand the transverse motion of the cavities during cooldown, their final location and the long term position stability after cryo-temperatures are settled, as well as the position reproducibility for several cold-warm cycles. It also may serve as vibration sensor, as the wire acts as a high-Q resonant detector for mechanical vibrations in the low-audio frequency range. The WPM system consists out of a stretched-wire position detection system, provided with help of INFN-Milano and DESY Hamburg, and RF generation and read-out electronics, developed at Fermilab.

43 PARTICLE ACCELERATORS↗

Cryogenic Testing of HL-LHC Q1/Q3 Cryo-Assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 Cryo-Assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-Assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressures up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvements for subsequent tests.

Rabehl, R. [Fermilab]↗

Cryogenic testing of HL-LHC Q1/Q3 cryo-assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvement for subsequent tests.

Rabehl, R. [Fermilab] (ORCID:0000000311130030)↗

HEPCloud Operations at Fermilab—The First Five Years

The HEPCloud Facility at Fermilab has now been in production operation for five years. This facility is a unified provisioning gateway to US high performance computing centers, including NERSC, OLCF, and ALCF, other large supercomputers run by the NSF, and commercial clouds. HEPCloud delivers hundreds of millions of core-hours yearly for CMS. HEPCloud also serves other Fermilab experiments including DUNE, Mu2e, Muon g-2, and NOvA. In this paper we present the practical considerations of operating a distributed facility such as HEPCloud. We also mention some of the interesting research and development that HEPCloud has been used for including GPU-based machine learning inference servers, and tests of Quantum Computing.

Timm, Steven [Fermilab]↗