Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FUKUSHIMA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Effects of chronic low-dose radiation on cataract prevalence and characterization in wild boar (Sus scrofa) from Fukushima, Japan

This study evaluated cataracts in wild boar exposed to chronic low-dose radiation. We examined wild boar from within and outside the Fukushima Exclusion Zone for nuclear, cortical, and posterior subcapsular (PSC) cataracts in vivo and photographically. Plausible upper-bound, lifetime radiation dose for each boar was estimated from radioactivity levels in each animal’s home range combined with tissue concentrations of 134+137Cesium. Fifteen exposed and twenty control boar were evaluated. There were no significant differences in overall prevalence or score for cortical or PSC cataracts between exposed and control animals. Nuclear (centrally located) cataracts were significantly more prevalent in exposed boar (p<0.05) and had statistically higher median scores. Plausible upper-bound, lifetime radiation dose ranged from 1 to 1,600 mGy in exposed animals, with no correlation between dose and cortical or PSC score. While radiation dose and nuclear score were positively associated, the impact of age could not be completely separated from the relationship. Additionally, the clinical significance of even the highest scoring nuclear cataract was negligible. Based on the population sampled, wild boar in the Fukushima Exclusion Zone do not have a significantly higher prevalence or risk of cortical or PSC cataracts compared to control animals.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Increased abundance of a common scavenger affects allocation of carrion but not efficiency of carcass removal in the Fukushima Exclusion Zone

Abstract The 2011 nuclear accident in Fukushima, Japan caused the evacuation of > 100,000 people and prompted studies on environmental impacts of radiological contamination. However, few researchers have explored how the human evacuation has affected ecosystem processes. Despite contamination, one common scavenger (wild boar, Sus scrofa ) is 2–3× more abundant inside the Fukushima Exclusion Zone (FEZ). Shifts in abundance of some scavenger species can have cascading effects on ecosystems, so our objective was to investigate impacts of the evacuation and the resulting increase in wild boar on vertebrate scavenger communities. We deployed cameras at 300 carcasses in the FEZ and a nearby inhabited area, and quantified carcass fate, scavenger species, and detection/persistence times. We also tested effects of carcass size and habitat on scavenger community composition and efficiency by balancing trials across two carcass sizes and habitats in each zone. Overall scavenger richness and carcass removal rates (73%) were similar in the FEZ and inhabited area, but species-specific carcass removal rates and occurrence differed between zones. Wild boar removed substantially more carcasses inside the FEZ, with implications for nutrient and contaminant distribution. Our results suggest carcass size affects scavenging dynamics more than human activity or habitat, and abundance changes of common scavengers can influence carrion resource allocation.

59 BASIC BIOLOGICAL SCIENCES↗

Post Fukushima tsunami simulations for Malaysian coasts

The recent recurrences of mega tsunamis in the Asian region have rekindled concern regarding potential tsunamis that could inflict severe damage to affected coastal facilities and communities. The 11 March 2011 Fukushima tsunami that crippled nuclear power plants in Northern Japan has further raised the level of caution. The recent discovery of petroleum reserves in the coastal water surrounding Malaysia further ignites the concern regarding tsunami hazards to petroleum facilities located along affected coasts. Working in a group, federal government agencies seek to understand the dynamics of tsunami and their impacts under the coordination of the Malaysian National Centre for Tsunami Research, Malaysian Meteorological Department. Knowledge regarding the generation, propagation and runup of tsunami would provide the scientific basis to address safety issues. An in-house tsunami simulation models known as TUNA has been developed by the authors to assess tsunami hazards along affected beaches so that mitigation measures could be put in place. Capacity building on tsunami simulation plays a critical role in the development of tsunami resilience. This paper aims to first provide a simple introduction to tsunami simulation towards the achievement of tsunami simulation capacity building. The paper will also present several scenarios of tsunami dangers along affected Malaysia coastal regions via TUNA simulations to highlight tsunami threats. The choice of tsunami generation parameters reflects the concern following the Fukushima tsunami.

54 ENVIRONMENTAL SCIENCES↗

Introduction to the Special Issue on the U.S. Response to the Fukushima Accident

Provides an introduction to the May 2012 issue of Health Physics, based on a special session at the 2011 Health Physics Society (HPS) annual meeting that focused on the United States&#x27; radiological response to the Fukushima Daiichi Nuclear Power Plant accident. This introduction outlines the papers in this important issue and describes the activities of the U.S. response participants, including the U.S. Department of Energy National Nuclear Security Administration (DOE/NNSA), Department of Defense, the U.S. Nuclear Regulatory Commission (NRC) and other organizations. Observations are provided and the stage is set for the articles in this issue which document many of the activities undertaken during the Fukushima accident and which describe challenges faced and valuable lessons learned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear safety regulation in the post-Fukushima era

The March 2011 Fukushima Daiichi nuclear accident prompted regulators around the world to take a hard look at their requirements for protecting nuclear plants against severe accidents. In the United States, the Nuclear Regulatory Commission (NRC) ordered a “top-to-bottom” review of its regulations, and ultimately approved a number of safety upgrades. It rejected other risk-reduction measures, however, using a screening process that did not adequately account for impacts of large-scale land contamination events. Among rejected options was a measure to end dense packing of 90 spent fuel pools, which we consider critical for avoiding a potential catastrophe much greater than Fukushima. Unless the NRC improves its approach to assessing risks and benefits of safety improvements—by using more realistic parameters in its quantitative assessments and also taking into account societal impacts—the United States will remain needlessly vulnerable to such disasters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fukushima Daiichi Accident Study Information Portal Quality Assurance Review: Pre-Public Release

This design review compared the current product with the original intent set forth in the initial internet portal design found in the document: Fukushima Daiichi Database Design, Revision 5. The current revision of the Fukushima Daiichi Accident Study Information Portal (FDASIP) is 1.0.21. This revision is one that restricts access for each user based on roles granted by the project administrator. The public access revision is currently on the test server and will be considered in this review as well.

42 ENGINEERING↗

Fukushima Daiichi accident study: status as of April 2012

Japan suffered an immense tragedy as a result of the 2011 Tohuku earthquake and resulting tsunami that caused widespread damage to the infrastructure of the country and more than 20,000 deaths, most from the tsunami. The magnitude 9 (Mw)1 earthquake, centered roughly 20 miles deep and 43 miles east of Japan, took place at 14:46 (JST) on March 11, 2011, and produced catastrophic damage to buildings, roads, communications, and regional electrical power. Damage to the Sendai region was especially large owing to its proximity to the epicenter of the seismic event that produced a tsunami with an estimated height that exceeded 14 meters at the site of the Fukushima reactors. The earthquake at 14:46 JST resulted in a scram and a regional loss of electrical power, requiring the Fukushima Daiichi power plants (Units 1, 2, and 3) to start emergency on-site diesel powered generators to maintain cooling at the plants. Unit 4 was defueled at the time for maintenance, and Units 5 and 6 were in a state of cold shutdown for maintenance.

Gauntt, Randall O.↗

Imaging the Core of Fukushima Reactor with Muons

The 9.0-magnitude earthquake, followed by the vast tsunami on March 11, 2011, caused a nuclear crisis at the Fukushima Daiichi reactors. Damage of the reactor cores attracted worldwide attention to the issue of the fundamental safety of nuclear energy. The Japanese government announced a cold shutdown in December 2011, and began a new phase of cleanup and decommissioning. However, it is difficult to plan the dismantling of the reactors without a realistic estimate of the extent of the damage to the cores and knowledge of the location of the melted fuel. Access to the reactor buildings is very limited due to high radiation fields. Los Alamos researchers have used experiments and modeling to show how muon imaging with detectors external to the reactors can enable damage assessment inside Fukushima. Physical Review Letters, AIP Advances, and the Journal of Applied Physics have published different aspects of this work.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Fukushima Daiichi Unit 1 Uncertainty Analysis -- Preliminary Selection of Uncertain Parameters and Analysis Methodology

Sandia National Laboratories (SNL) plans to conduct uncertainty analyses (UA) on the Fukushima Daiichi unit (1F1) plant with the MELCOR code. The model to be used was developed for a previous accident reconstruction investigation jointly sponsored by the US Department of Energy (DOE) and Nuclear Regulatory Commission (NRC). However, that study only examined a handful of various model inputs and boundary conditions, and the predictions yielded only fair agreement with plant data and current release estimates. The goal of this uncertainty study is to perform a focused evaluation of uncertainty in core melt progression behavior and its effect on key figures-of-merit (e.g., hydrogen production, vessel lower head failure, etc.). In preparation for the SNL Fukushima UA work, a scoping study has been completed to identify important core melt progression parameters for the uncertainty analysis. The study also lays out a preliminary UA methodology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Program, U.S. Efforts in Support of Examinations at Fukushima Daiichi-2017 Evaluations

Although the accident signatures from each unit at the Fukushima Daiichi Nuclear Power Station (NPS) [Daiichi] differ, much is not known about the end-state of core materials within these units. Some of this uncertainty can be attributed to a lack of information related to cooling system operation and cooling water injection. There is also uncertainty in our understanding of phenomena affecting: a) in-vessel core damage progression during severe accidents in boiling water reactors (BWRs), and b) accident progression after vessel failure (ex-vessel progression) for BWRs and Pressurized Water Reactors (PWRs). These uncertainties arise due to limited full scale prototypic data. Similar to what occurred after the accident at Three Mile Island Unit 2, these Daiichi units offer the international community a means to reduce such uncertainties by obtaining prototypic data from multiple full-scale BWR severe accidents. Information obtained from Daiichi is required to inform Decontamination and Decommissioning activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document, which has been updated to include FY2017 information, summarizes results from U.S. efforts to use information obtained by TEPCO Holdings to enhance the safety of existing and future nuclear power plant designs. This effort, which was initiated in 2014 by the Reactor Safety Technologies Pathway of the Department of Energy Office of Nuclear Energy Light Water Reactor (LWR) Sustainability Program, consists of a group of U.S. experts in LWR safety and plant operations that have identified examination needs and are evaluating TEPCO Holdings information from Daiichi that address these needs. Each year, annual reports include examples demonstrating that significant safety insights are being obtained in the areas of component performance, fission product release and transport, debris end-state location, and combustible gas generation and transport. In addition to reducing uncertainties related to severe accident modeling progression, these insights are being used to update guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, reduced uncertainties in modeling the events at Daiichi will improve the realism of reactor safety evaluations and inform future D&D activities by improving the capability for characterizing potential hazards to workers involved with cleanup activities. Highlights in this FY2017 report include new insights with respect to the forces required to produce the observed Daiichi Unit 1 (1F1) shield plug endstate, the observed leakage from 1F1 components, and the amount of combustible gas generation required to produce the observed explosions in Daiichi Units 3 and 4 (1F3 and 1F4). This report contains an appendix with a list of examination needs that was updated after U.S. experts reviewed recently obtained information from examinations at Daiichi. Additional details for higher priority, near-term, examination activities are also provided. This report also includes an appendix with a description of an updated website that has been reformatted to better assist U.S. experts by providing information in an archived retrievable location, as well as an appendix summarizing U.S. Forensics activities to host the TMI-2 Knowledge Transfer and Relevance to Fukushima Meeting that was held in Idaho Falls, ID, on October 10-14, 2016.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Post-Fukushima Research and Development Strategy for MELCOR

Numerous MELCOR modeling improvements and analyses have been performed in the time since the severe accidents at Fukushima Daiichi Nuclear Power Station that occurred in March 2011. This report briefly summarizes the related accident reconstruction and uncertainty analysis efforts. It further discusses a number of potential pursuits to further advance MELCOR modeling and analysis of the severe accidents at Fukushima Daiichi and severe accident modeling in general. Proposed paths forward include further enhancements to identified MELCOR models primarily impacting core degradation calculations, and continued application of uncertainty analysis methods to improve model performance and a develop deeper understanding of severe accident progression.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - November 2022 Meeting Notes and Information Request Status

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2023 (FY2023) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy, is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Fukushima-related information and associated discussions during these meetings benefit operating, new, and advanced reactors. Significant safety insights have been and are continuing to be obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional benefits to the operating fleet and new LWR and non-LWR designs. U.S. evaluations of obtained examination information and input regarding future Daiichi examinations are of interest to several organizations within Japan. Since its inception, the U.S. has provided consensus input for high priority time-sequenced examination tasks and supporting research activities. In their Mid-to-Long-term Examination Plan for 1F investigations, TEPCO included all remaining U.S. consensus information requests and additional information requests they identified. TEPCO periodically provides reports on the status of these requests (reflecting D&D priorities, new insights from investigations, and new technologies that become available). Hence, U.S. experts agreed that it was appropriate for TEPCO to track and prioritize these information requests as D&D progresses. U.S. experts will continue to review and comment on the information obtained from examinations and, as needed, provide additional details and relevant background material to support future examinations. As documented in this report, several other items, such as additional details on information requests pertaining to ex-vessel examinations, relevant references from prior research, additional documents to provide insights regarding recent investigation findings, and reviews of recently released documents, were agreed to during the FY2023 meeting.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NARAC Modeling During the Response to the Fukushima Dai-ichi Nuclear Power Plant Emergency

This paper summarizes the activities of the National Atmospheric Release Advisory Center (NARAC) during the Fukushima Dai-ichi nuclear power plant crisis. NARAC provided a wide range of products and analyses as part of its support including: (1) Daily Japanese weather forecasts and hypothetical release (generic source term) dispersion predictions to provide situational awareness and inform planning for U.S. measurement data collection and field operations; (2) Estimates of potential dose in Japan for hypothetical scenarios developed by the Nuclear Regulatory Commission (NRC) to inform federal government considerations of possible actions that might be needed to protect U.S. citizens in Japan; (3) Estimates of possible plume arrival times and dose for U.S. locations; and (4) Plume model refinement and source estimation based on meteorological analyses and available field data. The Department of Energy/National Nuclear Security Administration (DOE/NNSA) deployed personnel to Japan and stood up 'home team' assets across the DOE complex to aid in assessing the consequences of the releases from the Fukushima Dai-ichi Nuclear Power Plant. The DOE Nuclear Incident Team (NIT) coordinated response activities, while DOE personnel provided predictive modeling, air and ground monitoring, sample collection, laboratory analysis, and data assessment and interpretation. DOE deployed the Aerial Measuring System (AMS), Radiological Assistance Program (RAP) personnel, and the Consequence Management Response Team (CMRT) to Japan. DOE/NNSA home team assets included the Consequence Management Home Team (CMHT); National Atmospheric Release Advisory Center (NARAC); Radiation Emergency Assistance Center/Training Site (REAC/TS); and Radiological Triage. NARAC was activated by the DOE/NNSA on March 11, shortly after the Tohoku earthquake and tsunami occurred. The center remained on active operations through late May when DOE ended its deployment to Japan. Over 32 NARAC staff members, supplemented by other LLNL scientists, invested over 5000 person-hours of time and generated over 300 analyses and predictions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Discussion - Next Step for Fukushima Daiichi Muon Tomography

Specification of Fukushima Daiichi Muon Tomography (FMT): (1) 18-feet (5.5-m) drift tube, 2-inch (5-cm) diameter; (2) 108 tubes per layer; (3) Unit layer = 2 layer (detection efficiency: 0.96 x 0.96 = 92%); (4) 12 or 16 layer per module; (5) 16 layers allows momentum analysis at 30% level; (6) 2 module per super module (5.5 x 11 m{sup 2}); and (7) FMT = 2 super module. By deploying MMT next to a research reactor, we will be able to measure the impact of low level radiation fields on muon tomography and reconstruction processes. Radiation level during reactor operation is {approx}50 {micro}Sv/h which provides similar radiation environment of inside the FMT radiation shield at Fukushima Daiichi. We will implement coincidence algorithm on the FPGA board.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of a Method for Remote Detection of Fuel Relocation Outside the Original Core Volumes of Fukushima Reactor Units 1-3

This paper presents the results of a study to evaluate the feasibility of remotely detecting and quantifying fuel relocation from the core to the lower head, and to regions outside the reactor vessel primary containment of the Fukushima 1-3 reactors. The goals of this study were to determine measurement conditions and requirements, and to perform initial radiation transport sensitivity analyses for several potential measurement locations inside the reactor building. The radiation transport sensitivity analyses were performed based on reactor design information for boiling water reactors (BWRs) similar to the Fukushima reactors, ORIGEN2 analyses of 3-cycle BWR fuel inventories, and data on previously molten fuel characteristics from TMI- 2. A 100 kg mass of previously molten fuel material located on the lower head of the reactor vessel was chosen as a fuel interrogation sensitivity target. Two measurement locations were chosen for the transport analyses, one inside the drywell and one outside the concrete biological shield surrounding the drywell. Results of these initial radiation transport analyses indicate that the 100 kg of previously molten fuel material may be detectable at the measurement location inside the drywell, but that it is highly unlikely that any amount of fuel material inside the RPV will be detectable from a location outside the concrete biological shield surrounding the drywell. Three additional fuel relocation scenarios were also analyzed to assess detection sensitivity for varying amount of relocated material in the lower head of the reactor vessel, in the control rods perpendicular to the detector system, and on the lower head of the drywell. Results of these analyses along with an assessment of background radiation effects and a discussion of measurement issues, such as the detector/collimator design, are included in the paper.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MELCOR Applications to SOARCA and Fukushima

This PowerPoint presentation was organized as follows: Background; Overview of Fukushima Accidents; Comparisons of SOARCA Study with Fukushima accidents; Equipment functioning in real-world accidents; and, Conclusions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Environmental Remediation Activities in Japan Following the Fukushima Dai-ichi Reactor Incident - 12603

In March 2011, the Fukushima Dai-ichi reactor power plant was crippled by the Great Pacific earthquake and subsequent tsunami. Much of the focus in the news was on the reactor site itself as the utility company (TEPCO), the Japanese government, and experts from around the world worked to bring the damaged plants into a safe shutdown condition and stem the release of radioactivity to the environment. Most of the radioactivity released was carried out to sea with the prevailing winds. Still, as weather patterns changed and winds shifted, a significant plume of radioactive materials released from the plant deposited in the environment surrounding the plant, contaminating large land areas of the Fukushima Prefecture. The magnitude of the radiological impact to the surrounding environmental is so large that the Japanese government has had to reevaluate the meaning of 'acceptably clean'. In many respects, 'acceptably clean' cannot be a one-size-fits-all standard. The economics costs of such an approach would make impossible what is already an enormous and costly environmental response and remediation task. Thus, the Japanese government has embarked upon an approach that is both situation-specific and reasonably achievable. For example, the determination of acceptably clean for a nursery school or kindergarten play yard may be different from that for a parking lot. The acceptably clean level of residual radioactivity in the surface soil of a rice paddy is different from that in a forested area. The recognized exposure situation (scenario) thus plays a large role in the decision process. While sometimes complicated to grasp or implement, such an approach does prioritize national resources to address environment remediation based upon immediate and significant risks. In addition, the Japanese government is testing means and methods, including advanced or promising technologies, that could be proven to be effective in reducing the amount of radioactivity in the environment beyond a fixed, concentration based limit. Essentially, the definition of acceptably clean includes the concept of reasonably achievable, given the available technology, means and methods, and the cost to implement such. The Japanese government recently issued three technology demonstration contracts expressly designed to test and evaluate the available technologies, means, and methods, which, if implemented, might produce the greatest risk reduction from environmental contamination for the best value. One of the Japanese contract holders, Obayashi JV, has teamed with AMEC to demonstrate the applicability and capabilities of the Orion ScanPlot{sup SM} and ScanSort{sup SM} technologies in radiologically impacted towns both inside and immediately outside the 20 km restricted zone. This presentation provides some unique images and informative insight into the environmental radioactive impacts in and around the exclusion zone. It will provide a look at one element of the Japanese government?s efforts to achieve the greatest risk reduction that is reasonably achievable. The Orion ScanPlot{sup SM} and ScanSort{sup SM} are being used with success on the Japan Town Demonstration Project to assess pre-remedial action contamination levels, document the post-remedial action contamination levels and to precisely measure and segregate excavated soils based on their radioactive content and the prescribed segregation limits (DCS). Initial results suggest that these technologies could provide capabilities to the remedial action efforts that would result in considerable improvements in field data certainty and compliance with remedial objectives while reducing overall costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dose Estimation in Recycling of Decontamination Soil Due to Fukushima NPS Accident as Coastal Levees - 18138

After the Fukushima Nuclear Power Station accident, large quantities of radiocesium-contaminated soil generated from decontamination activities have been stored in the Fukushima prefecture. To complete the final disposal of decontamination soil, the Ministry of the Environment of Japan presented policy to reduce the disposal volume by using low-level decontamination soil as recycled materials. The use will be limited to civil engineering structures in public projects, such as coastal levee and road embankment, and be managed by the public authority. However, there has been no example or safety assessment of recycling of decontamination soil. To contribute to guideline development for the recycling by the Ministry of the Environment, we conducted the safety assessment for recycling of decontamination soil as coastal levee. First, we evaluated additional doses to workers and the public in the case of construction and service of coastal levee based on Japanese construction standards. From the result, the radioactive cesium concentration level of recycled materials, with which all additional doses meet the radiation criterion of 1 mSv/y, was derived to be 6,800 Bq/kg. For general designs of coastal levee in Japan, additional doses to the public in the case of service were below 10 μSv/y with derived radioactivity level. Finally, the radiation safety for collapse of coastal levee caused by natural disasters was evaluated to be on the safe side. With derived radioactivity level, additional doses in the case of disaster were confirmed to be below 1 mSv/y. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗