Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Environmental Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Environmental control and life support system evolution analysis

The Space Station Freedom Environmental Control and Life Support System (ECLSS) will have to accommodate the changes made to Freedom as it evolves over 30 years or more. Requirements will change as pressurized modules are added, crew numbers increase, and as the tasks to be performed change. This evolution will result in different demands on the ECLSS which will have to adapt to these changes. Technologies other than the baselined ones may be better able to perform the various ECLSS functions and technological advances will result in improved life support hardware better able to meet the new requirements.

Wieland, Paul↗

Methodology and Assumptions of Contingency Shuttle Crew Support (CSCS) Calculations Using ISS Environmental Control and Life Support Systems

The current International Space Station (ISS) Environmental Control and Life Support (ECLS) system is designed to support an ISS crew size of three people. The capability to expand that system to support nine crew members during a Contingency Shuttle Crew Support (CSCS) scenario has been evaluated. This paper describes how the ISS ECLS systems may be operated for supporting CSCS, and the durations expected for the oxygen supply and carbon dioxide control subsystems.

Prokhorov, Kimberlee↗

International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

Williams, David E.↗

Electrolyzer Exergy Analysis for an Environmental Control and Life Support System

An exergy based analysis of the Environmental Control and Life Support System (ECLSS) aboard the International Space Station (ISS) is conducted to assess its overall performance. Exergy is chosen as a measure of performance because it accounts for both the first and second laws of thermodynamics. The exergy efficiency of a system is first defined as the total exergy destroyed by the system relative to the total exergy input to the system. To determine the ECLSS exergy efficiency, the system is divided into constituent subsystems which in turn are divided into assemblies and components. Based on this system decomposition, exergy balances are derived for each assembly or component. Exergy balances and supporting calculations are implemented in MATLAB® code. The major subsystems of the ECLSS considered in this analysis include the Atmosphere Revitalization Subsystem (ARS), Atmosphere Control and Supply Subsystem (ACS), Temperature and Humidity Control Subsystem (THC), Water Recovery and Management Subsystem (WRM), and Waste Management Subsystem (WM). This paper focuses on the ARS and its constituent assemblies and components. Exergy efficiency of the ARS and its constituent assemblies and components is first presented. The Oxygen Generation Assembly (OGA), an assembly within the ARS, is then highlighted because the exergy destruction by the OGA is a large magnitude contributor to the overall exergy destruction of the ECLSS. The OGA produces oxygen to meet the crew's metabolic demand via water electrolysis in a proton exchange membrane (PEM) electrolyzer. The exergy destruction of the OGA's PEM electrolyzer is a function of the amount of oxygen produced, which determines the necessary current density and voltage drop across the PEM electrolyzer. In addition, oxygen production in the PEM electrolyzer requires deviation from the Nernst potential, presenting trade-offs between the exergy efficiency and critical life support functions. The results of parametric studies of PEM electrolyzer performance are presented with an emphasis on the impacts of polarization and operational conditions on exergy efficiency.

Chow, Raymond↗

Overview of the Environmental Control and Life Support System (ECLSS) Testing At MSFC

Previously, almost all water used by the crew during space flight has been transported from earth or generated in-flight as a by-product of fuel cells. Additionally, this water has been stored and used for relatively short periods. To achieve the United States' commitment to a permanent manned presence in space, more innovative techniques are demanded. Over 20,000 pounds of water and large quantities of air would have to be transported to the International Space Station (ISS) every 90 days with a corresponding amount of waste returned to earth, for an 8-person crew. This approach results in prohibitive logistics costs, and necessitates near complete recovery and recycling of water. The potential hazards associated with long-term reuse of reclaimed water and revitalized air resulted in the recognition that additional characterization of closed-loop systems and products is essential. Integrated physical/chemical systems have been designed, assembled, and operated to provide air and potable water meeting ISS quality specifications. The purpose of the Environmental Control and Life Support System (ECLSS) test program at NASA's Marshall Space Flight Center is to conduct research related to the performance of the ISS and its Environmental Control components. The ECLSS Test Program encompasses the Water Recovery Test (WRT), the Integrated Air Revitalization Test (IART), and Life Testing, which permits ECLSS design evaluation. These subsystems revitalize air and reclaim waste waters representative of those to be generated on-orbit. This paper provides an overview of MSFC's 1997 ECLSS testing. Specific tests include: the Stage 10 Water Recovery Test; the Contaminant Injection Test; the Performance Enhancement Test and Life Testing of the Four Bed Molecular Sieve; the Oxygen Generator Assembly Life Test; and the ISS Water Distribution Biofilm Life Test.

Traweek, Mary S.↗

Stress Corrosion Evaluation of Inconel X-750 for the International Space Station Environmental Control and Life Support System

Inconel X-750 alloy was evaluated for stress corrosion in support of the International Space Station Environmental Control and Life Support System. Round tensile specimens that were obtained from 0.25 in thick material successfully completed 365 days of exposure to baseline pretreat, baseline brine, alternate pretreat, alternate brine, and 3.5% NaCl alternate immersion without any failures at stresses of up to 90% of the yield strength. Posttest evaluations consisting of metallography and tensile testing did not indicate stress corrosion susceptibility.

International Space Station↗

Summary of Resources for the International Space Station Environmental Control and Life Support System For Core Complete Modules

The Core Complete Environmental Control and Life Support (ECLS) System for the International Space Station (ISS) will consist of components and subsystems in both the United States (U.S.) and International Partner elements which together will perform the functions of Temperature and Humidity Control (THC), Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Water Recovery and Management (WRM), Fire Detection and Suppression (FDS), and Vacuum System (VS) for the station. Due to limited resources available on ISS, detailed attention is given to minimizing and tracking all resources associated with all systems, beginning with estimates during the hardware development phase through measured actuals when flight hardware is built and delivered. A summary of resources consumed by the addition of future U.S. ECLS system hardware to get to Core Complete is presented, including launch weight, average continuous and peak power loads, on-orbit volume and resupply logistics.

Williams, David E.↗

Overview of Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems

The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the late 1980's, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in the design of a closed loop life support system.

Roman, Monsi C.↗

Computational Fluid Dynamics Uncertainty Analysis for Payload Fairing Spacecraft Environmental Control Systems

Spacecraft components may be damaged due to airflow produced by Environmental Control Systems (ECS). There are uncertainties and errors associated with using Computational Fluid Dynamics (CFD) to predict the flow field around a spacecraft from the ECS System. This paper describes an approach to estimate the uncertainty in using CFD to predict the airflow speeds around an encapsulated spacecraft.

Computational↗

ORION Environmental Control and Life Support Systems Suit Loop and Pressure Control Analysis

Under NASA's ORION Multi-Purpose Crew Vehicle (MPCV) Environmental Control and Life Support System (ECLSS) Project at Johnson Space Center's (JSC), the Crew and Thermal Systems Division has developed performance models of the air system using Thermal Desktop/FloCAD. The Thermal Desktop model includes an Air Revitalization System (ARS Loop), a Suit Loop, a Cabin Loop, and Pressure Control System (PCS) for supplying make-up gas (N2 and O2) to the Cabin and Suit Loop. The ARS and PCS are designed to maintain air quality at acceptable O2, CO2 and humidity levels as well as internal pressures in the vehicle Cabin and during suited operations. This effort required development of a suite of Thermal Desktop Orion ECLSS models to address the need for various simulation capabilities regarding ECLSS performance. An initial highly detailed model of the ARS Loop was developed in order to simulate rapid pressure transients (water hammer effects) within the ARS Loop caused by events such as cycling of the Pressurized Swing Adsorption (PSA) Beds and required high temporal resolution (small time steps) in the model during simulation. A second ECLSS model was developed to simulate events which occur over longer periods of time (over 30 minutes) where O2, CO2 and humidity levels, as well as internal pressures needed to be monitored in the cabin and for suited operations. Stand-alone models of the PCS and the Negative Pressure relief Valve (NPRV) were developed to study thermal effects within the PCS during emergency scenarios (Cabin Leak) and cabin pressurization during vehicle re-entry into Earth's atmosphere. Results from the Orion ECLSS models were used during Orion Delta-PDR (July, 2014) to address Key Design Requirements (KDR's) for Suit Loop operations for multiple mission scenarios.

Eckhardt, Brad↗

Formulation of advanced consumables management models: Environmental control and electrical power system performance models requirements

Software design specifications for developing environmental control and life support system (ECLSS) and electrical power system (EPS) programs into interactive computer programs are presented. Specifications for the ECLSS program are at the detail design level with respect to modification of an existing batch mode program. The FORTRAN environmental analysis routines (FEAR) are the subject batch mode program. The characteristics of the FEAR program are included for use in modifying batch mode programs to form interactive programs. The EPS program specifications are at the preliminary design level. Emphasis is on top-down structuring in the development of an interactive program.

Daly, J. K.↗

Risk Reduction of Orion Multi-Purpose Crew Vehicle (MPCV) Program Government-Furnished Equipment for Environmental Control and Life Support (ECLS)

The NASA Engineering and Safety Center (NESC) was requested to conduct technical risk-reduction activities for safety-critical government-furnished environmental control and life support (ECLS) equipment for the Multi-Purpose Crew Vehicle Program. These items include the post-landing anomaly gas monitor, the in-flight anomaly gas monitor, the emergency breathing mask, the 144-hour in-suit survival capability, the portable fire extinguisher, the smoke eater, and the post-landing carbon dioxide control system. This document contains the outcome of the NESC assessment.

Environmental Control and Life Support↗

Stress Corrosion Evaluation of NiTiHf Alloy for the International Space Station Environmental Control and Life Support System

A stress corrosion evaluation was performed on NiTiHf alloy because this material is considered a bearing material candidate for the Environmental Control and Life Support System. Stressed round tensile specimens survived exposures to alternate pretreat, alternate brine, baseline pretreat, baseline brine, and 3.5% NaCl alternate immersion. Metallographic evaluations did not detect stress corrosion on exposed samples. The ultimate tensile strength values varied significantly for this material, which is common for bearing materials. This variation was observed on both, exposed and nonexposed specimens. The results of this work indicate that this material has potential applications as a bearing material.

International Space Station (ISS)↗

Environmental control and life support system: Analysis of STS-1

The capability of the orbiter environmental control and life support system (ECLSS) to support vehicle cooling requirements in the event of cabin pressure reduction to 9 psia was evaluated, using the Orbiter versions of the shuttle environmental consumbles usage requirement evaluation (SECURE) program, and using heat load input data developed by the spacecraft electrical power simulator (SEPS) program. The SECURE model used in the analysis, the timeline and ECLSS configuration used in formulating the analysis, and the results of the analysis are presented. The conclusion which may be drawn drom these results. is summarized. There are no significant thermal problems with the proposed mission. There are, however, several procedures which could be optimized for better performance: setting the cabin HX air bypass and the interchanger water bypass to the zero flow position is of questionable efficacy; the cabin air pressure monitoring procedure should be re-evaluated; and the degree of equipment power down specified for this analysis and no problems were noted.

Steines, G.↗

Environmental control and life support system evolution

Space station growth scenarios were reviewed and environmental control and life support system (ECLSS) growth requirements and ECLSS-driven constraints derived. A broad range of advanced ECLSS technologies were evaluated for their potential of being developed for flight use. Based on these evaluations the 'hooks and scars' needed to accommodate subsystems based on the technologies were defined with particular attention to the fluid electrical interface requirements.

Wieland, Paul D.↗

International Space Station (ISS) Environmental Control and Life Support System Status: 2003-2004

The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2003 and March 2004. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements and the continued manufacturing and testing of the regenerative ECLS equipment.

Williams, David E.↗