Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “End Date”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Strength Tests on Thin-walled Duralumin Cylinders in Torsion

This report is the first of a series presenting the results of strength tests on thin-walled cylinders and truncated cones of circular and elliptical section; it comprises the results obtained to date from torsion (pure shear) tests on 65 thin-walled duralumin cylinders of circular section with ends clamped to rigid bulkheads. The effect of variations in the length/radius and radius/thickness ratios on the type of failure is indicated, and a semi-empirical equation for the shearing stress at maximum load is given.

TRUNCATED - CYLINDERS, CIRCULAR - STRENGTH↗

Work Breakdown Structure (WBS) and WBS dictionary

This document is intended to provide the framework for defining all work to be accomplished under the proposed contract for the mission support program as defined by Section J-1 Statement of Work (SOW) of the RFP No.8-1-3-TA-50030 dated 11/2/93. The time period of performance of this contract will be from 3/1/94 through to the end of fiscal 1999. In addition to providing the framework for the integration of the cost, schedule, and manpower planning necessary to accomplish this work it establishes the association among the WBS elements, the SOW, and the Technical Proposal.

Cocuzzo, F.↗

A Tree-Ring Chronology and Paleoclimate Record for the Younger Dryas-Early Holocene Transition from Northeastern North America

Spruce and tamarack logs dating from the Younger Dryas and Early Holocene (YDEH; approx. 12.9 - 11.3k cal a BP) were found at Bell Creek in the Lake Ontario lowlands of the Great Lakes region, North America. A 211-year tree-ring chronology dates to approx. 11 755 -11 545 cal a BP, across the YDEH transition. A 23-year period of higher year-to-year ring-width variability dates to around 11 650 cal a BP, infers strong regional climatic perturbations and may represent the end of the YD. Tamarack and spruce were dominant species throughout the YD - EH interval at the site, indicating that boreal conditions persisted into the EH, in contrast to geographical regions immediately south and east of the lowlands, but consistent with the Great Lakes interior lowlands. This infers that Bell Creek was at the eastern boundary of a boreal ecotone, perhaps a result of its lower elevation and the non-analog dynamics of the Laurentide Ice Sheet. This finding suggests that the ecotone boundary extended farther east during the YD - EH transition than previously thought.

dendroclimatology;northeastern North America;spruc↗

MSL MMRTG Power Modeling for Lifetime Performance Predictions

The Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) has been providing power to the Mars Science Laboratory (MSL) rover, Curiosity, for surface operations since 2012. The Jet Propulsion Laboratory (JPL) has employed the Life Performance Prediction Model (LPPM) to generate predictions and outputs based upon flight data from the rover and experimental data from the thermoelectric (TE) couples. In order to make these predictions, LPPM requires various spacecraft inputs relevant to RTG performance such as fin root temperature, load voltage, general purpose heat source (GPHS) inventory, etc., combined with couple data such as thermoelectric properties, interface degradation, and sublimation properties. With tens of thousands of hours of flight data to date, LPPM can not only track performance to date, but also make predictions on the power output of the MMRTG through the 17-year end-of-design-life (EODL). These predictions are useful for mission planners and surface operators who rely on the MMRTG for power in order to perform the critical science necessary during the mission. This paper will showcase the power data extracted from the flight electronics, comparing it to the predictions and outputs generated from LPPM.

Pinkowski, Stanley↗

A Missed Thrust Framework for Low-Thrust Spiral Trajectories to the NRHO

A framework is developed by which end-to-end optimization of many-revolution low-thrust spiral trajectories can be completed in the presence of missed thrust events. This framework is applied to the Lunar Transit trajectory by which the initial capability of NASA’s Gateway lunar space station will be delivered to a Near Rectilinear Halo Orbit. This low-thrust mission consists of three subphases, each designed according to the specific objectives and dynamical regimes encountered as the mission progresses from a medium Earth insertion orbit to cislunar space. The presented framework accounts for the unique considerations demanded by each mission phase and incorporates appropriate capabilities into a novel mission analysis tool. This methodology enables large scale and reliable analyses of missed thrust events across the end-to-end Lunar Transit to verify the robustness of flight trajectories across the full range of considered launch dates.

missed thrust↗

Agricultural Breadbaskets Shift Poleward Given Adaptive Farmer Behavior Under Climate Change

Modern food production is spatially concentrated in global “breadbaskets”. A major unresolved question is whether these peak production regions will shift poleward as the climate warms, allowing some recovery of potential climaterelated losses. While agricultural impacts studies to date have focused on currently cultivated land, the Global Gridded Crop Model Intercomparison Project (GGCMI) Phase 2 experiment allows us to assess changes in both yields and the location of peak productivity regions under warming. We examine crop responses under projected end-of-century warming using 7 process-based models simulating 5 major crops (maize, rice, soybeans, and spring and winter wheat) with a variety of adaptation strategies. We find that in no-adaptation cases, when planting date and cultivar choices are held fixed, regions of peak production remain stationary and yield losses can be severe, since growing seasons contract strongly with warming. When adaptations in management practices are allowed (cultivars that retain growing season length under warming and modified planting dates), peak productivity zones shift poleward and yield losses are largely recovered. While most growing-zone shifts are ultimately limited by geography, breadbaskets studied here move poleward over 600 km on average by end of the century under RCP8.5. These results suggest that agricultural impacts assessments can be strongly biased if restricted in spatial area or in the scope of adaptive behavior considered. Accurate evaluation of food security under climate change requires global modeling and careful treatment of adaptation strategies.

adaptation↗

Response to MRO's end-to-end data accountability challenges

(MRO) on August 12, 2005. It carries six science instruments and three engineering payloads. Because MRO will produce an unprecedented number of science products, it will transmit a much higher data volume via high data rate than any other deep space mission to date. Keeping track of MRO products as well as relay products would be a daunting, expensive task without a well-planned data-product tracking strategy. To respond to this challenge, the MRO project developed the End-to- End Data Accountability System by utilizing existing information available from both ground and flight elements. Therefore, a capability to perform first-order problem diagnosis is essential in order for MRO to answer the questions, where is my data? and when will my data be available? This paper details the approaches taken, design and implementation of the tools, procedures and teams that track data products from the time they are predicted until they arrive in the hands of the end users.

data delivery status tracking↗

Meeting today's requirements for large thermal vacuum test facilities

The Lockheed Thermal Vacuum Facility at Sunnyvale, California, completed in late 1986, one of the largest multi-program facilities constructed to date is described. The horizontal 12.2 m diameter by 24.4 m long chamber has removable heads at each end and houses a thermal shroud providing a test volume 10.4 m diameter by 24.4 m long. The chamber and thermal shroud are configured to permit the insertion of a 6.1 m wide by 24.4 m long vibration isolated optical bench. The pumpimg system incorporates an internal cryopumping array, turbomolecular pumps and cryopumps to handle multi-program needs and ranges of gas loads. The high vacuum system is capable of achieving clean, dry and empty pressures below 1.3 times 10 to the minus 6 power Pa (10 to the minus 8 power torr.)

Corinth, R. L.↗

Experimental comparison of time synchronization techniques by means of light signals and clock transport on the rotating earth

An experiment was conducted to investigate the equivalence of two methods of time transfer in a noninertial reference frame: by means of an electromagnetic signal using laser light pulses and by means of the slow ground transport of a hydrogen maser atomic clock. The experiment may also be interpreted as an investigation of whether the one-way speeds of light in the east-west and west-east directions on the rotating earth are the same. The light pulses were sent from a laser coupled to a telescope at the NASA Goddard Optical Research Facility (GORF) in Greenbelt, Maryland to the U.S. Naval Observatory (USNO) in Washington, DC. The optical path was made possible by a 30-cm flat mirror on a water tower near GORF and a 25-cm flat mirror on top of the Washington National Cathedral near USNO. The path length was 26.0 km with an east-west component of 20.7 km. The pulses were reflected back over the same path by a portable array of corner cube reflectors. The transmission and return times were measured with a stationary Sigma Tau hydrogen maser and a University of Maryland event timer at GORF, while the times of reflection were measured with a similar maser and event timer combination carefully transported to USNO. Both timekeeping systems were housed in highly insulated enclosures and were maintained at constant temperatures to within +/- 0.1 C by microprocessor controllers. The portable system was also protected from shock and vibration by pneumatic supports. The difference delta(T) between the directly measured time of reflection according to the portable clock and the time of reflection calculated from the light pulse signal times measured by the stationary clock was determined. For a typical trip delta(T) is less than 100 ps and the corresponding limit on an anisotropy of the one-way speed of light is delta(c/c) is less than 1.5 x 10(exp -6). This the only experiment to date in which two atomic clocks were calibrated at one location, one was slowly transported to the other end of a path, and the times of transmission, reflection, and return of short light pulses sent in different directions along the path were registered.

Nelson, R. A.↗

AXAF SIM focus mechanism study

The design requirements and initial design concept for the AXAF-I Science Instrument Module (SIM) were reviewed at Ball on September 29, 1993. The concept design SIM focus mechanism utilizes a planetary gearset, with redundant motors, to drive a large ring (called 'main housing bearing') via a spur gearset. This large drive ring actuates three tangent bar links (called 'push rods'), which in turn actuate three levers (called 'pin levers'). Each of the three pin levers rotates an 'eccentric pin,' which in turn moves the base of a bipod flexure in both the radial (normal to optical axis) and axial (focus along optical axis) directions. Three bipod flexures are employed, equally spaced at 120 degrees apart, the base of each being translated in the two directions as described above. A focus adjustment is made by rotating the drive ring, which drives the push rods and therefore the pin levers, which in turn rotate the eccentric pins, finally imparting the two motions to the base of each of the bipod flexures. The axial translation (focus adjustment) of the focused structure is the sum of the direct axial motion plus axial motion which comes from uniformly squeezing the three bipod bases radially inward. SAO documented the following concerns regarding the focus mechanism in memo WAP-FY94-001, dated October 7, 1993: (1) The focus adjustment depends, in large part, on the structural properties (stiffnesses and end fixities) of the bipod flexures, push rods, pin levers and eccentric pins. If these properties are not matched very well, then lateral translations as well as unwanted rotations of the focussed structure will accompany focus motion. In addition, the stackup of linkage tolerances and any nonuniform wear in the linkages will result in the same unwanted motions. Thermal gradients will also affect these motions. At the review Ball did not present supporting analyses to support their choice of this design concept. (2) The proposed 'primary' method of measuring focus is by counting motor steps. The 'backup' method is by a pot mounted on the drive ring. Neither method provides for a direct measurement of the quantity desired (focus position). This is of concern because of the long and indirect relationship between focus and the sensed quantity (drive ring rotation). There are three sinusoidal relationships and structural stiffness in the path, and the resulting calibration is likely to be highly nonlinear. These methods would require an accurate ground calibration. (3) Ground calibration (and verification) of focus vs. drive position must be done in 1-g on the ground. This calibration will be complicated by both the structural characteristics of the bipods and the fact that the CG of the translating portion of the SIM is not on the optical axis (thereby causing unwated rotations and changing the focus position vs. motor step and pot readout relationships). The SIM translating weight could be offloaded, but the calibration then becomes sensitive to any errors in offloading (both magnitude and direction). There are concerns as to whether a calibration to the required accuracy can be accomplished on the ground. (4) The choice of a potentiometer as the focus position sensor is questionable in terms of reliability for a five year mission. The results of SAO's study of items 1, 2 and 3 described above are presented in this report.

Tananbaum, H. D.↗

An Improved Hf Vapor Etching Apparatus for Stardust Particle Extraction

Introduction: The NASA Stardust mission captured thousands of particles from the Jupiter-family comet 81P/Wild 2 in a collector composed of aluminum foil and blocks of silica aerogel [1]. To date, most Wild 2 particles available for study are relatively large and coherent particles extracted individually from the ends of hollow, carrot-shaped impact tracks produced during impact into aerogel. However, >65% of the impacting mass can be found in the ‘bulb’ of the track, including nearly all of the <1 μm size fraction [2]. This fraction contains organic-rich material and is likely to include presolar grains, representing a critical opportunity to constrain the organic and presolar inventory of primitive outer solar system materials. However, the small size and susceptibility of this fraction to melting or alteration during capture poses significant analytical challenges. Previous attempts to extract and concentrate fine-grained material from the bulb of Stardust tracks have attempted to develop techniques that efficiently destroy aerogel and leave impactor particles relatively unharmed. The low density and high porosity of silica aerogel makes it more susceptible to attack by etching with hydrofluoric acid (HF) [3] or CF4 plasma ashing [4] than collected cometary silicates. Previous studies of HF vapor etching used HF solutions varying between 5 to 49% and noted that at high concentrations and etch rates, a liquid droplet was produced according to the etching reaction 4HF + SiO2 → SiF4 (g) + 2H2O [3]. SiF4 readily decomposes into HF and silicic acid in water, which has the potential to alter the freed cometary silicates. The plasma ashing technique avoids production of a liquid droplet and minimizes damage to embedded silicates but requires specialized equipment [4]. In this abstract, we present recent improvements to the HF etching procedure with the aim of constructing an etching chamber capable of slowly etching silica aerogel using small quantities of dilute HF. The etching chamber can be assembled using readily available materials.

Stardust↗

Abrupt Changes at the Permian/Triassic Boundary: Tempo of Events from High-Resolution Cyclostratigraphy

The Permian/Triassic (P/Tr) boundary (251.4 +/- 3 Myr) is marked by the most severe mass extinction in the geologic record. Recently, precise absolute dating has bracketed the marine extinctions and associated carbon-isotope anomaly within less than 1 Myr. We improve this resolution through high-resolution stratigraphy across the P/Tr boundary in the 331-m Gartnerkofel-1 core and nearby Reppwand outcrop section (Carnic Alps, Austria) utilizing FFT and wavelet timeseries analyses of cyclic components in down-hole core logs of density and natural gamma-ray intensity, and carbon-isotopic ratios of bulk samples. The wavelet analysis indicates continuity of deposition across the P/Tr boundary interval, and the timeseries analyses show evidence for persistent cycles in the ratio of approximately 40: 10: 4.7: 2.3 meters, correlated with Milankovitch-band orbital cycles of approximately 412: 100: 40: 20 kyr (eccentricity 1 and 2, obliquity, and precession), and giving a consistent average sedimentation rate of approximately 10 cm/1,000 yr. Milankovitch periods in delta C-13 and density in these shallow-water carbonates were most likely the result of climatically induced oscillations of sea level and climate, coupled with changes in ocean circulation and productivity, that affected sedimentation. Fluctuations in gamma radiation reflect varying input of clay minerals and the presence of shaly interbeds. Throughout the P/Tr boundary interval in the core, the 100,000-year eccentricity cycle seems to be dominant. Weaker obliquity and precession cycles are in line with the location of the Austrian section in the latest Permian, close to the Equator in the western bight of the Tethys, where obliquity and precessional effects on seasonal contrast might be subdued. Using the improved resolution provided by cycle analysis in the GK-1 core, we find that the dramatic change in the faunal record that marks the P/Tr boundary takes place over less than 6m, or less than 60,000 years. In the nearby Reppwand outcrop section, the same faunal changes occurs over only 0.8 m or about 8,000 years, close to the limit of time-resolution induced by bioturbation and reworking in these sediments. The sharp negative global carbon-isotope shift took place within less than or equal to 40,000 yr, and the isotope excursions persisted for approximately 480,000 yr into the Early Triassic. The results indicate that the severe marine faunal event that marks the P/Tr boundary was very sudden, perhaps less than the resolution window in the GK-1 core, and suggest a catastrophic cause. The wavelet-analysis approach to high-resolution cyclostratigraphy can be applied to other P/Tr boundary sections, and when combined with precise absolute dating and magnetostratigraphic methods promises a significant increase in resolution in determining the correlation and tempo of the end-Permian extinctions and related events worldwide.

Rampino, M. R.↗

A Catalog of Coronal "EIT Wave" Transients

SOHO Extreme Ultraviolet Imaging Telescope (EIT) data have been visually searched for coronal "EIT wave" transients over the period beginning 24 March 1997 extending through 24 June 1998. The dates covered start at the beginning of regular high-cadence (more than 1 image every 20 minutes) observations, ending at the 4-month interruption of SOHO observations in mid-1998. 176 events are included in this catalog. The observations range from "candidate" events, which were either weak or had insufficient data coverage, to events which were well-defined and were clearly distinguishable in the data. Included in the catalog are times of the EIT images in which the events are observed, diagrams indicating the observed locations of the wavefronts and associated active regions, and the speeds of the wavefronts. The measured speeds of the wavefronts varied from less than 50 to over 700 km/sec with "typical" speeds of 200-400 Msec.

Thompson, B. J.↗

A Catalog of Coronal "EIT Wave" Transients

Solar and Heliospheric Observatory (SOHO) Extreme ultraviolet Imaging Telescope (EIT) data have been visually searched for coronal "EIT wave" transients over the period beginning from 1997 March 24 and extending through 1998 June 24. The dates covered start at the beginning of regular high-cadence (more than one image every 20 minutes) observations, ending at the four-month interruption of SOHO observations in mid-1998. One hundred and seventy six events are included in this catalog. The observations range from "candidate" events, which were either weak or had insufficient data coverage, to events which were well defined and were clearly distinguishable in the data. Included in the catalog are times of the EIT images in which the events are observed, diagrams indicating the observed locations of the wave fronts and associated active regions, and the speeds of the wave fronts. The measured speeds of the wave fronts varied from less than 50 to over 700 km s(exp -1) with "typical" speeds of 200-400 km s(exp -1).

Thompson, B. J.↗

Artemis Lunar Mission Availability & Design

The National Aeronautics and Space Administration’s (NASA) Artemis Program is leading international spaceexploration in a return to human lunar missions. The mission design underpinning this program is a critical aspect inthe integration of the multiple vehicles, processes, and capabilities to execute the most demanding human spaceflightmissions to date. Frequently mission design is characterized solely by its trajectory and the associated delta-velocityto achieve the end-to-end mission on a single day of flight. However, in practical terms for spaceflight missions,actual performance must characterize the translation delta-velocity demand, integrated power and thermal, crew dayoperations, commodities limitations, launch vehicle opportunities, and numerous additional factors across numerouslaunch day dependent variables. These factors together provide a unified set of mission design constraints that mustall be met in order to execute a fully integrated mission. The frequency of achieving all of the mission designconstraints is thus characterized as mission availability. The mission availability reflects the number of opportunitiesin any given period (month, year, etc.) for which an end-to-end mission could be launched. Ensuring adequatemission availability for the Artemis Program is necessary to support long term viability and sustainability of humanlunar exploration. This paper will characterize the driving factors in the Artemis mission availability includingvehicle specific effects from the Space Launch System (SLS), Orion Multi-Purpose Crew Vehicle, Gateway, HumanLanding System (HLS) and other contributing projects. This analysis will also summarize the relevant factors thatfuture vehicles and projects should consider for the integration and expansion of exploration capabilities with theArtemis Program.

Nujoud Fahoum Merancy↗

Space Shuttle Status News Conference

Richard Gilbech, External Tank "Tiger Team" Lead, begins this space shuttle news conference with detailing the two major objectives of the team. The objectives include: 1) Finding the root cause of the foam loss on STS-114; and 2) Near and long term improvements for the external tank. Wayne Hale, Space Shuttle Program Manager, presents a chart to explain the external tank foam loss during STS-114. He gives a possible launch date for STS-121 after there has been a repair to the foam on the External Tank. He further discusses the changes that need to be made to the surrounding areas of the plant in New Orleans, due to Hurricane Katrina. Bill Gerstemaier, NASA Associate Administrator for Space Operations, elaborates on the testing of the external tank foam loss. The discussion ends with questions from the news media about a fix for the foam, replacement of the tiles, foam loss avoidance, the root cause of foam loss and a possible date for a new external tank to be shipped to NASA Kennedy Space Center.

Source record↗

[NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 1, part 2:] Technical communications in aeronautics: Results of an exploratory study

A study was undertaken that explored several aspects of technical communications in aeronautics. The study, which utilized survey research in the form of a self-administered questionnaire, was sent to 2,000 randomly selected members of the American Institute of Aeronautics and Astronautics. Six hundred and six usable questionnaires (30.3 percent) were received by the established cut off date. Part 2 of this study lists appendices to part 1, including survey instrument, aggregate totals, cross tabulations, and open-ended comments.

Pinelli, Thomas E.↗

Objective Lightning Probability Forecasting for Kennedy Space Center and Cape Canaveral Air Force Station, Phase III

The AMU created new logistic regression equations in an effort to increase the skill of the Objective Lightning Forecast Tool developed in Phase II (Lambert 2007). One equation was created for each of five sub-seasons based on the daily lightning climatology instead of by month as was done in Phase II. The assumption was that these equations would capture the physical attributes that contribute to thunderstorm formation more so than monthly equations. However, the SS values in Section 5.3.2 showed that the Phase III equations had worse skill than the Phase II equations and, therefore, will not be transitioned into operations. The current Objective Lightning Forecast Tool developed in Phase II will continue to be used operationally in MIDDS. Three warm seasons were added to the Phase II dataset to increase the POR from 17 to 20 years (1989-2008), and data for October were included since the daily climatology showed lightning occurrence extending into that month. None of the three methods tested to determine the start of the subseason in each individual year were able to discern the start dates with consistent accuracy. Therefore, the start dates were determined by the daily climatology shown in Figure 10 and were the same in every year. The procedures used to create the predictors and develop the equations were identical to those in Phase II. The equations were made up of one to three predictors. TI and the flow regime probabilities were the top predictors followed by 1-day persistence, then VT and Ll. Each equation outperformed four other forecast methods by 7-57% using the verification dataset, but the new equations were outperformed by the Phase II equations in every sub-season. The reason for the degradation may be due to the fact that the same sub-season start dates were used in every year. It is likely there was overlap of sub-season days at the beginning and end of each defined sub-season in each individual year, which could very well affect equation performance.

Crawford, Winifred C.↗