Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Emergency operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Human Factors in Space Exploration

The exploration of space is one of the most fascinating domains to study from a human factors perspective. Like other complex work domains such as aviation (Pritchett and Kim, 2008), air traffic management (Durso and Manning, 2008), health care (Morrow, North, and Wickens, 2006), homeland security (Cooke and Winner, 2008), and vehicle control (Lee, 2006), space exploration is a large-scale sociotechnical work domain characterized by complexity, dynamism, uncertainty, and risk in real-time operational contexts (Perrow, 1999; Woods et ai, 1994). Nearly the entire gamut of human factors issues - for example, human-automation interaction (Sheridan and Parasuraman, 2006), telerobotics, display and control design (Smith, Bennett, and Stone, 2006), usability, anthropometry (Chaffin, 2008), biomechanics (Marras and Radwin, 2006), safety engineering, emergency operations, maintenance human factors, situation awareness (Tenney and Pew, 2006), crew resource management (Salas et aI., 2006), methods for cognitive work analysis (Bisantz and Roth, 2008) and the like -- are applicable to astronauts, mission control, operational medicine, Space Shuttle manufacturing and assembly operations, and space suit designers as they are in other work domains (e.g., Bloomberg, 2003; Bos et al, 2006; Brooks and Ince, 1992; Casler and Cook, 1999; Jones, 1994; McCurdy et ai, 2006; Neerincx et aI., 2006; Olofinboba and Dorneich, 2005; Patterson, Watts-Perotti and Woods, 1999; Patterson and Woods, 2001; Seagull et ai, 2007; Sierhuis, Clancey and Sims, 2002). The human exploration of space also has unique challenges of particular interest to human factors research and practice. This chapter provides an overview of those issues and reports on sorne of the latest research results as well as the latest challenges still facing the field.

FROM↗

Project Echo: Standby Receiver System

The Echo I satellite receiving system at the Bell Telephone Laboratories facilities at Holmdel, New Jersey, required a 2390-Mc standby receiver system to maintain operation during possible failures of the primary maser receiver. This paper describes the details of the two matched parametric amplifiers that were used to provide the standby receiver. The use of this system in the initial Moonbounce experiments and in Project Echo is described. The details of an emergency operation at the beginning of a balloon pass are also presented.

Kibler, L. U.↗

A Simulation-Based Approach to Training Operational Cultural Competence

Cultural knowledge and skills are critically important for military operations, emergency response, or any job that involves interaction with a culturally diverse population. However, it is not obvious what cultural knowledge and skills need to be trained, and how to integrate that training with the other training that trainees must undergo. Cultural training needs to be broad enough to encompass both regional (culture-specific) and cross-cultural (culture-general) competencies, yet be focused enough to result in targeted improvements in on-the-job performance. This paper describes a comprehensive instructional development methodology and training technology framework that focuses cultural training on operational needs. It supports knowledge acquisition, skill acquisition, and skill transfer. It supports both training and assessment, and integrates with other aspects of operational skills training. Two training systems will be used to illustrate this approach: the Virtual Cultural Awareness Trainer (VCAT) and the Tactical Dari language and culture training system. The paper also discusses new and emerging capabilities that are integrating cultural competence training more strongly with other aspects of training and mission rehearsal.

Johnson, W. Lewis↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

Disaster Response and Preparedness Application: Emergency Environmental Response Tool (EERT)

In 2000, the National Aeronautics and Space Administration (NASA) Environmental Office at the John C. Stennis Space Center (SSC) developed an Environmental Geographic Information Systems (EGIS) database. NASA had previously developed a GIS database at SSC to assist in the NASA Environmental Office's management of the Center. This GIS became the basis for the NASA-wide EGIS project, which was proposed after the applicability of the SSC database was demonstrated. Since its completion, the SSC EGIS has aided the Environmental Office with noise pollution modeling, land cover assessment, wetlands delineation, environmental hazards mapping, and critical habitat delineation for protected species. At SSC, facility management and safety officers are responsible for ensuring the physical security of the facilities, staff, and equipment as well as for responding to environmental emergencies, such as accidental releases of hazardous materials. All phases of emergency management (planning, mitigation, preparedness, and response) depend on data reliability and system interoperability from a variety of sources to determine the size and scope of the emergency operation. Because geospatial data are now available for all NASA facilities, it was suggested that this data could be incorporated into a computerized management information program to assist facility managers. The idea was that the information system could improve both the effectiveness and the efficiency of managing and controlling actions associated with disaster, homeland security, and other activities. It was decided to use SSC as a pilot site to demonstrate the efficacy of having a baseline, computerized management information system that ultimately was referred to as the Emergency Environmental Response Tool (EERT).

Smoot, James↗

Emergency Management of Tomorrow Research – Task 3B Research and Development Community Awareness: Eliciting Emergency Management Stakeholder Input

The Department of Homeland Security (DHS) Science and Technology Directorate (S&T) is partnering with Pacific Northwest National Laboratory (PNNL) to execute the Emergency Management (EM) of Tomorrow Research (EMOTR) program to identify current EM research, elicit capability needs from EM practitioners, and identify where technology, such as artificial intelligence (AI), may benefit the future of EM and emergency operations centers. This report details the methodology, analysis, and insights of interviews and focus groups conducted as part of the task to elicit stakeholder input.

99 GENERAL AND MISCELLANEOUS↗

A Review of the Resuspension of Radioactively Contaminated Particles by Vehicle and Pedestrian Traffic—Current Theory, Practice, Gaps, and Needs

Here, the resuspension of radioactively contaminated particles in a built environment, such as from urban surfaces like foliage, building exteriors, and roadways, is described empirically by current plume and dosimetry models used for hazard assessment and long-term risk purposes. When applying these models to radiological contamination emergencies affecting urban areas, the accuracy of the results for recent contamination deposition is impacted in two main ways. First, the data supporting the underlying resuspension equations was acquired for open, quiescent conditions with no vehicle traffic or human activities, so it is not necessarily representative of the urban environment. Second, mechanical disturbance by winds in urban canyons and during emergency operations caused by vehicle traffic and human activities are not directly considered by the equations. Accordingly, plume and dosimetry models allow the user to input certain compensating values, but the models do not necessarily supply users instructions on what values to use. This manuscript reviews the available literature to comprehensively and consistently pool data for resuspension due to mechanically induced resuspension applicable to urban contamination. Because there are few studies that directly measured radioactive resuspension due to vehicles and pedestrians, this review novelly draws on a range of other studies involving non-radioactive particles, ranging from outdoor air pollution emissions to indoor allergen transport. The results lead to tabulated, recommended values for specific conditions in the emergency phase to help users of plume and dosimetry models maintain the conservativeness needed to properly capture the potential radiation dose posed by mechanically induced resuspension. These values are of benefit to model users until better data are available. The results also suggest the types of data that may result in improved plume and dose modeling.

61 RADIATION PROTECTION AND DOSIMETRY↗

Emergency Management of Tomorrow: Emerging Technologies and Concepts

This article for the Domestic Preparedness Journal introduces the Emergency Management of Tomorrow Research Program and its role exploring artificial intelligence for emergency management and emergency operation centers in the future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of a new control rod drive mechanism design for the ISU AGN-201M reactor

The Aerojet General Nucleonics (AGN) model 201-Modified, known as the AGN-201M reactor, plays an essential role in the educational and research activities at Idaho State University (ISU). The ISU AGN-201M's original Control Rod Drive Mechanism (CRDM) has been in operation for more than fifty years with no large-scale redesigns. The CRDM is required to eject the fuel rods within one second during a SCRAM event (also known as a 'reactor trip') and adjust the control rods' insertion speed, and keeps the rod insertion sequence correct. The existing control rod drive mechanisms meet these criteria but experience a few concerns due to aging. Concerns include complex maintenance and costly repairs for old electromechanical components, rod position feedback errors, and the impediment of the plate during a SCRAM due to binding of the lead screws of the existing mechanism. During a binding event, the drive mechanism becomes locked, preventing the control rod's magnetic plate from moving in or out under the reactor's normal and emergency operating conditions. Although, the binding has no effect on the ability of the rod to exit the core during the SCRAM. To counteract the concerns and issues with the current CRDM, a new design has been proposed using newer components and a simplified design. The new design utilizes more advanced electric and mechanical components that are commercially available. The new CRDM system is divided into four main aspects: (1) control rod movement design (motor, lead screw, guide rods), (2) control rod ejection (springs, electromagnet), (3) control rod position and feedback (position transducer, microswitches), and (4) material selection and structural analysis. The new design aims to reduce the overall complexity and probability of failure to improve the reactor's overall reliability. With proper material selection and improved structural design, the new drives are lighter with little to no change in structural integrity. The new control rod drive mechanism eliminates binding scenarios by using a single lead screw and implementing additional guide rods. An advanced linear position sensor and microswitches replace the existing and aging synchro system for accurate rod position feedback resulting in better reactivity control. The new design meets the reactor's operational limits by having an average reactivity insertion of 0.065% Δk/k per second, which corresponds to a total control rod insertion time of 19.23 s, while the control rod's ejection time remains less than one second during a SCRAM event. The new design ensures the reactor's long-term viability for educational and research activities by increasing the reliability and safety of operation for years to come.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Earth Observations to Assess Impact of Hurricane Katrina on John C. Stennis Space Center

The peril from hurricanes to Space Operations Centers is real and is forecast to continue; Katrina, Rita, and Wilma of 2005 and Charley, Frances, Ivan, and Jeanne of 2004 are sufficient motivation for NASA to develop a multi-Center plan for preparedness and response. As was demonstrated at SSC (Stennis Space Center) in response to Hurricane Katrina, NASA Centers are efficiently activated as local command centers, playing host to Federal and State agencies and first responders to coordinate and provide evacuation, relocation, response, and recovery activities. Remote sensing decision support provides critical insight for managing NASA infrastructure and for assisting Center decision makers. Managers require geospatial information to manage the federal city. Immediately following Katrina, SSC s power and network connections were disabled, hardware was inoperative, technical staff was displaced and/or out of contact, and graphical decision support tools were non-existent or less than fully effective. Despite this circumstance, SSC EOC (Emergency Operations Center) implemented response operations to assess damage and to activate recovery plans. To assist Center Managers, the NASA ASP (Applied Sciences Program) made its archive of high-resolution data over the site available. In the weeks and months after the immediate crisis, NASA supplemented this data with high-resolution, post-Katrina imagery over SSC and much of the affected coastal areas. Much of the high-resolution imagery was made available through the Department of Defense Clear View contract and was distributed through U.S. Geological Survey Center for Earth Resources Observation and Science "Hurricane Katrina Disaster Response" Web site. By integrating multiple image data types with other information sources, ASP applied an all-source solutions approach to develop decision support tools that enabled managers to respond to critical issues, such as expedient access to infrastructure and deployment of resources, provision of temporary shelter, logistical control of critical supplies, and the mobilization and coordination of assets from ground crews to aircraft/airspace management. Furthermore, ASP developed information products that illustrate risks to SSC's infrastructure from surge, inundation, and flood. Current plans include developing wind-risk prototype products for refinement and adoption into EOC plans.

Graham, William D.↗

Resilient U.S. Land Ports of Entry

The continued operation of Land Ports of Entry (LPOE), managed by the Customs and Border Protection (CBP) and General Services Administration% is vital to the U.S. economy and security. Border faculties are included in the Department of Homeland Security (DHS) Government Facilities Sector2, one of the 16 critical infrastructures "whose assets, systems, and networks, whether physical or virtual, are considered so vital to the United States that their incapacitation or destruction would have a debilitating effect on security, national economic security, national public health or safety, or any combination thereof.'" Specifically, disruptions to the flow of border crossing traffic, in the form of closures or increased border crossing wait times, impact the economy and security of all countries involved. This paper describes a process for analyzing and improving the resilience of U.S. Land Ports of Entry. For LPOE, the team believes that energy resilience is the primary objective due to the complete reliance on the e-manifest system and the increasing use of Multi-Energy Portals (MEPs). Emanifests are part of CPB's Automated Commercial Environment (ACE). They document several key pieces of information about cargo vehicles wishing to cross the border into the United States and are submitted before arriving at the port. Vehicles can be flagged for more invasive inspection based on the content of the e-manifest. MEPs are a non-intrusive inspection (NII) technology used to scan the contents of the cargo. Together MEPs and ACE serve an important role in aiding CBP with their mission to protect "the public from dangerous people and materials", and "enabling legitimate trade and travel.'" To analyze resilience of a port, the team would need to understand the port's current energy usage, which systems depend on energy and what backup systems exist, and any emergency operation plans that dictate how systems are operated in the event of a power outage. The team would also need to determine the design basis threats (DBTs) for the LPOE which could include natural disasters, manmade events, and accidents. The magnitudes of the DBTs are calculated and are then translated to expected impacts on the infrastructure and systems at the port. With this information gathered, existing LPOE models developed here at Sandia National Laboratories could be extended to support decisions about resilience. Current models are implemented in FlexSim, a 3rd party discrete event simulator. FlexSim provides 3-D visuals of physical layout that can reveal valuable insights, allows input to be variable (e.g. time it takes to interact with the CBP officer at primary inspection can vary) so that a whole range of possibilities can be captured in the results, and can be used to collect user-defined output metrics. Current LPOE models focus on cargo vehicle traffic, and process changes caused by the installation of new drive-through MEPs. Extending them to address resilience questions would require the addition of key pieces of information learned during the resilience analysis including critical systems, failure rates, and process changes for when failures occur. The primary output metric for current models is border crossing wait time. Additional metrics would also be added to the model to gain a more complete understanding of impacts related to resilience, for example, MEP scan rate. Once complete, the model could be used to analyze the effectiveness of mitigation strategies representing some future state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Universal bounds on CFT Distance Conjecture

For any unitary conformal field theory in two dimensions with the central charge c, we prove that, if there is a nontrivial primary operator whose conformal dimension ∆ vanishes in some limit on the conformal manifold, the Zamolodchikov distance t to the limit is infinite, the approach to this limit is exponential ∆ = exp(−αt + O(1)), and the decay rate obeys the universal bounds c−1/2 ≤ α ≤ 1. In the limit, we also find that an infinite tower of primary operators emerges without a gap above the vacuum and that the conformal field theory becomes locally a tensor product of a sigma-model in the large radius limit and a compact theory. As a corollary, we establish a part of the Distance Conjecture about gravitational theories in three-dimensional anti-de Sitter space. In particular, our bounds on α indicate that the emergence of exponentially light states is inevitable as the moduli field corresponding to t rolls beyond the Planck scale along the steepest path and that this phenomenon can begin already at the curvature scale of the bulk geometry. We also comment on implications of our bounds for gravity in asymptotically flat spacetime by taking the flat space limit and compare with the Sharpened Distance Conjecture.

AdS-CFT Correspondence↗

Entanglement Hamiltonian of Many-Body Dynamics in Strongly Correlated Systems

A powerful perspective in understanding nonequilibrium quantum dynamics is through the time evolution of its entanglement content. Yet apart from a few guiding principles for the entanglement entropy,to date, much less is known about the refined characteristics of entanglement propagation. In this paper we unveil signatures of the entanglement evolving and information propagating out of equilibrium, from the view of the entanglement Hamiltonian. We investigate quantum quench dynamics of prototypical Bose-Hubbard model using state-of-the-art numerical technique combined with conformal field theory. Before reaching equilibrium, it is found that a current operator emerges in the entanglement Hamiltonian, implying that entanglement spreading is carried by particle flow. In the long-time limit the subsystem enters a steady phase, evidenced by the dynamic convergence of the entanglement Hamiltonian to the expectation of a thermal ensemble. Importantly, the entanglement temperature in steady state is spatially independent,which provides an intuitive trait of equilibrium. These findings not only provide crucial information on how equilibrium statistical mechanics emerges in many-body dynamics, but also add a tool to exploring quantum dynamics from the perspective of the entanglement Hamiltonian.

36 MATERIALS SCIENCE↗

2020 Summer Resource Adequacy in the ERCOT Region

The study looks at the evolution of the Electric Reliability Council of Texas (ERCOT) market across the last decade to provide an understanding of how the market arrived at its current condition. In addition, the study examines four scenarios and utilizes probabilistic dispatch analysis to assess the potential for resource adequacy and reliability concerns under those scenarios. The study finds that under three of the four scenarios, the region will see an increased risk for Energy Emergency Alerts and need for emergency operator actions to ensure the reliable delivery of electricity to the more than 25 million people who ERCOT serves.

2020↗

Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the ninth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility (UPF), the Mercury Treatment Facility (MTF) on EFPC, the site-wide power grid upgrade, construction of an Emergency Operations Center, construction of a new Fire Station, Security Improvement Revitalization Program (SIRP), West End Protection Area Reduction (WEPAR) Project, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2021. However, moving forward, challenges to protect stormwater will continue from these projects. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2022. Y-12 will continue to implement appropriate Best Management Practices and reduce outside material storage areas where possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Permanent Variance from 10 CFR 851 for Construction

Lawrence Livermore National Security, LLC (LLNS) requests variance from 10 CFR 851 (the Rule) for construction work at Lawrence Livermore National Laboratory (LLNL). The request is based upon successful application of similar variances granted to LLNS in continued support of the National Nuclear Security Administration (NNSA) initiative to streamline the delivery of line-item construction projects under $50 million. This request is aligned with the approved NA 50 safety approach. Experience gained in the construction of the new LLNL Emergency Operations Center (EOC) under the variance granted in June 2020 and construction preparations to date on the Digital Infrastructure Capabilities Expansion (DICE) under the variance granted April 2022 is very encouraging. There are strong indicators that a benefit has been realized by both the subcontractors executing the work and the Laboratory. The variance has permitted local/regional construction businesses contracted to Management & Operation Contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851. This variance application was prepared according to the requirements in 10 CFR 851, Subpart D – Variances, § 851.31 Variance Process. This request is limited to subcontractor executed construction at LLNL.

42 ENGINEERING↗