Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ERCOT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

A Machine Learning Initializer for Newton-Raphson AC Power Flow Convergence

Power flow computations are fundamental to many power system studies. Obtaining a converged power flow case is not a trivial task especially in large power grids due to the non-linear nature of the power flow equations. One key challenge is that the widely used Newton based power flow methods are sensitive to the initial voltage magnitude and angle estimates, and a bad initial estimate would lead to non-convergence. This paper addresses this challenge by developing a random-forest (RF) machine learning model to provide better initial voltage magnitude and angle estimates towards achieving power flow convergence. This method was implemented on a real ERCOT 6102 bus system under various operating conditions. By providing better Newton-Raphson initialization, the RF model precipitated the solution of 2,106 cases out of 3,899 non-converging dispatches. These cases could not be solved from flat start or by initialization with the voltage solution of a reference case. Finally, results obtained from the RF initializer performed better when compared with DC power flow initialization, Linear regression, and Decision Trees.

random forest↗

Managing Wind Power Uncertainty Through Strategic Reserve Purchasing

With the rapidly increasing penetration of wind power, wind producers are becoming increasingly responsible for the deviation of the wind power output from the forecast. Such uncertainty results in revenue losses to the wind power producers (WPPs) due to penalties in ex-post imbalance settlements. This paper explores the opportunities available for WPPs if they can purchase or schedule some reserves to offset part of their deviation rather than being fully penalized in the real time market. The revenue for WPPs under such mechanism is modeled. The optimal strategy for managing the uncertainty of wind power by purchasing reserves to maximize the WPP's revenue is analytically derived with rigorous optimality conditions. The amount of energy and reserves that should be bid in the market are explicitly quantified by the probabilistic forecast and the prices of the energy and reserves. A case study using the price data from ERCOT and wind power data from NREL is performed to verify the effectiveness of the derived optimal bidding strategy and the benefits of reserve purchasing. Additionally, the proposed bidding strategy can also reduce the risk of variations on WPP's revenue.

17 WIND ENERGY↗

Frequency Response Assessment and Enhancement of the U.S. Power Grids towards Extra-High Photovoltaic Generation Penetrations – an Industry Perspective

Nonsynchronous generations such as photovoltaics (PVs) are expected to undermine bulk power systems (BPSs)' frequency response at high penetration levels. Though the underlying mechanism has been relatively well understood, the accurate assessment and effective enhancement of the U.S. interconnections, frequency response under extra-high PV penetration conditions remains an issue. In this paper, the industry-provided full-detail interconnection models were further validated by synchrophasor frequency measurements and realistically-projected PV geographic distribution information were used to develop extra-high PV penetration scenarios and dynamic models for the three main U.S. interconnections, including Eastern Interconnection (EI), Western Electricity Coordinating Council (WECC), and Electric Reliability Council of Texas (ERCOT). Up to 65% instantaneous PV and 15% wind penetration were simulated and the frequency response change trend of each U.S. interconnection due to the increasing PV penetration level were examined. Most importantly, the practical solutions to address the declining frequency response were discussed. This paper will provide valuable guidance for policy makers, utility operators and academic researchers not only in the U.S. but also other countries in the world.

14 SOLAR ENERGY↗

Resource Adequacy in Electricity Markets With Renewable Energy

This paper presents a market-based resource adequacy assessment framework to analyze the system generation portfolio that results in a competitive market environment. In particular, we apply the modeling framework to investigate the impact of high penetration levels of variable renewable energy resources and different market designs on achieving resource adequacy. The model captures the strategic capacity investment and retirement decision-making of profit-maximizing generation companies. In contrast to many previous studies, this paper considers markets for capacity, energy, and reserve products in detail; thus, the modeling framework allows improved analysis of generation expansion and revenue sufficiency in a competitive market environment. The modeling framework is based on Stackelberg leader-follower games and is formulated as a bi-level optimization problem, which is then transformed into a mathematical program with equilibrium constraints. Furthermore, we employ a Lagrangian decomposition algorithm to enhance computational performance. In a case study of the electric reliability council of texas (ERCOT) system, we compare the results from the proposed model with those obtained from a traditional centralized least-cost planning model. Finally, the results demonstrate the effectiveness of the proposed modeling framework and highlight the importance of considering strategic behavior in a competitive market framework when assessing resource adequacy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enabling Technologies for High Penetration of Wind and Solar Energy

High penetration of variable wind and solar electricity generation will require modifications to the electric power system. This work examines the impacts of variable generation, including uncertainty, ramp rate, ramp range, and potentially excess generation. Time-series simulations were performed in the Texas (ERCOT) grid where different mixes of wind, solar photovoltaic and concentrating solar power provide up to 80% of the electric demand. Different enabling technologies were examined, including conventional generator flexibility, demand response, load shifting, and energy storage. A variety of combinations of these technologies enabled low levels of surplus or curtailed wind and solar generation depending on the desired penetration of renewable sources. At lower levels of penetration (up to about 30% on an energy basis) increasing flexible generation, combined with demand response may be sufficient to accommodate variability and uncertainty. Introduction of load-shifting through real-time pricing or other market mechanisms further increases the penetration of variable generation. The limited time coincidence of wind and solar generation presents increasing challenges as these sources provide greater than 50% of total demand. System flexibility must be increased to the point of virtually eliminating must-run baseload generators during periods of high wind and solar generation. Energy storage also becomes increasingly important as lower cost flexibility options are exhausted. The study examines three classes of energy storage - electricity storage, including batteries and pumped hydro, hybrid storage (compressed-air energy storage), and thermal energy storage. Ignoring long-distance transmission options, a combination of load shifting and storage equal to about 12 hours of average demand may keep renewable energy curtailment below 10% in the simulated system.

14 SOLAR ENERGY↗

pnnl/capratTX

Thermoelectric Capacity at Risk Analysis Tool for ERCOT. capratTX is a unique R package, featuring algorithms for simulating water storages that provide cooling water for thermoelectric power plants. The tool may be used to compute long-term "capacity at risk" under a range of future climate projections.

Turner, Sean W D↗

Impact of simultaneous activities on frequency fluctuations — comprehensive analyses based on the real measurement data from FNET/GridEye

Simultaneous human activities such as the Super Bowl game would cause certain impacts on frequency fluctuations in power systems. With the help of FNET/GridEye measurements, this work aims to give comprehensive analyses on the frequency fluctuations during Super Bowl LIV held on Feb. 2, 2020, so as to better understand several phenomena caused by simultaneous activities and help system operation and control. First, recent developments of FNET/GridEye are introduced briefly. Second, the frequency fluctuations of Eastern Interconnection (EI), western electricity coordinating council (WECC), and electric reliability council of Texas (ERCOT) power systems during Super Bowl LIV are analyzed. Third, frequency fluctuations of Super Bowl Sunday and ordinary Sundays in 2020 are compared. Finally, the differences of frequency fluctuations among different years during the Super Bowl and their change trend are also given. Furthermore, several possible explanations including the simultaneity of electricity consumption at the beginning of commercial breaks and the halftime show, the increasing usage of the Internet, and the increasing size of TV screens are illustrated in detail in this work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Wind Power and Load Data at Multiple Time Scales

In this study we develop and apply new methods of data analysis for high resolution wind power and system load time series, to improve our understanding of how to characterize highly variable wind power output and the correlations between wind power and load. These methods are applied to wind and load data from the ERCOT region, and wind power output from the PJM and NYISO areas. We use a wavelet transform to apply mathematically well-defined operations of smoothing and differencing to the time series data. This approach produces a set of time series of the changes in wind power and load (or ?deltas?), over a range of times scales from a few seconds to approximately one hour. A number of statistical measures of these time series are calculated. We present sample distributions, and devise a method for fitting the empirical distribution shape in the tails. We also evaluate the degree of serial correlation, and linear correlation between wind and load. Our examination of the data shows clearly that the deltas do not follow a Gaussian shape; the distribution is exponential near the center and appears to follow a power law for larger fluctuations. Gaussian distributions are frequently used in modeling studies. These are likely to over-estimate the probability of small to moderate deviations. This in turn may lead to an over-estimation of the additional reserve requirement (hence the cost) for high penetration of wind. The Gaussian assumption provides no meaningful information about the real likelihood of large fluctuations. The possibility of a power law distribution is interesting because it suggests that the distribution shape for of wind power fluctuations may become independent of system size for large enough systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of Wind/Solar Co-located Generation in Texas

This paper evaluates the opportunity to load co-located wind and solar generation capacity onto a constrained transmission system while engendering only minimal losses. It quantifies the economic and energy opportunities and costs associated with pursuing this strategy in two Texas locations one in west Texas and the other in south Texas. The study builds upon previous work published by the American Solar Energy Society (ASES) which illuminated the potential benefits of negative correlation of wind and solar generation in some locations by quantifying the economic and energy losses which would arise from deployment of solar generation in areas with existing wind generation and constrained transmission capacity. Clean Energy Associates (CEA) obtained and incorporated wind and solar resource data and the Electric Reliability Council of Texas (ERCOT)) load and price data into a model which evaluates varying levels of solar thermal, solar photovoltaic (PV) and wind capacity against an assumed transmission capacity limit at each of the two locations.

14 SOLAR ENERGY↗

GOWind Project Final Technical Report

To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.

17 WIND ENERGY↗

Western Wind and Solar Integration Study Phase 3 – Frequency Response and Transient Stability

Power system operators and utilities worldwide have concerns about the impact of high-penetration wind and solar generation on electric grid reliability (EirGrid 2011b, Hydro-Quebec 2006, ERCOT 2010). The stability of North American grids under these conditions is a particular concern and possible impediment to reaching future renewable energy goals. Phase 3 of the Western Wind and Solar Integration Study (WWSIS-3) considers a 33% wind and solar annual energy penetration level that results in substantial changes to the characteristics of the bulk power system, including different power flow patterns, different commitment and dispatch of existing synchronous generation, and different dynamic behavior of wind and solar generation. WWSIS-3 evaluates two specific aspects of fundamental frequency system stability: frequency response and transient stability.

14 SOLAR ENERGY↗

Modeling and Analysis of Wholesale Electricity Market Design. Understanding the Missing Money Problem. December 2013 - January 2015

This project examined the impact of renewable energy sources, which have zero incremental energy costs, on the sustainability of conventional generation. This “missing money” problem refers to market outcomes in which infra-marginal energy revenues in excess of operations and maintenance (O&M) costs are systematically lower than the amortized costs of new entry for a marginal generator. The problem is caused by two related factors: (1) conventional generation is dispatched less, and (2) the price that conventional generation receives for its energy is lower. This lower revenue stream may not be sufficient to cover both the variable and fixed costs of conventional generation. In fact, this study showed that higher wind penetrations in the Electric Reliability Council of Texas (ERCOT) system could cause many conventional generators to become uneconomic.

16 TIDAL AND WAVE POWER↗

Area of Interest 4.Technical Interest to Electric Infrastructure Planners on Other Subjects

In 2010, the U.S. Department of Energy (DOE) provided $60M in funding to five regional entities to conduct interregional transmission planning activities: the Eastern Interconnection Planning Collaborative (EIPC); the Eastern Interconnection States Planning Council (EISPC); the Transmission Expansion Planning and Policy Committee (TEPPC); the State Provincial Steering Committee (SPSC);and the Electricity Reliability Council of Texas (ERCOT). DOE also provided funding to the Lawrence Berkeley National Laboratory (LBNL) to support aspects of these interregional transmission planning activities. LBNL’s support involved both technical assistance to DOE in its oversight of the activities conducted by the five regional entities and the preparation of six, standalone technical studies that were conducted in direct support for specific entities. This is the final report on LBNL’s activities. It consists of summaries of each activity; references are provided to each of the stand-alone studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrating Renewable Generation into Grid Operations: Four International Experiences

International experiences with power sector restructuring and the resultant impacts on bulk power grid operations and planning may provide insight into policy questions for the evolving United States power grid as resource mixes are changing in response to fuel prices, an aging generation fleet and to meet climate goals. Australia, Germany, Japan and the UK were selected to represent a range in the level and attributes of electricity industry liberalization in order to draw comparisons across a variety of regions in the United States such as California, ERCOT, the Southwest Power Pool and the Southeast Reliability Region. The study draws conclusions through a literature review of the four case study countries with regards to the changing resource mix and the electricity industry sector structure and their impact on grid operations and planning. This paper derives lessons learned and synthesizes implications for the United States based on answers to the above questions and the challenges faced by the four selected countries. Each country was examined to determine the challenges to their bulk power sector based on their changing resource mix, market structure, policies driving the changing resource mix, and policies driving restructuring. Each countries’ approach to solving those changes was examined, as well as how each country’s market structure either exacerbated or mitigated the approaches to solving the challenges to their bulk power grid operations and planning. All countries’ policies encourage renewable energy generation. One significant finding included the low- to zero-marginal cost of intermittent renewables and its potential negative impact on long-term resource adequacy. No dominant solution has emerged although a capacity market was introduced in the UK and is being contemplated in Japan. Germany has proposed the Energy Market 2.0 to encourage flexible generation investment. The grid operator in Australia proposed several approaches to maintaining synchronous generation. Interconnections to other regions provides added opportunities for balancing that would not be available otherwise, and at this point, has allowed for integration of renewables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sample EP Flow Analysis of Severely Damaged Networks

These are slides for a presentation at the working group meeting of the WESC SREMP Software Product Integration Team on sample EP flow analysis of severely damaged networks. The following topics are covered: ERCOT EP Transmission Model; Zoomed in to Houston and Overlaying StreetAtlas; EMPACT Solve/Dispatch/Shedding Options; QACS BaseCase Power Flow Solution; 3 Substation Contingency; Gen. & Load/100 Optimal Dispatch; Dispatch Results; Shed Load for Low V; Network Damage Summary; Estimated Service Areas (Potential); Estimated Outage Areas (potential).

97 MATHEMATICS AND COMPUTING↗

Ensuring Reliable Natural Gas-Fired Generation with Fuel Contracts and Storage - DOE/NETL-2017/1816

This report finds that natural gas-fired power plants purchase fuel both on the spot market and through firm supply contracts; there do not appear to be clear drivers propelling power plants toward one or the other type. Most natural gas-fired power generators are located near major natural gas transmission pipelines, and most natural gas contracts are currently procured on the spot market. Although there is some regional variation in the type of contract used, a strong regional pattern does not emerge. Whether gas prices are higher with spot or firm contracts varies by both region and year. Natural gas prices that push the generators higher in the supply curve would make them less likely to dispatch. Most of the natural gas generators discussed in this report would be unlikely to enter firm contracts if the agreed price would decrease their dispatch frequency. The price points at which these generators would be unlikely to enter a firm contract depends upon the region that the generator is in, and how dependent that region is on natural gas. The Electric Reliability Council of Texas (ERCOT) is more dependent on natural gas than either Eastern Interconnection or Western Interconnection. This report shows that above-ground storage is prohibitively expensive with respect to providing storage for an extended operational fuel reserve comparable to the amount of on-site fuel storage used for coal-fired plants. Further, both pressurized and atmospheric tanks require a significant amount of land for storage, even to support one day’s operation at full output. Underground storage offers the only viable option for 30-day operational storage of natural gas, and that is limited by the location of suitable geologic formations and depleted fields.

01 COAL, LIGNITE, AND PEAT↗

Models and methods for assessing the value of HVDC and MVDC technologies in modern power grids

This report reflects the results of U.S. Department of Energy’s (DOE) Grid Modernization project 0074 “Models and methods for assessing the value of HVDC [high-voltage direct current] and MTDC [multi-terminal direct current] technologies in modern power grids.” The work was done by the Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) in cooperation with Mid-Continent Independent System Operator (MISO) and Siemens. The main motivation of this study was to show the benefit of using direct current (DC) systems larger than those in existence today as they overlap with the alternating current (AC) systems. Proper use of their flexibility in terms of active/reactive power control and fast response can provide much-needed services to the grid at the same time as moving large blocks of energy to take advantage of cost diversity. Ultimately, the project’s success will enable decision-makers and investors to make well-informed decisions regarding this use of DC systems. This project showed the technical feasibility of HVDC macrogrid for frequency control and congestion relief in addition to bulk power transfers. Industry-established models for commonly used technologies were employed, along with high-fidelity models for recently developed HVDC converter technologies; like the modular multilevel converters (MMCs), a voltage source converters (VSC). Models for General Electric Positive Sequence Load Flow (GE PSLF) and Siemens Power System Simulator (PSS/E), widely used analysis programs, were for the first time adapted to include at the same time both Western Electricity Coordinating Council (WECC) and Eastern Interconnection (EI), the two largest North American interconnections. The high-fidelity models and their control were developed in detail for MMC system and extended to HVDC systems in point-to-point and in three-node multi-terminal configurations. Using a continental-level mixed AC-DC grid model, and using a HVDC macrogrid power flow and transient stability model, the results showed that the HVDC macrogrid relieved congestion and mitigated loop flows in AC networks, and provided up to 24% improvement in frequency responses. These are realistic studies, based on the 2025 heavy summer and EI multi-regional modeling working group (MMWG) 2026 summer peak cases. This work developed high-fidelity models and simulation algorithms to understand the dynamics of MMC. The developed models and simulation algorithms are up to 25 times faster than the existing algorithms. Models and control algorithms for high-fidelity models were designed and tested for point-to-point and multi-terminal configurations. The multi-terminal configuration was tested connecting simplified models of EI, WI, and Electric Reliability Council of Texas (ERCOT). The developed models showed up to 45% improvement in frequency response with the connection of all the three asynchronous interconnections in the United States using fast and advanced DC technologies like the multi-terminal MMC-DC system. Future work will look into developing high-fidelity models of other advanced DC technologies, combining high-fidelity models with the continental-level model, incorporating additional services. More scenarios involving large-scale HVDC and MTDC will be evaluated.

24 POWER TRANSMISSION AND DISTRIBUTION↗