Models and methods for assessing the value of HVDC and MVDC technologies in modern power grids

This report reflects the results of U.S. Department of Energy’s (DOE) Grid Modernization project 0074 “Models and methods for assessing the value of HVDC [high-voltage direct current] and MTDC [multi-terminal direct current] technologies in modern power grids.” The work was done by the Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) in cooperation with Mid-Continent Independent System Operator (MISO) and Siemens. The main motivation of this study was to show the benefit of using direct current (DC) systems larger than those in existence today as they overlap with the alternating current (AC) systems. Proper use of their flexibility in terms of active/reactive power control and fast response can provide much-needed services to the grid at the same time as moving large blocks of energy to take advantage of cost diversity. Ultimately, the project’s success will enable decision-makers and investors to make well-informed decisions regarding this use of DC systems. This project showed the technical feasibility of HVDC macrogrid for frequency control and congestion relief in addition to bulk power transfers. Industry-established models for commonly used technologies were employed, along with high-fidelity models for recently developed HVDC converter technologies; like the modular multilevel converters (MMCs), a voltage source converters (VSC). Models for General Electric Positive Sequence Load Flow (GE PSLF) and Siemens Power System Simulator (PSS/E), widely used analysis programs, were for the first time adapted to include at the same time both Western Electricity Coordinating Council (WECC) and Eastern Interconnection (EI), the two largest North American interconnections. The high-fidelity models and their control were developed in detail for MMC system and extended to HVDC systems in point-to-point and in three-node multi-terminal configurations. Using a continental-level mixed AC-DC grid model, and using a HVDC macrogrid power flow and transient stability model, the results showed that the HVDC macrogrid relieved congestion and mitigated loop flows in AC networks, and provided up to 24% improvement in frequency responses. These are realistic studies, based on the 2025 heavy summer and EI multi-regional modeling working group (MMWG) 2026 summer peak cases. This work developed high-fidelity models and simulation algorithms to understand the dynamics of MMC. The developed models and simulation algorithms are up to 25 times faster than the existing algorithms. Models and control algorithms for high-fidelity models were designed and tested for point-to-point and multi-terminal configurations. The multi-terminal configuration was tested connecting simplified models of EI, WI, and Electric Reliability Council of Texas (ERCOT). The developed models showed up to 45% improvement in frequency response with the connection of all the three asynchronous interconnections in the United States using fast and advanced DC technologies like the multi-terminal MMC-DC system. Future work will look into developing high-fidelity models of other advanced DC technologies, combining high-fidelity models with the continental-level model, incorporating additional services. More scenarios involving large-scale HVDC and MTDC will be evaluated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units, Volume I: The Critical Role of Thermal Units During Extreme Weather Events

This study examines the cold weather event now known as the Bomb Cyclone that blanketed much of the eastern half of the United States from Dec 27, 2017 through Jan 8, 2018. Analyses focus on six areas of organized markets administered by independent system operators in the US Eastern Interconnection and Texas. This report finds: (1) Combined, fossil and nuclear energy plants provided 89% of electricity during peak demand across all the ISOs; (2) Coal provided the most resilient form of generation in PJM; (3) The value of fuel-based power generation resilience in PJM during this event was estimated at $3.5 billion; (4) Natural gas price spikes, increased demand, and pipeline constraints led to significant fuel oil burn in the US Northeast; (5) Renewables imposed a resilience penalty on the system as output decreased as demand increased; (6) Underestimation of coal and nuclear retirements could give rise to reliability concerns and an inability to meet projected electricity demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Clean Grid Vision: A U.S. Perspective - Chapter 1. Clean Grid Scenarios

Chapter 1: Clean Grid Scenarios serves as a broad introduction to the type of future power systems envisioned in the Clean Grid Vision: one with high penetrations of variable renewable energy generation (for example, more than 53% nationally and up to 73% in the Eastern Interconnection) and significant share of natural gas. Our study shows that the conterminous United States has adequate resources to support such systems with current technologies, and these systems can be operated cost-effectively to meet all sub-hourly demand and reserve requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing a Power Plant Suitability Model for the Energy Zones Mapping Tool

This report provides an example of designing, developing, and running a power plant suitability model in the Energy Zones Mapping Tool (EZMT), a public, web-based mapping tool with a large spatial database focused on energy infrastructure, energy resources, and related siting factors. The example focuses on natural gas combined cycle (NGCC) power plants, which have several unique and interesting characteristics. NGCC plants typically provide peaking power to the electrical grid. Such plants can be started or stopped relatively quickly and are often used to supplement base load plants (such as nuclear or coal) during times of peak electrical consumption or to counterbalance lulls in variable power generation (such as wind or solar). Due to these and other factors, NGCC plants have been projected to increase in number under energy planning studies such as Hadley et al. The scope of the Hadley et. al. study is the Eastern Interconnection (EI), the electrical transmission grid serving much of the United States and Canada east of the Rocky Mountains. Results in the study are organized according to 22 Multi-region National—North American Electricity and Environment Model (NEEM) regions within the EI. NGCC plants usually have lower water requirements than other thermoelectric power plants they may replace; therefore, they are expected to have an interesting role in reducing the overall water requirements of energy generation.

20 FOSSIL-FUELED POWER PLANTS↗

Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART)

This report contains key findings from a project titled Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART), which was carried out through a collaborative effort of a team of researchers from Texas A&M Engineering Experiment Station, Temple University, and Quanta Technology, LLC. The in-kind support came from OSIsoft (acquired by AVEVA), which provided their PI Historian software to demonstrate the use case of streaming PMU data. The first section of the report describes the project goals and objectives related to the development of Machine Learning (ML) models capable of detecting and classifying events by processing phasor measurements captured in the field by Phasor Measurement Units (PMUs). The data for this study was contributed by the utilities/ISOs from the Western and Eastern interconnects and ERCOT, further referred to as Interconnect B (IC B), Interconnect A (IC A), and Interconnect C (IC C), respectively. The approach that the BDSMART Research Team proposed and the key research tasks defined by the team are outlined in this section. The next section describes the technical approach. We first discuss the data constraints related to the PMU measurements and data interpretation constraints imposed by the data contributors. They provided neither the topological information of the grid nor PMU placement locations and captured recorded data at very few locations in the system with the reporting rate of either 30 or 60 fps. The recordings are mostly positive sequence voltage, frequency, and ROCOF, and in some limited cases, three-phase voltages and currents. We then reflect on the bad data issues that stem from poor recording practices and vague definitions of the PMU status bits to supposedly be used for bad data identification. Finally, the data discovery points to imprecise time stamps with incomplete event start/end time, as well as inconsistent and incomplete event labeling, which combined make the implementation of the data models using supervising learning quite challenging. Following the data discovery study, we hypothesize that because the IC B data has the most complete labels, we should focus our model development on that data and then test it on data from other interconnects. We also define the common metrics used to evaluate the results from the ML algorithm tests. We concluded this section by summarizing the common ML models we used and explaining how we implemented and tested them. The issues from this section are expanded in the Training Dataset Report from this project. The final section of this report deals with the accomplishments and conclusions. As the accomplishments, we formulate the problem we are solving and what is achieved by solving the problem. We then reflect on each of the analytics tools we developed and point out the performance of each tool when applied to solving the mentioned problems. We reference this work for further details to the papers we published on each tool. In the conclusions, we give recommendations on how to improve future PMU recording practices to facilitate the ML algorithm implementation and guidance for the future standardization work aimed at clarifying the ambiguities associated with the PMU status bits. We finally list future tasks that can bring about further improvements in the proposed algorithms. The issues from this section are expanded in the Training, and Test Dataset Report filed at the project completion date.

97 MATHEMATICS AND COMPUTING↗

The Building ENergy Demand (BEND) Model: A Comprehensive Composite Building Energy Modeling Framework

The Building ENergy Demand (BEND) model was developed at Pacific Northwest National Laboratory (PNNL) to simulate climate-dependent hourly building energy demand with the ability to disaggregate down to or aggregate up to any geographic area of interest, including counties, states, electric utility service territories, and census regions. The BEND modeling framework is designed to study the effects of climate change, economics, technology advancement, and various mitigation policies on aggregate building energy demand. To make the process computationally feasible, BEND reduces granularity in building characteristics and weather forcing while maintaining enough detail to minimize systematic differences (biases) between BEND results and data from the Energy Information Administration (EIA). Based on the Commercial Building Energy Consumption Survey (CBECS) and Residential Energy Consumption Survey (RECS) databases, BEND establishes a set of representative buildings with predefined sets of building types, sizes, and vintages. These representative buildings are defined for each of the four U.S. census regions and the five climate zones used by the EIA for building surveys (hereafter “EIA climate zones”). BEND’s representative buildings are based on a statistical analysis of the CBECS and RECS databases that infers detailed parameters such as construction type, thermal properties, internal loads, equipment and mechanical systems, and operation schedules from the high-level descriptors in those databases (building type, vintage, size, and location). The representative buildings are simplified and consolidated into a set of prototype buildings for the purpose of simulating building energy demand. Combining the prototype buildings with weather files from selected locations and years, BEND creates a set of simulation-ready building models to be run using the EnergyPlus simulation engine (EnergyPlus). The base spatial unit of each BEND simulation is a subregion that is the intersection of an International Energy Conservation Code climate zone, a census region, and an EIA climate zone; analysis for each spatial unit is influenced by the weather file BEND selects to represent the climate-similar area. The major simulation outputs of interest to BEND are hourly energy consumption values for each simulated year, possibly for multiple fuel types. Based on building-stock weights derived from the CBECS/RECS data, the hourly output streams are aggregated to a single, 8760-hour load profile for each of the major building categories—residential and commercial—with the possibility of segregating by fuel types. To correct for biases inherent in the use of a limited suite of representative buildings, BEND is calibrated against observational targets of total annual building energy consumption and hourly load profiles (including peak demand) obtained for the decision-relevant geographic scales of interest (e.g., total electric load data for individual balancing authorities available from EIA). Based on available data such as population distribution, BEND is able to aggregate both up and down scales, allowing the study of building energy demand over a range of spatial scales (e.g., states or counties within the Western Electricity Coordinating Council, Eastern Interconnection, or the entire U.S.) and/or subsets of building types (e.g., office buildings with particular size ranges).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interpreting Forced Oscillation Notifications from ESAMS: General Guidance for Reliability Coordinators

The Eastern Interconnection Situational Awareness Monitoring System (ESAMS) project demonstrated the feasibility of aggregating synchrophasor measurements from across an interconnection, analyzing them, and providing real-time wide-area situational awareness to system operators who may have excellent visibility within their footprint but lack an interconnection-wide view. An application within ESAMS that has garnered industry interest involves detecting forced oscillations visible across multiple areas, identifying the region where the oscillation originated from, quantifying the uncertainty in source localization results, and notifying users in real-time if the detected oscillation amplitudes cross a specified threshold. It is expected that system operators will utilize their internal SCADA/EMS/synchrophasor systems in conjunction with information provided by ESAMS to take effective mitigation actions if forced oscillation notifications are received. This report provides some general guidance on how the ESAMS information can be used for source localization and coordination among multiple reliability coordinators; and also identifies potential enhancements to ESAMS notifications for improved interpretability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Eastern Renewable Generation Integration Study: Flexibility and High Penetrations of Wind and Solar; NREL (National Renewable Energy Laboratory)

Balancing wind and solar in a model is relatively easy. All you need to do is assume a very large system with infinite flexibility! But what if you don't have an infinitely flexible system? What if there are thousands of generators nestled in a handful of regions that are unlikely to change their operational practices? Would you still have enough flexibility to balance hundreds of gigawatts of wind and solar at a 5 minute level? At NREL, we think we can, and our industry partners agree. This presentation was presented at the IEEE Power and Energy Society General Meeting by Aaron Bloom, highlighting results of the Eastern Renewable Generation Integration Study.

14 SOLAR ENERGY↗

Baselining PMU Data to Find Patterns and Anomalies

This paper looks at the application of situational awareness methodologies with respect to power grid data. These methodologies establish baselines that look for typical patterns and atypical behavior in the data. The objectives of the baselining analyses are to provide: real-time analytics, the capability to look at historical trends and events, and reliable predictions of the near future state of the grid. Multivariate algorithms were created to establish normal baseline behavior and then score each moment in time according to its variance from the baseline. Detailed multivariate analytical techniques are described in this paper that produced ways to identify typical patterns and atypical behavior. In this case, atypical behavior is behavior that is unenvisioned. Visualizations were also produced to help explain the behavior that was identified mathematically. Examples are shown to help describe how to read and interpret the analyses and visualizations. Preliminary work has been performed on PMU data sets from BPA (Bonneville Power Administration) and EI (Eastern Interconnect). Actual results are not fully shown here because of confidentiality issues. Comparisons between atypical events found mathematically and actual events showed that many of the actual events are also atypical events; however there are many atypical events that do not correlate to any actual events. Additional work needs to be done to help classify the atypical events into actual events, so that the importance of the events can be better understood.

Baselining analyses↗

Visualizing Electrical Power Systems as Flow Fields

We describe a method for visualizing data flows on large networks. We transform data flow on fixed networks into a vector field, which can be directly visualized using scientific flow visualization techniques. We evaluated the method on power flowing through two transmission power networks: a small, regional, IEEE test system (RTS-96) and a large national-scale system (the Eastern Interconnection). For the larger and more complex transmission system, the method illustrates features of the power flow that are not accessible when visualizing the power transmission with traditional network visualization techniques.

97 MATHEMATICS AND COMPUTING↗

Distributed Parareal in Time with Adaptive Coarse Solver for Large Scale Power System Simulations

This paper describes a distributed Parareal in time algorithm with the adaptive coarse solver. In the distributed algorithm, the propagation of a coarse solution is distributed among processors in addition to the fine solution propagation. In the adaptive coarse solver the complexity of the model is changed based on the size of generator rotor angle deviation. In addition, non-iterative approach to model a ZIP load is presented. The proposed method is tested on the large-scale 5617-machine 70285-bus Eastern Interconnection system.

Osipov, Denis↗

Hybrid EMT-TS Simulation Strategies to Study High Bandwidth MMC-Based HVdc Systems

Modular multilevel converters (MMCs) are widely used in the design of modern high-voltage direct current (HVdc) transmission system. High-fidelity dynamic models of MMCs-based HVdc system require small simulation time step and can be accurately modeled in electro-magnetic transient (EMT) simulation programs. The EMT program exhibits slow simulation speed and limitation on the size of the model and brings certain challenges to test the high-fidelity HVdc model in system-level simulations. This paper presents the design and implementation of a hybrid simulation framework, which enables the co-simulation of the EMT model of Atlanta-Orlando HVdc line and the transient stability (TS) model of the entire Eastern Interconnection system. This paper also introduces the implementation of two high-fidelity HVdc line models simulated at different time steps and discusses a dedicated method for sizing the buffer areas on both sides of the HVdc line. The simulation results of the two HVdc models with different sizes of buffer areas are presented and compared.

Liu, Yuan↗

Phasor-Measurement-Unit-Based Data Analytics Using Digital Twin and PhasorAnalytics Software

A major objective of this project was to apply GE’s commercial machine learning and data analytics toolsets to large-scale, real-world, anonymized Phasor Measurement Unit (PMU) datasets in order to extract signatures, correlated and/or causal factors, and precursor patterns associated with significant power system phenomena. The project had a particular emphasis on extraction of insights relevant to asset health monitoring, real-time load modeling and cybersecurity monitoring. Additionally, the team was directed to undertake a comprehensive data quality analysis for the provided datasets and encouraged to estimate the ‘machine-learning readiness’ of the datasets by documenting any major obstacles to the application of commercial machine learning algorithms. To accomplish the aforementioned objectives, the project team’s work centered around the identification of key event signatures and application of the identified event signatures for event detection and event classification. The industry-validated, semi-supervised machine learning strategy employed for event signature identification involved several major tasks, including data-preprocessing, generation of an overabundance of features, normal data identification, normality modeling, and event signature identification through a methodical, quantitative ranking of features in order of relevance to each studied event type. Throughout the project, data quality issues and mitigation techniques were investigated. In this report, insights are provided regarding the readiness of the provided synchrophasor datasets for application of machine learning and data analytics. The methodologies employed for this technical strategy are summarized in this report. With regards to data preprocessing and feature generation, the provided Training and Test Datasets were ingested into GE’s big data environment. Subsequently, the team applied bad data cleansing and data imputation scripts, event detection scripts, and application programming interfaces (APIs) to the datasets for convenient data access. The project team completed development and validation of dozens of physics-based, statistics-based and transformation-based feature functions used for the extraction of over 60 synchrophasor features. Using a new parallel feature generation technology developed on this project, over 60 features have been rapidly generated for the full two years’ worth of Training and Test Dataset data associated with both the Eastern and Western interconnects. Even accommodating for temporal down-sampling inherent to the feature extraction procedure, this parallel feature generation activity resulted in a massive feature set with a storage requirement approximately equal to that of the raw training dataset itself. With regards to normal data identification and normality modeling, a normality model was built using the feature data extracted from the Training Dataset and iteratively refined subsequent to incremental adjustments and expansions of the Training Dataset feature data. With respect to event characterization and signature identification, an event signature identification pipeline was developed and used in conjunction with the normality model to identify over 15 event signatures for key event categories within the Training Dataset. The identified event signatures were used to characterize hundreds of key events in terms of relative severity, duration, and location of the event. An investigation was undertaken to identify correlated and causal factors involved in transformer events. A separate investigation into temporal trends in ring-down analysis results was undertaken to determine possible associations between system dynamics and various other factors such as loading, season or year. To validate the identified event signatures, additional work was undertaken to develop signature-based anomaly detection and classification tools suitable for convenient application to the synchrophasor datasets. The anomaly detection and classification tools, suitable for online application, were then applied to the entirety of the Eastern Interconnect Training and Test Datasets. Performance of the event detection and classification tools was evaluated upon receipt of the Test Dataset event logs (i.e., the labels for events contained in the Test Dataset), and promising results were obtained despite several challenges (documented herein) associated with application of supervised or semi-supervised machine learning methods to large-scale, anonymized datasets. Finally, the detection and classification tools were used to detect, classify, and characterize thousands of new events not included in the original event logs provided by the DOE within both the Training and Test Datasets.

24 POWER TRANSMISSION AND DISTRIBUTION↗