101 records · Page 6

Welding of Haynes 282 to Steels to Enable Modular Rotors for Advanced Ultra Super-Critical Steam Turbines

Steam turbines for an Advanced Ultra Super Critical (AUSC) fossil fired power plant will operate at temperatures well above those of current commercial steam cycles with inlet temperatures more than 760 C , which is beyond the capabilities of alloy steels presently used for steam turbine applications and requires advanced materials. Large components such as steam turbine rotors may be made of nickel based super alloys such as Haynes 282 (H282). However, monolithic forgings of superalloys in the sizes required for large steam turbines rotors can be prohibitively expensive besides many technical challenges. To minimize cost and alleviate the related technical challenges, superalloy use needs to be limited to locations on the steam turbine rotor where strength and temperature requirements cannot be met by conventional steels. This is possible if nickel-based superalloys can be successfully welded to steels and the related technical challenges - machining parts made of dissimilar welded materials, non-destructive examination of such welds for flaw detection; and, material properties of such hybrid components – are sufficiently addressed. In this technology development project, we successfully welded H282 to plates up to ~ 75 mm (~ 3 inches) to a 3.5NiCrMoV steel of similar thickness. Advanced ultrasonic inspection technique called Phased Array Ultrasonic Testing (PAUT) was employed to examine the dissimilar H282-Steel welds, into which flat bottomed side drilled holes (SDH) of various diameters were introduced, to determine the minimum detectable feature sizes; it was shown that with PAUT SDH of dia. down to 0.5 mm could be detected in the base alloys and SDH with dia. down to 2.4 mm could be detected in the weld metal under multiple orientations successfully. An autonomous machining process monitoring system was developed and demonstrated whereby the forces acting on the cutting tool could be actively monitored as the cutting tool transitioned from H282 to Steel across the weld using which the machining parameters can be potentially altered without interruption to extend tool life. This project successfully achieved its objectives of - i. Developing a welding methodology and viable welding geometries, to successfully join H282 to steel 3.5CrMoNiV steel to enable manufacture of modular steam turbine rotors for AUSC applications (conditions of at least 760 °Celsius and 3,100 psia (pounds per square inch absolute pressure) and evaluate the material properties of the welded specimen. ii. Employ the advanced ultrasonic inspection technique to the dissimilar weld metal joint and determine the minimum detectable feature sizes. iii. Develop effective machining techniques to machine such hybrid structures with online tool force monitoring and effect machine state metrics for optimal results.

20 FOSSIL-FUELED POWER PLANTS↗

An Update on the Geothermal Data Repository's Data Standards and Pipelines: Geospatial Data and Distributed Acoustic Sensing Data: Preprint

The Department of Energy's (DOE) Geothermal Data Repository (GDR) team has implemented data standards and automated data pipelines for the following data types: 1) drilling data, 2) geospatial datasets, and 3) DAS data. An additional data pipeline is proposed for stimulation data. These data standards and pipelines are intended to improve the real-world applicability of geothermal machine learning outputs through improving the quality of data. More specifically, through standardizing high-value datasets, the GDR is reducing project-specific data curation requirements, allowing more time to be spent on actual research. By automating this process, the burden of standardization is taken off of the user, overall increasing the availability of standardized data. This paper provides an update on the GDR's transition toward data standardization through automated data pipelines and calls for feedback from the community on how we can improve this process.

cloud-optimized↗

An Update on the Geothermal Data Repository's Data Standards and Pipelines: Geospatial Data and Distributed Acoustic Sensing Data

The Department of Energy's (DOE) Geothermal Data Repository (GDR) team has implemented data standards and automated data pipelines for the following data types: 1) drilling data, 2) geospatial datasets, and 3) DAS data. An additional data pipeline is proposed for stimulation data. These data standards and pipelines are intended to improve the real-world applicability of geothermal machine learning outputs through improving the quality of data. More specifically, through standardizing high-value datasets, the GDR is reducing project-specific data curation requirements, allowing more time to be spent on actual research. By automating this process, the burden of standardization is taken off of the user, overall increasing the availability of standardized data. This paper provides an update on the GDR's transition toward data standardization through automated data pipelines and calls for feedback from the community on how we can improve this process.

cloud-optimized↗

HFTS-1 (Final Report)

Despite the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells can be a complex subject. In addition to the increased expense of multistage fracturing in horizontal wells, increasing the number of fracturing stages does not always correlate with a commensurate increase in production. The problem is the application of a uniform fracture stimulation design to all stages with no consideration for geological variations along the wellbore. The result is an inefficient use and costly waste of energy and water. Optimization of the fracturing process requires an understanding of the cause-and-effect relationship between fracturing parameters and local geological properties at a given location along the wellbore. Realizing that the generalized rock mechanics theories and hypotheses are not truly applicable to fractured and laminated shales, quantifiable impacts of a shale’s geomechanical and depositional features are a prerequisite for design and implementation of optimized hydraulic fractures. The overarching goal of this project is to understand and define the relationships of shale geology and fracture dynamics using detailed field data that includes coring of the fracture domain. Finally, resource recovery from shale formations is estimated to be less than fifteen percent. Research proposed in this project will establish the foundations for investigating enhanced recovery techniques for increased resource recovery in existing fracture treated wells. Natural gas as an EOR fluid is in the initial stages of being used broadly in the oil and gas industry and as such, many aspects of the process need to be researched and addressed prior to widespread acceptance. In addition, re-fracturing techniques, particularly using cemented liners also need to be further investigated. This project explores several of these EOR techniques in greater detail, not just at the theoretical level, but through actual field test sites. This report delves into the research program, identified tasks, several studies, observations, results, and conclusions under the Hydraulic Fracturing Test Site (HFTS) project. This test project is subdivided into three distinct phases and each phase is discussed in detail under separate sections. The original test site for Phase 1 as well as the Phase 2 site are in Midland Basin in Texas and operated by Laredo Petroleum. In the first two phases, the program targeted the Wolfcamp formation in Midland Basin. Phase 3 of the study targeted the EagleFord play in South Texas with Devon Energy as the operator. Significant conclusions from this study include: 1) lateral and vertical fracture growth mapping as well as proppant transport behavior, 2) Use of field gas and its applicability for huff n puff EOR injection in the Midland Basin, 3) Development and validation of proppant log, both at core scale as well as in-fill well implementation by analyzing drilling mud return samples, 4) Applicability of liner refracturing including best practices for enhanced unit level productivity. This report will detail all these studies as well as technical results and conclusions from said studies. These include general subsurface characterization work, completion designs as implemented, studies looking at fracture geometry, high resolution microseismic study, advanced crosswell strain mapping studies including drainage characterization, core characterization results, proppant analysis (core and observation wells), geochemistry, etc. to name a few.

02 PETROLEUM↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Optimizing a chemical cleaning protocol to determine the nickel isotopic composition of ancient seawater from carbonates

Reconstructing the ancient marine cycle of Ni, a trace metal in the oceans essential to enzymes regulating the C, N, and O cycles, would inform how Ni bioavailability shaped early life. The Ni isotopic composition of seawater (δ 60 Ni SW ) through time could provide insight, but this approach requires sedimentary archives that faithfully record δ 60 Ni SW . Carbonates are an often-used record of seawater chemistry, but contaminants could bias the measured δ 60 Ni of bulk sediment. To isolate the true carbonate-bound δ 60 Ni signal, we optimized a chemical cleaning protocol designed to minimize non‑carbonate Ni contributions and maximize carbonate recovery. We analyzed ODP Site 1007 sediments and evaluated oxidative and reductive pre-cleaning steps and carbonate dissolution protocols. Our results show that only reductive cleaning significantly altered the subsequent carbonate leachate composition, lowering Ni/Ca ratios by up to 60% and δ 60 Ni values by as much as 0.4 ‰. In contrast, δ 60 Ni values were largely insensitive to premature carbonate dissolution during pre-cleaning or to partial leaching of silicates during carbonate dissolution, even at higher acid molarities or longer reaction times. We recommend an evidence-based protocol that removes hydro-soluble salts and clays, applies reductive cleaning and oxidative cleaning for certain sample compositions, and dissolves carbonate using 0.5 M acetic acid, adjusted to pH 5. Using these results, we infer a ∼ 0.9 ‰ Ni isotopic fractionation between chemically cleaned deep-water carbonates (+0.4 ± 0.1 ‰) and deep seawater. This method development is a key step toward accurately reconstructing ancient marine Ni cycles.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

GOOML - Finding Optimization Opportunities for Geothermal Operations: Preprint

Geothermal Operational Optimization with Machine Learning (GOOML) is a transferable and extensible component-based geothermal asset modeling framework that considers complex steamfield relationships and identifies optimization prospects using a data-driven approach. We have used this framework to develop digital twins that provide steamfield operators with an operational environment to analyze and understand historical and forecasted power production, explore new steamfield configuration possibilities, and seek optimal asset management for real world applications. The GOOML modeling software is built on a generic component-based systems framework that allows for both historical and forecast analysis. A GOOML model can perform historical data-assimilation using first-principal thermodynamics to create a meaningful data model. Historical production data can then be coupled with a forecast framework to train machine-learning models of steamfield components to predict future outputs. This modeling environment enables digital exploration of steamfield design configurations and operational scenarios. GOOML digital twins have been developed for steamfields in New Zealand and the United States representing differing power generation and field conditions. These digital twins have been validated by comparing hindcast predictions against historical production data. Reinforcement learning experiments were conducted to demonstrate the ability to programmatically explore the operations space using machine learning agents. Our initial results are compelling; two to five percent increases in annual energy production were demonstrated by the GOOML models with no additional infrastructure build required. GOOML offers a new approach to geothermal operations by applying state-of-the-art machine learning algorithms, comprehensive data analytics, and interaction with digital twins. Through application of these tools, operators will realize greater availability and higher net generation which will increase the cost effectiveness of geothermal energy projects.

access↗

Utah FORGE: Optimization of a Plug-and-Perf Stimulation (Fervo Energy)

Information around the plug-and-perf treatment design at Utah FORGE by Fervo Energy. Objective and Purpose: - Develop a multistage hydraulic stimulation approach designed specifically to target the top three factors that control the technical and commercial viability of an EGS system: i) Achieving sufficient injectivity to support high cross-well flow rates ii) Distributing flow evenly across the wellbore and reservoir to maximize heat mining efficiency, ensure sustained heat transfer, and mitigate thermal breakthrough iii) Overcoming the effects of stress heterogeneity, stress shadowing, and variations in natural fracture properties during the stimulation treatment, leading to a more predictable stimulated reservoir volume and offset well placement - The following activities will be performed: i) Design, plan, and execute a multistage plug-and-perf stimulation treatment at a Fervo site with data acquisition and well testing activities aimed at addressing key technical aspects of the issues above ii) Perform data processing and interpretation of field results to translate the results form the Fervo site to a site-specific design at the Utah FORGE site iii) Design, plan, and execute a multistage plug-and-perf stimulation treatment design at the Utah FORGE site Methods and Approach: - Design a detailed data acquisition plan to maximize learning around: i) DFIT testing ii) Petrophysical logging, image logging iii) Permanent DAS/DTS fiber optic monitoring iv) Deep borehole microseismic monitoring v) Shallow borehole induced seismicity monitoring vi) Injection/production testing (RTA analysis, tracer testing) vii) Integrated numerical modeling and production forecasting

15 GEOTHERMAL ENERGY↗

Evaluation of “Tight Oil” Well Performance and Completion Practices in the Powder River Basin - “Time Slice” Analysis

The objective of this paper is to assess how well completion practices and well performance have evolved over time (“time slices”) in the tight sands and shales of the Powder River Basin (PRB). This information can provide a foundation for helping operators define more effective well completion practices and thus optimize well performance in an emerging “tight oil” basin. To start, the authors assembled a “database” containing well completion practices, production data, and geologic information for more than 800 horizontal (Hz) wells targeting three “tight oil” formations -- Turner, Frontier, and Mowry--placed on production in the past dozen years. To control for the impact of geologic and reservoir properties on well performance, the authors defined 12 geologically distinct areas (“partitions”) for the Turner, Frontier, and Mowry Shale in the Powder River Basin (4 partitions in each formation). This paper discusses the methodology for establishing “time slices” for each partition within each of the three “tight oil” formations, including (1) taking out, to the extent practical, the effects of geology by partitioning the three “tight oil” formations based on their geologic parameters; (2) using type curves and estimated ultimate recoveries (EURs) to establish a reliable measure of well performance; and (3) rigorously inspecting the production and well completion data to assure a quality dataset. Partition #2, a high thermal maturity area of the Frontier Sandstone in the western Powder River Basin, helps illustrate the results of the study. Using a dataset of 55 Hz wells, the study found that well performance has steadily improved, with oil EURs increasing from 180 MBbl in 2012-13 to 290 MBbl in 2018-19. Much of this improvement was due to the use of longer Hz laterals, increasing notably from 3,765 ft in 2012-13 to 10,260 ft in 2018-19. More intensive completion practices contributed, as well. For example, the number of frac stages more than doubled, from 17 to 35, and proppant concentrations increased from 1,060 lbs/ft to 1,320 lbs/ft. Finally, the data show diminishing returns to longer laterals and more intensive completion practices. For example, the key performance measure of oil EUR per 1,000 ft of lateral is decreasing. For 2012-13, Hz wells recovered 50 MBbl of oil per 1,000 ft of lateral while the more recent 2018-19 Hz wells only provide 30 MBbl of oil per 1,000 ft of lateral. Considerable insight can be gained by using “time slices” and geologic partitioning to better understand the relationship between changes in well drilling and completion practices and changes in well performance in emerging “tight oil” plays. The results from this study can also serve as a foundation for subsequent, more intense efforts involving data analytics for defining more optimum well completion practices targeting specified geologic settings and formations.

02 PETROLEUM↗

Analysis and Integration of the Hydraulic Fracturing Test Site-2 (HFTS-2) Comprehensive Dataset

Hydraulic Fracturing Test Site-2 (HFTS-2) is a field-based research experiment performed in the Permian (Delaware) Basin. The unique aspect of this program was the acquisition of a unique, comprehensive, diagnostic dataset. Additionally, shorter parent wells drilled three years before the child wells offered clear distinction between the stages influenced by parent-child effects and the stages without any effects. The goal of this study was to analyze and integrate this comprehensive diagnostic dataset to understand the areal and vertical extent of hydraulic fractures (HF). The paper also provides insights on the effects of parent wells’ depletion on child well HF geometry based on various monitoring methods and subsurface models. Areal and vertical coverage for all HFTS-2 wells during stimulation and depletion was estimated based on analysis and interpretation of diagnostics and advanced modeling results. HFTS-2 diagnostics included microseismic (MS), pre- and post-stimulation logs and cores, bottomhole gauges, and fiber optic (FO) data. The diagnostics results (MS, FO, image logs) were integrated and used to calibrate subsurface models. Additional field tests were designed and implemented for depletion monitoring. The tailored program for monitoring depletion included vertical and slant well pressures, interference testing, and a vertical strain depletion trial. Areal Coverage: Conventional MS (and FO MS) were used to compute HF dimensions, which were compared with diagnostics (FO strain, gauge, image logs) observations and calibrated subsurface models. A post-production interference test did not show offset well communication. Vertical Coverage: Vertical coverage during stimulation was monitored using a vertical monitoring well. The stronger mechanical strain signals showed good correlation with MS event intensities, geomechanical properties, and gauge inferences. Vertical depletion was estimated based on vertical/slant well gauges and strain depletion tests. Parent-Child Effects: Diagnostics and calibrated subsurface models show asymmetry in child well fracture geometries for stages that overlap parent wells. Child well image logs serve as a good indicator for parent Downloaded from http://onepetro.org/URTECONF/proceedings-pdf/21URTC/2-21URTC/D021S031R004/2477423/urtec-2021-5241-ms.pdf/1 by Carol Worster on 28 February 2022 URTeC 5241 well HF tracking. Child well MS events had an eastward bias, in line with pre-stimulation image logs, and was confirmed by parent well frac hits. Novel/Additive Information: The dataset presents a unique, over-constrained problem space to compare independent techniques to arrive at HF metrics (i.e., stimulation height and/or half-length), unlike a single source dataset, in which calibration is done using available data to guide predictions. Here, the asymmetry in HF geometry seen in the stages influenced by parent-child effects offers unique insights into well spacing and landing, which are key capital decisions the unconventional resources industry is seeking to optimize.

58 GEOSCIENCES↗