Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Drilling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Uncertainty evaluation for twist drilling stability model

This paper describes the first uncertainty analysis for drilling stability using a frequency-domain drilling stability model. The stability model inputs include: the modal parameters for the torsional-axial vibration mode from the twist drill-holder-spindle axial frequency response function; and the mechanistic coefficients that relate the torque and thrust force to chip area for the selected drill-workpiece material combination. Furthermore, Monte Carlo simulation is applied to propagate the input uncertainties to output uncertainty in the predicted stability map, which separates stable from unstable (chatter) zones in the spindle speed-chip width parameter space. Additionally, the mean stability boundary and its 95% confidence intervals are determined for five cases: varying all four inputs simultaneously and varying them individually. This enables the individual sensitivities to be compared. Experimental results from drilling tests are included for comparison to the prediction. Additionally, Matlab code is provided to implement the stability model and Monte Carlo uncertainty analysis.

42 ENGINEERING↗

Utah FORGE: Well 16A(78)-32 Drilling Data

This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly deviated deep well. It was completed 60 days ahead of schedule. Rig move in began 10/22/2020 and drilling commenced on 10/30/2020, and total depth was reached on 12/18/2020. Drilling was followed by a diagnostic fracture injection test (DFIT), logging, and circulating casing. The rig was released on 1/12/2021. The upper part of the well was drilled vertically through approximately 4,700 feet of sediments before penetrating into high strength, crystalline granite. The well was deviated at a 65 degree angle from vertical after reaching a depth of 6,000 ft. This angle was maintained for the remainder of the well's trajectory. The well ultimately reached a true vertical depth of 8,559 feet, and a total measured depth of 10,987 feet. Preliminary measurements indicate temperatures at the "toe" of the well will exceed 442 degrees F (228 degrees C). Approximately 74 ft of core of the granitic and metamorphic rocks that will form the FORGE reservoir was also recovered.

15 GEOTHERMAL ENERGY↗

Microhole drilling technology utilizing a golden section search algorithm

A fundamental issue in microhole drilling is that delivering high weight-on-bit (WOB), high torque rotational horsepower to a conventional drill bit does not scale down to the hole sizes necessary to realize the envisioned cost savings An optimization algorithm called a golden section search (GSS) was used to systematically identify the preferred WOB for a given set of conditions. This research focused on implementing and evaluating two low WOB drilling technologies for microhole drilling: - Laser-assisted mechanical drill, which was tested in the laboratory - Lightly modified commercial off-the-shelf (COTS) percussive hammer, which was tested in a limited field test. Data were collected for microhole GSS using WOB optimization via simulation as well as at the Blue Canyon Dome Site in Socorro, NM. Information on the attached files and folders are as follows: - the .tdms files are LabView data files, which can be opened within Excel using a .tdms add-in or using a Matlab .tdms converter - the .tdms_index files are part of the .tdms file structure - sampling rate, column headers, and length data within the .tdms files follow SOP when utilizing Excel and/or Matlab as described above

15 GEOTHERMAL ENERGY↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 3.4 Report: Complete Well Design and Drilling Plan

We are pleased to present the following materials, which serve as confirmation of the successful completion of Task 3.4 Complete Well Design and Drilling Plan Milestone, in accordance with the Project OASIS Project Management Plan. More specifically, the following provides confirmation of a team-wide call that was held on September 25, 2023, to discuss the CarbonSAFE Phase II drilling program, the well drilling prognosis, and an overview of risks associated with the program by category as well as probability and impact. A comprehensive Site-Specific Drilling Report will be provided to DOE-NETL 30 days after completion of drilling activities.

20 FOSSIL-FUELED POWER PLANTS↗

Percussive Augmenter of Rotary Drills (PARoD)

Increasingly, NASA exploration mission objectives include sample acquisition tasks for in-situ analysis or for potential sample return to Earth. To address the requirements for samplers that could be operated at the conditions of the various bodies in the solar system, a piezoelectric actuated percussive sampling device was developed that requires low preload (as low as 10N) which is important for operation at low gravity. This device can be made as light as 400g, can be operated using low average power, and can drill rocks as hard as basalt. Significant improvement of the penetration rate was achieved by augmenting the hammering action by rotation and use of a fluted bit to provide effective cuttings removal. Generally, hammering is effective in fracturing drilled media while rotation of fluted bits is effective in cuttings removal. To benefit from these two actions, a novel configuration of a percussive mechanism was developed to produce an augmenter of rotary drills. The device was called Percussive Augmenter of Rotary Drills (PARoD). A breadboard PARoD was developed with a 6.4 mm (0.25 in) diameter bit and was demonstrated to increase the drilling rate of rotation alone by 1.5 to over 10 times. Further, a large PARoD breadboard with 50.8 mm diameter bit was developed and its tests are currently underway. This paper presents the design, analysis and preliminary test results of the percussive augmenter.

percussive augmenter↗

Percussive Augmenter of Rotary Drills (PARoD)

Increasingly, NASA exploration mission objectives include sample acquisition tasks for in-situ analysis or for potential sample return to Earth. To address the requirements for samplers that could be operated at the conditions of the various bodies in the solar system, a piezoelectric actuated percussive sampling device was developed that requires low preload (as low as 10 N) which is important for operation at low gravity. This device can be made as light as 400 g, can be operated using low average power, and can drill rocks as hard as basalt. Significant improvement of the penetration rate was achieved by augmenting the hammering action by rotation and use of a fluted bit to provide effective cuttings removal. Generally, hammering is effective in fracturing drilled media while rotation of fluted bits is effective in cuttings removal. To benefit from these two actions, a novel configuration of a percussive mechanism was developed to produce an augmenter of rotary drills. The device was called Percussive Augmenter of Rotary Drills (PARoD). A breadboard PARoD was developed with a 6.4 mm (0.25 in) diameter bit and was demonstrated to increase the drilling rate of rotation alone by 1.5 to over 10 times. The test results of this configuration were published in a previous publication. Further, a larger PARoD breadboard with a 50.8 mm (2.0 in) diameter bit was developed and tested. This paper presents the design, analysis and test results of the large diameter bit percussive augmenter.

piezoelectric actuation↗

Wellbore Stability and Mud Loss Management in Geothermal Drilling: Optimizing Mud Weight to Mitigate Tensile Wellbore Fracturing at The Geysers, California

As part of a U.S. Department of Energy (DOE) Geothermal Technologies Office-funded initiative, Geysers Power Company, LLC, a subsidiary of Calpine Corporation, has been working to enhance drilling performance at the world’s largest geothermal field, The Geysers, in northern California. In a recent drilling operation of the GDC-36 well, excessive mud losses were encountered, initially addressed through repeated but largely ineffective cement plugging. Ultimately, the most effective strategy was to drill blind through the loss zones, made feasible by the high rate of penetration (ROP) achieved with PDC bits, allowing significant progress before the mud tanks were depleted and water-sensitive argillic formation layers could collapse. In response to these challenges, the project team explored alternative methods to minimize downtime and risks associated with cement plugging and continuous mud loss and to contemplate the driving mechanisms for the losses. Wellbore imaging using Formation MicroImager (FMI) and Ultrasonic Borehole Imager (UBI) tools revealed longitudinal tensile fractures, which were attributed to mud weights exceeding the minimum circumferential stress resulting from the native stress field and formation pressure. This study examines the mud losses encountered and leverages wellbore imaging data to understand the mechanisms behind mud induced tensile fracturing in specific rock facies. Understanding fracture behavior across different lithologies is crucial, as fractures within the reservoir can enhance steam migration throughout the system. The reservoir at The Geysers lies within the Mesozoic Franciscan Assemblage, a tectonic mélange formed by subduction. It consists of metamorphosed turbidite sandstone (greywacke) and mudstone (argillite), oceanic upper crust (including greenstone and chert), and serpentinized ultramafic rocks - each exhibiting distinct geomechanical fracturing properties. The structural fabric of the Franciscan Assemblage was shaped by low-angle Mesozoic thrust faulting and later overprinted by sub-vertical strike-slip structures related to the Pacific-North American plate boundary. A wellbore stability model was developed using core measurements and logs to simulate fracturing scenarios during drilling under varying stress conditions. These simulations guided the development of an optimized mud weight management strategy that should enable adaptive adjustments during drilling, reducing the likelihood of tensile fracturing and mud losses, ultimately improving operational efficiency.

15 GEOTHERMAL ENERGY↗

In situ x-ray imaging to understand subsurface behavior during continuous wave laser drilling

A limited understanding regarding the underlying dynamics and mechanisms of material removal during continuous wave laser drilling has presented significant challenges in achieving precision and process control. Here, to address this, we employed high-fidelity, in situ synchrotron x-ray imaging to reveal previously unknown material behaviors during continuous wave laser drilling with power modulation. Our findings highlight that high-aspect ratio drill holes are achieved when the laser modulation frequency falls within the range of 8–12 kHz, provided that the laser average power and modulation amplitude levels meet the specified limits. Under these conditions, we identified a material removal mechanism driven by incremental accumulation of recoil pressure that gradually pushes material upward from deep within the substrate to the surface. This mechanism manifested as a low-frequency fluctuation in the vapor depression depth, resulting in periodic instances of material ejection. Furthermore, our study underscores that rapid expansion of the melt pool and the widening of the drill hole opening can impede effective material removal by redirecting energy from material ejection to increasing the melt pool size. This investigation contributes essential insights into the subsurface dynamics involved in the drilling of high-aspect ratio holes, furthering our fundamental understanding of this intricate process.

47 OTHER INSTRUMENTATION↗

RadResponder Nationwide Drill 2020: FRMAC participation After Action Report

On February 11th, 2020 FRMAC participated in the 2020 RadResponder nationwide drill involving survey data review and approval. During this drill, dozens of organizations from across the country participated in uploading simulated survey results to their own RadResponder event and reviewing those data given some "best-practice" guidelines. FRMAC participated in this drill to learn how this process is carried out in RadResponder and to determine some areas of improvement that will make FRMACs use of RadResponder more effective and efficient. As drill participants, the four FRMAC staff each set up their own RadResponder events so they could work independently to work through each step. Each were given an import file with 60 survey measurements to import and review. At the end of the drill a hotwash was held where users were able to ask questions and receive feedback from Chainbridge and FRMAC participants. In summary, several areas for improvement have been identified and will be categorized as items that need immediate attention (Bugs), areas for improvement in the near-term (change requests), and ideas on how the overall process can be improved (feature requests). The items presented in this report by no means reflect all the required changes FRMAC Monitoring and Sampling and Assessment will need to carry out their procedures in RadResponder but do represent a step in the right direction. A full review and exercise of the FRMAC process will need to be conducted with more subject matter experts to discover all the required features FRMAC needs to carry out their mission.

97 MATHEMATICS AND COMPUTING↗

2021 Consequence Management Hotline Drill After Action Report

In March 2021, a functional area drill was held at the Remote Sensing Laboratory–Nellis that focused on using CBRNResponder and the Digital Field Monitoring (DFM) tablets for sample hotline operations and the new paper Sample Control Forms (SCFs) for sample collection. Participants included staff trained and billeted as sample control specialists and Consequence Management Response Team (CMRT) field monitoring personnel. Teams were able to successfully gather and transfer samples to the sample control hotline staff through the manual process, though there were several noted areas for improvement. In July and October 2021, two additional functional area drills were held at Sandia National Laboratories that focused on field sample collection and custody transfer at the sample control hotline for the Consequence Management (CM) Radiological Assistance Program (RAP) program. The overarching goal of the drills was to evaluate the current CM process for sample collection, sample drop off, and sample control using the CBRNResponder mobile and web-based applications. The July 2021 drill had an additional focus to have a subset of samples analyzed by the local analytical laboratory, Radiation Protection Sample Diagnostics (RPSD) laboratory, to evaluate the Laboratory Access portal on CBRNResponder. All three drills were able to accomplish their objectives however, there were several issues noted (Observations: 25 Urgent, 29 Important, and 22 Improvement Opportunities). The observations were prioritized according to their impact on the mission as well as categorized to align with the programmatic functional area required to address the issue. This report provides additional detail on each observation for skillset/program leads and software developers to consider for future improvement or mandatory efforts.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

2021 NIRT Mini Drill (After Action Report)

During the summer and fall of 2021, several functional area drills were held that focused on exercising Consequence Management’s (CM) ability to extract and use data from RadResponder for the purpose of answering intermediate-phase questions presented as technical inject requests for information (RFI) in Sandia National Laboratories (SNL) Consequence Management Operational System (COSMOS) software. The scenario chosen was that of Northern Lights 2016 (NL16) which was a large-scale nuclear power plant (NPP) release exercise in the state of Minnesota. The NL16 data was extracted from the Radiological Assessment and Monitoring System (RAMS) event where it was created and was reformatted for implanting to a new RadResponder event. Next, the beta-version of a laboratory sample data simulator was used to generate more sample data that was injected to the event. Five “mini-drills” were devised with each prompt defined by a data-based need. For each drill, a team of assessment and NARAC scientists worked the problem using the drill prompt and the available data in RadResponder. The teams held a kickoff meeting, had several days to work the problem, and then reported their results as well as observations in a hotwash. Several areas for improvement in both the software and process were identified during the course of these drills. This report will document the process of addressing each RFI and the discovered gaps in both software capability and methodology so that they can be considered for future development and investment by the CM and NIRT programs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Detecting the Presence of Intrusive Drilling in Secure Transport Containers Using Non-Contact Millimeter-Wave Radar

We employ a 77–81 GHz frequency-modulated continuous-wave (FMCW) millimeter-wave radar to sense anomalous vibrations during vehicle transport at highway speeds for the first time. Secure metallic containers can be breached during transport by means of drilling into their sidewalls but detecting a drilling signature is difficult because the large vibrations of transport drown out the small vibrations of drilling. For the first time, we demonstrate that it is possible to use a non-contact millimeter-wave radar sensor to detect this micron-scale intrusive drilling while highway-speed vehicle movement shakes the container. With the millimeter-wave radar monitoring the microdoppler signature of the container’s vibrating walls, we create a novel signal-processing pipeline consisting of range–angle tracking, time–frequency analysis, horizontal stripe image convolution, and principal component analysis to create a robust and powerful detection statistic to alarm if drilling is present. To support this pipeline, we develop a statistical model combining the vibrating container and the random vibrations induced by vehicle movement to explore the robustness of the sensor’s detection capabilities. The presented results strongly support the inclusion of a millimeter-wave radar vibration sensor into a transport security system.

Wagner, Samuel↗

Optimizing Deep Geothermal Drilling for Energy Sustainability in the Appalachian Basin

This study investigates the geological and geomechanical characteristics of the MIP 1S geothermal well in the Appalachian Basin to optimize drilling and address the wellbore stability issues encountered. Data from well logs, sidewall core analysis, and injection tests were used to derive elastic and rock strength properties, as well as stress and pore pressure profiles. A robust 1D-geomechanical model was developed and validated, correlating strongly with wellbore instability observations. This revealed significant wellbore breakout, widening the diameter from 12 ¼ inches to over 16 inches. Advanced technologies like Cerebro Force™ In-Bit Sensing were used to monitor drilling performance with high accuracy. This technology tracks critical metrics such as bit acceleration, vibration in the x, y, and z directions, Gyro RPM, stick-slip indicators, and bending on the bit. Cerebro Force™ readings identified hole drag caused by poor hole conditions, including friction between the drill string and wellbore walls and the presence of cuttings or debris. This led to higher torque and weight on bit (WOB) readings at the surface compared to downhole measurements, affecting drilling efficiency and wellbore stability. Optimal drilling parameters for future deep geothermal wells were determined based on these findings.

Environmental Sciences & Ecology↗

Comparison of experimental and predicted performance of 150-millimeter-bore solid and drilled ball bearings to 3 million DN

Seven 150-millimeter-bore ball bearings were run under 8900-newton (2000-lbf) thrust load at speeds from 6670 to 20,000 rpm (1 million to 3 million DN). Four of the bearings had conventional solid balls, and three bearings had drilled (cylindrically hollow) balls with 50-percent mass reduction. The bearings were under-race cooled and slot lubricated with a type 2 ester oil at flow rates from 4.35 x 0.001 to 5.94 x 0.001 cubic meter/min (1.15 to 1.57 gal/min). Friction torque and temperature were measured on all bearings. While there was considerable spread in the temperature data, the drilled ball bearings tended to run slightly cooler than the solid ball bearings at higher speeds. No significant difference in torque was noted, however, between the solid and drilled ball bearings. One bearing of each type was rerun at 17,800-newton (4000-lbf) thrust load. The solid ball bearings performed satisfactorily at 3 million DN. However, at about 2 million DN the drilled ball bearing experienced a broken ball, and cracks appeared in other balls as a result of flexure fatigue. Metallurgical examination of the cracked balls indicated a brittle structure in the bore of the drilled balls.

Scibbe, H. W.↗

Experimental system for drilling simulated lunar rock in ultrahigh vacuum

An experimental apparatus designed for studying drillability of hard volcanic rock in a simulated lunar vacuum of 5 x 10 to the minus 10th power torr is described. The engineering techniques used to provide suitable drilling torque inside the ultrahigh vacuum chamber while excluding all hydrocarbon are detailed. Totally unlubricated bearings and gears were used to better approximate the true lunar surface conditions within the ultrahigh vacuum system. The drilling system has a starting torque of 30 in-lb with an unloaded running torque of 4 in-lb. Nominal torque increase during drilling is 4.5 in-lb or a total drilling torque of 8.5 in-lb with a 100-lb load on the drill bit at 210 rpm. The research shows conclusively that it is possible to design operational equipment for moderate loads operating under UHV conditions without the use of sealed bearings or any need of lubricants whatsoever.

Roepke, W. W.↗

Chemical stratigraphy of the Apollo 17 deep drill cores 70009-70007

A description is presented of an analysis of a total of 26 samples from three core segments (70009, 70008, 70007) of the Apollo 17 deep drill string. The deep drill string was taken about 700 m east of the Camelot Crater in the Taurus-Littrow region of the moon. Three core segments have been chemically characterized from the mainly coarse-grained upper portion of the deep drill string. The chemical data suggest that the entire 70007-70009 portion of the deep drill string examined was not deposited as a single unit, but was formed by several events sampling slightly different source materials which may have occurred over a relatively short period of time. According to the data from drill stem 70007, there were at least two phases of deposition. Core segment 70009 is probably derived from somewhat different source material than 70008. It seems to be a very well mixed material.

Ehmann, W. D.↗

Mars Analog Rio Tinto Experiment (MARTE): 2003 Drilling Campaign to Search for a Subsurface Biosphere at Rio Tinto Spain

The MARTE (Mars Astrobiology Research and Technology Experiment) project, an ASTEP field experiment, is exploring for a hypothesized subsurface anaerobic chemoautotrophic biosphere in the region of the Tinto River- or Rio Tinto- in southwestern Spain. It is also demonstrating technology needed to search for a subsurface biosphere on Mars. The project has three primary objectives: (1) search for and characterize subsurface life at Rio Tinto along with the physical and chemical properties and sustaining energy sources of its environment, (2) perform a high fidelity simulation of a robotic Mars drilling mission to search for life, and (3) demonstrate the drilling, sample handling, and instrument technologies relevant to searching for life on Mars. The simulation of the robotic drilling mission is guided by the results of the aseptic drilling campaign to search for life at Rio Tinto. This paper describes results of the first phase of the aseptic drilling campaign.

Stoker, Carol↗

Ultrasonic rotary-hammer drill

A mechanism for drilling or coring by a combination of sonic hammering and rotation. The drill includes a hammering section with a set of preload weights mounted atop a hammering actuator and an axial passage through the hammering section. In addition, a rotary section includes a motor coupled to a drive shaft that traverses the axial passage through the hammering section. A drill bit is coupled to the drive shaft for drilling by a combination of sonic hammering and rotation. The drill bit includes a fluted shaft leading to a distal crown cutter with teeth. The bit penetrates sampled media by repeated hammering action. In addition, the bit is rotated. As it rotates the fluted bit carries powdered cuttings helically upward along the side of the bit to the surface.

Bar-Cohen, Yoseph↗