Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Design and Verification of External Occulters for Direct Imaging of Extrasolar Planets

An occulter is an optical element which is placed in front of the telescope to block most of the light from a star before it reaches the optics inside, without blocking the planet.In our case, we use two spacecraft ying in formation: First has its edge shaped to cancel the starlight Second is the telescope which images the star and planet

starshades↗

Trace Contaminant Control for the International Space Station's Node 1- Analysis, Design, and Verification

Trace chemical contaminant generation inside crewed spacecraft cabins is a technical and medical problem that must be continuously evaluated. Although passive control through materials selection and active control by adsorption and catalytic oxidation devices is employed during normal operations of a spacecraft, contaminant buildup can still become a problem. Buildup is particularly troublesome during the stages between the final closure of a spacecraft during ground processing and the time that a crewmember enters for the first time during the mission. Typically, the elapsed time between preflight closure and first entry on orbit for spacecraft such as Spacelab modules was 30 days. During that time, the active contamination control systems are not activated and contaminants can potentially build up to levels which exceed the spacecraft maximum allowable concentrations (SMACs) specified by NASA toxicology experts. To prevent excessively high contamination levels at crew entry, the Spacelab active contamination control system was operated for 53 hours just before launch.

Perry, J. L.↗

Ionizing Radiation Environment on the International Space Station: Performance vs. Expectations for Avionics and Material

The role of structural shielding mass in the design, verification, and in-flight performance of International Space Station (ISS), in both the natural and induced orbital ionizing radiation (IR) environments, is reported. Detailed consideration of the effects of both the natural and induced ionizing radiation environment during ISS design, development, and flight operations has produced a safe, efficient manned space platform that is largely immune to deleterious effects of the LEO ionizing radiation environment. The assumption of a small shielding mass for purposes of design and verification has been shown to be a valid worst-case approximation approach to design for reliability, though predicted dependences of single event effect (SEE) effects on latitude, longitude, SEP events, and spacecraft structural shielding mass are not observed. The Figure of Merit (FOM) method over predicts the rate for median shielding masses of about 10g/cm(exp 2) by only a factor of 3, while the Scott Effective Flux Approach (SEFA) method overestimated by about one order of magnitude as expected. The Integral Rectangular Parallelepiped (IRPP), SEFA, and FOM methods for estimating on-orbit (Single Event Upsets) SEU rates all utilize some version of the CREME-96 treatment of energetic particle interaction with structural shielding, which has been shown to underestimate the production of secondary particles in heavily shielded manned spacecraft. The need for more work directed to development of a practical understanding of secondary particle production in massive structural shielding for SEE design and verification is indicated. In contrast, total dose estimates using CAD based shielding mass distributions functions and the Shieldose Code provided a reasonable accurate estimate of accumulated dose in Grays internal to the ISS pressurized elements, albeit as a result of using worst-on-worst case assumptions (500 km altitude x 2) that compensate for ignoring both GCR and secondary particle production in massive structural shielding.

Koontz, Steven L.↗

A novel design optimization framework to sustain remanufacturability

The ever-increasing global carbon emissions have urged the need for environmentally conscious/sustainable product design, for which the design for remanufacturing (DfRem) is one potential approach. DfRem targets at designing products that have multiple life cycles, thus significantly reducing raw material usage, energy consumption, and carbon emissions. In this paper, we develop a three-stage framework that consists of (1) systematic design space exploration and a multi-objective optimization formulation to minimize the likelihood of failure causes (such as fatigue and wear) and environmental footprint, (2) topology optimization to further reduce material usage without significantly affecting the load-carrying capability of the product, and (3) post-topology optimization design verification to ensure the proposed design satisfies all design constraints. The environmental impact can be assessed at varying comprehensiveness levels (e.g., design and manufacturing phase, use phase) and in terms of carbon or GHG emission, energy use, and waste generation. Because the novel design framework predominantly adjusted the geometry, we focused on mass-based change and energy savings due to sustained remanufacturability. The multi-objective optimization formulation in the first step results in a Pareto optimal set of possible design solutions that the designer can use for the second step. Finally, we demonstrate the utility of this framework through a case study of an engine cylinder head subjected to thermo-mechanical loads, where we find that about 5% of the product mass can be conserved with only about a 3% increase in surface area that has a fatigue life less than 10,000 cycles.

42 ENGINEERING↗

Validation of a fault-tolerant clock synchronization system

A validation method for the synchronization subsystem of a fault tolerant computer system is investigated. The method combines formal design verification with experimental testing. The design proof reduces the correctness of the clock synchronization system to the correctness of a set of axioms which are experimentally validated. Since the reliability requirements are often extreme, requiring the estimation of extremely large quantiles, an asymptotic approach to estimation in the tail of a distribution is employed.

Butler, R. W.↗

Manipulator design and development for the Ranger satellite servicing vehicle

The Ranger program is a planned series of low cost telerobotics flight experiments, based on the use of Pegasus launch vehicles. As the first step towards this goal, the Space Systems Lab was developing a neutral buoyancy version of Ranger for use in design verification and operations testing. The design approach and results of the Ranger manipulator development program is related. Ranger is designed to incorporate four appendages: a pair of dexterous, seven degree of freedom manipulators for general manipulation; a six DOF grappling arm for securing the vehicle to the local work site; and a five DOF positioning manipulator for the stereo camera pair that provide feedback to the remote operator. Each of these manipulators incorporate unique approaches to satisfying design requirements. The numerical and operational requirements are given for Ranger manipulators, and the evolution is discussed of the differing design approaches based on similarities and differences in the requirements. Testing results for individual joints and manipulator assemblies are presented, followed by initial results of operational testing on satellite servicing tasks with the integrated Ranger neutral buoyancy vehicle.

Howard, Russell D.↗

Integrated design of the CSI evolutionary structure: A verification of the design methodology

One of the main objectives of the Controls-Structures Interaction (CSI) program is to develop and evaluate integrated controls-structures design methodology for flexible space structures. Thus far, integrated design methodologies for a class of flexible spacecraft, which require fine attitude pointing and vibration suppression with no payload articulation, have been extensively investigated. Various integrated design optimization approaches, such as single-objective optimization, and multi-objective optimization, have been implemented with an array of different objectives and constraints involving performance and cost measures such as total mass, actuator mass, steady-state pointing performance, transient performance, control power, and many more. These studies have been performed using an integrated design software tool (CSI-DESIGN CODE) which is under development by the CSI-ADM team at the NASA Langley Research Center. To date, all of these studies, irrespective of the type of integrated optimization posed or objectives and constraints used, have indicated that integrated controls-structures design results in an overall spacecraft design which is considerably superior to designs obtained through a conventional sequential approach. Consequently, it is believed that validation of some of these results through fabrication and testing of a structure which is designed through an integrated design approach is warranted. The objective of this paper is to present and discuss the efforts that have been taken thus far for the validation of the integrated design methodology.

Maghami, Peiman G.↗

Novel Test and Analysis Methodology for the Assessment of Joint under Re-entry Environment

Spacecraft thermal protection systems require unique approaches for design verification due to the extreme environments seen during space travel and atmospheric re-entry. In this work, unique considerations for design, analysis, and verification of a tiled heatshield design with material nonlinearity, material property temperature-dependency, material property rate-dependency, and geometric stress concentrations are presented. Such designs require a thorough application of the building block approach to derive appropriate material property datasets, and a novel application of analysis models to aid in the structural verification with testing. The custom application of material rate-dependency in finite element analysis software is presented as a means of leveraging the rate-dependent test data for the material property dataset. Because bonded tile heatshields contain so many design considerations and nonlinearities which often preclude the ability to easily achieve the requisite test factors in qualification testing, a novel sub-element test was developed that amplifies the stress singularity beyond flight conditions. The test achieves an over-test over flight stress conditions. The approach for sub-element coupon design can be extended to other bonded joint designs and can be used in aiding a qualification program.

Pavel Babuska↗

Space shuttle main engine controller assembly, phase C-D

System design and system analysis and simulation are slightly behind schedule, while design verification testing has improved. Input/output circuit design has improved, but digital computer unit (DCU) and mechanical design continue to lag. Part procurement was impacted by delays in printed circuit board, assembly drawing releases. These are the result of problems in generating suitable printed circuit artwork for the very complex and high density multilayer boards.

Source record↗

A Low Temperature, Reverse Brayton Cryocooler

This status report covers the fifty-second month of a project to develop a low temperature, reverse-Brayton cryocooler using turbomachines. This program consists of a Basic Phase and four Option Phases. Each of the Phases is directed to a particular load/temperature combination. The technology and fundamental design features of the components used in these systems are related but differ somewhat in size, speed, and some details in physical geometry. Each of the Phases can be carried out independently of the others, except that all of the Phases rely on the technology developed and demonstrated during the Basic Phase. The Basic Phase includes the demonstration of a critical component and the production of a prototype model cryocooler. The critical technology demonstration will be the test of a small turboalternator over a range of conditions at temperatures down to 6 K. These tests will provide design verification data useful for the further design of the other coolers. The prototype model cooler will be designed to provide at least 5 mW of cooling at 6 K. The heat rejection temperature for this requirement is 220 K or greater. The input power to the system at these conditions is to be less than 60 W.

Swift, Walter L.↗

NASA's Advanced Extra-Vehicular Activity Space Suit Pressure Garment 2018 Status and Development Plan

This paper presents both near-term and long-term NASA Advanced Extra-vehicular Activity (EVA) Pressure Garment development efforts. The near-term plan discusses the development of pressure garment components for the first design iteration of the International Space Station exploration space suit demonstration configuration, termed the xEMU Demo. The xEMU Demo effort is targeting a 2023-2025 flight demonstration timeframe. The Fiscal Year 2018 (FY18) tasks focus on either the initiation or maturation of component design, depending on the state of development of the components, and the assembly of a suit configuration, termed Z-2.5, that will be used to evaluate changes to the upper torso geometry in a Neutral Buoyancy Laboratory (NBL) test series. The geometry changes, which are being driven by the need to reduce the front-to-back dimension of the advanced extravehicular mobility unit, diverge from a proven shape, such as that of the Mark III Space Suit Technology Demonstrator. The 2018 efforts culminate in the Z-2.5 NBL test. The lessons learned from the Z-2.5 NBL test will inform the xEMU Demo design as the effort moves toward design verification testing and preliminary and critical design reviews. The long-term development plan looks to surface exploration and operations. Technology and knowledge gaps exist between the xEMU Demo configuration; a lunar surface capability, xEMU; and Mars surface suit, mEMU. The development plan takes into account both the priority and the anticipated development duration for each particular technology. The long-term development plan will be updated as risks are mitigated and gaps are closed, but its overarching structure will remain intact.

space suit↗

Structural Verification of the First Orbital Wonder of the World - The Structural Testing and Analysis of the International Space Station (ISS)

The International Space Station (ISS) can be considered one of the structural engineering wonders of the world. On par with the World Trade Center, the Colossus of Rhodes, the Statue of Liberty, the Great Pyramids, the Petronas towers and the Burj Khalifa skyscraper of Dubai, the ambition and scope of the ISS structural design, verification and assembly effort is a truly global success story. With its on-orbit life projected to be from its beginning in 1998 to the year 2020 (and perhaps beyond), all of those who participated in its development can consider themselves part of an historic engineering achievement representing all of humanity. The structural design and verification of the ISS could be the subject of many scholarly papers. Several papers have been written on the structural dynamic characterization of the ISS once it was assembled on-orbit [1], but the ground-based activities required to assure structural integrity and structural life of the individual elements from delivery to orbit through assembly and planned on-orbit operations have never been totally summarized. This paper is intended to give the reader an overview of some of the key decisions made during the structural verification planning for the elements of the U.S. On-Orbit Segment (USOS) as well as to summarize the many structural tests and structural analyses that were performed on its major elements. An effort is made for this paper to be summarily comprehensive, but as with all knowledge capture efforts of this kind, there are bound to be errors of omission. Should the reader discover any of these, please feel free to contact the principal author. The ISS (Figure 1) is composed of pre-integrated truss segments and pressurized elements supplied by NASA, the Russian Federal Space Agency (RSA), the European Space Agency (ESA) and the Japanese Aerospace Exploration Agency (JAXA). Each of these elements was delivered to orbit by a launch vehicle and connected to one another either robotically or autonomously. The primary structure of each element was assembled and verified by teams of responsible structural engineers within and among their respective agencies and agency contractors.

Zipay, John J.↗

A3 Subscale Diffuser Test Article Design

This paper gives a detailed description of the design of the A3 Subscale Diffuser Test (SDT) Article Design. The subscale diffuser is a geometrically accurate scale model of the A3 altitude rocket facility. It was designed and built to support the SDT risk mitigation project located at the E3 facility at Stennis Space Center, MS (SSC) supporting the design and construction of the A3 facility at SSC. The subscale test article is outfitted with a large array of instrumentation to support the design verification of the A3 facility. The mechanical design of the subscale diffuser and test instrumentation are described here

Saunders, G. P.↗

Photoheliograph thermal concepts study. Volume 2: Detailed analysis

The photoheliograph thermal concepts study which was to define and compare the performance of thermal subsystem concepts for each of three photoheliograph designs oriented toward unique solar observation missions is reported. These design and missions are categorized as: (1) A 150-centimeter photoheliograph for large solar observatory (LSO) missions. This design is intended for multiyear orbital operations as a part of a complement of solar telescopes in a free-flying LSO configuration. (2) A 100-centimeter photoheliograph for shuttle sorties. This design is intended for observation periods of up to 2 weeks while mounted in the cargo bay of the shuttle orbiter vehicle. (3) A 100-centimeter photoheliograph for balloon missions. This design is intended to be a design verification unit and precursor to the orbital flight designs. Mission duration is on the order of a single day at an altitude of approximately 24.4 kilometers. For each of these photoheliograph designs, the basic thermal environments, boundary conditions, and applicable thermal control concepts were defined and the interactions between concepts and environments were determined. A baseline thermal control concept was selected for the three classes of photoheliographs described.

Source record↗

Space Shuttle OMS engine valve technology

Valve technology program to determine shutoff valve concepts suitable for the Orbital Maneuvering System (OMS) engine of the Space Shuttle. The tradeoff studies selected the electric torque motor operated dual poppet and ball valves as the most desirable valve concepts for the OMS Engine Shutoff Valve. A prototype of one of these concepts was built and subjected to a design verification program. A number of unique features were designed to include the required contamination insensitivity, operating fluid compatibility, decontamination capability, minimum maintenance requirement and long service life capability.

Wichmann, H.↗

Tethered Satellite System Tip Canister - Thermal design and test

The Tethered Satellite System (TSS) is scheduled for launch, on STS-46 in mid-1992. The major mission objective is to investigate electrodynamic phenomena associated with long electrically conductive tether, in the earth orbital environment. A spherical Satellite (1.6-m diameter), remains connected to the Orbiter throughout TSS-1 mission by a conductive tether. The Satellite operates at up to 20 km above the Orbiter during the TSS mission. The Tip Canister (TPC), that is mounted on the end of a 12-m retractable boom, contains mechanisms that control and monitor tether movement. The TPC is an independent thermal system from the base 'Deployer/Spacelab Pallet'. This paper presents the TPC thermal design verification approach that includes a description of thermal design and thermal balance testing. Flight TPC temperature predictions are also presented.

Chapter, John J.↗

Design of a modular digital computer system DRL 4 and 5

Design and development efforts for a spaceborne modular computer system are reported. An initial baseline description is followed by an interface design that includes definition of the overall system response to all classes of failure. Final versions for the register level designs for all module types were completed. Packaging, support and control executive software, including memory utilization estimates and design verification plan, were formalized to insure a soundly integrated design of the digital computer system.

Source record↗