Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Deployable Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Development of a tethered satellite force transducer

The SEDS (Small Expendable Deployer System)/Delta II is a demonstration flight of a tethered satellite deployer system. The satellite or end mass payload, which is deployed and tethered to the Delta II rocket, is instrumented to determine its dynamics during deployment. A three-component force transducer or strain-gage balance was developed to measure tether tension on the end-mass side of the tether. The transducer was designed to measure tensions up to 20N in each direction and resolve tensions as low as 0.002N. In addition, the transducer was required to withstand the shock, vibration, and temperature excursions of the mission. The development of the transducer from design to testing and integration is discussed.

Rhew, Ray D.

Smashing the Stovepipe: Leveraging the GMSEC Open Architecture and Advanced IT Automation to Rapidly Prototype, Develop and Deploy Next-Generation Multi-Mission Ground Systems

Satellite/Payload Ground Systems - Typically highly-customized to a specific mission's use cases - Utilize hundreds (or thousands!) of specialized point-to-point interfaces for data flows / file transfers Documentation and tracking of these complex interfaces requires extensive time to develop and extremely high staffing costs Implementation and testing of these interfaces are even more cost-prohibitive, and documentation often lags behind implementation resulting in inconsistencies down the road With expanding threat vectors, IT Security, Information Assurance and Operational Security have become key Ground System architecture drivers New Federal security-related directives are generated on a daily basis, imposing new requirements on current / existing ground systems - These mandated activities and data calls typically carry little or no additional funding for implementation As a result, Ground System Sustaining Engineering groups and Information Technology staff continually struggle to keep up with the rolling tide of security Advancing security concerns and shrinking budgets are pushing these large stove-piped ground systems to begin sharing resources - I.e. Operational / SysAdmin staff, IT security baselines, architecture decisions or even networks / hosting infrastructure Refactoring these existing ground systems into multi-mission assets proves extremely challenging due to what is typically very tight coupling between legacy components As a result, many "Multi-Mission" ops. environments end up simply sharing compute resources and networks due to the difficulty of refactoring into true multi-mission systems Utilizing continuous integration / rapid system deployment technologies in conjunction with an open architecture messaging approach allows System Engineers and Architects to worry less about the low-level details of interfaces between components and configuration of systems GMSEC messaging is inherently designed to support multi-mission requirements, and allows components to aggregate data across multiple homogeneous or heterogeneous satellites or payloads - The highly-successful Goddard Science and Planetary Operations Control Center (SPOCC) utilizes GMSEC as the hub for it's automation and situational awareness capability Shifts focus towards getting GS to a final configuration-managed baseline, as well as multi-mission / big-picture capabilities that help increase situational awareness, promote cross-mission sharing and establish enhanced fleet management capabilities across all levels of the enterprise.

GMSEC

An overview of a tether deployment monitoring system

A study was conducted to investigate the feasibility of monitoring the position of a tether during tether deployment. Several major configurations were investigated, including considerations of passive or active optical detection, radar, lidar, and active instrumentation packages. Cost, weight, the impact on tether operational dynamics, and the orbiter integration considerations were studied for each of these methods. Results indicated that implementation of such a monitoring system can be accomplished with little or no impact on tether deployment operations. Design diagrams are presented for two launchers and a tether attitude/tension detector.

Ibanez, P.

Deployable Sheet Material Systems and Methods

Exemplary deployable sheet material systems may be configured to stow and deploy sheet material. The systems may include one or more masts, one or more extendable booms, and one or more guys wires configured to function in conjunction with each other to deploy the sheet material and then to maintain the sheet material in the deployed configuration.

Abrams, John L.

Laser power conversion system analysis, volume 1

The orbit-to-orbit laser energy conversion system analysis established a mission model of satellites with various orbital parameters and average electrical power requirements ranging from 1 to 300 kW. The system analysis evaluated various conversion techniques, power system deployment parameters, power system electrical supplies and other critical supplies and other critical subsystems relative to various combinations of the mission model. The analysis show that the laser power system would not be competitive with current satellite power systems from weight, cost and development risk standpoints.

Jones, W. S.

Phase 3 study of selected tether applications in space, mid-term review

Topics addressed include: guidelines for the Space Transportation System (STS) payload deployer design; mini-orbital maneuvering vehicle (MOMV) design: shuttle tether deployer systems (STEDS); cost modeling; tethered platform analysis; fuel savings analysis; and STEDS control simulation.

Source record

Tethered Dynamics Explorer and Tethered Atmospheric Probe - A low-cost, low-risk tethered satellite program

A tethered satellite flight program to test theoretical studies of tether concepts is proposed. The program consists of multiple flights of an ELV such as the Delta II, using the Small Expendable Deployment System (SEDS) to deploy two instrumented satellite payloads, the Tethered Dynamics Explorer (TDE) and the Tethered Atmospheric Probe (TAP). The applications and characteristics of the TDE and the TAP are described, including verification of the SEDS, the validation of the dynamics and control model for low-tension deployment and the force and moment instrumentation, the demonstration of tether initiated reentry, the collection of in-situ atmospheric and aerothermodynamic data, and the study of long-term tether exposure.

Deloach, R.

Some tether applications with small launch vehicles

This paper describes four potentially useful tether applications that are best suited to or even limited to small launch vehicles and their payloads. The first application uses a Small Expendable-tether Deployment System (SEDS) to deploy a 20-40 km tether which transfers momentum from the spent final stage to its payload. This de-orbits the stage and boosts the payload. The other concepts are endo-atmospheric applications specific to various kinds of boosters. In one, a large helicopter gently recovers a reusable booster while it is descending by parachute. Another improves the performance of a small single-stage-to-orbit launch vehicle, by lifting it by helicopter to an altitude of about 3 kilometers before ignition. The last tows an air-breathing launch vehicle to high speed behind a supersonic aircraft, to eliminate any need for low-speed propulsion on the launch vehicle.

Carroll, Joseph A.

Case for Deploying Complex Systems Utilizing Commodity Components

When the International Space Station (ISS) finally reached an operational state, many of the Payload Operations and Integration Facility (POIF) hardware components were reaching end of life, COTS product costs were soaring, and the ISS budget was becoming severely constrained. However, most requirement development was complete. In addition, the ISS program is a fully functioning program with at least fifteen years of operational life remaining. Therefore it is critical that any upgrades, refurbishments, or enhancements be accomplished in realtime with minimal disruptions to service. For these and other reasons, it was necessary to ensure the viability of the POIF. Due to the to the breadth of capability of the POIF (a NASA ground station), it is believed that the lessons to be learned by other complex systems are applicable and any solutions garnered by the POIF are applicable to other complex systems as well. With that in mind, a number of new approaches have been investigated to increase the portability of the POIF and reduce the cost of refurbishment, operations, and maintenance. These new approaches were directed at the Total Cost of Ownership (TCO); not only the refurbishment but also current operational difficulties, licensing, and anticipation of the next refurbishment. Our basic premise is that technology had evolved dramatically since the concept of the POIF ground system and we should leverage our experience on this new technological landscape. Fortunately, Moore's law and market forces have changed the landscape considerably. These changes are manifest in five (5) ways that are particularly relevant to POIF: 1. Complex Instruction Set Computing (CISC) processors have advanced to unprecedented levels of compute capacity with a dramatic cost break, 2. Linux has become a major operating system supported by most vendors on a broad range of platforms, 3. Windows(TradeMark) based desktops are pervasive in the office environment, 4. Stable and affordable WindowsTM development environments and tools are available and offer a rich set of capabilities, 5. The WindowsTM 2000 provides a stable client platform, Therefore, five studies were proposed, developed, and are in the current process of deployment which dramatically reduces the cost of operations, maintenance, refurbishment, and deployment of a ground system. Restating and refining the basic premise stated earlier, it is possible to enhance operations through the replacement of hardware and software components with commodity based items wherever applicable. This will dramatically reduce the overall lifecycle cost of the project. The first study leveraged the POIF S secure, three-tier, web architecture to replace the client workstations with lower cost PC platforms. A second study initiated a review of COTS products to examine the level of added value of each product. This study included replacement of some COTS products with custom code, deletions, substitutions, and consolidation of COTS products. Studies three and four reviewed the server architectures of the data distribution systems and Enhanced HOSC System (EHS) command and telemetry system to propose migration to new platforms, both software and hardware. The final study reviewed current IP communication technologies, developed an operational model for flight operations, and demonstrated that voice over IP was practical and could be integrated into operations.

Bryant, Barry S.

Quality Function Deployment for Large Systems

Quality Function Deployment (QFD) is typically applied to small subsystems. This paper describes efforts to extend QFD to large scale systems. It links QFD to the system engineering process, the concurrent engineering process, the robust design process, and the costing process. The effect is to generate a tightly linked project management process of high dimensionality which flushes out issues early to provide a high quality, low cost, and, hence, competitive product. A pre-QFD matrix linking customers to customer desires is described.

Dean, Edwin B.

NASA's Space Launch System: SmallSat Deployment to Deep Space

Leveraging the significant capability it offers for human exploration and flagship science missions, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. Current plans call for such opportunities to begin with the rocket's first flight; a launch of the vehicle's Block 1 configuration, capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO), which will send the Orion crew vehicle around the moon and return it to Earth. On that flight, SLS will also deploy 13 CubeSat-class payloads to deep-space destinations. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. While the SLS Program is making significant progress toward that first launch, preparations are already under way for the second, which will see the booster evolve to its more-capable Block 1B configuration, able to deliver 105t to LEO. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. The Block 1B vehicle will be the workhorse of the Proving Ground phase of NASA's deep-space exploration plans, developing and testing the systems and capabilities necessary for human missions into deep space and ultimately to Mars. Ultimately, the vehicle will evolve to its full Block 2 configuration, with a LEO capability of 130 metric tons. Both the Block 1B and Block 2 versions of the vehicle will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This paper will outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Robinson, Kimberly F.

NASA's Space Launch System: SmallSat Deployment to Deep Space

Leveraging the significant capability it offers for human exploration and flagship science missions, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. Current plans call for such opportunities to begin with the rocket's first flight; a launch of the vehicle's Block 1 configuration, capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO), which will send the Orion crew vehicle around the moon and return it to Earth. On that flight, SLS will also deploy 13 CubeSat-class payloads to deep-space destinations. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. While the SLS Program is making significant progress toward that first launch, preparations are already under way for the second, which will see the booster evolve to its more-capable Block 1B configuration, able to deliver 105t to LEO. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. The Block 1B vehicle will be the workhorse of the Proving Ground phase of NASA's deep-space exploration plans, developing and testing the systems and capabilities necessary for human missions into deep space and ultimately to Mars. Ultimately, the vehicle will evolve to its full Block 2 configuration, with a LEO capability of 130 metric tons. Both the Block 1B and Block 2 versions of the vehicle will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This paper will outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Robinson, Kimberly F.

Payload deployment method and system

A method and apparatus for deploying the payload of space shuttle or the like is described. It is referred to as the Stabilized Payload Deployment System (SPDS). The payload is rotated about an axis outside of the payload but approximately longitudinally with the cargo bay of the shuttle craft. The payload may thus be rotated through ninety degrees. In this case, that is, in its rotated position, the payload may or may not have a small portion located within the cargo bay. Alternatively, the payload may be located completely outside of the bay. According to the apparatus two separable hinge-like devices connect at one longitudinal side or edge of the payload to respective ones of the payload trunnions at different longitudinally spaced locations along the length of the payload. Separation of the payload from the cargo bay is made by unlatching a latch and by the use of a repulsion spring at the position of each hinge-like device. Two four-link mechanisms allow movement between payload and bay. Such accommodative movement is required especially during launch when considerable vibration is encountered.

Barnett, Clifford J.

Design of deployable-truss masts for Space Station

This paper presents an overview of three deployable-truss designs that were considered for use on Space Station Freedom to deploy the solar array wings. The first design chosen early in the program was a nut-deployed coilable longeron mast which has the advantage of being lightweight and reliable, with considerable flight history. Subsequently, because of the restructure of Space Station, a second design was chosen: a lanyard-deployed FASTMast (Folding Articulated Square Truss Mast), which has improved strength and redundancy characteristics for a given stowed volume. After further definition of the load requirements during deployment, however, it became necessary to modify the deployment system, resulting in the third mast design for space station solar arrays: a nut-deployed FASTMast, which was ultimately selected to provide increased stiffness and strength during deployment. This paper presents a brief review of these mast designs and their associated deployment systems, emphasizing the trade-offs involved in selecting between them. In addition, some innovative features of the FASTMast design as it stands currently for Space Station are described, and a brief review of the test program that is underway to qualify this design for flight is included.

Bowden, Mary

Development of Test Article Building Block (TABB) for deployable platform systems

The concept of a Test Article Building Block (TABB) is described. The TABB is a ground test article that is representative of a future building block that can be used to construct LEO and GEO deployable space platforms for communications and scientific payloads. This building block contains a main housing within which the entire structure, utilities, and deployment/retraction mechanism are stowed during launch. The end adapter secures the foregoing components to the housing during launch. The main housing and adapter provide the necessary building-block-to-building-block attachments for automatically deployable platforms. Removal from the shuttle cargo bay can be accomplished with the remote manipulator system (RMS) and/or the handling and positioning aid (HAPA). In this concept, all the electrical connections are in place prior to launch with automatic latches for payload attachment provided on either the end adapters or housings. The housings also can contain orbiter docking ports for payload installation and maintenance.

Greenberg, H. S.

Energy, economic, and environmental tradeoffs at run-of-river hydropower facilities

Hydropower’s ability to quickly adapt to variability from wind and solar generation by fluctuation flow rates can allow the electricity grid to integrate more renewable capacity. However, these rapid flow fluctuations, required to meet variability needs, can negatively impact aquatic ecosystems. In this study, we quantified energy-economic-environment tradeoffs at five conventional hydropower facilities (i.e. hydropower produced ad a dam on a river channel) across the United States to identify a mix of operational regimes that can provide flexibility to support variable renewable energy integration and environmental protections. Model results show a range of ability to meet demand from 4.7% to 97.8% depending on which case study is considered. Additionally, when modeling the case study facilities on a range of RoR conditions, allowing a % of inflow as discharge, we found the range of 140–200% of inflow allowed as discharge lead to lowest environmental impact while meeting the highest amount of demand. Our sensitivity analysis results demonstrated the Richard-Baker Flashiness Index, used to measure flowrate changes, and Revenue, were negatively correlated with the percent of hydropower generation within the defined Regional Energy Deployment System balancing area (i.e. region in which energy demand and energy supply is balanced based on the Regional Energy Deployment System model) yet positively correlated to the variable renewable energy generation percentage in the defined balancing area. In conclusion, our results suggest hydropower operations can aid in increasing renewable energy generation while limiting environmental impacts when considering a holistic analysis of energy-economic-environment tradeoffs.

Economic impact

Large space deployable antenna systems

The design technology is described for manufacturing a 20 m or larger space erectable antenna with high thermal stability, high dynamic stiffness, and minimum stowed size. The selected approach includes a wrap rib design with a cantilever beam basic element and graphite-epoxy composite lenticular cross section ribs. The rib configuration and powered type operated deploying mechanism are described and illustrated. Other features of the parabolic reflector discussed include weight and stowed diameter characteristics, structural dynamics characteristics, orbit thermal aperture limitations, and equivalent element and secondary (on axis) patterns. A block diagram of the multiple beam pattern is also presented.

Source record

Fiber-Optic Strain-Gage Tank Level Measurement System for Cryogenic Propellants

Measurement of tank level, particularly for cryogenic propellants, has proven to be a difficult problem. Current methods based on differential pressure, capacitance sensors, temperature sensors, etc.; do not provide sufficiently accurate or robust measurements, especially at run time. These methods are designed to measure tank-level, but when the fluids are in supercritical state, the liquid-gas interface disappears. Furthermore, there is a need for a non-intrusive measurement system; that is, the sensors should not require tank modifications and/or disturb the fluids. This paper describes a simple, but effective method to determine propellant mass by measuring very small deformations of the structure supporting the tank. Results of a laboratory study to validate the method, and experimental data from a deployed system are presented. A comparison with an existing differential pressure sensor shows that the strain gage system provides a much better quality signal across all regimes during an engine test. Experimental results also show that the use of fiber optic strain gages (FOSG) over classic foil strain gages extends the operation time (before the system becomes uncalibrated), and increases accuracy. Finally, a procedure is defined whereby measurements from the FOSG mounted on the tank supporting structure are compensated using measurements of a FOSG mounted on a reference plate and temperature measurements of the structure. Results describing the performance of a deployed system that measures tank level during propulsion tests are included.

Figueroa, Fernando