Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DRILL PIPES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

97 records · Page 6

Groundwater characterization and monitoring at a complex industrial waste site using electrical resistivity imaging

A contaminated industrial waste site in Washington State (USA) containing buried, metallic-waste storage tanks, pipes, and wells, was evaluated to determine the feasibility of monitoring groundwater remediation activities associated with an underlying perched aquifer system using electrical resistivity tomography. The perched aquifer, located ~65 m below ground surface and ~10 m above the regional water table, contains high concentrations of nitrate, uranium, and other contaminants of concern from past tank leaks and intentional releases of wastes to surface disposal sites. The extent of the perched water aquifer is not well known, and the effectiveness of groundwater extraction for contaminant removal is uncertain, so supplemental characterization and monitoring technologies are being evaluated. Numerical simulations of subsurface flow and contaminant transport were performed with a highly resolved model of the hydrogeologic system and waste site infrastructure, and these simulations were used as the physical basis for electrical resistivity tomography modeling. The modeling explicitly accounted for metallic infrastructure at the site. The effectiveness of using surface electrodes versus surface and horizontal subsurface electrodes, for imaging groundwater extraction from the perched water aquifer, was investigated. Although directional drilling is a mature technology, its use for electrode emplacement in the deep subsurface under a complex industrial waste site via horizontal wells has not yet been demonstrated. Results from this study indicate that using horizontal subsurface electrode arrays could significantly improve the ability of electrical resistivity tomography to image deep subsurface features and monitor remediation activities under complex industrial waste sites.

54 ENVIRONMENTAL SCIENCES↗

NASA Tech Briefs, September 2012

Topics covered include: Beat-to-Beat Blood Pressure Monitor; Measurement Techniques for Clock Jitter; Lightweight, Miniature Inertial Measurement System; Optical Density Analysis of X-Rays Utilizing Calibration Tooling to Estimate Thickness of Parts; Fuel Cell/Electrochemical Cell Voltage Monitor; Anomaly Detection Techniques with Real Test Data from a Spinning Turbine Engine-Like Rotor; Measuring Air Leaks into the Vacuum Space of Large Liquid Hydrogen Tanks; Antenna Calibration and Measurement Equipment; Glass Solder Approach for Robust, Low-Loss, Fiber-to-Waveguide Coupling; Lightweight Metal Matrix Composite Segmented for Manufacturing High-Precision Mirrors; Plasma Treatment to Remove Carbon from Indium UV Filters; Telerobotics Workstation (TRWS) for Deep Space Habitats; Single-Pole Double-Throw MMIC Switches for a Microwave Radiometer; On Shaft Data Acquisition System (OSDAS); ASIC Readout Circuit Architecture for Large Geiger Photodiode Arrays; Flexible Architecture for FPGAs in Embedded Systems; Polyurea-Based Aerogel Monoliths and Composites; Resin-Impregnated Carbon Ablator: A New Ablative Material for Hyperbolic Entry Speeds; Self-Cleaning Particulate Prefilter Media; Modular, Rapid Propellant Loading System/Cryogenic Testbed; Compact, Low-Force, Low-Noise Linear Actuator; Loop Heat Pipe with Thermal Control Valve as a Variable Thermal Link; Process for Measuring Over-Center Distances; Hands-Free Transcranial Color Doppler Probe; Improving Balance Function Using Low Levels of Electrical Stimulation of the Balance Organs; Developing Physiologic Models for Emergency Medical Procedures Under Microgravity; PMA-Linked Fluorescence for Rapid Detection of Viable Bacterial Endospores; Portable Intravenous Fluid Production Device for Ground Use; Adaptation of a Filter Assembly to Assess Microbial Bioburden of Pressurant Within a Propulsion System; Multiplexed Force and Deflection Sensing Shell Membranes for Robotic Manipulators; Whispering Gallery Mode Optomechanical Resonator; Vision-Aided Autonomous Landing and Ingress of Micro Aerial Vehicles; Self-Sealing Wet Chemistry Cell for Field Analysis; General MACOS Interface for Modeling and Analysis for Controlled Optical Systems; Mars Technology Rover with Arm-Mounted Percussive Coring Tool, Microimager, and Sample-Handling Encapsulation Containerization Subsystem; Fault-Tolerant, Real-Time, Multi-Core Computer System; Water Detection Based on Object Reflections; SATPLOT for Analysis of SECCHI Heliospheric Imager Data; Plug-in Plan Tool v3.0.3.1; Frequency Correction for MIRO Chirp Transformation Spectroscopy Spectrum; Nonlinear Estimation Approach to Real-Time Georegistration from Aerial Images; Optimal Force Control of Vibro-Impact Systems for Autonomous Drilling Applications; Low-Cost Telemetry System for Small/Micro Satellites; Operator Interface and Control Software for the Reconfigurable Surface System Tri-ATHLETE; and Algorithms for Determining Physical Responses of Structures Under Load.

Source record↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Vertical Pipe Units - 17121

The 618-10 Burial Ground is approximately 148 m by 143 m (485 feet by 470 feet) and consists of 12 trenches and 94 Vertical Pipe Units (VPU's). It is located approximately 8.1 km (5 miles) north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). There are different variants of VPUs. Some VPUs are simply corrugated culverts or standard pipes, 36 cm (14 in.) diameter and 3.1 m to 4.6 m (10- to 15-ft) long, buried vertically. Some VPUs are carbon steel pipes 25 to 61 cm (10 to 24 in.) in diameter and up to 4.6 m (15 ft) in length. The final design of the VPUs is 56 cm (22-in) diameter, 4.4 m (14.4 ft) long waste receptacles constructed by welding five 208 L (55-gallon) bottomless drums together end-to-end and burying them vertically, separated by approximately 3.1 m (10 feet) on center in rows approximately 7.6 m (25 feet) apart. The 618-10 Burial Ground contains approximately 94 VPUs. Historical documents indicate that shielding materials (e.g., concrete or soil) may have been added to the VPUs to reduce dose rates over the openings, and that each VPU was backfilled with sand and capped with concrete at the end of its service life. Historical documents also indicate that the VPUs were covered with approximately 0.6 m (2-ft) of soil when they were closed, and an additional 0.6 m (2-ft) of topsoil was later added for surface stabilization. In general, the process for VPU remediation was as follows: - Installed four cone penetrometers (CPTs) around the exterior of each individual VPU and sent radiation detection probes down the interior of the CPTs to get initial radiation data in order to calculate the overall curie content and create maps showing the dose rate distribution throughout the VPU. - Removed the CPTs and installed a 122 cm (48-in) diameter, 1.3 cm (0.5-in) thick steel over-casing using a vibrating hammer suspended from a crane that encompassed the VPU with some surrounding soil. - Using a Bauer BG-30 drill rig with a specifically designed augur bit and a specially designed confinement system the auger process was used to stabilize and size reduce the contents. - Once the auger reached a depth of 8.5 m (28 feet) the BG-30 drill stem was separated and additional characterization was completed by sending a radiation probe down the center of the drill stem to gather radiological data. - Once auguring and characterization was completed the waste was removed using a specially designed extended clamshell retrieval bucket and placed into individual 2.7 m x 1.5 m x 1.2 m (9-ft x 5-ft x 4-ft) metal boxes. - After the waste was placed into the metal waste boxes a low strength grout was added and the grout and waste material was mixed using a large rake device attached to an excavator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Controlled Removal of Bricks from a Reactor Shaft: An Unconventional Approach - 16406

The first German prototype Fast Breeder Nuclear Reactor (KNK) is currently being dismantled after being the only operating Fast Breeder-type reactor in Germany. The complete dismantling is based on 10 decommissioning permits. Package 3 of the 9. decommissioning permit, which is currently under preparation, comprises the dismantling of the biological shield. Package 2 comprised the dismantling of the Primary Shield. In preparation to lift the 14 primary shield segments on height of the reactor core, these were milled at 16 positions and equipped with a total of 26 holes. As a result of the milling and drilling process, an estimated amount of 500-600 kg cast iron swarfs accumulated at the bottom of the 12 m deep reactor shaft. The cobalt in the cast iron was activated to cobalt-60 during operation. This results in a measurable dose-rate of 30-35 mSv/h. At the conical bottom of the reactor shaft were still the remaining parts of the thermal insulation consisting of a lining with brick stones, covered with loose remnants of the thermal insulation, loose metallic residues and cut-off wheels of the angel grinder. For the next dismantling step, the removal of the activated part of the biological shield, it is necessary that the cast iron swarfs must be removed as well as the remains of the thermal insulation. Firstly, this is necessary to reduce the dose rate inside the shaft for subsequent breakthrough operations and, secondly to have a statically resilient surface for the installation of a necessary working platform for next dismantling tools. There was no access for personnel. A manual removal was also not possible due to the existing dose rate. The cast iron swarfs supposed to be removed by a remote controlled suction unit, which was installed on top of a drum and mounted in a special rack. The complete system was lowered into the reactor shaft by using a crane. After removing the major amount of swarfs, the remaining swarfs as well as the sheet metal liner should be collected with a magnetic grabber. The solution for the metal removal was easy to realize, but there was no idea how to remove the remaining bricks remote controlled out of the reactor shaft. Another boundary was that only existing facilities were supposed to be used in addition to the new suction system, i.e. the existing cranes, gripper, as well as the double lid lock of the encasing for the handling of the vacuum cleaner, the transport of the drum and the lock procedure. The design essentially consists of a suction unit and a collecting unit. Both units are connected hooked by the three single suspension chains on the rack on the traverse and connection of the suction tube. Subsequently the entire unit was drained in the 12 m deep reactor shaft. The entire unit has been lifted out of the reactor shaft and placed on a defined set-down position. At this position, now both of the units could be separated by using the Master-Slave-Manipulator in the encasing (A100). By using different suction pipes the reactor shaft bottom could be exempted from the cast iron swarfs within a few days. The suction unit worked in such a positive way that it was decided to remove the loose refractory bricks, metallic residues, cut off wheels, etc., too. Metal parts remaining on the ground were removed by a magnet. This pragmatic approach avoided additional complex design works and the need of constructing special solutions and thus, massively saved time, cost and dose rate. The duration of planning, permission including implementation amounted to approximately 3 to 4 months. The additional work could be performed directly after the actual dismantling step.

07 ISOTOPE AND RADIATION SOURCES↗

Analysis of Dynamic Stress in The Reactor Core Barrel Due to the Pressure Pulsations

This article presents vibrations analysis of the reactor core barrel caused by pressure pulsations induced by the main coolant pump. For this purpose, the calculations of the pressure distribution in the annulus between the core barrel and the reactor pressure vessel, bounded above by a separating ring were performed. Using transfer matrix method is obtained the solution of two-dimensional problem of pressure pulsations in the annulus between reactor core barrel and reactor vessel. The calculation results are compared with the pulsation pressure measurements made at commissioning unit 2 of the South Ukraine Nuclear Power Station. The distribution of pressure over the height of core barrel was obtained, which makes possible to estimate its strength for variant deformation of the core barrel as a beam, and in the case of deformation of the core barrel as a shell. The calculation results are used to assess the reliability of core barrel pre-load, which clamps the core barrel flange in place at the top, at full power operating. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Foundation Heat Exchanger Final Report: Demonstration, Measured Performance, and Validated Model and Design Tool

Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first cost of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foundation Heat Exchanger Final Report: Demonstration, Measured Performance, and Validated Model and Design Tool

Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first cost of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.

15 GEOTHERMAL ENERGY↗