Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOLLARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Hydrogen energy systems technology study

The paper discusses the objectives of a hydrogen energy systems technology study directed toward determining future demand for hydrogen based on current trends and anticipated new uses and identifying the critical research and technology advancements required to meet this need with allowance for raw material limitations, economics, and environmental effects. Attention is focused on historic production and use of hydrogen, scenarios used as a basis for projections, projections of energy sources and uses, supply options, and technology requirements and needs. The study found more than a billion dollar annual usage of hydrogen, dominated by chemical-industry needs, supplied mostly from natural gas and petroleum feedstocks. Evaluation of the progress in developing nuclear fusion and solar energy sources relative to hydrogen production will be necessary to direct the pace and character of research and technology work in the advanced water-splitting areas.

Kelley, J. H.↗

The development of a portable cardiac ultrasonoscope

This paper describes a new, portable, battery powered echocardioscope developed at the NASA-Ames Research Center in cooperation with the Stanford University School of Medicine. This instrument has three major advantages over existing equipment. First, it is compact and light weight for easy portability. Second, its DC operation makes it safer to use in remote settings where AC power is unavailable or in intensive care and neonatal units where AC instruments could present electrical hazards for the patient. Third, its design and packaging should enable it to sell for several thousand dollars less than presently marketed ultrasonoscopes. The cooperative development of this instrument, its principles of operation, and the significance of its unique features are presented.

Schmidt, G.↗

SEATSAT programs option analysis

A preliminary analysis of the costs of SEASAT follow-on options is presented. All the options assume the existence of SEASAT-A as currently defined in the SEASAT Economic Assessment. It is assumed that each option will continue through the year 2000 and approach operational system status in the 1983-1986 period, depending upon the sensor package selected. The launch vehicle assumed through 1983 is the Atlas Agena. After 1983, it is assumed SEASAT-A will switch to the use of the Space Shuttle. All cost estimates are 1976 dollars for fiscal year cost accounting, with no inflation rate included.

Luckl, L.↗

United States benefits of improved worldwide wheat crop information from a LANDSAT system overview

The value of improvements in worldwide information on wheat crops provided by LANDSAT was measured in the context of world wheat markets. These benefits were based on exiting LANDSAT technical goals and assumed that information would be made available to the United States and other countries at the same time. The benefits to the United States of such public LANDSAT information on wheat crops were found to be 174 million dollars a year on the average. The benefits from improved wheat crop information compare favorably with the annual system's cost of about $62 million. A detailed empirical sample demonstration of the effect of improved information was developed. The history of wheat commodity prices for 1971-72 was reconstructed and the price changes from improved vs. historical information were compared.

Source record↗

An integrated circuit floating point accumulator

Goddard Space Flight Center has developed a large scale integrated circuit (type 623) which can perform pulse counting, storage, floating point compression, and serial transmission, using a single monolithic device. Counts of 27 or 19 bits can be converted to transmitted values of 12 or 8 bits respectively. Use of the 623 has resulted in substantial savaings in weight, volume, and dollar resources on at least 11 scientific instruments to be flown on 4 NASA spacecraft. The design, construction, and application of the 623 are described.

Goldsmith, T. C.↗

DSN research and technology support

The ongoing activities at the Venus Station (DSS 13) and the Microwave Test Facility (MTF) discussed include: (1) equipment implementation for unattended operation at DSS 13; (2) salvaging of a 20-kW klystron, at a cost savings of several thousand dollars by the DSN High Power Transmitter Facility; (3) extensive tracking activities with the 26-m antenna including DSN Platform Parameters, Multistation Planetary Radar, Helios II Spectrum Broadening Analysis, VLBI Validation, Planetary Radio Astronomy, and Pulsar Rotation Constancy, for a total time of 219-1/4 observing hours; (4) clock synchronization transmissions from the DSS 13 master clock to the overseas 64-m antenna complexes and special implementation activities in support of PV-78; and (5) implementation of a hydrogen maser frequency standard and the pathfinder installation of a utility control system (UCS) and significant station modification and maintenance.

Jackson, E. B.↗

Space station systems analysis study. Part 3: Documentation. Volume 4: Supporting research and technology report

A brief description of recommended supporting research and technology items resulting from the space station analysis study is provided. Descriptions include the title; the status with respect to the state of the art; the justification; the technical plan including objectives and technical approach; resource requirements categorized by manpower, specialized facilities, and funding in 1977 dollars; and also the target schedule. The goal is to provide high confidence in the solutions for the various functional system development problems, and to do so within a time period compatible with the overall evolutionary space construction base schedule.

Source record↗

Economic benefits of improved meteorological forecasts - The construction industry

Estimates are made of the potential economic benefits accruing to particular industries from timely utilization of satellite-derived six-hour weather forecasts, and of economic penalties resulting from failure to utilize such forecasts in day-to-day planning. The cost estimate study is centered on the U.S. construction industry, with results simplified to yes/no 6-hr forecasts on thunderstorm activity and work/no work decisions. Effects of weather elements (thunderstorms, snow and sleet) on various construction operations are indicated. Potential dollar benefits for other industries, including air transportation and other forms of transportation, are diagrammed for comparison. Geosynchronous satellites such as STORMSAT, SEOS, and SMS/GOES are considered as sources of the forecast data.

Bhattacharyya, R. K.↗

An operational earth resources satellite system - The Landsat follow-on program

The Landsats 1 and 2 have demonstrated the role of remote sensing from satellite in research, development, and operational activities essential to the better management of our resources. Hundreds of agricultural, geological, hydrological, urban land use, and other investigations have raised the question of the development of an operational system providing continuous, timely data. The Landsat follow-on study addressed the economics, technological performance, and design of a system in transition from R&D to operations. Economic benefits were identified; and a complete system from sensors to the utilization in forecasting crop production, oil and mineral exploration, water resources management was designed. Benefits-to-costs ratio in present-worth dollars is at least 4:1.

Stroud, W. G.↗

Efficient civil helicopters - The payoff of directed research

Studies have been performed to identify the key areas and cost of research that will reduce the cost of operation of helicopters through reduction of energy consumption, increased performance, and reduction of maintenance. The basic analyses were made for a large passenger helicopter, with subsequent studies considering applicability to all sizes. These study results were then applied to the existing and projected U.S./Canada helicopter fleet to compare the cost of research to the dollars saved as a result of that research. These comparisons show that research costs to reduce energy and lower maintenance have payback periods of less than one year, either as higher return to the operator or as lower rental price to the customer.

Wiesner, W.↗

Satellite solar power - Will it pay off

A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.

Hazelrigg, G. A., Jr.↗

Approaches to rotor fragment protection

Key airworthiness design criteria considerations for fragment protection as found in various FAA requirements in FAR Parts 25 and 33, and in interpretive 8110 orders are reviewed. The impact of providing aircraft armor in lieu of engine armor for typical three- and four-engine wide bodied transports for protection within the length of the engine case as well as from fragments exiting ahead of the enlet engine inlet flange is assessed. For protection within the length of the engine case, armor weight penalties, plus fuel burned and dollar cost of carrying the armor protection are defined. Immediately ahead of the inlet flange, direct tangential impacts are predominant, but further forward, rebound impacts predominate. Armor thickness requirements and fuel cost impact of protection are given.

Oconnor, M. A., Jr.↗

Letter to Don Fuqua on space shuttle commitment, 12 April 1977

NASA budget committments for the Space Shuttle program are delineated, estimating $6.816 billion (FY 1978 dollars) for the design, development, test and evaluation phase of operations. Current estimates for refurbishment of Orbiters 101 and 102 and procurement of Orbiters 103, 104, and 105 amount to $1.988 billion. Ground support equipment costs are estimated to be an additional $432 million.

Fletcher, J. C.↗

Report on NASA five-year planning, fiscal years 1978 through 1982

This plan is NASA's initial description of its projected research and development activities for the years 1978 through 1982. Stated goals are: (1) assurance of U.S. Preeminence in aviation, (2) scientific exploration of the universe, (3) global information services, and (4) permanent U.S. presence in space. The program represents a budget increase in NASA's aeronautical and space research and development of between three and four percent per year in terms of FY 1978 dollars.

Culbertson, P. E.↗

A cost-benefit evaluation of the LANDSAT flow-on operational system

Disciplines to benefit from the LANDSAT Follow-on System include agriculture, petroleum and mineral exploration, hydrologic land use, water resources management, forestry, land use planning and monitoring, and soil management. The annual quantified benefits are in the range of 420 to 970 million (FY 1976 dollars). The operational system sized to achieve the quantified benefits involves a single orbiting satellite with a backup satellite in launch readiness. The ground system includes a basic processing system which feeds information to three user systems - one for agriculture, one for hydrologic land use, and a third for all other users. The resulting present worth benefit cost ratio is at least equal to four with a reasonable likelihood of exceeding nine. This benefit cost ratio is evaluated for an infinite time horizon at the discount rate of 10 percent.

Source record↗

Overview of the tri-service hybrid microelectronics MM and T programs

It was stated that the Army has aggressively pursued new hybrid techniques more than either the Navy or Air Force. It has 30 ongoing hybrid projects in various stages of contracting and execution, while the Navy has 6 and Air Force 2. The Army is programming for 8 hybrid projects in fiscal year 1979, the Navy for 5 and Air Force none. In terms of dollars, the Army's fiscal year 1979 program is worth $2.25 million, and the Navy is expected to spend about $1.7 million.

Mcburney, C. E.↗

Cost benefit analysis of the transfer of NASA remote sensing technology to the state of Georgia

The author has identified the following significant results. First order benefits can generally be quantified, thus allowing quantitative comparisons of candidate land cover data systems. A meaningful dollar evaluation of LANDSAT can be made by a cost comparison with equally effective data systems. Users of LANDSAT data can be usefully categorized as performing three general functions: planning, permitting, and enforcing. The value of LANDSAT data to the State of Georgia is most sensitive to the parameters: discount rate, digitization cost, and photo acquisition cost. Under a constrained budget, LANDSAT could provide digitized land cover information roughly seven times more frequently than could otherwise be obtained. Thus on one hand, while the services derived from LANDSAT data in comparison to the baseline system has a positive net present value, on the other hand if the budget were constrained, more frequent information could be provided using the LANDSAT system than otherwise be obtained.

Zimmer, R. P.↗