Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEMOLITION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Crickets{sup TM} and Curies: Lessons Learned from the Steel Industry - 18221

The global nuclear power industry, and to a lesser extent, the decommissioning and demolition of old nuclear weapons plants, obviously present challenges to those in the radioactive waste management field. Some if not many of these challenges have already been dealt with, and resolved, in the steel industry, including its recycling component. This paper presents proven state-of-the-art radiation detection systems used in steel and related recycling facilities, emphasizing current, reliable and flexible technologies for characterization, volume reduction, and remote handling of recyclable solid wastes contaminated and, just as important, not contaminated, with a wide range of radioactive isotopes. It will also cover features of remotely operated waste handling equipment effective in reducing or eliminating exposure of workers engaged in decontamination and demolition work on active and/or inactive nuclear installations. The industry group identified above has a long-standing policy regarding any radioactivity in potentially recyclable as well as waste materials it receives: if it is detected, it is rejected. The US Steel Manufacturers Association (SMA) put it this way in one of their Public Policy Statements: 'SMA members have not, and will not, accept scrap that is known to be radioactively contaminated' (emphasis included in the original) (1). This policy, adopted around the globe, obviously has major implications for decommissioning and demolition projects. To put it bluntly, if rad-contaminated metal, concrete, or other materials are sent to a facility for possible recycling, reuse or even disposal, they may well be rejected. If so, the materials will be returned to the generator--at the generator's cost-and a new solution will have to be found. This also results in additional costs for the generator. Facilities in the steel making and metal recycling industries have access to, and routinely count on, a wide range of proven detection technologies and techniques for monitoring incoming shipments and sorting the materials in them. The approaches range from using sensitive handheld instruments for pinpointing and isolating small devices such as isotope-containing gauges and radium dials all the way up to technologies effective for large volumes and weights of contaminated construction and demolition material. In this latter realm, the most suitable, robust, and field-proven system for decommissioning and demolition work is a radiation detection system fitted to a grappling and/or magnetic device, known as the Crickets{sup TM} technology, which automatically scans bulk material with no added effort or time in material handling operations. Highly versatile, a Crickets{sup TM} system can be put to work on any material-handling system, including grapples handling volumes ranging from 1 up to 18 cubic yards, while detecting radioactivity in real-time over a very wide dose range, from nSv to Sv levels. Other field-proven real-time measuring radiation detection devices can be fixed to conveyor belts with traverse speeds up 3 meters/second, also measuring in real time and over the same dose range, allowing both recyclable and waste materials with a pre-set level of radioactivity to be diverted off the belt. Finally, there are highly sensitive radiation portal installations for detecting radiation from materials being transported by vehicles, including those with roll-offs, dump trailers, and other containers, again in real-time and for the same dose ranges. For vehicles, the speed must be carefully controlled-the vehicles need to travel from 5 to 10 km/h through the scanning zone to ensure that maximum detection capability is maintained. When radiation detection systems at recycling and steel making facilities detect radioactive material in an incoming shipment, these facilities have a zero tolerance for accepting the cargo. Therefore, it is imperative that material from a demolition operation that is slated to be sent for recycling or other reuse be checked at the point of demolition at similar detection levels to avoid possible rejection later of a shipment because of its radioactivity. In addition to measuring overall radiation levels (for example, total gamma), when necessary, combinations of different radiation detection media can be used to detect the presence and intensities of specific isotopes such as U-235, Cs-137, Co-60, Am-241, etc., again in real-time and over a similar dose range. These detection technologies can be fixed or transportable. More important for the rad-waste management profession, this overall systems approach can be tailored and adapted during use on-site in any dismantling, demolition or remediation project, to allow materials to be thoroughly scanned before being released to the recycling stream for reuse, or to appropriate long-term storage and disposal facilities. Potentially recyclable materials with contamination such as steel beams and rebar will set off alarms at recycling facilities, resulting in unnecessary added expenses to the generator, primarily due to increased transportation costs, time delays and additional rad-waste handling and disposal charges. Additionally, there are situations where relatively lightly contaminated materials, once identified and appropriately characterized, can be reused in new construction applications, such as concrete from demolition being used in the base layer for roads or recycled steel used for repair or construction of bridges. In other cases, specific smaller volumes can be sent to specialized rad-waste disposal sites. These radiation detection systems can also be custom tailored to ensure proper handling and disposition of contaminated materials destined for reuse in specific applications where, for example, acceptable levels of radioactivity in NORM or TENORM can be reused or safely disposed of. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford site asbestos management lessons learned - 15183

The U.S. Department of Energy (DOE) is responsible for the environmental cleanup of the Hanford Site central plateau. As part of this responsibility, DOE contractors conduct deactivation, decommissioning, decontamination, and demolition (D4) of retired/inactive facilities, including very large chemical processing facilities. To date, DOE contractors have demolished hundreds of facilities, reducing baseline site maintenance costs and reducing the environmental threats and hazards that the degrading buildings present. Many of these Hanford facilities include asbestos-containing materials (as well as other hazardous components), which must be managed in compliance with applicable regulations and standards. In most cases, the facilities are demolished as Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) removal or remedial actions. In an effort to streamline cleanup operations and to utilize site cleanup funding more efficiently, while still being protective of personnel and the environment, agreements were reached between the US Environmental Protection Agency (EPA) Hanford Project Office, the Washington Department of Ecology (Ecology), the Benton Clean Air Agency (BCAA) and the US Department of Energy Richland Operations Office (DOE-RL) on approaches to be utilized for demolition. One of these approaches would involve leaving cement asbestos board siding (e.g. transite), an EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP) Category II non-friable asbestos-containing material, in place during demolition using heavy equipment, employing a set of controls that would maintain protection of personnel and the environment. This agreement was documented in a number of formal communications, including Notices of Intent issued as required by the asbestos NESHAP regulation, letters between the various agencies, CERCLA work plans, and the approved contractor baselines. A large number of buildings were demolished with transite siding in place, using the agreed upon controls and approaches. Personnel breathing zone and work area perimeter monitoring verified that the controls employed were protective in that there were no exceedances of permissible exposure limits during or after the demolition operations. EPA later reconsidered their previous concurrence with demolishing transite materials in place and issued a joint letter with Ecology revoking concurrence on any of the aforementioned CERCLA decision documents and associated work plans. DOE and their contractors took action to comply with the approach to demolition preferred by EPA for future demolitions, and initiated a series of actions to modify asbestos management practices in their operations accordingly. This paper will discuss both the actions taken to address EPA concerns with sites where transite materials were left in place for demolition and actions taken to ensure that the central plateau D4 program complies with the 40 CFR 61 Subpart M, National Emission Standard for Asbestos, (Asbestos NESHAP) methods for asbestos management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

36 MATERIALS SCIENCE↗

An Architectural Survey of the U12G Tunnel Historic District, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to demolish six buildings and three storage areas located at the U12g Tunnel portal area in Area 12 of the Nevada National Security Site (NNSS). The buildings are 12-358 (Signal Vault); 12-201800 (Storage Quonset Hut); 12-202555 (Walker Shack); 12-868 (Pipe Assembly); 12-B100933 (Electrical Shop); 12-B100944 (Conference Room); and Storage Area 1; Storage Area 2; and Storage Area 3. The buildings and storage areas were selected for demolition as part of the DOE’s Real Property Efficiency Plan to reduce the footprint of unused and non-operational facilities on the NNSS. They are all vacant and have no proposed uses for current or upcoming NNSS missions. Demolition activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. Identification efforts began with resources proposed for demolition in federal Fiscal Year (FY) 23. Four buildings were proposed to be demolished in FY23 (12-358, 12-868, 12-201800, and 12-202555). These buildings and the U12g Tunnel Historic District (SHPO No. D444) were recorded in Identification, Evaluation, and Finding of Adverse Effect for the Proposed Demolition of Five Buildings in Area 12, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2023). Identification efforts indicated three buildings (12-358, 12-201800, and 12-868) supported nuclear testing in the U12g Tunnel. The fourth building post-dated the use of U12g Tunnel for nuclear testing activities. The report recommended that three of the four buildings (12-358, 12-201800, 12-868) and the U12g Tunnel Historic District may be eligible for the National Register of Historic Places (NRHP). The report also found that the undertaking would have an adverse effect on the three buildings and on the historic district. The Nevada State Historic Preservation Office (SHPO) concurred with the report’s findings (Reed 2023). The U12g Tunnel was determined eligible as a historic district under the Secretary of the Interior’s (SOI) Significance Criterion A, at the local level, in the context of the Cold War as an underground testing environment for the development of nuclear weapons and to assess the effects of a nuclear explosion on materials and equipment with a period of significance from 1959 to 1971. It was also determined eligible under Significance Criterion C for embodying the distinctive characters of a horizontal tunnel complex used for nuclear testing and as a significant and distinguishable entity. The three buildings were determined to be contributing elements of the district. The undertaking was expanded with the addition of two buildings and three storage areas proposed to be demolished and located within U12g Tunnel Historic District in FY24. These five resources (12-B100933, 12-B100944, and Storage Areas 1, 2, and 3) were recorded in Supplemental Identification, Evaluation, and Finding of Effect for Additional Proposed Demolition at U12g Tunnel, Area 12, Nevada national Security Site, Nye County, Nevada (Brannan et al. 2024). Identification efforts indicated that the two buildings and Storage Area 1 supported nuclear testing in the U12g Tunnel. Storage Area 1 and Storage Area 2 post-dated the nuclear testing activities at U12g Tunnel and were not recommended as contributing elements to the district. The report also found that the undertaking would have an adverse effect on the newly identified buildings and one storage area and on the historic district. The SHPO concurred that the expanded undertaking would result in adverse effects to historic properties (Reed 2025). To resolve these adverse effects, NNSA/NFO, in consultation with the SHPO, is following standard mitigation as stipulated in the 2024 Programmatic Agreement DE-GM58-22NA25554 Among the U.S. Department of Energy and the Nevada State Historic Preservation Officer and the Advisory Council on Historic Preservation Concerning the Protection of Historic Properties on the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the NNSS PA). The standard mitigation measures are outlined in Appendix D of the NNSS PA. As such, this architectural survey has been prepared in accordance with Appendix D of the NNSS PA and follows the report format outlined in Appendix F. It includes a historic context that describes the district’s origin, history, and support functions, its significance in the context of nuclear testing on the NNSS, and identifies contributing and non-contributing elements within the district. The report is accompanied by Architectural Resource Assessment (ARA) forms for individual resources and a Historic District Resource Assessment (HDRA) for the U12g Tunnel Historic District. In total, this architectural report identified 32 primary resources within the district boundary. Six of the primary resources were previously identified as contributing elements. An additional 17 resources are recommended as contributing elements to the district for a total of 23 contributing elements. The other nine resources identified are recommended as non-contributing elements to the district.

12-201800↗

The Road to 2020: Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA): Cleanup of the East Tennessee Technology Park - 17425

Uranium enrichment activities at the 890-ha (2,200-acre) East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, date back to the World War II Manhattan Project. The site produced nuclear fuel for weapons and reactors for four decades. Because of these operations, ETTP has a legacy of radiologically and chemically contaminated buildings, soil, sediment, and groundwater that required remedial action to reduce the risk to human health and the environment. Since the early 1990's, the DOE Oak Ridge Office of Environmental Management (OREM) has directed the environmental cleanup of this contaminated site through the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process. Cleanup activities have included the demolition of contaminated facilities and structures, including five gaseous diffusion buildings; remediation of contaminated soils; disposal of associated waste; and treatment of contaminated groundwater. In August 2016, DOE realized its Vision 2016, demolition of all five gaseous diffusion buildings at ETTP. This milestone marked the first time that an entire uranium enrichment complex has been demolished. The landmark cleanup included deactivation and demolition of 418,064 m{sup 2} (4.5 million ft{sup 2}) of radiologically and chemically contaminated facilities, and disposal of more than 55,000 truckloads of debris. Fulfillment of Vision 2016 was a major step toward completing ETTP cleanup by 2020. To attain 2020 cleanup, DOE and its cleanup contractor, URS - CH2M Oak Ridge LLC (UCOR), must complete demolition of the following areas: - Poplar Creek Facilities; - K-731 Switch House; - Building K-1037; - Central Neutralization Facility; - K-1200 Complex; - Toxic Substances Control Act Incinerator facilities; - Balance of Site Facilities. In addition, DOE will complete all remedial actions in accordance with current Records of Decision (RODs); as well as cleanup activities involving surface water, sediment, and groundwater that will be addressed in a final site-wide ROD. All waste, including soils, debris, and rubble from demolition and remediation activities, will be dispositioned. Final cleanup of ETTP further advances DOE's goal for re-industrialization of the site as a private sector industrial park. With risks reduced, hazards removed, and the environment restored, DOE can transfer usable ETTP building and land assets to the community for redevelopment and reuse. A history center, equipment building, viewing tower, and wayside exhibits will tell the story of the site, honoring its contributions to the nation's defense and energy needs. Approximately 1,214 ha (3,000 acres) of adjoining lands, now the Black Oak Ridge Conservation Easement (BORCE), will be used for conservation and recreational purposes, including green-ways and trail systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO{sub 2}F{sub 2} deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO{sub 2}F{sub 2} deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO{sub 2}F{sub 2} source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO{sub 2}F{sub 2} deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined review of the HMS software algorithms and supporting field measurements lead to the conclusion that the majority of process gas pipe measurements are adequately corrected for source self-attenuation using HMS4. While there will be instances where the UO{sub 2}F{sub 2} holdup mass presents an infinitely thick deposit to the NaI-HMS4 system these situations are expected to be infrequent. This work confirms that the HMS4 system can quantify UO{sub 2}F{sub 2} holdup, in its current configuration (deposition, enrichment, and geometry), below the DQO levels for the K-25 building decommissioning and demolition project. For an area measurement of process gas pipe in the K-25 building, if an infinitely thick UO{sub 2}F{sub 2} deposit is identified in the range of enrichment of {approx}4-40%, the holdup quantity exceeds the corresponding DQO established for the K-25 building demolition project.

54 ENVIRONMENTAL SCIENCES↗

Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radioactive Contamination Tenacity on Building Substrate - 17417

Radiological decontamination is an essential enterprise that has become more important over the last four decades due to unfortunate accidents and the threat of terrorist actions. Decontamination can be an effective, beneficial alternative for the cleanup of radiological contamination events; however, the costs and benefits need to be balanced against those for complete removal and demolition of contaminated areas or facilities. Demolition and removal are often the first options considered in such circumstances as decontamination may be thought of as slow and costly. Decontamination has advantages, including significant waste reduction over demolition. In areas with buildings of cultural or societal importance, demolition may not be an option. Three decontamination evaluation test series are the focus of this article: SIMCON 1 and 2 (i.e., simulated contamination), and Urban RDD (radiological dispersal device, i.e., a dirty bomb detonation). These test series revealed that different contaminants respond differently during decontamination. This was found to be true with both SIMCON and Urban RDD simulant tests. SIMCON 2 especially demonstrated that chemically different contaminants respond differently to different decontamination methods: cesium appears to be less tenacious (more easily removed) than zirconium using chemical methods. These differences were underscored by the Urban RDD tests where americium and cobalt tended to precipitate on high pH surfaces (such as concrete), making them easier to remove, while cesium and strontium were essentially unaffected by surface pH and were imbibed more strongly into the substrate pore structure. While authorities argue over the contributions of contaminant chemistry and substrate morphology, the clear answer is that each has a contribution to the tenacity of a contaminant. Knowing how these characteristics interact will make us better at decontamination in the field. This knowledge refutes the efforts of perhaps well-meaning marketers to define our decontamination problems by what products they are trying to sell; often a 'one size fits all' type approach. Knowing even a little bit about the character of the decontamination problem will save time and money and increase the efficacy of decontamination. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removable, Sequestration Coatings for Mitigating Hazardous Contaminants Related to Deactivation and Decommissioning Activities

This project is a collaborative effort between InnoSense LLC (ISL) and Oak Ridge National Laboratory (ORNL) aimed at mitigating the mercury (Hg) contamination problem at the Y-12 National Security Complex (NSC). The report summarizes the research and technology development work of the Phase IIB Project, led by Dr. Uma Sampathkumaran at ISL for the period of July 31, 2017–October 31, 2021. The Y-12 site cleanup includes technologies for safe and cost-effective facility demolition, soil remediation, and on-site treatment and disposal of mercury bearing wastes. One of the technology demonstration goals was a reactive strippable coating for targeted pre-demolition and de-contamination to limit Hg mobilization and the volume of debris requiring treatment for disposal. Toward this, ISL has developed a water-based reactive strippable coating (Trap & See-Hg™) to sequester elemental Hg(0) and mercuric Hg(II) species in the coating. The coating provides multiple benefits including (1) Hg vapor suppression, (2) sealing in the hazardous contaminants, (3) visually locating the contaminant through color changes, and (4) remediating the contaminated surfaces upon coating removal. Through collaboration between ORNL and ISL in Phase II work, the team successfully demonstrated the Trap & See-Hg technology to (1) visually locate the presence of Hg on concrete, soil and drywall surfaces, (2) effectively sequester all mercury species (elemental, soluble and insoluble Hg) from lab-generated and ex-situ soil and brick/rubble samples collected from the Y 12 site with 80 to 95% efficiency to capture/reduce Hg vapor concentration, (3) be applied by manual and robotic spray applicators and cure at room ambient, (4) remain a cohesive and peelable coating upon drying, and (5) sequester Hg0 from walls in the alpha-2 building basement at Y-12 during a small scale in-situ field trial. In Phase IIB, ISL’s effort was focused on refining the coating formulations with additives containing passive and reactive sorbents, colorimetric indicator, and thixotropic agents to achieve the desired performance. The paints were then evaluated at ORNL for applicability to metal and concrete surfaces of different sizes and shapes, and soil rubble, Hg-sorption capacity and achieving sag-free coating on surfaces when applied by a manual spray applicator. Ambient cure of the coating resulted in a dry thickness of 16–20 mil. The coatings were removed from smooth or rough surfaces with low to moderate force. Both lab-generated Hg-contaminated samples and soil and brick/rubble samples containing a range of Hg concentrations (collected from the Y-12 site by UCOR) were used in this project. Optimized formulations were applied to these samples and evaluated for ability to suppress Hg vapors, sequester Hg 0 and Hg(II) species and color mapping of mercury species on the test surface. The ORNL team initially identified three to four potential sites at Y-12 and ORNL for potential demonstration. However, the pandemic closed any possible avenues for on-site demonstration of the robotic spray applicator. The metal and concrete samples with low to high Hg content provided by UCOR from an ongoing demolition were subsequently used for ex-situ sample characterization and analysis at ORNL over a period of 25 days. The coatings suppressed Hg vapors with an efficiency of 95–99% from heavily contaminated metal and 60% from concrete substrate. Analysis of total Hg in the peeled paints indicates sorption capacities ranging from 12 µg Hg/g of paint from concrete to 1.2 mg Hg/g of paint from the metal substrates while peeled paints from soil samples could capture a total Hg from 2.3 mg Hg/g to 66 mg/g paint. Toxicity characteristic leaching procedure (TCLP) tests recovered total mercury leached at 0.15±0.0008 µg/L for concrete to 126.81±0.67 µg/L and 377.25±5.67 µg/L for the two metal substrates, to allow for informed decisions on downstream disposal considerations. Together, this Phase IIB demonstrated the potential value of the Trap & See-Hg for Hg uptake, vapor suppression, and color mapping, and may thus be used to enhance worker safety during site cleanup, facility demolition, and downstream waste disposal at Y-12 NSC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Contamination Tenacity on Building Substrate – 17417

Radiological decontamination is an essential enterprise that has become more important over the last four decades due to unfortunate accidents and the threat of terrorist actions. Decontamination can be an effective, beneficial alternative for the cleanup of radiological contamination events; however, the costs and benefits need to be balanced against those for complete removal and demolition of contaminated areas or facilities. Demolition and removal are often the first options considered in such circumstances as decontamination may be thought of as slow and costly. Decontamination has advantages, including significant waste reduction over demolition. In areas with buildings of cultural or societal importance, demolition may not be an option. Three decontamination evaluation test series are the focus of this article: SIMCON 1 and 2 (i.e., simulated contamination), and Urban RDD (radiological dispersal device, i.e., a dirty bomb detonation). These test series revealed that different contaminants respond differently during decontamination. This was found to be true with both SIMCON and Urban RDD simulant tests. SIMCON 2 especially demonstrated that chemically different contaminants respond differently to different decontamination methods: cesium appears to be less tenacious (more easily removed) than zirconium using chemical methods. These differences were underscored by the Urban RDD tests where americium and cobalt tended to precipitate on high pH surfaces (such as concrete), making them easier to remove, while cesium and strontium were essentially unaffected by surface pH and were imbibed more strongly into the substrate pore structure. While authorities argue over the contributions of contaminant chemistry and substrate morphology, the clear answer is that each has a contribution to the tenacity of a contaminant. Knowing how these characteristics interact will make us better at decontamination in the field. This knowledge refutes the efforts of perhaps well-meaning marketers to define our decontamination problems by what products they are trying to sell; often a “one size fits all” type approach. Knowing even a little bit about the character of the decontamination problem will save time and money and increase the efficacy of decontamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Decommissioning the Humboldt Bay Power Plant - 13604

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) to Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reuse of Material Containing Natural Radionuclides - 12444

Disposal of and use of wastes containing natural radioactive material (NORM) or technologically enhanced natural radioactive material (TENORM) with excessive natural background as a building material is very important in the supervision body activity. At the present time, the residents of Octyabrsky village are under resettlement. This village is located just near the Priargunsky mining and chemical combine (Ltd. 'PPGHO'), one of the oldest uranium mines in our country. The vacated wooden houses in the village are demolished and partly used as a building material. To address the issue of potential radiation hazard of the wooden beams originating from demolition of houses in Octyabrsky village, the contents of the natural radionuclides (K-40, Th-232, Ra-226, U- 238) are being determined in samples of the wooden beams of houses. The NORM contents in the wooden house samples are higher, on average, than their content in the reference sample of the fresh wood shavings, but the range of values is rather large. According to the classification of waste containing the natural radionuclides, its evaluation is based on the effective specific activity. At the effective specific activity lower 1.5 kBq/kg and gamma dose rate lower 70 μR/h, the material is not considered as waste and can be used in building by 1 - 3 classes depending upon A{sub eff} value. At 1.5 kBq/kg < A{sub eff} ≤ 4 kBq/kg (4 class), the wooden beams might be used for the purpose of the industrial building, if sum of ratios between the radionuclide specific activity and its specific activity of minimum significance is lower than unit. The material classified as the waste containing the natural radionuclides has A{sub eff} higher 1.5 kBq /kg, and its usage for the purpose of house-building and road construction is forbidden. As for the ash classification and its future usage, such usage is unreasonable, because, according to the provided material, more than 50% of ash samples are considered as radioactive waste containing natural radionuclides. All materials originated from demolition of houses in Octyabrsky village are subjected to the obligatory radiation control. The decision to use the wooden beams shall enter into force after agreement with the State Sanitary and Epidemiological Supervision bodies. Conclusions: 1 - The wooden beam originated from the house demolition in Octyabrsky village might be used as the construction material only in case of compliance with the requirements of the regulatory documents, as well as under approval of the authorities responsible for the state sanitary and epidemiological supervision in this area. 2 - The industrial control is introduced to verify the compliance with the current regulations. 3 - The material originated from the house demolition might be used only if such usage does not cause increasing radiation exposure to the public. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From Decommissioning B411 Decontamination Centre at Whiteshell Laboratories - 18211

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on the largest organically cooled, heavy water moderated nuclear reactor in the world, the WR-1. It is now operated by Canadian Nuclear Laboratories (CNL) and is the first major decommissioning project of a nuclear research establishment in Canada. One of the major projects to support the closure of Whiteshell Laboratories (WL) is the decommissioning and demolition of the Building 411 (B411) Decontamination Centre, which provided a decontamination service for maintaining research and development of experimental rigs, equipment and tools in a safe usable state. It also provided a laundry service for radioactively contaminated clothing. The team successfully self-performed their first demolition of a nuclear facility, but not without challenges. The baseline decommissioning strategy assumed most of the facility would meet unconditional clearance levels; however when characterization revealed the extent of contamination exceeded initial assumptions projected from process knowledge, in conjunction with resource challenges and a waste disposal pathway not firmly established, active remediation of the facility was undertaken. With an unknown waste acceptance criteria for the future waste disposal facility, sludge that had accumulated in a tank used to collect xylene and organic coolant from contaminated tools and equipment and the selection of appropriate waste packages for waste storage, transportation and disposal forced the project team to adjust their demolition timeline. This, coupled with developing an open air demolition plan and managing an uncertain end state criteria, were just some of the major tasks the team successfully navigated. The impact on both schedule and cost performance caused by the change in strategy, and the lessons learned experienced by the WL Decommissioning Project Team that are being applied as the Whiteshell Laboratories Closure Project (WLCP) moves forward with the next major decommissioning challenge, are highlighted in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ORNL Soils Remediation and Slabs Removal - The Bridge from D and D to Redevelopment - 12342

The landscape of the Oak Ridge National Laboratory (ORNL) has dramatically changed over the past 2 years with demolition of aging facilities in the Central Campus. Removal of these infrastructure legacies was possible due to an influx of DOE-Environmental Management funding through the American Recovery and Reinvestment Act of 2009 (ARRA). Facility D and D traditionally removes everything down to the building slab, and the Soils and Sediments Program is responsible for slabs, below-grade footers and sub-grade structures, abandoned waste utilities, and soils contaminated above certain risk levels that must be removed before the site can be considered for redevelopment. DOE-EM has used a combination of base and ARRA funding to facilitate the clean-up process in ORNL's 2000 Area. Demolition of 13 buildings in the area was funded by the ARRA. Characterization of the remaining slabs, underground pipelines and soils was funded by DOE-EM base funding. Additional ARRA funding was provided for the removal of the slabs, pipelines and contaminated soils. Removal work is in progress and consists of removing and disposing of approximately 7,650 cubic meters (m{sup 3}) of concrete, 2,000 m{sup 3} of debris, and 400 m{sup 3} of contaminated soil. Immediately adjacent to the 2000 Area is the Oak Ridge Science and Technology Park and the modernized ORNL western campus. The Science and Technology Park is the only private sector business and technology park located within the footprint of a national laboratory. The completion of this work will not only greatly reduce the risk to the ORNL campus occupants but also allow this much sought after space to be available for redevelopment and site reuse efforts at ORNL. Demolition of aging facilities enabled by injection of ARRA funding has significantly altered the landscape at ORNL while reducing risk to laboratory personnel and operations and providing valuable central campus land parcels for redevelopment to expand and enhance the science mission of the Laboratory. D and D of these infrastructure legacies that were once eyesores that harbored risk in the ORNL Central Campus have been transformed to green spaces and extremely valuable candidate sites for future buildings. The 2000 Area slabs and soils removal marks the first step in creating the bridge between the modernized east and west campus and acts as the cornerstone in the redevelopment of the ORNL Central Campus area which will be a key contributor to ORNL meeting its vision of the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of 130 mSv/hr. Soil Contamination Under a Hot Cell - 17301

Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently engineering a system to safely remove and dispose of highly contaminated soil underneath Building 324 located adjacent to the Columbia River on the Hanford Site in Washington State. Cleaning up the waste site will allow for the eventual demolition of the building, which is a top priority for DOE and CH2M due to the proximity of the Columbia River and City of Richland. Building 324 at Hanford was originally constructed in 1966 and was operated for a number of years serving various missions. One of the missions involved development of treatment processes for liquid high activity waste. As of result of one particular mission, liquid high activity waste was spilled in one of the building's hot cells (known as 'B' Cell) and the liquid leaked from a breach in a sump and through construction joints in the hot cell floor and into the soil. Sampling efforts using borehole technology revealed significant under-building contamination with dose rates measuring has high as 130 mSv/hr (13,000 R/hr.). The Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) between the Washington State, Department of Ecology (Ecology), the U.S. Environmental Protection Agency and the DOE has established a 2021 milestone for demolition and removal of the Building 324. Before building demolition can be undertaken, the highly contaminated soil must be removed from beneath the hot cell while the hot cell structure remains in place to provide shielding and containment during the soil remediation. CH2M will fabricate and install remotely operated equipment that will remove debris and grout in the cell, the floor of the hot cell, and the contaminated soil beneath the hot cell and package that soil for disposal. To ensure that the structure remains intact and does not shift during soil removal, support for the building structure must also be constructed as a prerequisite for the planned work. CH2M will use a full-scale mock-up of the Building 324 B Cell and airlock area to assist in the testing of the remotely operated equipment and the training of the soil removal team in a contamination-free environment to ensure efficient and safe performance of the challenging work of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NORM in Building Materials: A Case Study in Releasing and Disposing of Building Debris within the DOE System - 18123

In 2013, the Office of Management and Budget issued Memorandum 2013-02, clarifying its 'Freeze the Footprint' policy. Memorandum 2013-02 requires that all federal agencies maintain or reduce their total square footage, within each subsequent year, from a FY2012 baseline. Memorandum 2013-02 also requires that total square footage remain constant with respect to the type/intended use of a building. At Los Alamos National Laboratory (LANL), this means that new construction cannot occur without demolition of equivalent (both in type and square footage) building(s). Since 2013, decommissioning and demolition of aging, unused facilities at LANL has increased. In 2016, the TA16-280 building complex was scheduled for demolition. TA16-280 is a former high explosives (HE) processing facility that consists of six buildings connected to each other via weatherproof walkways. It was constructed in the 1950's and has been subsequently used for HE shipping, receiving, and storage. Interviews with radiation protection staff suggest that some of the buildings within the complex may have been used to store depleted uranium metal parts in a non-dispersible form. It is LANL policy to conduct decommissioning surveys for radioactive materials when building history cannot confirm that a structure is radiologically non-impacted. LANL follows the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) process to develop its surveys and clear structures from radiological control. After clearance, a structure may be dispositioned as non-regulated waste, at a significant cost savings compared to regulated disposition pathways such as low-level waste. MARSAME measurements conducted in the 16-280 complex were elevated compared to reference measurements of surrogate materials, and a majority of the survey units failed to pass indistinguishable from background (IFB), which is LANL's unregulated clearance criteria. Further measurements conducted both in situ and in the laboratory indicated the presence of naturally-occurring thorium in several building materials including: poured concrete, the glaze atop ceramic blast tiles, and the porcelain enamel on the exterior of blast-proof ceiling lamps. Other than naturally-occurring thorium, there were no elevated radionuclide concentrations detected in building materials. It should be noted that there was no history of thorium use in the 16-280 complex, and the material in question was in all cases fixed to and within the building materials in question. Except in certain specific cases, such material is exempt from regulation under the Atomic Energy Act of 1954 [3], as amended, and is therefore exempt from regulation under the Nuclear Regulatory Commission, the Department of Energy, and agreement state regulatory frameworks. Despite this regulatory exemption, disposition of material from the 16-280 complex proved to be challenging, principally because local industrial landfills stipulate 'No radioactive material' in their Waste Acceptance Criteria. This disconnect between what is regulated and what is disposable creates a situation where some DOE sites find it easier to disposition property as Low Level Waste in lieu of pursuing a non-regulated disposition pathway. This presentation will explore the specifics of the 16-280 decommissioning project as well as the implications of the release/disposition disconnect for naturally occurring radioactive material and project planning at LANL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗