Trends in modern system theory

The topics considered are related to linear control system design, adaptive control, failure detection, control under failure, system reliability, and large-scale systems and decentralized control. It is pointed out that the design of a linear feedback control system which regulates a process about a desirable set point or steady-state condition in the presence of disturbances is a very important problem. The linearized dynamics of the process are used for design purposes. The typical linear-quadratic design involving the solution of the optimal control problem of a linear time-invariant system with respect to a quadratic performance criterion is considered along with gain reduction theorems and the multivariable phase margin theorem. The stumbling block in many adaptive design methodologies is associated with the amount of real time computation which is necessary. Attention is also given to the desperate need to develop good theories for large-scale systems, the beginning of a microprocessor revolution, the translation of the Wiener-Hopf theory into the time domain, and advances made in dynamic team theory, dynamic stochastic games, and finite memory stochastic control.

Athans, M.↗

On stochastic control system design methods for weakly coupled large scale linear systems.

This paper considers the problem of decentralized control of two weakly coupled linear stochastic systems, using quadratic performance indices. The basic idea is to have each controller control independently his own system, based upon noisy measurements of his own output. To compensate for the effects of weak coupling upon the resultant performance, fake white plant noise is introduced to each system. The appropriate intensity of the fake plant noise is obtained through the solution of an off-line deterministic matrix optimal control problem. The effects of this design method upon the overall coupled system performance are analyzed as a function of the degree of intersystem coupling.

Kwong, R.↗

Update on Development of SiC Multi-Chip Power Modules

Progress has been made in a continuing effort to develop multi-chip power modules (SiC MCPMs). This effort at an earlier stage was reported in 'SiC Multi-Chip Power Modules as Power-System Building Blocks' (LEW-18008-1), NASA Tech Briefs, Vol. 31, No. 2 (February 2007), page 28. The following recapitulation of information from the cited prior article is prerequisite to a meaningful summary of the progress made since then: 1) SiC MCPMs are, more specifically, electronic power-supply modules containing multiple silicon carbide power integrated-circuit chips and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking; 2) The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules; and, 3) In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications. Because identical SiC MCPM building blocks could be utilized in such a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. This concludes the information from the cited prior article. The main activity since the previously reported stage of development was the design, fabrication, and testing a 120- VDC-to-28-VDC modular power-converter system composed of eight SiC MCPMs in a 4 (parallel)-by-2 (series) matrix configuration, with normally-off controllable power switches. The SiC MCPM power modules include closed-loop control subsystems and are capable of operating at high power density or high temperature. The system was tested under various configurations, load conditions, load-transient conditions, and failure-recovery conditions. Planned future work includes refinement of the demonstrated modular system concept and development of a new converter hardware topology that would enable sharing of currents without the need for communication among modules. Toward these ends, it is also planned to develop a new converter control algorithm that would provide for improved sharing of current and power under all conditions, and to implement advanced packaging concepts that would enable operation at higher power density.

Lostetter, Alexander↗

SiC Multi-Chip Power Modules as Power-System Building Blocks

The term "SiC MCPMs" (wherein "MCPM" signifies "multi-chip power module") denotes electronic power-supply modules containing multiple silicon carbide power devices and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking. Moreover, the higher-temperature capabilities of SiC MCPMs could enable operation in environments hotter than Si-based power systems can withstand. The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules. In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications: typical functions could include regulating voltages, storing energy, and driving motors. Because identical SiC MCPM building blocks could be utilized in a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. Several prototype DC-to-DC power-converter modules containing SiC power-switching devices were designed and built to demonstrate the feasibility of the SiC MCPM concept. In anticipation of a future need for operation at high temperature, the circuitry in the modules includes high-temperature inductors and capacitors. These modules were designed to be stacked to construct a system of four modules electrically connected in series and/or parallel. The packaging of the modules is designed to satisfy requirements for series and parallel interconnection among modules, high power density, high thermal efficiency, small size, and light weight. Each module includes four output power connectors two for serial and two for parallel output power connections among the modules. Each module also includes two signal connectors, electrically isolated from the power connectors, that afford four zones for signal interconnections among the SOI controllers. Finally, each module includes two input power connectors, through which it receives power from an in-line power bus. This design feature is included in anticipation of a custom-designed power bus incorporating sockets compatible with snap-on type connectors to enable rapid replacement of failed modules.

Lostetter, Alexander↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Sensing Electrical Networks Securely & Economically (SENSE)

The growing adoption of distributed energy resources (DERs) like battery energy storage systems and roof top solar/PV and the rapid penetration of electric vehicles (EVs), the electric grid is undergoing a major transformation with elevated stress on legacy grid assets. Despite a lot of expenditure to address these challenges, both in dollars and manpower, utilities have not been able to receive the value that was promised. The gains have been most visible at the transmission and substation level, especially where the main objective was improving operational and economic efficiency for the utility. Improving visibility and control at a few select points enhances the existing and established paradigm of centralized command and control. With changing load patterns, load types and the overall transition to an “active grid”, the centralized control and coordination paradigm gets challenged. To address the challenges, a new architecture and mechanism is needed, one that supports decentralized control and decision making, extracting value streams at the grid edge, particularly as the changes are fueled by transitions occurring in the distribution system. To address this, a communications and data processing platform, “GAMMA” was developed and demonstrated through the project. At the heart of the platform, are distributed, intelligent edge nodes with sensing and compute capabilities, that can record and analyze information locally. They are embedded in sensors and actuators specific to different distribution system applications. Phase 1 of the project focused on developing novel sensor technology that can be used for monitoring utility pole top distribution transformers. The sensors were designed with the objective of being low-cost, communicating with the GAMMA cloud using novel “delay-tolerant” networking using Bluetooth and a secure mobile application. They were non-intrusive in nature so that they can be installed quickly in the field, resulting in overall low cost of deployment and operations. Following the successful completion of Phase 1, the team manufactured 100 units for a field demonstration in Phase 2. The field demonstration was carried out on two real feeder systems with the local utility partner. In total, 100 sensors were installed and operated over a period of 6 months in the state of Georgia. The platform is operational end to end, with the cloud infrastructure deployed on a distributed, serverless environment that can serve multiple data streams, an analytics engine and a portal to securely view the data from multiple assets. The data collected through the GAMMA Mobile Phone app showcased the viability of the novel delay tolerant networking architecture, and the data processing algorithms developed through the course of the project, were successful in extracting important information about the overall network, improving the utility’s visibility and situational awareness in the distribution feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Relationships between digital signal processing and control and estimation theory

Research directions in the fields of digital signal processing and modern control and estimation theory are discussed. Stability theory, linear prediction and parameter identification, system synthesis and implementation, two-dimensional filtering, decentralized control and estimation, and image processing are considered in order to uncover some of the basic similarities and differences in the goals, techniques, and philosophy of the disciplines.

Willsky, A. S.↗

Cost decomposition of linear systems with application to model reduction

A means is provided to assess the value or 'cst' of each component of a large scale system, when the total cost is a quadratic function. Such a 'cost decomposition' of the system has several important uses. When the components represent physical subsystems which can fail, the 'component cost' is useful in failure mode analysis. When the components represent mathematical equations which may be truncated, the 'component cost' becomes a criterion for model truncation. In this latter event component costs provide a mechanism by which the specific control objectives dictate which components should be retained in the model reduction process. This information can be valuable in model reduction and decentralized control problems.

Skelton, R. E.↗

Active thermal control for an advanced power platform

Effective use of the Shuttle Orbiter during the operational phase will require the provision of electrical power from free-flying power platforms which will interface with the Orbiter. Such platforms present unique requirements for active thermal control based upon the long life and high heat load requirements which will be necessary to provide 25 kW or more of electricity to the Orbiter and payloads. This paper will present key issues in the design of these active thermal control systems (ATCS) and will discuss potential solutions intended to ensure maximum effectiveness of advanced power platforms. Such issues include proper selection of coolant fluid for the power platform and payload loops; selection and development of thermal control surfaces for five-year life; the use of off-the-shelf hardware vs development of unique hardware, central vs decentralized control of the ATCS; system life and reliability as a factor in determining redundancy and the possibility of on-orbit EVA maintenance; and the interfaces between the power platform and the Orbiter and payloads.

Owen, J. W.↗

Survey on large scale system control methods

The problem inherent to large scale systems such as power network, communication network and economic or ecological systems were studied. The increase in size and flexibility of future spacecraft has put those dynamical systems into the category of large scale systems, and tools specific to the class of large systems are being sought to design control systems that can guarantee more stability and better performance. Among several survey papers, reference was found to a thorough investigation on decentralized control methods. Especially helpful was the classification made of the different existing approaches to deal with large scale systems. A very similar classification is used, even though the papers surveyed are somehow different from the ones reviewed in other papers. Special attention is brought to the applicability of the existing methods to controlling large mechanical systems like large space structures. Some recent developments are added to this survey.

Mercadal, Mathieu↗

A High-Authority/Low-Authority Control Strategy for Coupled Aircraft-Style Bays

This paper presents a numerical investigation of an active structural acoustic control strategy for coupled aircraft-style bays. While structural coupling can destabilize or limit the performance of some model-based decentralized control systems, fullycoupled centralized control strategies are impractical for typical aircraft containing several hundred bays. An alternative is to use classical rate feedback with matched, collocated transducer pairs to achieve active damping. Unfortunately, due to the conservative nature of this strategy, stability is guaranteed at the expense of achievable noise reduction. Therefore, this paper describes the development of a combined control strategy using robust active damping in addition to a high-authority controller based on linear quadratic Gaussian (LQG) theory. The combined control system is evaluated on a tensioned, two-bay model using piezoceramic actuators and ideal point velocity sensors. Transducer placement on the two-bay structure is discussed, and the advantages of a combined control strategy are presented.

Schiller, N. H.↗

Safe and Private Forward-trading Platform for Transactive Microgrids

Power grids are evolving at an unprecedented pace due to the rapid growth of distributed energy resources (DER) in communities. These resources are very different from traditional power sources, as they are located closer to loads and thus can significantly reduce transmission losses and carbon emissions. However, their intermittent and variable nature often results in spikes in the overall demand on distribution system operators (DSO). To manage these challenges, there has been a surge of interest in building decentralized control schemes, where a pool of DERs combined with energy storage devices can exchange energy locally to smooth fluctuations in net demand. Building a decentralized market for transactive microgrids is challenging, because even though a decentralized system provides resilience, it also must satisfy requirements such as privacy, efficiency, safety, and security, which are often in conflict with each other. As such, existing implementations of decentralized markets often focus on resilience and safety but compromise on privacy. In this article, we describe our platform, called TRANSAX, which enables participants to trade in an energy futures market, which improves efficiency by finding feasible matches for energy trades, enabling DSOs to plan their energy needs better. TRANSAX provides privacy to participants by anonymizing their trading activity using a distributed mixing service, while also enforcing constraints that limit trading activity based on safety requirements, such as keeping planned energy flow below line capacity. We show that TRANSAX can satisfy the seemingly conflicting requirements of efficiency, safety, and privacy. We also provide an analysis of how much trading efficiency is lost. Trading efficiency is improved through the problem formulation, which accounts for temporal flexibility, and system efficiency is improved using a hybrid-solver architecture. Lastly, we describe a testbed to run experiments and demonstrate its performance using simulation results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Digital signal processing and control and estimation theory -- Points of tangency, area of intersection, and parallel directions

A number of current research directions in the fields of digital signal processing and modern control and estimation theory were studied. Topics such as stability theory, linear prediction and parameter identification, system analysis and implementation, two-dimensional filtering, decentralized control and estimation, image processing, and nonlinear system theory were examined in order to uncover some of the basic similarities and differences in the goals, techniques, and philosophy of the two disciplines. An extensive bibliography is included.

Willsky, A. S.↗

Computation of the fuel optimal degree of controllability

A new algorithm based on discretization is propposed which gives arbitrarily accurate results for fuel-optimal degree of controllability (DOC) as the discretization interval approaches zero. This research on DOC was motivated by the problem of optimizing the actuator locations in the control of large flexible spacecraft, but the concepts can also be applied to model reduction and as a measure of coupling between subsystems in hierarchical or decentralized control. The approach utilized is related closely to the time-optimal DOC algorithm; however, additional constraints must be applied, and a useful approach is found that avoids substantial increase in complexity. Algorithms are developed to calculate both the volume and the minimum distance to the boundary of the recovery region as the two choices of the controllability measure. Accurate methods for computation of both the time-optimal and fuel-optimal DOC for maneuver problems, are also described.

Chen, Xin↗

Development of a Practical Broadband Active Vibration Control System

The goal of this work is to develop robust, lightweight, and low-power control units that can be used to suppress structural vibration in flexible aerospace structures. In particular, this paper focuses on active damping, which is implemented using compact decentralized control units distributed over the structure. Each control unit consists of a diamond-shaped piezoelectric patch actuator, three miniature accelerometers, and analog electronics. The responses from the accelerometers are added together and then integrated to give a signal proportional to velocity. The signal is then inverted, amplified, and applied to the actuator, which generates a control force that is out of phase with the measured velocity. This paper describes the development of the control system, including a detailed description of the control and power electronics. The paper also presents experimental results acquired on a Plexiglas window blank. Five identical control units installed around the perimeter of the window achieved 10 dB peak reductions and a 2.4 dB integrated reduction of the spatially averaged velocity of the window between 500 and 3000 Hz.

Schiller, Noah H.↗

Using Distributed Operations to Enable Science Research on the International Space Station

In the early days of the International Space Station (ISS) program, and as the organization structure was being internationally agreed upon and documented, one of the principal tenets of the science program was to allow customer-friendly operations. One important aspect of this was to allow payload developers and principle investigators the flexibility to operate their experiments from either their home sites or distributed telescience centers. This telescience concept was developed such that investigators had several options for ISS utilization support. They could operate from their home site, the closest telescience center, or use the payload operations facilities at the Marshall Space Flight Center in Huntsville, Alabama. The Payload Operations Integration Center (POIC) processes and structures were put into place to allow these different options to its customers, while at the same time maintain its centralized authority over NASA payload operations and integration. For a long duration space program with many scientists, researchers, and universities expected to participate, it was imperative that the program structure be in place to successfully facilitate this concept of telescience support. From a payload control center perspective, payload science operations require two major elements in order to make telescience successful within the scope of the ISS program. The first element is decentralized control which allows the remote participants the freedom and flexibility to operate their payloads within their scope of authority. The second element is a strong ground infrastructure, which includes voice communications, video, telemetry, and commanding between the POIC and the payload remote site. Both of these elements are important to telescience success, and both must be balanced by the ISS program s documented requirements for POIC to maintain its authority as an integration and control center. This paper describes both elements of distributed payload operations and discusses the benefits and drawbacks.

Bathew, Ann S.↗

Cross Feedback Control of a Magnetic Bearing System: Controller Design Considering Gyroscopic Effects

For flywheel rotors or other rotors with significant ratios of moments of inertia, the influence of gyroscopic effects has to be considered. While conservative or damped systems remain stable even under gyroscopic effects, magnetically suspended rotors can be destabilized with increasing rotational speed. The influence of gyroscopic effects on the stability and behavior of a magnetic bearing system is analyzed. The analysis is carried out with a rigid body model for the rotor and a nonlinear model for the magnetic bearing and its amplifier. Cross feedback control can compensate gyroscopic effects. This compensation leads to better system performance and can avoid instability. Furthermore, the implementation of this compensation is simple. The main structure of a decentralized controller can still be used. It has only to be expanded by the cross feedback path.

Ahrens, Markus↗

Randomly Sampled-Data Control Systems

The purpose is to solve the Linear Quadratic Regulator (LQR) problem with random time sampling. Such a sampling scheme may arise from imperfect instrumentation as in the case of sampling jitter. It can also model the stochastic information exchange among decentralized controllers to name just a few. A practical suboptimal controller is proposed with the nice property of mean square stability. The proposed controller is suboptimal in the sense that the control structure is limited to be linear. Because of i. i. d. assumption, this does not seem unreasonable. Once the control structure is fixed, the stochastic discrete optimal control problem is transformed into an equivalent deterministic optimal control problem with dynamics described by the matrix difference equation. The N-horizon control problem is solved using the Lagrange's multiplier method. The infinite horizon control problem is formulated as a classical minimization problem. Assuming existence of solution to the minimization problem, the total system is shown to be mean square stable under certain observability conditions. Computer simulations are performed to illustrate these conditions.

Han, Kuoruey↗