Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Crew Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

A sequential Attacker-Defender game for distribution systems resilience enhancement against extreme weather events

Improving distribution system resilience against frequent extreme weather events is important for reliable power system operations. Especially when dealing with events such as hurricanes that have short-term predictions, proactive pre-event preparedness plays a vital role in system resilience performance. In this paper, we propose a novel approach to construct pre-event resource allocation plans for system operators to cope with upcoming threats through a sequential attacker-defender game framework. The sequential attacker-defender game is designed to model the interaction between the extreme weather and the system operator. In each round of the game, the attacker and the defender sequentially update their current strategies by accounting for the opponent’s action set. The attacker model is formulated as a bi-level problem to identify the severe outage scenarios, and the defender model is formulated as a two-stage optimization problem to determine the allocation of restoration resources including mobile responsive resources and repair crews. Two scale-reduction strategies are proposed to ensure the scalability of the game scheme. Finally, case studies on the IEEE 33-bus and a 7149-node practical utility system validate the effectiveness of the proposed sequential game and the efficiency of the scale-reduction strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A method to assess social sustainability of capture fisheries: An application to a Norwegian trawler

Social sustainability assessment of capture fisheries is, both in terms of method development and measurement, not well developed. The objective of this study, therefore, was to develop a method consisting of indicators and rubrics (i.e. categories that articulate levels of performance) to assess social sustainability of capture fisheries. This method was applied to a Norwegian trawler that targets cod and haddock in the northeast Atlantic. Based on previous research, 13 social sustainability issues were selected. To measure the state of these issues, 17 process and outcome indicators were determined. To interpret indicator values, rubrics were developed for each indicator, using standards set by international conventions or data retrieved from national statistics, industry agreements or scientific publications that explore rubric scales. The indicators and rubrics were subsequently used in a social sustainability assessment of a Norwegian trawler. This assessment indicated that overall, social sustainability of this trawler is relatively high, with high rubric scores, for example, for worker safety, provisions aboard for the crew and companies' salary levels. The assessment also indicated that the trawler could improve on healthy working environment, product freshness and fish welfare during capture. This application demonstrated that our method provides insight into social sustainability at the level of the vessel and can be used to identify potential room for improvement. This method is also promising for social sustainability assessment of other capture fisheries. - Highlights: • A method was developed for social sustainability assessment of capture fisheries. • This method entailed determining outcome and process indicators for important issues. • To interpret indicator values, a rubric was developed for each indicator. • Use of this method gives insight into social sustainability and improvement options. • This method is promising for social sustainability assessment of capture fisheries.

54 ENVIRONMENTAL SCIENCES↗

Resource Characterization and Quantification of Natural Gas-Hydrate and Associated Free-Gas Accumulations in the Prudhoe Bay - Kuparuk River Area on the North Slope of Alaska

Natural gas hydrates have long been considered a nuisance by the petroleum industry. Hydrates have been hazards to drilling crews, with blowouts a common occurrence if not properly accounted for in drilling plans. In gas pipelines, hydrates have formed plugs if gas was not properly dehydrated. Removing these plugs has been an expensive and time-consuming process. Recently, however, due to the geologic evidence indicating that in situ hydrates could potentially be a vast energy resource of the future, research efforts have been undertaken to explore how natural gas from hydrates might be produced. This study investigates the relative permeability of methane and brine in hydrate-bearing Alaska North Slope core samples. In February 2007, core samples were taken from the Mt. Elbert site situated between the Prudhoe Bay and Kuparuk oil fields on the Alaska North Slope. Core plugs from those core samples have been used as a platform to form hydrates and perform unsteady-steady-state displacement relative permeability experiments. The absolute permeability of Mt. Elbert core samples determined by Omni Labs was also validated as part of this study. Data taken with experimental apparatuses at the University of Alaska Fairbanks, ConocoPhillips laboratories at the Bartlesville Technology Center, and at the Arctic Slope Regional Corporation's facilities in Anchorage, Alaska, provided the basis for this study. This study finds that many difficulties inhibit the ability to obtain relative permeability data in porous media-containing hydrates. Difficulties include handling unconsolidated cores during initial core preparation work, forming hydrates in the core in such a way that promotes flow of both brine and methane, and obtaining simultaneous two-phase flow of brine and methane necessary to quantify relative permeability using unsteady-steady-state displacement methods.

02 PETROLEUM↗

Subscale maturation of advanced reactor technologies (SMART): A path forward for nuclear thermal propulsion fuel and reactor development

Nuclear Thermal Propulsion (NTP) systems are actively being developed for future crewed missions to Mars. NTP systems excel in missions where both high thrust and high specific impulse are required, but modern NTP systems currently do not have a Technology Readiness Level (TRL) high enough for use in crewed space exploration. TRLs are used to demonstrate the level of rigor with which a component/system has been tested/demonstrated for its intended use. While space systems technology in general must be qualified as a unit, nuclear technology must be first demonstrated to meet qualification level requirements both at the fuel (component) level and the reactor (subsystem) level. Here, in this paper, historic NTP development programs are surveyed to identify a testing and development strategy that can be effectively implemented to allow for NTP reactor development. Based on this strategy, required facilities to enable such activities are identified. Current domestic experimental capabilities to support NTP qualification are limited to separate effects testing of individual components. Separate effects testing is found extensively in historic NTP development efforts but is not sufficient for full fuel and reactor qualification. Combined effects testing allows for an accurate assessment of fuel performance but is not achievable for NTP conditions in existing facilities. Assessment of historic development programs suggests that an intermediate, subscale test facility is necessary to advance NTP TRLs. A solution to meet this need is proposed, namely the Subscale Maturation of Advanced Reactor Technologies (SMART) facility. SMART will mitigate risk to NTP development by enabling performance and reactor physics demonstrations of NTP subsystems. A SMART facility could be built by modifying existing nuclear test facilities, which may potentially enable schedule and cost savings. To pursue reactor qualification beyond the subscale, a new ground test facility will be necessary. This ground test facility should be developed concurrently with SMART to allow for the facility to be operational in time for expedited NTP engine demonstration.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Distribution Integrity Management Plan (DIMP): Los Alamos National Laboratory Natural Gas Distribution System

This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP™) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP™ uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP™ advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records for all piping system installed after the effective date of this Plan will be captured and retained in the UI records documentation system. Primary Utility Asbuilts are maintained by Utilities Mapping (UMAP) and additional records are maintained on the N drive. Engineering Change Notices (ECNs) are stored on the N drive under configuration management and kept up by Utilities and Infrastructure Division Office (UI-DO). Records include, at a minimum, the location where new piping and appurtenances are installed and the material of which they are constructed.

03 NATURAL GAS↗

Demonstration Assessment of Light-Emitting Diode (LED) Roadway Lighting at the I-35W Bridge, Minneapolis, MN

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology conducted in 2009 at the recently reconstructed I-35W bridge in Minneapolis, MN. The project was supported under the U.S. Department of Energy (DOE) Solid-State Lighting GATEWAY Technology Demonstration Program. Other participants in the demonstration project included the Minnesota Department of Transportation (Mn/DOT), Federal Highways Administration (FHWA), and BetaLED™ (a division of Ruud Lighting). Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. DOE has implemented a three-year evaluation of the LED luminaires in this installation in order to develop new longitudinal field data on LED performance in a challenging, real-world environment. This document provides information through the initial phase of the I-35W bridge project, up to and including the opening of the bridge to the public and the initial feedback received on the LED lighting installation from bridge users. Initial findings of the evaluation are favorable, with minimum energy savings level of 13% for the LED installation relative to the simulated base case using 250W high-pressure sodium (HPS) fixtures. The LEDs had an average illuminance level of 0.91 foot candles compared to 1.29 fc for the HPS lamps. The LED luminaires cost $38,000 more than HPS lamps, yielding a lengthy payback period, however the bridge contractor had offered to include the LED luminaires as part of the construction package at no additional cost. One potentially significant benefit of the LEDs in this installation is avoiding rolling lane closures on the heavily-traveled interstate bridge for the purpose of relamping the HPS fixtures. Rolling lane closures involve multiple crew members and various maintenance and safety vehicles, diversion of traffic, as well as related administrative tasks (e.g., approvals, scheduling, etc.). Mn/DOT records show an average cost of relamping fixtures along interstate roadways of between $130-150 per pole. The previous bridge saw a lamp mortality rate of approximately 50% every two years, though the new bridge was designed to minimize many of the vibration issues. A voluntary Web-based feedback survey of nearly 500 self-described bridge users showed strong preference for the LED lighting - positive comments outnumbered negative ones by about five-to-one.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Selective Dynamical Imaging of Interferometric Data

Recent developments in very long baseline interferometry (VLBI) have made it possible for the Event Horizon Telescope (EHT) to resolve the innermost accretion flows of the largest supermassive black holes on the sky. The sparse nature of the EHT’s (u, v)-coverage presents a challenge when attempting to resolve highly time-variable sources. We demonstrate that the changing (u, v)-coverage of the EHT can contain regions of time over the course of a single observation that facilitate dynamical imaging. These optimal time regions typically have projected baseline distributions that are approximately angularly isotropic and radially homogeneous. We derive a metric of coverage quality based on baseline isotropy and density that is capable of ranking array configurations by their ability to produce accurate dynamical reconstructions. We compare this metric to existing metrics in the literature and investigate their utility by performing dynamical reconstructions on synthetic data from simulated EHT observations of sources with simple orbital variability. We then use these results to make recommendations for imaging the 2017 EHT Sgr A* data set.

79 ASTRONOMY AND ASTROPHYSICS↗

THEMIS: A Parameter Estimation Framework for the Event Horizon Telescope

The Event Horizon Telescope (EHT) provides the unprecedented ability to directly resolve the structure and dynamics of black hole emission regions on scales smaller than their horizons. This has the potential to critically probe the mechanisms by which black holes accrete and launch outflows, and the structure of supermassive black hole spacetimes. However, accessing this information is a formidable analysis challenge for two reasons. First, the EHT natively produces a variety of data types that encode information about the image structure in nontrivial ways; these are subject to a variety of systematic effects associated with very long baseline interferometry and are supplemented by a wide variety of auxiliary data on the primary EHT targets from decades of other observations. Second, models of the emission regions and their interaction with the black hole are complex, highly uncertain, and computationally expensive to construct. As a result, the scientific utilization of EHT observations requires a flexible, extensible, and powerful analysis framework. We present such a framework, Themis, which defines a set of interfaces between models, data, and sampling algorithms that facilitates future development. We describe the design and currently existing components of Themis, how Themis has been validated thus far, and present additional analyses made possible by Themis that illustrate its capabilities. Importantly, we demonstrate that Themis is able to reproduce prior EHT analyses, extend these, and do so in a computationally efficient manner that can efficiently exploit modern high-performance computing facilities. Themis has already been used extensively in the scientific analysis and interpretation of the first EHT observations of M87.

79 ASTRONOMY AND ASTROPHYSICS↗

Fuel Fabrication Facility Study for FCF HALEU

Nuclear energy technology developers seek to bring to market new advanced reactor designs and new light water reactor fuel designs, many of which would deploy fuel made from uranium with 235 U enrichment ranging from 5% to 19.75%. There is currently no commercial supply of uranium in this enrichment range, which is higher than used in today’s light water reactors but still lower than the safeguards limit of 20% 235 U. This limitation is a barrier to development of demonstration of these new nuclear energy technologies. As a means to address this near-term need, DOE and Idaho National Laboratory (INL) has considered how the HALEU product from sodium-bonded spent fuel treatment in the INL Fuel Conditioning Facility (FCF), located at the Materials and Fuels Complex (MFC), might be provided and fabricated into some of the new fuel designs. The evaluation presented in this report addresses the potential establishment of two types of fuel fabrication capability at INL, represented generically as a ceramic-type (or pellet-type) fuel fabrication line and a metallic fuel fabrication line. Because the FCF HALEU feedstock contains residual transuranic contamination and a relatively small amount of residual fission products, fabrication with that material is necessarily performed inside of engineered confinement barriers, such as gloveboxes, which would be filled with inert gas for most of the fuel types considered. The throughput rate of the fabrication lines envisioned is 2.5 metric tons of HALEU fuel per year, which is judged to be sufficiently representative of engineering-scale. Space in three existing buildings was identified for consideration in this study of pre-conceptual equipment layouts. The scope and nature of the work needed to prepare each of the three buildings for each type of fuel fabrication was identified (though not in engineering detail), and three-dimensional models of envisioned fabrication equipment were laid out in each of the buildings to assess adequacy of space. The study concluded that either type of fuel fabrication line can feasibly be installed and operated in either of the three buildings. However, each of the three buildings presents different challenges in preparation, due to accommodating current missions that would need to be relocated or necessary decontamination and decommissioning work to free-up space for fuel fabrication, or due to complications of accessibility. Rough order-of-magnitude (ROM) cost estimates for preparing buildings begin at $10M ( 20%/+50%) and would increase with increased complexity of building modifications. The cost of fabrication equipment and gloveboxes is roughly estimated to be $21M (-20%/+50%) for a metallic fuel fabrication line and $27M (-20%/+50%) for a ceramic/intermetallic fuel fabrication line. Nominal operating costs are estimated to be $7M per year (in 2019 dollars), increasing from lower amounts needed as the operating crew is being assembled and trained.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

SYMBA: An end-to-end VLBI synthetic data generation pipeline

Realistic synthetic observations of theoretical source models are essential for our understanding of real observational data. In using synthetic data, one can verify the extent to which source parameters can be recovered and evaluate how various data corruption effects can be calibrated. These studies are the most important when proposing observations of new sources, in the characterization of the capabilities of new or upgraded instruments, and when verifying model-based theoretical predictions in a direct comparison with observational data. We present the SYnthetic Measurement creator for long Baseline Arrays (SYMBA), a novel synthetic data generation pipeline for Very Long Baseline Interferometry (VLBI) observations. SYMBA takes into account several realistic atmospheric, instrumental, and calibration effects. Here, we used SYMBA to create synthetic observations for the Event Horizon Telescope (EHT), a millimetre VLBI array, which has recently captured the first image of a black hole shadow. After testing SYMBA with simple source and corruption models, we study the importance of including all corruption and calibration effects, compared to the addition of thermal noise only. Using synthetic data based on two example general relativistic magnetohydrodynamics (GRMHD) model images of M 87, we performed case studies to assess the image quality that can be obtained with the current and future EHT array for different weather conditions. Our synthetic observations show that the effects of atmospheric and instrumental corruptions on the measured visibilities are significant. Despite these effects, we demonstrate how the overall structure of our GRMHD source models can be recovered robustly with the EHT2017 array after performing calibration steps, which include fringe fitting, a priori amplitude and network calibration, and self-calibration. With the planned addition of new stations to the EHT array in the coming years, images could be reconstructed with higher angular resolution and dynamic range. In our case study, these improvements allowed for a distinction between a thermal and a non-thermal GRMHD model based on salient features in reconstructed images.

79 ASTRONOMY AND ASTROPHYSICS↗

First M87 Event Horizon Telescope Results. VII. Polarization of the Ring

In 2017 April, the Event Horizon Telescope (EHT) observed the near-horizon region around the supermassive black hole at the core of the M87 galaxy. These 1.3 mm wavelength observations revealed a compact asymmetric ring-like source morphology. This structure originates from synchrotron emission produced by relativistic plasma located in the immediate vicinity of the black hole. Here we present the corresponding linear-polarimetric EHT images of the center of M87. We find that only a part of the ring is significantly polarized. The resolved fractional linear polarization has a maximum located in the southwest part of the ring, where it rises to the level of ~15%. The polarization position angles are arranged in a nearly azimuthal pattern. We perform quantitative measurements of relevant polarimetric properties of the compact emission and find evidence for the temporal evolution of the polarized source structure over one week of EHT observations. The details of the polarimetric data reduction and calibration methodology are provided. We carry out the data analysis using multiple independent imaging and modeling techniques, each of which is validated against a suite of synthetic data sets. The gross polarimetric structure and its apparent evolution with time are insensitive to the method used to reconstruct the image. These polarimetric images carry information about the structure of the magnetic fields responsible for the synchrotron emission. Their physical interpretation is discussed in an accompanying publication.

79 ASTRONOMY AND ASTROPHYSICS↗

First M87 Event Horizon Telescope Results. II. Array and Instrumentation

The Event Horizon Telescope(EHT)is a very long baseline interferometry (VLBI) array that comprises millimeter- and submillimeter-wavelength telescopes separated by distances comparable to the diameter of the Earth. At a nominal operating wavelength of∼1.3 mm, EHT angular resolution(λ/D)is∼25μas, which is sufficient to resolve nearby supermassive black hole candidates on spatial and temporal scales that correspond to their event horizons. With this capability, the EHT scientific goals are to probe general relativistic effects in the strong-field regime and to study accretion and relativistic jet formation near the black hole boundary. In this Letterwe describe the system design of the EHT, detail the technology and instrumentation that enable observations, and provide measures of its performance. Meeting the EHT science objectives has required several key developments that have facilitated the robust extension of the VLBI technique to EHT observing wavelengths and the production of instrumentation that can be deployed on a heterogeneous array of existing telescopes and facilities. To meet sensitivity requirements, high-bandwidth digital systems were developed that process data at rates of 64 gigabit s−1, exceeding those of currently operating cm-wavelength VLBI arrays by more than an order of magnitude. Associated improvements include the development of phasing systems at array facilities, new receiver installation at several sites, and the deployment of hydrogen maser frequency standards to ensure coherent data capture across the array. These efforts led to the coordination and execution of the first Global EHT observations in2017 April, and to event-horizon-scale imaging of the supermassive black hole candidate in M87.

79 ASTRONOMY AND ASTROPHYSICS↗

The Event Horizon General Relativistic Magnetohydrodynamic Code Comparison Project

Recent developments in compact object astrophysics, especially the discovery of merging neutron stars by LIGO, the imaging of the black hole in M87 by the Event Horizon Telescope, and high- precision astrometry of the Galactic Center at close to the event horizon scale by the GRAVITY experiment motivate the development of numerical source models that solve the equations of general relativistic magnetohydrodynamics (GRMHD). In this work we compare GRMHD solutions for the evolution of a magnetized accretion flow where turbulence is promoted by the magnetorotational instability from a set of nine GRMHD codes: Athena++, BHAC, Cosmos++, ECHO, H-AMR, iharm3D, HARM-Noble, IllinoisGRMHD, and KORAL. Agreement among the codes improves as resolution increases, as measured by a consistently applied, specially developed set of code performance metrics. Thus, we decide that the community of GRMHD codes is mature, capable, and consistent on these test problems.

79 ASTRONOMY AND ASTROPHYSICS↗

First Sagittarius A* Event Horizon Telescope Results. II. EHT and Multiwavelength Observations, Data Processing, and Calibration

We present Event Horizon Telescope (EHT) 1.3 mm measurements of the radio source located at the position of the supermassive black hole Sagittarius A* (Sgr A*), collected during the 2017 April 5–11 campaign. The observations were carried out with eight facilities at six locations across the globe. Novel calibration methods are employed to account for Sgr A*'s flux variability. The majority of the 1.3 mm emission arises from horizon scales, where intrinsic structural source variability is detected on timescales of minutes to hours. The effects of interstellar scattering on the image and its variability are found to be subdominant to intrinsic source structure. The calibrated visibility amplitudes, particularly the locations of the visibility minima, are broadly consistent with a blurred ring with a diameter of ∼50 μas, as determined in later works in this series. Contemporaneous multiwavelength monitoring of Sgr A* was performed at 22, 43, and 86 GHz and at near-infrared and X-ray wavelengths. Several X-ray flares from Sgr A* are detected by Chandra, one at low significance jointly with Swift on 2017 April 7 and the other at higher significance jointly with NuSTAR on 2017 April 11. The brighter April 11 flare is not observed simultaneously by the EHT but is followed by a significant increase in millimeter flux variability immediately after the X-ray outburst, indicating a likely connection in the emission physics near the event horizon. We compare Sgr A*’s broadband flux during the EHT campaign to its historical spectral energy distribution and find that both the quiescent emission and flare emission are consistent with its long-term behavior.

79 ASTRONOMY AND ASTROPHYSICS↗