Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Crawler”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Tight Fits for Americas Next Moon Rocket, Ares V

America has begun the development of a new heavy lift rocket which will enable humans to return to the moon and reach even farther destinations. Five decades ago, the National Aeronautics and Space Administration designed a system (called Saturn/Apollo) to carry men to the moon and back; the rocket which boosted them to the moon was the Saturn V. Saturn V was huge relative to contemporary rockets and is still the largest rocket ever launched. The new moon rocket is called Ares V. It will insert 40% more payload into low earth orbit than Saturn V; and after docking with the crew spacecraft, it will insert 50% more payload onto the translunar trajectory than Saturn V. The current design of Ares V calls for two liquid-fueled stages and 2 "strap-on" solid rockets. The solid rockets are extended-length versions of the solid rockets used on the Shuttle. The diameter of the liquid stages is at least as large as the first stage of the Saturn V; the height of the lower liquid stage (called the core stage) is longer than the external tank of the Shuttle. Huge rockets require huge infrastructure and, during the Saturn/Apollo era, America invested significantly in manufacturing, assembly and launch facilities which are still in use today. Since the Saturn/Apollo era, America has invested in additional infrastructure for the Shuttle program. Ares V must utilize this existing infrastructure, with reasonable modifications. Building a rocket with 50% more capability in the same buildings, testing it in the same test stands, shipping on the same canals under the same bridges, assembling it in the same building, rolling it to the pad on the same crawler, and launching it from the same launch pad is an engineering and logistics challenge which goes hand-in-hand with designing the structure, tanks, turbines, engines, software, etc. necessary to carry such a large payload to earth orbit and to the moon. This paper quantitatively discusses the significant "tight fits" that are constraining Ares V. The engineers designing and building the infrastructure for the Saturn/Apollo program usually added margins and growth capability; sometimes the size of existing facilities (such as the width of a draw bridge) was not a constraint. Ares V may utilize the "extra" space in the existing facilities and expand other tight fits. Some of the tight fits cannot be overcome without great expense; raising the roof on the Vertical Assembly Building for example. Other tight fits are easily overcome; the transporter at the manufacturing facility for the core stage can pass under low ceilings and later over a dike (without dragging the middle) by retracting or extending the struts which support the stage. Tight fits discussed in this paper include manufacturing (jigs, widths, heights, and local transportation), testing (test stand sizes and crane capability), transportation to the test stands and the launch site (barge, waterway, and rail), assembly (VAB internal dimensions and door size), roll-out limits, and launch pad size.

Jaap, John↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗

Modeling and Simulation of the ARES UPPER STAGE Transportation, Lifting, Stacking and Mating Operations Within the Vehicle Assembly Building at KSC

This viewgraph presentation describes the modeling and simulation of the Ares Upper Stage Transportation, lifting, stacking, and mating operations within the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC). An aerial view of KSC Launch Shuttle Complex, two views of the Delmia process control layout, and an upper stage move subroutine and breakdown are shown. An overhead image of the VAB and the turning basin along with the Pegasus barge at the turning basin are also shown. This viewgraph presentation also shows the actual design and the removal of the mid-section spring tensioners, the removal of the AFT rear and forward tensioners tie downs, and removing the AFT hold down post and mount. US leaving the Pegasus Barge, the upper stage arriving at transfer aisle, upper stage receiving/inspection in transfer aisle, and an overhead view of upper stage receiving/inspection in transfer aisle are depicted. Five views of the actual connection of the cabling to the upper stage aft lifting hardware are shown. The upper stage transporter forward connector, two views of the rotation horizontal to vertical, the disconnection of the rear bolt ring cabling, the lowering of the upper stage to the inspection stand, disconnection of the rear bolt ring from the upper stage, the lifting of the upper stage and inspection of AFT fange, and the transfer of upper stage in an integrated stack are shown. Six views of the mating of the upper stage to the first stage are depicted. The preparation, inspection, and removal of the forward dome are shown. The upper stage mated on the integrated stack and crawler is also shown. This presentation concludes with A Rapid Upper Limb Assessment (RULA) utilizing male and female models for assessing risk factors to the upper extremities of human beings in an actual physical environment.

Kromis, Phillip A.↗

Reconstruction of Ares I-X Integrated Vehicle Rollout Loads

The measurements taken during the Ares I-X test flight provided a unique opportunity to assess the accuracy of the models and methods used to analyze the loads and accelerations present in the planned Ares I vehicle. During the rollout of the integrated vehicle from the Vehicle Assembly Building (VAB) to the launch pad, the vehicle and its supporting structure are subjected to wind loads and the vibrations produced by the crawler-transporter (CT) that is carrying it. While the loads induced on the vehicle during this period are generally low relative to those experienced in flight, the rollout is a period of operation of primary interest to those designing both the ground support equipment and the interfaces between the launch vehicle and its supporting structure. In this paper, the methods used for reconstructing the loads during the rollout phase are described. The results generated are compared to measured values, leading to insight into the accuracy of the Ares I assessment techniques.

Chamberlain, Matthew K.↗

Reconstruction of Ares I-X Integrated Vehicle Rollout Loads

The measurements taken during the Ares I-X test flight provided a unique opportunity to assess the accuracy of the models and methods used to analyze the loads and accelerations present in the planned Ares I vehicle. During the rollout of the integrated vehicle from the Vehicle Assembly Building (VAB) to the launch pad, the vehicle and its supporting structure are subjected to wind loads and the vibrations produced by the crawler-transporter (CT) that is carrying it. While the loads induced on the vehicle during this period are generally low relative to those experienced in flight, the rollout is a period of operation of primary interest to those designing both the ground support equipment and the interfaces between the launch vehicle and its supporting structure. In this paper, the methods used for reconstructing the loads during the rollout phase are described. The results generated are compared to measured values, leading to insight into the accuracy of the Ares I assessment techniques.

Chamberlain, Matthew K.↗

Shuttle Program Loads Integration: Going From Concept to Operations and Staying Successful

From the beginning of the Shuttle Program to its end, integrated loads and dynamics analyses and tests have been critical in shaping the vehicle design and operational decisions for NASA and its customers. Starting with scaled models and simple mathematical simulations of the structural dynamics, engineers defined the required structural stiffness and predicted the limit loads for each element of the system. Early structural tests provided reasonable confidence that the models and predictions were good. The first launch of the Space Shuttle brought surprises, though, when the ignition overpressure event caused a forward fuel tank support strut to buckle, among several unexpected effects. The launch pad and other ground equipment became an integral part of the system integration, especially where the acoustic and pressure environments of ignition and lift-off were concerned. Following the Challenger accident, operating limits were changed in response to new understandings of how the integrated system performed. Controlling loads while maximizing performance was a key tenet of the Performance Enhancement design process, which enabled construction of the International Space Station. During the return to flight after the Columbia accident, engineers grew to understand that loads during the roll maneuver were also important to the vehicle s structural margin and life. At this point the crawler transport from the Vehicle Assembly Building to the launch pad also became a part of the integrated loads analysis. Even in the last years of the Space Shuttle Program, new data still provided interesting insights into this complicated and fascinating spaceship. This paper will present some examples of the important findings by the team of specialists that supported the Integrated Loads and Dynamics Panel for the Space Shuttle Program.

Bernstein, Karen↗

Cooperative Lander-Surface/Aerial Microflyer Missions for Mars Exploration

Concepts are being investigated for exploratory missions to Mars based on Bioinspired Engineering of Exploration Systems (BEES), which is a guiding principle of this effort to develop biomorphic explorers. The novelty lies in the use of a robust telecom architecture for mission data return, utilizing multiple local relays (including the lander itself as a local relay and the explorers in the dual role of a local relay) to enable ranges ~10 to 1,000 km and downlink of color imagery. As illustrated in Figure 1, multiple microflyers that can be both surface or aerially launched are envisioned in shepherding, metamorphic, and imaging roles. These microflyers imbibe key bio-inspired principles in their flight control, navigation, and visual search operations. Honey-bee inspired algorithms utilizing visual cues to perform autonomous navigation operations such as terrain following will be utilized. The instrument suite will consist of a panoramic imager and polarization imager specifically optimized to detect ice and water. For microflyers, particularly at small sizes, bio-inspired solutions appear to offer better alternate solutions than conventional engineered approaches. This investigation addresses a wide range of interrelated issues, including desired scientific data, sizes, rates, and communication ranges that can be accomplished in alternative mission scenarios. The mission illustrated in Figure 1 offers the most robust telecom architecture and the longest range for exploration with two landers being available as main local relays in addition to an ephemeral aerial probe local relay. The shepherding or metamorphic plane are in their dual role as local relays and image data collection/storage nodes. Appropriate placement of the landing site for the scout lander with respect to the main mission lander can allow coverage of extremely large ranges and enable exhaustive survey of the area of interest. In particular, this mission could help with the path planning and risk mitigation in the traverse of the long-distance surface explorer/rover. The basic requirements of design and operation of BEES to implement the scenarios are discussed. Terrestrial applications of such concepts include distributed aerial/surface measurements of meteorological events, i.e., storm watch, seismic monitoring, reconnaissance, biological chemical sensing, search and rescue, surveillance, autonomous security/ protection agents, and/or delivery and lateral distribution of agents (sensors, surface/subsurface crawlers, clean-up agents). Figure 2 illustrates an Earth demonstration that is in development, and its implementation will illustrate the value of these biomorphic mission concepts.

Thakoor, Sarita↗

Framework for Integrating Science Data Processing Algorithms Into Process Control Systems

A software framework called PCS Task Wrapper is responsible for standardizing the setup, process initiation, execution, and file management tasks surrounding the execution of science data algorithms, which are referred to by NASA as Product Generation Executives (PGEs). PGEs codify a scientific algorithm, some step in the overall scientific process involved in a mission science workflow. The PCS Task Wrapper provides a stable operating environment to the underlying PGE during its execution lifecycle. If the PGE requires a file, or metadata regarding the file, the PCS Task Wrapper is responsible for delivering that information to the PGE in a manner that meets its requirements. If the PGE requires knowledge of upstream or downstream PGEs in a sequence of executions, that information is also made available. Finally, if information regarding disk space, or node information such as CPU availability, etc., is required, the PCS Task Wrapper provides this information to the underlying PGE. After this information is collected, the PGE is executed, and its output Product file and Metadata generation is managed via the PCS Task Wrapper framework. The innovation is responsible for marshalling output Products and Metadata back to a PCS File Management component for use in downstream data processing and pedigree. In support of this, the PCS Task Wrapper leverages the PCS Crawler Framework to ingest (during pipeline processing) the output Product files and Metadata produced by the PGE. The architectural components of the PCS Task Wrapper framework include PGE Task Instance, PGE Config File Builder, Config File Property Adder, Science PGE Config File Writer, and PCS Met file Writer. This innovative framework is really the unifying bridge between the execution of a step in the overall processing pipeline, and the available PCS component services as well as the information that they collectively manage.

Mattmann, Chris A.↗

Role of EIS in Materials and Coatings Selection for NASA's Launch Facilities

Corrosion studies began at NASA's John F. Kennedy Space Center (KSC) in 1966, during the Gemini/Apollo Programs, with the evaluation of long-term anti-corrosion coatings for carbon steel structures. NASAIKSC's Atmospheric Exposure Test Site was established at that time on the beach near the launch pad. In the years that followed, numerous studies at the site have identified materials, coatings, and maintenance procedures for launch hardware and equipment exposed to the highly corrosive environment at the launch pad. The atmosphere at the launch pad is highly corrosive due to the proximity of the Atlantic Ocean, high heat from rocket exhaust, and since the introduction of the Space Shuttle, the acidic combustion products of the Solid Rocket Boosters (SRBs). Currently, NASAIKSC maintains about $2 billion worth of unique equipment and facilities, not including the orbiters, each valued at about $1.8 billion. Among the items: two launch complexes, two crawler transporters, three mobile launch platforms, and specialized testing equipment. Atmospheric exposure provides very valuable data but it takes a long time and relies on human visual inspection. NASA Technical Standard for Protective Coatings requires 18 months of good performance at the Atmospheric Exposure Test Site for preliminary approval and continued good performance for 5 years for final approval of a coating system. The use of electrochemical impedance spectroscopy (EIS) was introduced at KSC in 1989 as a supplement to the traditional dc electrochemical techniques and atmospheric exposure studies. This paper presents and overview of several projects in which EIS was used in order to select materials and coatings to be used at NASA's launch facilities [1-2].

Calle, Luz Marina↗

Exploring the Solid Rocket Boosters and Properties of Matter

I worked for the United Space Alliance, LLC (USA) with the Solid Rocket Booster (SRB) Materials and Process engineers (M&P). I was assigned a project in which I needed to research and collect chemical and physical properties information, material safety data sheets (MSDS), and other product information from the vendor's websites and existing "inhouse" files for a select group of materials used in building and refurbishing the SRBs. This information was then compiled in a report that summarized the information collected. My work site was at the Kennedy Space Center (KSC). This allowed for many opportunities to visit and tour sites operated by NASA, by USA, and by the Air Force. This included the vehicle assembly building (VAB), orbital processing facilities (OPF), the crawler with the mobile launch pad (MLP), and the SRB assembly and refurbishment facility (ARF), to name a few. In addition, the launch, of STS- 117 took place within the first week of employment allowing a day by day following of that mission including post flight operations for the SRBs. Two Delta II rockets were also launched during these 7 weeks. The sights were incredible and the operations witnessed were amazing. I learned so many things I never knew about the entire program and the shuttle itself. The entire experience, especially my work with the SRB materials, inspired my plan for implementation into the classroom.

Moffett, Amy↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP↗

NASA Work Experience

I have had the opportunity to support the analytical laboratories in chemical analysis of unknown samples, using Optical Microscopy (OM), Polarizing Light Microscopy (PLM), Fourier-Transform Infrared Spectroscopy (FT-IR), Scanning Electron Microscopy with Energy Dispersive Spectroscopy (SEMEDS), and X-ray Powder Diffraction (XPD). I have assisted in characterizing fibers pulled from a spacecraft, a white fibrous residue discovered in a jet refueler truck, brown residue from a plant habitat slated for delivery to the ISS (International Space Station), corrosion on a pipe from a sprinkler, and air filtration material brought back from the ISS. I also conducted my own fiber study in order to practice techniques and further my understanding of background concepts. Furthermore, I had the opportunity to participate in diverse work assignments, where I was assigned to work with other branches of the engineering department for 1-2 days each. The first was in the Materials Science branch where I participated in the construction of the plant habitat intended for use in research aboard the ISS. The second was in the Testing Design branch where I assisted with tensile and hardness testing of over 40 samples. In addition, I have had the privilege to attend multiple tours of the NASA KSC campus, including to the Astronaut Crew Quarters, the VAB (the main area, the Columbia room, and the catwalk), the Visitor Center housing the shuttle Atlantis, the Saturn-V exhibit, the Prototype laboratory, SWAMP WORKS, the Shuttle Landing Facility, the Crawler, and the Booster Fabrication Facility (BFF). Lastly, much of my coursework prepared me for this experience, including numerous laboratory courses with topics diverse as chemistry, physics, and biology.

Florida Tech↗

Printable Spacecraft: Flexible Electronic Platforms for NASA Missions

Atmospheric confetti. Inchworm crawlers. Blankets of ground penetrating radar. These are some of the unique mission concepts which could be enabled by a printable spacecraft. Printed electronics technology offers enormous potential to transform the way NASA builds spacecraft. A printed spacecraft's low mass, volume and cost offer dramatic potential impacts to many missions. Network missions could increase from a few discrete measurements to tens of thousands of platforms improving areal density and system reliability. Printed platforms could be added to any prime mission as a low-cost, minimum resource secondary payload to augment the science return. For a small fraction of the mass and cost of a traditional lander, a Europa flagship mission might carry experimental printed surface platforms. An Enceladus Explorer could carry feather-light printed platforms to release into volcanic plumes to measure composition and impact energies. The ability to print circuits directly onto a variety of surfaces, opens the possibility of multi-functional structures and membranes such as "smart" solar sails and balloons. The inherent flexibility of a printed platform allows for in-situ re-configurability for aerodynamic control or mobility. Engineering telemetry of wheel/soil interactions are possible with a conformal printed sensor tape fit around a rover wheel. Environmental time history within a sample return canister could be recorded with a printed sensor array that fits flush to the interior of the canister. Phase One of the NIAC task entitled "Printable Spacecraft" investigated the viability of printed electronics technologies for creating multi-functional spacecraft platforms. Mission concepts and architectures that could be enhanced or enabled with this technology were explored. This final report captures the results and conclusions of the Phase One study. First, the report presents the approach taken in conducting the study and a mapping of results against the proposed Phase One objectives. Then an overview of the general field of printed electronics is provided, including manufacturing approaches, commercial drivers, and the current state of integrated systems. The bulk of the report contains the results and findings of Phase One organized into four sections: a survey of components required for a printable spacecraft, technology roadmaps considerations, science mission and engineering applications, and potential risks and challenges of the technology.

Spacecraft↗

Feasibility Study of SDAS Instrumentation's Ability to Identify Mobile Launcher (ML)/Crawler-Transporter (CT) Modes During Rollout Operations

The Space Launch System (SLS) and its Mobile Launcher (ML) will be transported to the launch pad via the Crawler-Transporter (CT) system. Rollout (i.e., transportation) loads produce structural loads on the integrated SLS/Orion Multi-Purpose Crew Vehicle (MPCV) launch vehicle which are of a concern with respect to fatigue. As part of the risk reduction process and in addition to the modal building block test approach that has been adopted by the SLS Program, acceleration data will be obtained during rollout for use in modal parameter estimation. There are several occurrences where the ML/CT will be transported either into the Vertical Assembly Building (VAB) or to the launch pad and back without the SLS stack as part of the Kennedy Space Center (KSC) Exploration Ground Systems (EGS) Integrated Test and Checkout (ITCO). NASA KSC EGS has instrumentation installed on both the ML and CT to record data during rollout, at the launch pad, and during liftoff. The EGS instrumentation on the ML, which includes accelerometers, is referred to as the Sensor Data Acquisition System (SDAS). The EGS instrumentation on the CT, which also includes accelerometers, is referred to as the CT Data Acquisition System (CTDAS). The forces and accelerations applied to the ML and CT during a rollout event will be higher than any of the planned building block modal tests. This can be very beneficial in helping identify nonlinear behavior in the structure. Developing modal parameters from the same test hardware in multiple boundary conditions and under multiple levels of excitation is a key step in developing a well correlated FEM. The purpose of this study was three fold. First, determine the target modes of the ML/CT in its rollout configuration. Second, determine if the test degrees of freedom (DOF) corresponding to the layout of the SDAS/CTDAS accelerometers (i.e. position and orientation) is sufficient to identify the target modes. Third, determine if the Generic Rollout Forcing Functions (GRFF's) is sufficient for identifying the ML/CT target modes accounting for variations in CT speed, modal damping, and sensor/ambient background noise levels. The finding from the first part of this study identified 28 target modes of the ML/CT rollout configuration based upon Modal Effective Mass Fractions (MEFF) and engineering judgement. The finding from the second part of this study showed that the SDAS/CTDAS accelerometers (i.e. position and orientation) are able to identify a sufficient number of the target modes to support model correlation of the ML/CT FEM. The finding from the third part of this study confirms the GRFFs sufficiently excite the ML/CT such that varying quantities of the defined target modes should be able to be extracted when utilizing an Experimental Modal Analysis (EMA) Multi-Input Multi-Output (MIMO) analysis approach. An EMA analysis approach was used because Operational Modal Analysis (OMA) tools were not available and the GRFFs were sufficiently uncorrelated. Two key findings from this third part of the study are that the CT speed does not show a significant impact on the ability to extract the modal parameters and that keeping the ambient background noise observed at each accelerometer location at or below 30 µgrms is essential to the success of this approach.

Winkel, James P.↗

Modal Test of the NASA Mobile Launcher at Kennedy Space Center

The NASA Mobile Launcher (ML), located at Kennedy Space Center (KSC), has recently been modified to support the launch of the new NASA Space Launch System (SLS). The ML is a massive structure—consisting of a 345-foot tall tower attached to a two-story base, weighing approximately 10.5 million pounds—that will secure the SLS vehicle as it rolls to the launch pad on a Crawler Transporter, as well as provide a launch platform at the pad. The ML will also provide the boundary condition for an upcoming SLS Integrated Modal Test (IMT). To help correlate the ML math models prior to this modal test, and allow focus to remain on updating SLS vehicle models during the IMT, a ML-only experimental modal test was performed in June 2019. Excitation of the tower and platform was provided by five uniquely-designed test fixtures, each enclosing a hydraulic shaker, capable of exerting thousands of pounds of force into the structure. For modes not that were not sufficiently excited by the test fixture shakers, a specially-designed mobile drop tower provided impact excitation at additional locations of interest. The response of the ML was measured with a total of 361 accelerometers. Following the random vibration, sine sweep vibration, and modal impact testing, frequency response functions were calculated and modes were extracted for three different configurations of the ML in 0 Hz to 12 Hz frequency range. This paper will provide a case study in performing modal tests on large structures by discussing the Mobile Launcher, the test strategy, an overview of the test results, and recommendations for meeting a tight test schedule for a large-scale modal test.

Hydraulic shakers↗

Space Launch System: SLS Real Time Rollout Monitoring for MPCV

The NASA Space Launch System (SLS) rocket, Orion spacecraft, and Mobile Launcher (ML) are transported to Pad 39B from the Vehicle Assembly Building on a large, tracked vehicle known as the Crawler Transporter (CT). The CT is a holdover from the Apollo and Space Shuttle programs but has been extensively upgraded to accommodate the SLS. The Dynamic Rollout Test (DRT) on March 17, 2022 marked the first full rollout of the SLS and ML. Analysis indicated that loads and vibrations would be well below design limits, but out of an abundance of caution it was decided to monitor the response in real time during the rollout to assure that loads remained within predicted limits. This first rollout was outfitted with extensive test instrumentation such as accelerometers, pressure sensors, and strain gauges. This instrumentation remained in place following the integrated vehicle modal test and was being used for additional Operational Modal Analysis (OMA) during the rollout in addition to the real-time monitoring. This presentation discusses the specific loads and accelerations monitored during the rollout, how and why those responses were chosen, and how the system was implemented. Finally, a post-rollout loads reconstruction is used to assess the process and the analysis tools used for the rollout analysis.

SLS↗

Mobile Manipulation and Survey System for H-Canyon and Other Applications across the DOE Complex - 17309

The Nuclear and Applied Robotics Group (NRG) at the University of Texas at Austin is leading a team of university, industry, and national lab partners to develop and deploy a mobile manipulation and survey system for the H-Canyon Air Exhaust (CAEX) tunnels. Since the 1950's, these tunnels have connected Savannah River's nuclear chemical separations facilities to a terminus of sand filters. The tunnel must be periodically inspected. The conditions are harsh: 30+ mph air flow, acid vapors, alpha contamination, high beta and gamma dose, uneven floor surfaces, small entry port, obstacle debris, 'muddy' paths, standing water, and overhead obstacles. Since 2003, 5 crawlers have been deployed to inspect the tunnel with sufficient but limited success. Thus, H-Canyon provides an opportunity to develop and deploy a more robust system adhering to the notion of Multi-user / Multi-use (Mu2) in which a system is developed to complete a particular mission, but designed to maximize its extended use (multiple missions, locations, operators, etc.). Previous deployments provide a set of experiences upon which to learn and build. The environment is challenging and representative of other envisioned scenarios across the national nuclear complex. This paper reviews the history of system deployment into H-Canyon, the lessons learned from these experiences and then derives the requirements that will drive a 3 year effort to develop and deploy a system for H-Canyon inspection and other missions. The paper then concludes with a summary of technologies that enable a path to a functional prototype based on the current conceptual solution. This examination of available technologies and remaining technological gaps can assist the client in assessing the risk associated with proposed development and the range of application possible with a delivered functional prototype. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗