Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Conference planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Mars Sample Return - studies for a fresh look

Included in the paper are both the themes resulting from the industry studies and the general scope of the focused concepts used to assess the current planning for the Mars Sample Return (MSR) mission and precursor missions. Included in this conference are papers by the four industrial teams, as well as a fifth study by JPL's Team-X to provide further corroboration of study results. The results suggest that a scientifically justifiable mission is possible, and that technology and precursor mission demonstration plans currently in the Mars Program are justified (with some modifications).

Mars Sample Return MSR↗

Proceedings of the Next Generation Exploration Conference

The Next Generation Exploration Conference (NGEC) brought together the emerging next generation of space leaders over three intensive days of collaboration and planning. The participants extended the ongoing work of national space agencies to draft a common strategic framework for lunar exploration, to include other destinations in the solar system. NGEC is the first conference to bring together emerging leaders to comment on and contribute to these activities. The majority of the three-day conference looked beyond the moon and focused on the "next destination": Asteroids, Cis-Lunar, Earth 3.0, Mars Science and Exploration, Mars Settlement and Society, and Virtual Worlds and Virtual Exploration.

Schingler, Robbie↗

An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

Miller, Edward F.↗

Press conference on Skylab

A discussion on the Skylab reentry date and its predicted effects is presented. The plans for a coordination center and its activities to monitor the reentry of Skylab are discussed.

Source record↗

The NASA ISRO SAR (NISAR) Mission - Validation of Science Measurement Requirements

The NASA ISRO Synthetic Aperture Radar (NISAR) is scheduled for launch early in 2024 from the Satish Dhawan Space Centre (SDSC), at Sriharikota, near Chennai, India. This mission is the result of a collaboration between NASA and Indian Space Research Organization (ISRO), where NASA has contributed elements of the mission such as an L-band SAR, and ISRO has contributed other elements, such as an S-band SAR. After successful launch, the NISAR mission will collect left-looking L-band SAR data over most of the Earth’s land areas twice during every 12-day exact repeat orbit. (once while in an ascending orbit direction and once while in a descending orbit direction). NASA and ISRO have individual and joint requirements on the mission that include the performance of the imaging radars onboard the spacecraft. For example, NASA must demonstrate that this L-band SAR will achieve a set of identified science measurement accuracy requirements that span Ecosystem science, Solid Earth science, and Cryosphere science disciplines. Likewise, ISRO has several applications objectives on both the L-band and S-band data from NISAR that the ISRO science team and project will be developing and testing. Pre-launch and post-launch activities have been planned to validate that these requirements are met. Here, we will discuss how the NASA plans are being executed and will present any initial results at the conference.

Chapman, Bruce↗

Space Station Freedom Utilization Conference: Executive summary

From August 3-6, 1992, Space Station Freedom Program (SSFP) representatives and prospective Space Station Freedom researchers gathered at the Von Braun Civic Center in Huntsville, Alabama, for NASA's first annual Space Station Freedom (SSF) Utilization Conference. The sessions presented are: (1) overview and research capabilities; (2) research plans and opportunities; (3) life sciences research; (4) technology research; (4) microgravity research and biotechnology; and (5) closing plenary.

Source record↗

TPSAS-NF1676L-13678-DND

An area that shows promise in enhancing structural integrity of aircraft and aerospace structures is integral stitched composite technology. The most recent generation of this technology is the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) concept. The goal of the PRSEUS concept is to provide damage-containment capability for composite structures while reducing overall structural weight. The National Aeronautics and Space Administration, the Boeing Company, and the Federal Aviation Administration (FAA) have partnered in an effort to assess the damage-containment features of a full-scale curved PRSEUS panel using the FAA Full-Scale Aircraft Structural Test Evaluation and Research facility. The background, test plan, fixture modifications, pre-test analysis, and planned experimental procedure were presented at the 2011 Aircraft Airworthiness and Sustainment Conference. This follow-on paper and presentation will provide details of the experimental procedure, test results, nondestructive inspection results, and preliminary test analysis comparison. The test program included three phases of loading and inspections: Phase I, as-built; Phase II, with barely visible impact damage (BVID); and Phase III, with a two-bay notch severing the central stiffener. Axial tension, internal pressure, and combined axial tension and internal pressure load conditions were applied during each phase using load levels that demonstrate compliance with the strength, deformation, and damage-tolerance requirements of Title 14 Code of Federal Regulations Part 25. Pressure loads were based on an operating pressure of 9.2 psi, designated as 1P, and the axial loads were based on a design limit load (DLL) of 227 kip. The Phase I test results provided a baseline. First, 50 percent limit-load levels were applied for each of the three load cases to verify proper load introduction and repeatability by examining strain and displacement results. Next, three limit-load cases were applied: limit pressure of 12.2 psi (1.33 P), axial DLL of 227 kip, and combined 1P pressure and axial DLL. Linear strain and displacement results were observed in all load cases. For Phase-II testing, the panel was impacted to introduce BVID with an energy of 40 ft-lb, with the impact located between the central stringer stitch line and flange edge. The impact created non-penetrating visual damage with fiber breaks and delamination between the skin and stringer flange. Limit-load conditions were applied followed by pressure overload of 18.4 psi (2P) and ultimate load conditions, defined as 1.5 times DLL. Inspections were performed after each load case; no damage growth was observed. For Phase-III testing, a two-bay notch was machined severing the central stiffener. The panel was then subjected to limit-load conditions, followed by combined 1P pressure while increasing axial tension load to catastrophic failure. As limit combined loads were approached, damage initiation was observed in the form of 45? splitting at 1P + 79% DLL. Axial loading was increased to 1P + 150 percent DLL causing damage to propagate to the adjacent stringer flanges. Damage was contained within the two-bay region by the stitching rows up to 1P + 176% DLL. Axial load was further increased until catastrophic failure, when a stringer rod failed at 1P + 192% DLL. These test results further verify the damage containment features of the PRSEUS concept and suggest its appropriateness for future flight vehicles.

Andrew Bergan↗

m:N Working Group Annual Status Report

This document serves as an annual report of m:N Unmanned Aircraft Systems (UAS) subgroup activities, addressed challenges, and roadmaps for the future. The subgroups consist of small Unmanned Aircraft Systems (sUAS), Large UAS, High Altitude Platform Systems (HAPS), and Urban Air Mobility (UAM). Also included in this report are participant lists for each subgroup (Appendix B) and future roadmap and outreach plans.The subgroups meet in a virtual format multiple times throughout the year. Twice a year, participants from all the subgroups come together as part of the m:N working group to brief each other in person on progress, challenges, and path forward ideas for successful incorporation of UAS into the airspace. Recent m:N in person meetings include: - November 29-30, 2022 at the NASA Ames Research Center in Mountain View, CA - May 9 & 11, 2023 at AUVSI’s Xponential conference in Denver, CO - The next in person working group meeting is planned for November 28-30, 2023 at NASA Langley in Hampton, Virginia The m:N UAS working group is run by Jay Shively (Adaptive Aerospace) and Andy Thurling (Thurling Aero Consulting) and is comprised of members from government, industry, and academia in an effort to identify and reduce barriers to m:N operations. This effort also includes identifying requirements, use cases, and metrics to support organizations and groups including the Federal Aviation Administration (FAA) and Radio Technical Commission for Aeronautics (RTCA’s) SC-228 Detect and Avoid committee.

multi-vehicle↗

The Spectrum Orbit Utilization Program (SOUP) used for DBS plan analysis at RARC '83

This paper describes the history, functions, and usage of the program that was used to analyze the plans for direct broadcast satellite service developed in the course of the 1983 Regional Administrative Radio Conference for ITU Region 2. Given the requirements for direct broadcast service by the administrations, the conference delegates (1) developed the appropriate technical parameters; (2) made tentative assignments to the orbit locations, frequencies, and polarizations of space stations, (3) calculated the interferences and margins of such assignments through the use of the Spectrum Orbit Utilization Program (SOUP); and (4) iterated this procedure until an acceptable plan was found.

Davidson, J.↗

Proceedings of Second Conference on Solar Simulation Research

The subjects most actively discussed informally at the 1964 meeting included progress reports on solar simulators which have been completed or are planned or under construction. Need for radiometric standards and the possible need for further solar data were also discussed.

SOLAR SIMULATION↗

Capabilities, limitations, and use of BC SAT-R2 conference software

The computer software developed for the BC SAT-R2 Conference has certain capabilities and limitations which are described. Capabilities of each major program element are addressed with respect to providing the required functions for planning and output reporting. Limitations arise from the inability to exactly represent certain systems that may be examined. Expected use of the software package during the Conference is outlined.

Miller, E. F.↗

Contractor and government - Teamwork and commitment

Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

Griffin, G. D.↗

Discrete X-Ray Source Populations and Star-Formation History in Nearby Galaxies

This program aims in understanding the connection between the discrete X-ray source populations observed in nearby galaxies and the history of star-formation in these galaxies. The ultimate goal is to use this knowledge in order to constrain X-ray binary evolution channels. For this reason although the program is primarily observational it has a significant modeling component. During the first year of this study we focused on the definition of a pilot sample of galaxies with well know star-formation histories. A small part of this sample has already been observed and we performed initial analysis of the data. However, the majority of the objects in our sample either have not been observed at all, or the detection limit of the existing observations is not low enough to probe the bulk of their young X-ray binary populations. For this reason we successfully proposed for additional Chandra observations of three targets in Cycle-5. These observations are currently being performed. The analysis of the (limited) archival data for this sample indicated that the X-ray luminosity functions (XLF) of the discrete sources in these galaxies may not have the same shape as is widely suggested. However, any solid conclusions are hampered by the small number of detected sources. For this reason during the second year of this study, we will try to extend the sample in order to include more objects in each evolutionary stage. In addition we are completing the analysis of the Chandra monitoring observations of the Antennae galaxies. The results from this work, apart from important clues on the nature of the most luminous sources (Ultra-luminous X-ray sources; ULXs) provide evidence that source spectral and/or temporal variability does not significantly affect the shape of their X-ray luminosity functions. This is particularly important for comparisons between the XLFs of different galaxies and comparisons with predictions from theoretical models. Results from this work have been presented in several conferences. Refereed journal papers presenting these conclusions are currently in preparation. An important part of this study is the Chandra survey of the Small Magellanic Cloud, our second nearest star- forming galaxy. So far we have been awarded 5 Chandra observations of the central youngest part of the galaxy. These observations will help to study the very faint end of the young X-ray binary populations which is not possible to probe in more distant objects. Results from this study have been presented in several conferences and two papers are in preparation. In addition during year-2 we are planning of undertaking the task of identifying optical counterparts to the X-ray sources, which will help us to isolate interlopers (sources not associated with the SMC) and classify the X-ray binaries which are found to be associated with the SMC. In the theoretical front, the Star-Track X-ray binary population synthesis code which will be used for the modeling of the X-ray binary populations (led by co-I V. Kalogera and C. Belczynski), is complete. A first test using the XLF of the star-forming galaxy NGC-1569 showed remarkable agreement between the observed and the modeled XLF. These results are presented in an ApJ. Letters paper (Belczynski et al, 2004, 601, 147). During year-2 of this study we are planning of performing a parameter study in order to investigate which parameters are most important for the shape of the XLF. In addition we will perform comparisons with observations of other galaxies from our sample as they become available.

Zezas, Andreas↗

Structural Integrity and Durability of Reusable Space Propulsion Systems

A two-day conference on the structural integrity and durability of reusable space propulsion systems was held on 14 to 15 May 1991 at the NASA Lewis Research Center. Presentations were made by industry, university, and government researchers organized into four sessions: (1) aerothermodynamic loads; (2) instrumentation; (3) fatigue, fracture, and constitutive modeling; and (4) structural dynamics. The principle objectives were to disseminate research results and future plans in each of four areas. This publication contains extended abstracts and the visual material presented during the conference. Particular emphasis is placed on the Space Shuttle Main Engine (SSME) and the SSME turbopump.

Source record↗

Infrastructure and resource development needs to support a significant expansion of US nuclear capacity

In December 2023, the United States pledged at a United Nations conference to triple nuclear energy by 2050. In May of 2025 a new administration announced plans to quadruple nuclear energy by 2025, setting a new target that requires understanding the key infrastructure and resources needed to achieve large-scale deployment. This study attempts to quantify “what it takes” to deploy an additional 200 GWe of nuclear capacity. It projects demand levels for workforce, fuel, uranium mining and enrichment, waste management, supply chain, land, licensing, and water. Demand growth is also contextualized. For example, the peak number of construction workers required is approximately 215,000, a 37 % increase in the current US utility construction workforce. Up to 80,000 MT/year of mined uranium will be needed, necessitating a 60-fold increase in US mining production or a doubling of global mining if sourced externally. Advanced reactor fuels, uranium mining, and nuclear-grade equipment production would need substantial expansion. Operational workforce, enrichment needs, and licensing submissions also face significant increases. Although water consumption may see relatively lower increases, securing water rights poses unique challenges. This study consolidates various demand metrics in a broad context, highlighting the necessity of early preparations, such as workforce training, to support a tripling of nuclear energy. While it outlines the demand-side requirements, it does not assess the difficulties of ramping up or other supply-side issues. The findings also shed light on the impact of reactor size and reactor technology on various demand metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗