Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Completeness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Dinuclear systems in complete fusion reactions

Formation and evolution of dinuclear systems in reactions of complete fusion are considered. Based on the dinuclear system concept, the process of compound nucleus formation is studied. Arguments confirming the validity of this concept are given. The main problems of describing the complete fusion in adiabatic approximation are listed. Calculations of evaporation residue cross sections in complete fusion reactions leading to formation of superheavy nuclei are shown. Isotopic trends of the cross sections of heavy nuclei formation in complete fusion reactions are considered.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A method for achieving complete microbial genomes and improving bins from metagenomics data

Metagenomics facilitates the study of the genetic information from uncultured microbes and complex microbial communities. Assembling complete genomes from metagenomics data is difficult because most samples have high organismal complexity and strain diversity. Some studies have attempted to extract complete bacterial, archaeal, and viral genomes and often focus on species with circular genomes so they can help confirm completeness with circularity. However, less than 100 circularized bacterial and archaeal genomes have been assembled and published from metagenomics data despite the thousands of datasets that are available. Circularized genomes are important for (1) building a reference collection as scaffolds for future assemblies, (2) providing complete gene content of a genome, (3) confirming little or no contamination of a genome, (4) studying the genomic context and synteny of genes, and (5) linking protein coding genes to ribosomal RNA genes to aid metabolic inference in 16S rRNA gene sequencing studies. We developed a semi-automated method called Jorg to help circularize small bacterial, archaeal, and viral genomes using iterative assembly, binning, and read mapping. In addition, this method exposes potential misassemblies from k-mer based assemblies. We chose species of the Candidate Phyla Radiation (CPR) to focus our initial efforts because they have small genomes and are only known to have one ribosomal RNA operon. In addition to 34 circular CPR genomes, we present one circular Margulisbacteria genome, one circular Chloroflexi genome, and two circular megaphage genomes from 19 public and published datasets. We demonstrate findings that would likely be difficult without circularizing genomes, including that ribosomal genes are likely not operonic in the majority of CPR, and that some CPR harbor diverged forms of RNase P RNA. Code and a tutorial for this method is available at https://github.com/lmlui/Jorg and is available on the DOE Systems Biology KnowledgeBase as a beta app.

59 BASIC BIOLOGICAL SCIENCES↗

Complete Fiber/Copper Cable Solution for Long-Term Temperature and Pressure Measurement in Supercritical Reservoirs and EGS Wells

High Temperature insulated wire and optical fiber cable is a key enabling technology for the Geothermal Technologies Program (GTP). Without insulated electrical wires and optical fiber, downhole temperature and pressure sensors, flow meters and gauges cannot communicate with the surface. Unfortunately, there are currently no insulated electrical wire or fiber cable constructions capable of surviving for extended periods of deployment in a geothermal well (240-325°C) or supercritical (374°C) reservoir. This has severely hindered engineered reservoir creation, management and utilization, as hot zones and cool water intrusions cannot be understood over time. The lack of a insulated electrical wire and fiber cable solution is a fundamental limitation to the viability of this energy source. The High Temperature Downhole Tools target specification is development of tools and sensors for logging and monitoring wellbore conditions at depths of up to 10,000 meters and temperatures up to 374oC. It well recognized in the industry that no current electronic or fiber cable can be successfully deployed in a well and function successfully for more a few days at temperatures over 240oC. The goal of this project was to raise this performance level significantly. Prysmian Group’s objective in this project was to develop a complete, multi-purpose cable solution for long-term deployment in geothermal wells/reservoirs that can be used with the widest variety of sensors. In particular, the overall project objective was to produce a manufacturable cable design that can perform without serious degradation: • At temperatures up to 374°C; • At pressures up to 220 bar; • In a hydrogen-rich environment; and • For the life of the well (> 5 years). This cable incorporates: • Specialty optical fibers, with specific glass chemistry and high temperature and pressure protective coatings for data communication and distributed temperature and pressure sensing, and • High-temperature insulated wire conductors Prysmian Group has developed a geothermal fiber optic cable (GFOC) solution which incorporates novel glass chemistry for optical fibers to operate at the required bandwidths in high temperature/high pressure hydrogen rich environments with fiber protection, high temperature insulated conductors and protective cladding for cable components. The cable solution has been tested in a geothermal installation for 10 months. The electrical insulation and optical fibers have been validated through laboratory testing to ensure successful operation for greater than 5 years at 300°C, with the possibility of higher temperatures depending on the particular well environment. With the 300°C optical fiber and electrical insulation developments completed and validated in laboratory tests the greatest challenge to a complete 300°C cable solution was protecting the optical fibers in the cable. Optical fibers are typically incased in a protective tube where the tube is filled with a gel. The gel serves as mechanical protection, prevent moisture ingress, and can include hydrogen scavenging materials. A suitable gel for use at 300°C could not be identified and an industrialized alternative was not fully attained. Despite the problems encountered and the lower long-term operating temperature of the cable solution, the project showed success in developing a complete cable solution for a large portion of the geothermal wells in operation today. Further work to obtain the higher long-term temperature goal of the project can be achieved based on the knowledge gained in the current project. This project is significant for many reasons including the new materials science, manufacturing technology, energy independence, and jobs created and will create.

15 GEOTHERMAL ENERGY↗

Causal Analysis Report for "Demolition of Historic and Yet-to-be-Determined Radar Towers at TTR Without Completing Required NEPA Process"

Two radar towers at the Tonopah Test Range (TTR), Contraves Towers 22-00 and 12-00, were torn down prior to completion of the required National Environmental Policy Act (NEPA) process. National Technology and Engineering Solutions of Sandia, LLC, (NTESS) submission of the NEPA checklist triggered a Sandia Field Office (SFO) review of the proposed work scope and was to include a required consultation between SFO and the Nevada State Historic Preservation Office (SHPO) to assess any adverse effect(s) on historic properties or contributing element(s) to a historic district and, if so, determine a resolution. Following the consultation, SFO provides approval/denial of the proposed work detailed on the submitted NEPA checklist. Contraves Tower 22-00 is a historic structure, as formally determined by the SFO in consultation with the SHPO. The historical eligibility of Contraves Tower 12-00 is yet to be determined. On February 13, 2018, NTESS notified SFO that Contraves Tower 22-00 at TTR was torn down in May 2017 prior to completion of the required the NEPA process, including consultation with the SHPO. NTESS submitted two NEPA checklists to SFO in 2016 for the removal of several structures no longer required by NTESS. The first NEPA checklist listed three historic structures (one of which was Contraves Tower 22-00) and SFO determination on whether consultation with the SHPO is necessary as well as approval/denial of the NEPA checklist is pending. The second NEPA checklist listed five non-historic structures, one of which was Contraves Tower 12-00. SFO approved the NEPA checklist covering non historic structures except for the Contraves Tower 12-00, as the Contraves Tower 12-00 requires further consultation with the SHPO by SFO. Only after completion of the consultation would SFO determine approval/denial on the remaining property cited within the NEPA checklist. In late January 2018, NTESS personnel discovered that Contraves Tower 22-00 was no longer listed in the Facility Information Management System (FIMS). Upon further investigation, NTESS personnel verified that the Contraves Tower 22-00 had been removed in May 2017. During the initial extent of condition, it was discovered that Contraves Tower 12-00 had also been torn down in May 2017 as part of this same destruction and demolition (D&D) activity. Both Contraves Towers 22-00 and 12-00) had been torn down prior to completion of the NEPA process, including consultation with the SHPO.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Revisiting the completeness and luminosity function in high-redshift low-luminosity quasar surveys

Recent studies have derived quasar luminosity functions (QLFs) at various redshifts. However, the faint side of the QLF at high redshifts is still too uncertain. An accurate estimate of the survey completeness is essential to derive an accurate QLF for use in studying the luminosity-dependent density evolution (LDDE) of the quasar population. Here we investigate how the luminosity dependence of quasar spectra (the Baldwin effect) and the attenuation model for the intergalactic medium (IGM) affect the completeness estimates. For this purpose, we specifically revisit the completeness of quasar surveys at z∼4--5, using the COSMOS images observed with Subaru/Suprime-Cam. As a result, we find that the completeness estimates are sensitive to the luminosity dependence of the quasar spectrum and to different the IGM attenuation models. At z∼4, the number density of quasars when we adopt the latest IGM model and take the luminosity dependence of spectra into account is (3.49±1.62)×10{sup −7} Mpc{sup −3} mag{sup −1} for −24.09<M{sub 1450}<−23.09 and (5.24±2.13)×10{sup −7} Mpc{sup −3} mag{sup −1} for −23.09<M{sub 1450}<−22.09, which are ∼24% lower than that estimated by the conventional method. On the other hand, at z∼5, the 1σ confidence upper limit of the number density at −24.5<M{sub 1450}<−22.5 in our new estimates is ∼43% higher than that estimated previously. The results suggest that the luminosity dependence of the quasar spectrum and the IGM model are important for deriving the accurate number density of high-z quasars. Even taking these effects into account, the inferred LDDE of quasars is consistent with the AGN downsizing evolutionary picture.

79 ASTRONOMY AND ASTROPHYSICS↗

HectoMAP: The Complete Redshift Survey (Data Release 2)

HectoMAP is a dense redshift survey of 95,403 galaxies based primarily on MMT spectroscopy with a median redshift z = 0.345. The survey covers 54.64 deg 2 in a 1$_{.}^{°}$5 wide strip across the northern sky centered at a decl. of 43$_{.}^{°}$25. We report the redshift, the spectral indicator D n 4000, and the stellar mass. The red-selected survey is 81% complete for 55,962 galaxies with (g - r) > 1 and r < 20.5; it is 72% complete for 32,908 galaxies with (g - r > 1, (r - i) > 0.5 and 20.5 < r < 21.3. Comparison of the survey basis SDSS photometry with the HSC-SSP photometry demonstrates that HectoMAP provides complete magnitude-limited surveys based on either photometric system. We update the comparison between the HSC-SSP photometric redshifts with HectoMAP spectroscopic redshifts; the comparison demonstrates that the HSC-SSP photometric redshifts have improved between the second and third data releases. HectoMAP is a foundation for examining the quiescent galaxy population (63% of the survey), clusters of galaxies, and the cosmic web. HectoMAP is completely covered by the HSC-SSP survey, thus enabling a variety of strong- and weak-lensing investigations.

79 ASTRONOMY AND ASTROPHYSICS↗

Geographic applications program: Reports completed and in preparation

The purpose of the present compilation is to bring together for ready reference a list of all reports, both completed and in preparation, resulting from NASA sponsorship of the geography program. Wherever possible, complete bibliographic citations are given. Since some of the 141 reports listed are not yet completed, citations can not all be in complete form. The reason for including incomplete citations is the sponsor's need for rather rapid feed-back of information so that it can have a bearing on on-going program planning. This should, therefore, be considered a working bibliography.

Alexander, R. H.↗

Complete the development and construction of a spaceborne hydrogen maser clock

The objective, to complete the development of an engineering model of a spaceborne hydrogen maser, was successfully achieved. A layout of the maser and detail drawings of the physics package was completed during the first 7 months of the contract. A computer model was made for the maser's thermal design. Using numerical computations, heater resistances were established for 7 temperature controlled zones. The physics package includes: a vacuum manifold that houses four sorption pumps capable of scavenging hydrogen for 4 years, a titanium vacuum tank housing the cavity, metallic seals for all vacuum joints, an RF dissociator within the vacuum envelope, a two-layer printed circuit solenoid and four layers of moly-permalloy magnetic shields. Problems were encountered and overcome in the procurements of the PC solenoid and the magnetic shields. After completion of the fabrication of the maser's components, the maser was assembled using these parts and other components made available by SAO, NRL, and NASA from earlier development work. In March, 1990, the vacuum system was assembled, and by May the maser assembly was completed. The magnetic shielding was poor and the shields were removed, reannealed by a local vendor, and the maser was reassembled. The maser began tests in early June and has been oscillating since that time. The test results of the maser are very good and a life test of the maser is being conducted. It is anticipated that the development and construction of a maser to be tested in space under a new contract from NASA's Marshall Space Flight Center will continue.

Vessot, Robert F. C.↗

Accelerated complete-linearization method for calculating NLTE model stellar atmospheres

Two approaches to accelerating the method of complete linearization for calculating NLTE model stellar atmospheres are suggested. The first one, the so-called Kantorovich variant of the Newton-Raphson method, consists of keeping the Jacobi matrix of the system fixed, which allows us to calculate the costly matrix inversions only a few times and then keep them fixed during the subsequent computations. The second method is an application of the Ng acceleration. Both methods are extremely easy to implement with any model atmosphere code based on complete linearization. It is demonstrated that both methods, and especially their combination, yield a rapidly and globally convergent algorithm, which takes 2 to 5 times less computer time, depending on the model at hand and the required accuracy, than the ordinary complete linearization. Generally, the time gain is more significant for more complicated models. The methods were tested for a broad range of atmospheric parameters, and in all cases they exhibited similar behavior. Ng acceleration applied on the Kantorovich variant thus offers a significant improvement of the standard complete-linearization method, and may now be used for calculating relatively involved NLTE model stellar atmospheres.

Hubeny, I.↗

Development of a Climatology of Vertically Complete Wind Profiles from Doppler Radar Wind Profiler Systems

This paper describes in detail the QC and splicing methodology for KSC's 50- and 915-MHz DRWP measurements that generates an extensive archive of vertically complete profiles from 0.20-18.45 km. The concurrent POR from each archive extends from April 2000 to December 2009. MSFC NE applies separate but similar QC processes to each of the 50- and 915-MHz DRWP archives. DRWP literature and data examination provide the basis for developing and applying the automated and manual QC processes on both archives. Depending on the month, the QC'ed 50- and 915-MHz DRWP archives retain 52-65% and 16-30% of the possible data, respectively. The 50- and 915-MHz DRWP QC archives retain 84-91% and 85-95%, respectively, of all the available data provided that data exist in the non- QC'ed archives. Next, MSFC NE applies an algorithm to splice concurrent measurements from both DRWP sources. Last, MSFC NE generates a composite profile from the (up to) five available spliced profiles to effectively characterize boundary layer winds and to utilize all possible 915-MHz DRWP measurements at each timestamp. During a given month, roughly 23,000-32,000 complete profiles exist from 0.25-18.45 km from the composite profiles' archive, and approximately 5,000- 27,000 complete profiles exist from an archive utilizing an individual 915-MHz DRWP. One can extract a variety of profile combinations (pairs, triplets, etc.) from this sample for a given application. The sample of vertically complete DRWP wind measurements not only gives launch vehicle customers greater confidence in loads and trajectory assessments versus using balloon output, but also provides flexibility to simulate different DOL situations across applicable altitudes. In addition to increasing sample size and providing more flexibility for DOL simulations in the vehicle design phase, the spliced DRWP database provides any upcoming launch vehicle program with the capability to utilize DRWP profiles on DOL to compute vehicle steering commands, provided the program applies the procedures that this report describes to new DRWP data on DOL. Decker et al. (2015) details how SLS is proposing to use DRWP data and splicing techniques on DOL. Although automation could enhance the current DOL 50-MHz DRWP QC process and could streamline any future DOL 915-MHz DRWP QC and splicing process, the DOL community would still require manual intervention to ensure that the vehicle only uses valid profiles. If a program desires to use high spatial resolution profiles, then the algorithm could randomly add high-frequency components to the DRWP profiles. The spliced DRWP database provides lots of flexibility in how one performs DOL simulations, and the algorithms that this report provides will assist the aerospace and atmospheric communities that are interested in utilizing the DRWP.

Barbre, Robert E., Jr.↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Completion of the Operational Closure of Tank 18F and Tank 19F at the Savannah River Site by Grouting - 13236

Radioactive waste is stored in underground waste tanks at the Savannah River Site (SRS). The low-level fraction of the waste is immobilized in a grout waste form, and the high level fraction is disposed of in a glass waste form. Once the waste is removed, the tanks are prepared for closure. Operational closure of the tanks consists of filling with grout for the purpose of chemically stabilizing residual material, filling the tank void space for long-term structural stability, and discouraging future intrusion. Two of the old-style single-shell tanks at the SRS have received regulatory approval confirming waste removal had been completed, and have been stabilized with grout as part of completing operational closure and removal from service. Consistent with the regulatory framework, two types of grout were used for the filling of Tanks 18F and 19F. Reducing grout was used to fill the entire volume of Tanks 18F and 19F (bulk fill grout) and a more flowable grout was used to fill equipment that was left in the tank (equipment fill grout). The reducing grout was added to the tanks using portable grout pumps filled from concrete trucks, and delivered the grout through slick lines to the center riser of each tank. Filling of the two tanks has been completed, and all equipment has been filled. The final capping of riser penetrations brings the operation closure of Tanks 18F and 19F to completion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Single visit completeness optimization

The Terrestrial Planet Finder Coronagraph (TPF-C) is a NASA pre-phase. A orbiting telescope with the goal of detecting and characterizing visible and near-IR light refelected from terrestrial planets. We use observational completeness, defined as the fraction of potentially observable planets that are detected, to determine how well the proposed telescope meets the mission goals. Single visit completeness is optimized by slecting the length of observation per target that maximizes the completeness for the ensemble of stars. In this memo we describe the integration time calculations and two approaches to single visit optimization.

optimization↗

HPC formulations of optimization algorithms for tensor completion

Tensor completion is a powerful tool used to estimate or recover missing values in multi-way data. It has seen great success in domains such as product recommendation and healthcare. Tensor completion is most often accomplished via low-rank sparse tensor factorization, a computationally expensive non-convex optimization problem which has only recently been studied in the context of parallel computing. In this work, we study three optimization algorithms that have been successfully applied to tensor completion: alternating least squares (ALS), stochastic gradient descent (SGD), and coordinate descent (CCD++). We explore opportunities for parallelism on shared- and distributed-memory systems and address challenges such as memory- and operation-efficiency, load balance, cache locality, and communication. Among our advancements are a communication-efficient CCD++ algorithm, an ALS algorithm rich in level-3 BLAS routines, and an SGD algorithm which combines stratification with asynchronous communication. Furthermore, we show that introducing randomization during ALS and CCD++ can accelerate convergence. We evaluate our parallel formulations on a variety of real datasets on a modern supercomputer and demonstrate speedups through 16384 cores. Further, these improvements reduce time-to-solution from hours to seconds on real-world datasets. We show that after our optimizations, ALS is advantageous on parallel systems of small-to-moderate scale, while both ALS and CCD++ provide the lowest time-to-solution on large-scale distributed systems.

97 MATHEMATICS AND COMPUTING↗

Robust Matrix Completion State Estimation in Distribution Systems

Due to the insufficient measurements in the distribution system state estimation (DSSE), full observability and redundant measurements are difficult to achieve without using the pseudo measurements. The matrix completion state estimation (MCSE) combines the matrix completion and power system model to estimate voltage by exploring the low-rank characteristics of the matrix. This paper proposes a robust matrix completion state estimation (RMCSE) to estimate the voltage in a distribution system under a low-observability condition. Tradition state estimation weighted least squares (WLS) method requires full observability to calculate the states and needs redundant measurements to proceed a bad data detection. The proposed method improves the robustness of the MCSE to bad data by minimizing the rank of the matrix and measurements residual with different weights. It can estimate the system state in a low-observability system and has robust estimates without the bad data detection process in the face of multiple bad data. The method is numerically evaluated on the IEEE 33-node radial distribution system. The estimation performance and robustness of RMCSE are compared with the WLS with the largest normalized residual bad data identification (WLS-LNR), and the MCSE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sample Complexity of Power System State Estimation Using Matrix Completion

In this paper, we propose an analytical framework to quantify the amount of data samples needed to obtain accurate state estimation in a power system - a problem known as sample complexity analysis in computer science. Motivated by the increasing adoption of distributed energy resources into the distribution-level grids, it becomes imperative to estimate the state of distribution grids in order to ensure stable operation. Traditional power system state estimation techniques mainly focus on the transmission network which involve solving an overdetermined system and eliminating bad data. However, distribution networks are typically underdetermined due to the large number of connection points and high cost of pervasive installation of measurement devices. In this paper, we consider the recently proposed state-estimation method for underdetermined systems that is based on matrix completion. In particular, a constrained matrix completion algorithm was proposed, wherein the standard matrix completion problem is augmented with additional equality constraints representing the physics (namely power-flow constraints). We analyze the sample complexity of this general method by proving an upper bound on the sample complexity that depends directly on the properties of these constraints that can lower number of needed samples as compared to the unconstrained problem. To demonstrate the improvement that the constraints add to state estimation, we test the method on a 141-bus distribution network case study and compare it to the traditional least squares minimization state estimation method.

24 POWER TRANSMISSION AND DISTRIBUTION↗