Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cargo”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Ram accelerator direct launch system for space cargo

The ram accelerator, a chemically-propelled mass driver, is presented as a new approach for directly launching acceleration-insensitive pay-loads into LEO. The cargo vehicle resembles the centerbody of a conventional ramjet and travels through a launch tube filled with a premixed gaseous fuel and oxidizer mixture. The tube acts as the outer cowling of the ramjet and the combustion process travels with the vehicle. Two modes of ram accelerator drive are described, which when used in sequence, are capable of accelerating the cargo vehicle to 10 km/sec. The requirements for placing a 2000 kg vehicle with 50 percent payload fraction into a 400 km orbit, with a minimum of on-board rocket propellant for circularization maneuvers, are examined. It is shown that aerodynamic heating during atmospheric transit results in very little ablation of the nose. Both direct and indirect orbital insertion scenarios are investigated, and a three-step maneuver consisting of two burns and aerobraking is found to minimize the on-board propellant mass. A scenario involving a parking orbit below the desired final orbit is suggested as a means to increase the flexibility of the mass launch concept.

Bruckner, A. P.↗

Design of a Thermal and Micrometeorite Protection System for an Unmanned Lunar Cargo Lander

The first vehicles to land on the lunar surface during the establishment phase of a lunar base will be unmanned lunar cargo landers. These landers will need to be protected against the hostile lunar environment for six to twelve months until the next manned mission arrives. The lunar environment is characterized by large temperature changes and periodic micrometeorite impacts. An automatically deployable and reconfigurable thermal and micrometeorite protection system was designed for an unmanned lunar cargo lander. The protection system is a lightweight multilayered material consisting of alternating layers of thermal and micrometeorite protection material. The protection system is packaged and stored above the lander common module. After landing, the system is deployed to cover the lander using a system of inflatable struts that are inflated using residual fuel (liquid oxygen) from the fuel tanks. Once the lander is unloaded and the protection system is no longer needed, the protection system is reconfigured as a regolith support blanket for the purpose of burying and protecting the common module, or as a lunar surface garage that can be used to sort and store lunar surface vehicles and equipment. A model showing deployment and reconfiguration of the protection system was also constructed.

Hernandez, Carlos A.↗

Winged cargo return vehicle. Volume 1: Conceptual design

The Advanced Design Project (ADP) allows an opportunity for students to work in conjunction with NASA and other aerospace companies on NASA Advanced Design Projects. The following volumes represent the design report: Volume 1 Conceptual Design; Volume 2 Wind Tunnel Tests; Volume 3 Structural Analysis; and Volume 4 Water Tunnel Tests. The project chosen by the University of Minnesota in conjunction with NASA Marshall Space Flight Center for this year is a Cargo Return Vehicle (CRV) to support the Space Station Freedom. The vehicle is the third generation of vehicles to be built by NASA, the first two being the Apollo program, and the Space Shuttle program. The CRV is to work in conjunction with a personnel launch system (PLS) to further subdivide and specialize the vehicles that NASA will operate in the year 2000. The cargo return vehicle will carry payload to and from the Space Station Freedom (SSF).

Source record↗

Biconic cargo return vehicle with an advanced recovery system. Volume 1: Conceptual design

The conceptual design of the biconic Cargo Return Vehicle (CRV) is presented. The CRV will be able to meet all of the Space Station Freedom (SSF's) resupply needs. Worth note is the absence of a backup recovery chute in case of Advanced Recovery System (ARS) failure. The high reliability of ram-air parachutes does not warrant the penalty weight that such a system would create on successful missions. The CRV will launch vertically integrated with an Liquid Rocket Booster (LRB) vehicle and meets all NASA restrictions on fuel type for all phases of the mission. Because of the downscaled Orbital Maneuvering Vehicle (OMV) program, the CRV has been designed to be able to transfer cargo by docking directly to the Space Station Freedom as well as with OMV assistance. The CRV will cover enough crossrange to reach its primary landing site, Edwards Airforce Base, and all secondary landing sites with the exception of one orbit. Transportation back to KSC will be via the Boeing Super Guppy. Due to difficulties with man-rating the CRV, it will not be used in a CERV role. A brief summary of the CRV's specifications is given.

Source record↗

Launch packaging options for the PV power module cargo element

NASA recently embarked on the Space Station Freedom program, which will utilize the Shuttle Orbiter for transportation to orbit. Each flight is unique in terms of the hardware that is manifested and the method by which it is integrated to form viable cargo elements. Various constraints determine the packaging options for the three PV power module combined assemblies. Several packaging options for the PV power module cargo element are presented. These options are discussed in terms of their impact on the overall flight hardware manifest as determined by the various constraints.

Hoberecht, Mark A.↗

Advanced propulsion options for the Mars cargo mission

Several advanced propulsion options for a split-mission piloted Mars exploration scenario are presented. The primary study focus is on identifying concepts that can reduce total initial mass in low earth orbit (IMLEO) for the cargo delivery portion of the mission; in addition, concepts that can reduce the trip time of the piloted option are assessed. The propulsion options considered are nuclear thermal propulsion, solar sails, multimegawatt-class nuclear electric propulsion, solar electric propulsion, magnetic sails, mass drivers, rail guns, solar thermal rockets, beamed-energy propulsion systems, and tethers. For the cargo mission, solar sails are found to provide the greatest mass savings over the baseline chemical system, although they suffer from having very long trip times; a good performance compromise between a low IMLEO and a short trip time can be obtained using multimegawatt-class nuclear electric propulsion systems.

Frisbee, Robert H.↗

Biconic cargo return vehicle with an advanced recovery system

The current space exploration initiative is focused around the development of the Space Station Freedom (SSF). Regular resupply missions must support a full crew on the station. The present mission capability of the shuttle is insufficient, making it necessary to find an alternative. One alternative is a reusable Cargo Return Vehicle (CRV). The suggested design is a biconic shaped, dry land recovery CRV with an advance recovery system (ARC). A liquid rocket booster will insert the CRV into a low Earth orbit. Three onboard liquid hydrogen/liquid oxygen engines are used to reach the orbit of the station. The CRV will dock to the station and cargo exchange will take place. Within the command and control zone (CCZ), the CRV will be controlled by a gaseous nitrogen reaction control system (RCS). The CRV will have the capability to exchange the payload with the Orbital Maneuvering Vehicle (OMV). The bent biconic shape will give the CRV sufficient crossrange to reach Edwards Air Force Base and several alternative sites. Near the landing site, a parafoil-shaped ARS is deployed. The CRV is designed to carry a payload of 40 klb, and has an unloaded weight of 35 klb.

Source record↗

Cargo transfer vehicle - An element of the National Launch System

The paper describes the cargo transport vehicle (CTV), a rendezvous- and capture-capable on-orbit maneuvering stage of the NASA/DOD National Launch System (NLS) developed for off-loading the Space Shuttle for cargo delivery to the Space Station Freedom. Special attention is given to the background of the NLS CTV technology, a typical Space Station delivery mission profile, the design features of the payload accommodation system, and the forward propulsion module. The feasibility of the CTV functioning as an upper stage, in addition to acting as an on-orbit maneuvering system, is being presently considered.

Buchanan, Harry↗

Cargo vehicle architecture options

The sessions featured are: (1) the earth-to-orbit cargo; (2) the manned earth-to-orbit cargo systems; (3) the manned transfer vehicles; and (4) the advanced propulsion.

Austin, R. Eugene↗

Advanced cargo aircraft may offer a potential renaissance in freight transportation

The increasing demand for air freight transportation has prompted studies of large, aerodynamically efficient cargo-optimized aircraft capable of carrying intermodal containers, which are typically 8 x 8 x 20 ft. Studies have accordingly been conducted within NASA to ascertain the specifications and projected operating costs of such a vehicle, as well as to identify critical, development-pacing technologies. Attention is here given not only to the rather conventional, 10-turbofan engined configuration thus arrived at, but numerous innovative configurations featuring such concepts as spanloading, removable cargo pods, and ground effect.

Morris, Shelby J.↗

Software For Nearly Optimal Packing Of Cargo

PACKMAN computer program used to find nearly optimal arrangements of cargo items in storage containers, subject to such multiple packing objectives as utilization of volumes of containers, utilization of containers up to limits on weights, and other considerations. Automatic packing algorithm employed attempts to find best positioning of cargo items in container, such that volume and weight capacity of container both utilized to maximum extent possible. Written in Common LISP.

Fennel, Theron R.↗

Gemini: A long-range cargo transport

The proposed Gemini, a long-range cargo transport, is designed as a high capacity, dedicated cargo transporter of 8'x8'x20' inter-modal containers, and long-range design. These requirements will result in a design that is larger than any existing aircraft. Due to the size, a conventional configuration would result in an aircraft unable to operate economically at existing airports. It is necessary to design for a minimum possible empty weight, wingspan, and landing gear track. After considering both a single fuselage biplane and a double fuselage biplane configuration, the design team choose the double fuselage biplane configuration. Both of these configuration choices result in a reduced wing root bending moment and subsequently in substantial savings in the wing weight. An overall decrease in the weight of the airplane, its systems, and fuel will be a direct result of the wing weight savings.

Source record↗

The Challenge to Advanced Cargo Aircraft Systems

The successful synthesis of all-new advanced cargo aircraft system concepts which can compete economically with less advanced additional, or derivative, aircraft from programs initiated earlier is a difficult task in view of the adverse impact of inflation and other economic factors on later programs. Reasonable projections promise technologically superior concepts. The adverse impact of continuing inflation on relative economic performance, however, must be carefully considered. A conflict between minimizing fuel usage and achieving best economics is also addressed. Some potential solutions for future all-new cargo systems are examined.

Cleveland, F. A.↗

Flight Schedule and the Circadian Clock Influence on Sleep Loss During Overnight Cargo Operations

Thirty-four flight crew members were monitored before, during, and after two 8-day overnight cargo duty patterns which involved multiple flights at night crossing no more than one time zone per 24 h. Rectal temperature, heart rate, and wrist activity were recorded every 2 min. Sleep quantity and quality, and nap timing, were noted in a logbook. To reduce the masking effects of physical activity on temperature, 0.28 C was added to each subject's raw temperature data whenever he reported being asleep. For both masked and unmasked data, daily temperature minima were estimated from the multiple complex demodulated waveform. The temperature minima did not show a progressive adaptation to night duty, which was interrupted by a night off after 5 nights on one trip pattern and after 3 nights on the other. On duty days, the average temperature minimum delayed by about 3 h, occurring near the end of the duty period. Daytime sleep episodes averaged 2.9 h shorter than nighttime sleep episodes, and were rated as lighter, less restorative, and poorer overall. Fifty-three percent of subjects slept more than once per 24 h while they were on night duty, compared to 17% when able to sleep at night. The total sleep per 24 h on duty days averaged 1.2 h less than pretrip. Twenty-nine percent of subjects lost more than 2 h of sleep per 24 h across the 8-day duty patterns. After night duty, subjects awoke around 1400 local time, even when they had slept 2-3 h less than a normal nocturnal sleep episode. Consequently, the duration of morning sleep episodes was correlated with the off-duty time (multiple r(sup 2)=0.44, F=37.23, p less than 0.0001). Anecdotally, crew members complained of being unable to sleep longer and not feeling well-rested. These wakeups were clustered 6 h after the temperature minimum, which suggests that they may have been a response to the circadian wakeup signal. Daytime layovers in which crew members were able to sleep again in the evening ended later (0200-0300) and were longer (average 19.2 h versus 14.8 h) than those in which they slept only once in the morning. Overnight cargo crew members are working around the time of the circadian nadir with an accumulating sleep debt. Two scheduling factors affect sleep loss during these operations: how long before the circadian wakeup signal crew members come off duty, and whether the layover lasts long enough to permit a second sleep episode in the early evening.

Gander, Philippa H.↗

Integration of Launch Vehicle Simulation/Analysis Tools and Lunar Cargo Lander Design

Simulation and analysis of vehicle performance is essential for design of a new launch vehicle system. It is more and more demand to have an integrated, highly efficient, robust simulation tool with graphical user interface (GUI) for vehicle performance and simulations. The objectives of this project are to integrate and develop launch vehicle simulation and analysis tools in MATLAB/Simulink under PC Platform, to develop a vehicle capable of being launched on a Delta-IV Heavy Launch Vehicle which can land on the moon with the goal of pre-implanting cargo for a new lunar mission, also with the capability of selecting other launch vehicles that are capable of inserting a payload into Trans-Lunar Injection (TLI). The vehicle flight simulation software, MAVERIC-II (Marshall Aerospace VEhicle Representation In 'C'), developed by Marshall Space Flight Center was selected as a starting point for integration of simulation/analysis tools. The goals are to convert MAVERIC-II from UNIX to PC platform and build input/output GUI s in the MATLAB environment, and then integrate them under MATLAB/Simulink with other modules. Currently, MAVERIC-II has been successfully converted from UNIX to PC using Microsoft Services for UNIX subsystem on PC. Input/Output GUI's have been done for some key input/output files. Calling MAVERIC-II from Simulink has been tested. Details regarding Lunar Cargo Lander Design are described in Part 2/2 of the paper on page X-1.

Shiue, Yeu-Sheng Paul↗

External Cargo Integration Overview

This viewgraph presentation reviews the system integration efforts for external cargo for the International Space Station (ISS). The role and responsibility of the External Carriers Ofice is reviewed. The presentation also reviews the application of the office to the Commercial Cargo Services contract.

Gueera, Alan↗

Powering Exploration: The Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA)'s Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. The Ares Projects continue to make progress toward design, component testing, and early flight testing of the Ares I crew launch vehicle, as well as early design work for Ares V cargo launch vehicle. Ares I and Ares V will form the core space launch capabilities the United States needs to continue its pioneering tradition as a spacefaring nation. This paper will discuss programmatic, design, fabrication, and testing progress toward building these new launch vehicles.

Cook, Stephen A.↗

Taking the Next Steps: The Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA)'s Constellation Program is depending on the Ares Projects Office (APO) to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon, Mars, and beyond. The APO continues to make progress toward design, component testing, and early flight testing of the Ares I crew launch vehicle, as well as early design work for the Ares V cargo launch vehicle. Ares I and Ares V will form the core space launch capabilities that the United States needs to continue its pioneering tradition as a spacefaring nation (Figure 1). This paper will discuss design, fabrication, and testing progress toward building these new launch vehicles.

Cook, Stephen A.↗