The advantages of cost plus award fee contracts

A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

Keathley, William C.↗

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗

Development of a Space Vehicle Electromagnetic Interference/compatibility Specification. Volume 3 - System Specification

This specification represents a new approach to controlling electromagnetic interference. In this approach the system integration contractor will be responsible for the development of discrete specification limits to be utilized on the program to which this specification is applied. The specification limits imposed upon subsystem contractors will be developed by the use of a computer program, available from the procuring agency, which is designed to consider the total system electromagnetic environment in the computation of these limits. The integration contractor will be required to mathematically model those circuits which represent required emitters and receptors of electromagnetic energy on the space vehicle. There are contained herein, a list of available computer models into which must be inserted particular parameters of the spacecraft subsystems. These functional models, when inserted into the computer program, will develop discrete specification limits based upon the requirements of the particular system modelled.

Cooperstein, B. D.↗

Skylab checkout operations

The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.

Timmons, K. P.↗

Summary and evaluation of the parametric study of potential early commercial MHD power plants (PSPEC)

Two parallel contracted studies were conducted. Each contractor investigated three base cases and parametric variations about these base cases. Each contractor concluded that two of the base cases (a plant using separate firing of an advanced high temperature regenerative air heater with fuel from an advanced coal gasifier and a plant using an intermediate temperature metallic recuperative heat exchanger to heat oxygen enriched combustion air) were comparable in both performance and cost of electricity. The contractors differed in the level of their cost estimates with the capital cost estimates for the MHD topping cycle and the magnet subsystem in particular accounting for a significant part of the difference. The impact of the study on the decision to pursue a course which leads to an oxygen enriched plant as the first commercial MHD plant is described.

Staigner, P. J.↗

A correlation study of X-29A aircraft and associated analytical development

Results of the contractor structural and aerodynamic analysis of the X-29A aircraft are verified. A brief history and potential advantages of the X-29A aircraft are discussed. The NASA developed computer package, STARS (STructures, Aerodynamics, and Related Systems), which is used in verifying contractor results is discussed. Enhancements of the STARS package are described, particularly the incorporation of the FASTEX computer program under STARS, and the development of a complete computer graphics system. A comparative study of free vibration and aerodynamic analysis of the X-29A aircraft is given. This study has shown that the natural frequencies and modeshapes determined analytically by STARS and the contractor compare relatively well with experimentally determined data. Also included in the study is the formulation and development of the higher-order plane-stress finite dynamic triangular element.

Ahmadi, Ali↗

Multi-megawatt inverter/converter technology for space power applications

Large power conditioning mass reductions will be required to enable megawatt power systems envisioned by the Strategic Defense Initiative, the Air Force, and NASA. Phase 1 of a proposed two phase interagency program has been completed to develop an 0.1 kg/kW DC/DC converter technology base for these future space applications. Three contractors, Hughes, General Electric (GE), and Maxwell were Phase 1 contractors in a competitive program to develop a megawatt lightweight DC/DC converter. Researchers at NASA Lewis Research Center and the University of Wisconsin also investigated technology in topology and control. All three contractors, as well as the University of Wisconsin, concluded at the end of the Phase 1 study, which included some critical laboratory work, that 0.1-kg/kW megawatt DC/DC converters can be built. This is an order of magnitude lower specific weight than is presently available. A brief description of each of the concepts used to meet the ambitious goals of this program are presented.

Myers, Ira T.↗

Orbital transfer rocket engine technology: Advanced engine study

An advanced LOX/LH2 engine study for the use of NASA and vehicle prime contractors in developing concepts for manned missions to the Moon, Mars, and Phobos is documented. Parametric design data was obtained at five engine thrusts from 7.5K lbf to 50K lbf. Also, a separate task evaluated engine throttling over a 20:1 range and operation at a mixture ratio of 12 plus or minus 1 versus the 6 plus or minus 1 nominal. Cost data was also generated for DDT&E, first unit production, and factors in other life cycle costs. The major limitation of the study was lack of contact with vehicle prime contractors to resolve the issues in vehicle/engine interfaces. The baseline Aerojet dual propellant expander cycle was shown capable of meeting all performance requirements with an expected long operational life due to the high thermal margins. The basic engine design readily accommodated the 20:1 throttling requirement and operation up to a mixture ratio of 10 without change. By using platinum for baffled injector construction the increased thermal margin allowed operation up to mixture ratio 13. An initial engine modeling with an Aerojet transient simulation code (named MLETS) indicates stable engine operation with the baseline control system. A throttle ratio of 4 to 5 seconds from 10 percent to 100 percent thrust is also predicted. Performance predictions are 483.1 sec at 7.5K lbf, 487.3 sec at 20K lbf, and 485.2 sec at 50K lbf with a mixture ratio of 6 and an area ratio of 1200. Engine envelopes varied from 120 in. length/53 in. exit diameter at 7.5K lbf to 305 in. length/136 in. exit diameter at 50 K lbf. Packaging will be an important consideration. Continued work is recommended to include more vehicle prime contractor/engine contractor joint assessment of the interface issues.

Hayden, Warren R.↗

Fingerprinting of Materials

Recent issues emerging in our fiscal and ecological environments have promulgated that federal agencies shall promote activities which respond to the improvement of both. In response to these developments, the National Aeronautics and Space Administration (NASA) has undertaken an innovative approach to improve the control of materials used in all NASA manufacturing activities. In concert with this goal, NASA is requiring that its contractors and their sub-contractors perform a more intensive consolidation of technologies that can provide an accounting of materials, which includes in-coming materials, materials in process, end-products and waste materials. The purpose of this handbook is to provide guidelines to NASA and its contractor personnel for the planning and implementation of chemical fingerprinting programs and to illustrate the chemical and statistical fundamentals needed for successful use of chemical fingerprinting.

Workman, Gary L↗

New developments in NASA quality assurance

The purpose of this talk is to examine and discuss NASA's basic quality concept, the policy and procedures which define and implement this concept and subsequently explore the NASA-Industry quality relationships which are essential to the success of NASA's quality assurance concept. It is important to emphasize that NASA's Quality Assurance program is predicated on the concept of an individually tailored quality program for each significant NASA procurement - particularly, large space systems. As a result, NASA's Quality Assurance program - to be effective - must be responsive to various technologies, hardware systems, and space missions. In addition, the program must be responsive to changing policies and practices in research, engineering and procurement. Key issues in the NASA-Contractor quality relationships in the framework of an over all NASA-Industry partnership include: (1) the necessity for NASA to effectively discharge its responsibility for providing clear and complete definition of quality requirements at all phases of the procurement cycle; (2) the right of the contractor to expect an explicit definition of NASA quality requirements in each RFP and contract and to request same if it is not provided; (3) the necessity for the contractor to have a dynamic and responsive quality program which is directed towards assuring that the hardware meets all technical requirements and to accomplish this in an effective and efficient manner; and (4) the critical need for investigation and study of the economic aspects of quality and an evaluation of our policies and practices based upon the results of such a study.

Condon, John E.↗

Kennedy Space Center's NASA/Contractor Team-Centered Total Quality Management Seminar: Results, methods, and lessons learned

It is apparent to everyone associated with the Nation's aeronautics and space programs that the challenge of continuous improvement can be reasonably addressed only if NASA and its contractors act together in a fully integrated and cooperative manner that transcends the traditional boundaries of proprietary interest. It is, however, one thing to assent to the need for such integration and cooperation; it is quite another thing to undertake the hard tasks of turning such a need into action. Whatever else total quality management is, it is fundamentally a team-centered and team-driven process of continuous improvement. The introduction of total quality management at KSC, therefore, has given the Center a special opportunity to translate the need for closer integration and cooperation among all its organizations into specific initiatives. One such initiative that NASA and its contractors have undertaken at KSC is a NASA/Contractor team-centered Total Quality Management Seminar. It is this seminar which is the subject of this paper. The specific purposes of this paper are to describe the following: Background, development, and evolution of Kennedy Space Center's Total Quality Management Seminar; Special characteristics of the seminar; Content of the seminar; Meaning and utility of a team-centered design for TQM training; Results of the seminar; Use that one KSC contractor, EG&G Florida, Inc. has made of the seminar in its Total Quality Management initiative; and Lessons learned.

Kinlaw, Dennis C.↗

NASA Johnson Space Center: Total quality partnership

The development of and benefits realized from a joint NASA, support contractor continuous improvement process at the Johnson Space Center (JSC) is traced. The joint effort described is the Safety, Reliability, and Quality Assurance Directorate relationship with its three support contractors which began in early 1990. The Continuous Improvement effort started in early 1990 with an initiative to document and simplify numerous engineering change evaluation processes. This effort quickly grew in scope and intensity to include process improvement teams, improvement methodologies, awareness, and training. By early 1991, the support contractor had teams in place and functioning, program goals established and a cultural change effort underway. In mid-l991 it became apparent that a major redirection was needed to counter a growing sense of frustration and dissatisfaction from teams and managers. Sources of frustration were isolated to insufficient joint participation on teams, and to a poorly defined vision. Over the next year, the effort was transformed to a truly joint process. The presentation covers the steps taken to define vision, values, goals, and priorities and to form a joint Steering Committee and joint process improvement teams. The most recent assessment against the President's award criteria is presented as a summary of progress. Small, but important improvement results have already demonstrated the value of the joint effort.

Harlan, Charlie↗

Toxic substances registry system: Index of material safety data sheets

The Material Safety Data Sheets (MSDS's) listed in this index reflect product inventories and associated MSDS's which were submitted to the Toxic Substances Registry database maintained by the Base Operations Contractor at the Kennedy Space Center. The purpose of this index is to provide KSC government, contractor, and tenant organizations a means to access information on the hazards associated with these chemicals. The Toxic Substance Registry Service (TSRS) was established to manage information dealing with the storage and use of toxic and otherwise hazardous materials at KSC. As a part of this service, the BOC Environmental Health Services maintains a central repository of MSDS's which were provided to TSRS. The data on the TSRS are obtained from NASA, contractor, and tenant organizations who use or store hazardous materials at KSC. It is the responsibility of these organizations to conduct inventories, obtain MSDS's, distribute Hazard Communication information to their employees, and otherwise implement compliance with appropriate Federal, State, and NASA Hazard Communication and Worker Right-to-Know regulations and policies.

Source record↗

Towards the formal specification of the requirements and design of a processor interface unit

Work to formally specify the requirements and design of a Processor Interface Unit (PIU), a single-chip subsystem providing memory interface, bus interface, and additional support services for a commercial microprocessor within a fault-tolerant computer system, is described. This system, the Fault-Tolerant Embedded Processor (FTEP), is targeted towards applications in avionics and space requiring extremely high levels of mission reliability, extended maintenance free operation, or both. The approaches that were developed for modeling the PIU requirements and for composition of the PIU subcomponents at high levels of abstraction are described. These approaches were used to specify and verify a nontrivial subset of the PIU behavior. The PIU specification in Higher Order Logic (HOL) is documented in a companion NASA contractor report entitled 'Towards the Formal Specification of the Requirements and Design of a Processor Interfacs Unit - HOL Listings.' The subsequent verification approach and HOL listings are documented in NASA contractor report entitled 'Towards the Formal Verification of the Requirements and Design of a Processor Interface Unit' and NASA contractor report entitled 'Towards the Formal Verification of the Requirements and Design of a Processor Interface Unit - HOL Listings.'

Fura, David A.↗

Report of the Space Shuttle Management Independent Review Team

At the request of the NASA Administrator a team was formed to review the Space Shuttle Program and propose a new management system that could significantly reduce operating costs. Composed of a group of people with broad and extensive experience in spaceflight and related areas, the team received briefings from the NASA organizations and most of the supporting contractors involved in the Shuttle Program. In addition, a number of chief executives from the supporting contractors provided advice and suggestions. The team found that the present management system has functioned reasonably well despite its diffuse structure. The team also determined that the shuttle has become a mature and reliable system, and--in terms of a manned rocket-propelled space launch system--is about as safe as today's technology will provide. In addition, NASA has reduced shuttle operating costs by about 25 percent over the past 3 years. The program, however, remains in a quasi-development mode and yearly costs remain higher than required. Given the current NASA-contractor structure and incentives, it is difficult to establish cost reduction as a primary goal and implement changes to achieve efficiencies. As a result, the team sought to create a management structure and associated environment that enables and motivates the Program to further reduce operational costs. Accordingly, the review team concluded that the NASA Space Shuttle Program should (1) establish a clear set of program goals, placing a greater emphasis on cost-efficient operations and user-friendly payload integration; (2) redefine the management structure, separating development and operations and disengaging NASA from the daily operation of the space shuttle; and (3) provide the necessary environment and conditions within the program to pursue these goals.

Source record↗

Advanced Orion Optimized Laser System Analysis

Contractor shall perform a complete analysis of the potential of the solid state laser in the very long pulse mode (100 ns pulse width, 10-30 hz rep-rate) and in the very short pulse mode (100 ps pulse width 10-30 hz rep rate) concentrating on the operation of the device in the 'hot-rod' mode, where no active cooling the laser operation is attempted. Contractor's calculations shall be made of the phase aberrations which develop during the repped-pulse train, and the results shall feed into the adaptive optics analyses. The contractor shall devise solutions to work around ORION track issues. A final report shall be furnished to the MSFC COTR including all calculations and analysis of estimates of bulk phase and intensity aberration distribution in the laser output beam as a function of time during the repped-pulse train for both wave forms (high-energy/long-pulse, as well as low-energy/short-pulse). Recommendations shall be made for mitigating the aberrations by laser re-design and/or changes in operating parameters of optical pump sources and/or designs.

Source record↗

An optimal user-interface for EPIMS database conversions and SSQ 25002 EEE parts screening

The Electrical, Electronic, and Electromechanical (EEE) Parts Information Management System (EPIMS) database was selected by the International Space Station Parts Control Board for providing parts information to NASA managers and contractors. Parts data is transferred to the EPIMS database by converting parts list data to the EP1MS Data Exchange File Format. In general, parts list information received from contractors and suppliers does not convert directly into the EPIMS Data Exchange File Format. Often parts lists use different variable and record field assignments. Many of the EPES variables are not defined in the parts lists received. The objective of this work was to develop an automated system for translating parts lists into the EPIMS Data Exchange File Format for upload into the EPIMS database. Once EEE parts information has been transferred to the EPIMS database it is necessary to screen parts data in accordance with the provisions of the SSQ 25002 Supplemental List of Qualified Electrical, Electronic, and Electromechanical Parts, Manufacturers, and Laboratories (QEPM&L). The SSQ 2S002 standards are used to identify parts which satisfy the requirements for spacecraft applications. An additional objective for this work was to develop an automated system which would screen EEE parts information against the SSQ 2S002 to inform managers of the qualification status of parts used in spacecraft applications. The EPIMS Database Conversion and SSQ 25002 User Interfaces are designed to interface through the World-Wide-Web(WWW)/Internet to provide accessibility by NASA managers and contractors.

Watson, John C.↗