Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned

Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operating supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Update on Construction Planning for the Bulgarian Low and Short-Lived Intermediate Level Radioactive Waste Repository - 16159

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for low and short-lived inter-mediate level radioactive waste, the National Disposal Facility (NDF), at the Radiana Site adjacent to the Kozloduy Nuclear Power Plant (KNPP). This paper presents an update on construction planning activities that were originally presented at the 2015 Waste Management Conference. The Site, a rectangular area approximately 1.2 km east-west by 0.4 north-south, is located on a slopping area between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. Construction of the NDF will be divided into three phases separated by approximately 20 years each. The first phase will see the construction of the primary support facilities, referred to as the Auxiliary Buildings and including the Waste Reception and Buffer Storage (WRBS) Building, and the first set of 22 reinforced concrete disposal cells and supporting infrastructure, including a network of subsurface observation galleries, the Infiltration Network Control (ICN) Galleries. Each disposal cell will be 20.15 m long by 17.05 m wide by 9.45 m in height. The disposal cells will be arranged in two parallel rows. Disposal activities will be conducted using overhead cranes installed inside of track mounted mobile roofs. Each row of disposal cells will be serviced by one mobile roof. The mobile roofs will be supported by massive concrete foundations. Construction at the site will present several logistical challenges that will need to be overcome to fully realize the NDF. First in order to begin construction of these facilities nearly 1 million m{sup 3} of soil will require excavation and handling. Consistent with requirements to minimize potential environmental impacts identified in the site Environmental Safety Assessment (EIA) excavated soil will, to the extent possible, remain onsite. Approximately three quarters of the soil can be accommodated within the site boundaries. Another challenge results from requirements imposed by the ground conditions. The sub-grade at the site, which consists primarily of loess, will require considerable improvement. To this end a 5 m thick loess-cement cushion will be constructed across much of the site. Specifically, the cushion will be required beneath the disposal cells and the WRBS Building. The cushion beneath the disposal cells also contains embedded structures, including the ICN Galleries as well as the massive concrete foundation beams required for the two mobile roofs. Construction of these structures will require planned interruptions in the construction of the loess-cement cushion. Specific cement types and strict quality requirements will be required for completion of the loess-cement cushion as well as for the completion of the ICN Galleries. The construction planning will need to account for the large volumes of soil to be excavated as well as ensuring sufficient material supplies in terms of both quality as well as quantity. Large quantities of materials including both dry cement for mixing with the loess, and wet concrete for pouring of the mobile roof foundations are ac-counted for by the plan. However, even after completion of these activities additional challenges are addressed by the plan related to the contemporaneous construction management of the auxiliary buildings and the disposal cells. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bottleneck Detection in Modular Construction Factories Using Computer Vision

The construction industry is increasingly adopting off-site and modular construction methods due to the advantages offered in terms of safety, quality, and productivity for construction projects. Despite the advantages promised by this method of construction, modular construction factories still rely on manually-intensive work, which can lead to highly variable cycle times. As a result, these factories experience bottlenecks in production that can reduce productivity and cause delays to modular integrated construction projects. To remedy this effect, computer vision-based methods have been proposed to monitor the progress of work in modular construction factories. However, these methods fail to account for changes in the appearance of the modular units during production, they are difficult to adapt to other stations and factories, and they require a significant amount of annotation effort. Due to these drawbacks, this paper proposes a computer vision-based progress monitoring method that is easy to adapt to different stations and factories and relies only on two image annotations per station. In doing so, the Scale-invariant feature transform (SIFT) method is used to identify the presence of modular units at workstations, and the Mask R-CNN deep learning-based method is used to identify active workstations. This information was synthesized using a near real-time data-driven bottleneck identification method suited for assembly lines in modular construction factories. This framework was successfully validated using 420 h of surveillance videos of a production line in a modular construction factory in the U.S., providing 96% accuracy in identifying the occupancy of the workstations and an F-1 Score of 89% in identifying the state of each station on the production line. The extracted active and inactive durations were successfully used via a data-driven bottleneck detection method to detect bottleneck stations inside a modular construction factory. The implementation of this method in factories can lead to continuous and comprehensive monitoring of the production line and prevent delays by timely identification of bottlenecks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures

This project aimed to reduce the field construction times and fabrication costs of reinforced concrete (RC) nuclear structures through the use of: 1) high-strength steel deformed reinforcing bar (rebar); 2) prefabricated high-strength rebar (HSR) assemblies with headed anchorages; and 3) high-strength concrete (HSC). The focus of the project was not to develop new innovations on materials, but rather to fill a major knowledge gap on the effectiveness, code conformity, and viability (i.e., practicality, commercial availability) of existing high-strength materials in nuclear structures, especially in shear walls, their connections/joints, and around penetrations. These advances promote the Nuclear Energy Enabling Technologies Advanced Methods for Manufacturing (NEET-1) goals of accelerating deployment schedules by at least 6 months and reducing component fabrication costs by 20% or more. Toward this vision, the following objectives were identified and completed: Develop limit-benefit and cost-benefit analysis frameworks: The structural and economic limits and benefits of HSR and HSC in nuclear walls were evaluated. Importantly, it was found that modest increases in concrete strength up to 10.0 ksi and rebar yield strength up to 100 ksi result in the most economic designs and improved structural performance (Barbachyn et al., 2017a and Barbachyn et al., 2017b). Also, an industry survey was distributed to determine the cost benefits associated with prefabrication. Importantly, on-site worker-hours are significantly reduced, allowing for significantly accelerated construction schedules (Devine et al. 2018b). Develop an optimization methodology for structural design: An optimization study was deemed not necessary since the trivial solution with maximized use of high-strength materials and prefabrication always resulted in the largest cost and time savings. Instead, the benefits (and limits) of high-strength materials and prefabrication on construction costs and on-site construction time were investigated through a parametric study. Cost-reductions through the use of HSR and HSC were found to be greater than 40%. Also, on-site construction time of nuclear shear walls can be reduced by up to 83% through the use of prefabricated rebar assemblies. Conduct experimental evaluations of nuclear shear walls and wall-foundation joints: A large scale experimental program was completed on shear-critical RC cantilever deep beams. From these experiments, it was demonstrated that increasing rebar yield strength had a greater effect on increasing lateral strength than increasing the concrete compressive strength. Further, using HSR together with HSC resulted in the highest lateral strength and displacement ductility (Devine et al. 2018a). Additionally, large-scale reversed-cyclic lateral load tests were conducted on RC shear walls. It was demonstrated that through the utilization of HSR and HSC, a wall with 55% reduced vertical and horizontal rebar area was able to achieve 91% of the peak lateral strength of a conventional wall using state-of-practice materials with the same geometry. Further, trim reinforcement with headed anchorages around the penetrations proved to be effective. Develop validated numerical simulation models: Numerical modeling was completed in two phases during this project using 3 different finite element software packages. The first phase used existing measured data from previous experimental studies on stocky RC walls to validate simplified predictive models. Models using two different programs were validated based on a database of 38 stocky walls (Barbachyn et al., 2017a). The second phase occurred after experimental testing using a third and more detailed finite element package. Prediction improvements for the initial stiffness, lateral deformations, damage propagation, and failure mechanisms were targeted. The resulting detailed models more accurately predicted the peak lateral strength, initial and secant stiffnesses, lateral deformations, and cracking patterns of the wall test specimens subjected to reversed-cyclic lateral loading as compared to the simplified pretest models. Develop validated design procedures, tools, and criteria: This project evaluated the accuracy of existing closed-form design equations from U.S. building design standards and previous research (Barbachyn et al. 2017a and Devine et al. 2018a). It was shown that the current predictive equations for shear strength capacity need to be revisited as they provide significant scatter and gross overestimates, indicating the potential for unconservative designs. Further, for both the deep beam and shear wall specimens, the numerical models and flexural capacity predictions provided the most accurate strength predictions. Develop cost-effective field construction procedures: To promote the use of prefabricated rebar assemblies, the following construction conditions where prefabrication would be used instead of in-place rebar tying were identified from an industry survey: 1) to save on construction schedule; 2) to improve safety and/or quality control; 3) for areas with heavy rebar congestion; and 4) for structures with significant repetition in rebar layout. All of these conditions directly apply and benefit nuclear construction where construction costs and schedules are extensive, safety and quality are of utmost importance, the reinforcement is extremely dense, and the reinforcement layout is repetitive in many regions of the shear walls. Additionally, an experimental study was conducted to investigate the changes in bar spacing (with respect to code-required rebar spacing and placement tolerances) when a horizontally assembled prefabricated two-dimensional (2D) rebar mat or three-dimensional (3D) rebar cage is lifted (or tripped) to a vertical position. It was found that the bars involved in both the lateral translation of the rebar assemblies (i.e., movement of the assembly in its horizontal position) and the tripping process were most susceptible to large spacing changes, and thus, their positions within the assembly would need to be checked after the placement of the assembly in place within the formwork. Importantly, the spacings of all of the other bars in the assembly were not affected significantly by the lateral translation and tripping process, thereby eliminating the need to recheck their positions within the assembly (Devine et al. 2018b).

36 MATERIALS SCIENCE↗

A comparative method of air emission impact assessment for building construction activities

Highlights: • Impact assessment comparisons for various construction activities are presented. • Impacts of activities are compared from global, regional and local perspectives. • Excavation related activities have the highest POFP impact contributions at local level. • Material related activities have the highest GWP contribution. - Abstract: Different construction activities may indicate distinct environmental impacts due to their uniqueness. Ability to assess and compare the environmental impacts from different construction activities can aid the process of minimising emissions at different building construction processes. The study presents a comparative impact assessment methodology to evaluate environmental impacts at different activities during the building construction stage. Significant impact related construction activities for five major impact categories namely global warming potential (GWP 100), acidification potential (AP), Eutrophication potential (EP), Photochemical oxidation formation potential (POFP) and Human toxicity potential (HTP) are compared from the global, regional and local perspectives. A case study of a residential building in Australia is used to demonstrate the application of the functions of the developed method. The results of the case study indicated that the method can be effectively used to compare environmental impacts of different construction activities at different geographical perspectives considered. The method can be used by designers and contractors in comparing impacts of various construction activities to identify the most emission effective construction processes.

54 ENVIRONMENTAL SCIENCES↗

Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using sophisticated scientific modeling optimized the 100-HX's approximately 0.7 square mile (181 hecto-meters) extraction and injection well field to support continuous operation of a maximum of 800 gallons (3,028 liters) per minute, 24 hours per day, and 7 days per week. The use of traditional resin technology for the plant's ion exchange system required a change out of the resin every 12 weeks and shipment to an offsite facility 1,500 miles (2,414 kilometers) away for regeneration. Instead, the project leadership pursued newer technology with a disposable resin that could be disposed of on-site and would require less frequent change outs, reducing the project's life cycle costs by more than $16 million. Constructing the facility had its own challenges. The well field location overlapped ecologically sensitive lands where bald eagles and native wildlife use the land for their mating habitat for nearly half of the year. Building locations had to be planned around historically and culturally sensitive areas, and around another contractor's remediation work zones. Also, the size of the well field required a transfer (pumping) facility and installation of more than 60 miles (97 kilometers) of high-density polypropylene pipe, 23 miles (38 kilometers) of power cable, and 28 miles (46 kilometers) of control cable. Along with schedule and budget constraints typical of any fast-track project, the project team dealt with severe resource constraints due to competing projects across the Hanford Site caused by the influx of American Recovery and Reinvestment Act stimulus funding. In addition, the project team itself was stretched between completing another $25 million dollar construction project while designing and constructing this project. In order to save money, the project schedule was compressed by three months from the original baseline schedule. This was made possible by the strong use of project management principles throughout the design, construction, and testing phases, as well as implementation of many lessons learned from a similar construction project. In summary, the 100-HX Project truly was a unique blend of science, technology, construction and project management. In summary, Hanford's 100-HX Pump and Treat Project was a successful blend of science, technology, construction, and project management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CT image construction of a totally deflated lung using deformable model extrapolation

Purpose: A novel technique is proposed to construct CT image of a totally deflated lung from a free-breathing 4D-CT image sequence acquired preoperatively. Such a constructed CT image is very useful in performing tumor ablative procedures such as lung brachytherapy. Tumor ablative procedures are frequently performed while the lung is totally deflated. Deflating the lung during such procedures renders preoperative images ineffective for targeting the tumor. Furthermore, the problem cannot be solved using intraoperative ultrasound (U.S.) images because U.S. images are very sensitive to small residual amount of air remaining in the deflated lung. One possible solution to address these issues is to register high quality preoperative CT images of the deflated lung with their corresponding low quality intraoperative U.S. images. However, given that such preoperative images correspond to an inflated lung, such CT images need to be processed to construct CT images pertaining to the lung's deflated state. Methods: To obtain the CT images of deflated lung, we present a novel image construction technique using extrapolated deformable registration to predict the deformation the lung undergoes during full deflation. The proposed construction technique involves estimating the lung's air volume in each preoperative image automatically in order to track the respiration phase of each 4D-CT image throughout a respiratory cycle; i.e., the technique does not need any external marker to form a respiratory signal in the process of curve fitting and extrapolation. The extrapolated deformation field is then applied on a preoperative reference image in order to construct the totally deflated lung's CT image. The technique was evaluated experimentally using ex vivo porcine lung. Results: The ex vivo lung experiments led to very encouraging results. In comparison with the CT image of the deflated lung we acquired for the purpose of validation, the constructed CT image was very similar. The intensity mean absolute difference between these two images was calculated to be at 1%. Tumor center as well as a number of anatomical fiducial markers were traced in different corresponding slices of the two images. The average misalignment obtained for the constructed CT image was (0.64, 0.39, 0.11) mm, which indicates a very desirable accuracy for lung brachytherapy applications. Conclusions: The image construction accuracy obtained in this research is suitable for intraoperative tasks; e.g., tumor localization and fusing with real time navigation data in lung brachytherapy. These applications involve image registration with intraoperative U.S. images in order to enhance their poor quality. The proposed technique is also useful for preoperative tasks such as planning of lung brachytherapy treatment.

60 APPLIED LIFE SCIENCES↗

Functional and structural similarity of human DNA primase [4Fe4S] cluster domain constructs

The regulatory subunit of human DNA primase has a C-terminal domain (p58C) that contains a [4Fe4S] cluster and binds DNA. Previous electrochemical analysis of a p58C construct revealed that its affinity for DNA is sensitive to the redox state of the [4Fe4S] cluster. Concerns about the validity of this conclusion have been raised, based in part on differences in X-ray crystal structures of the p58C 272-464 construct used for that study and that of a N-terminally shifted p58C 266-456 construct and consequently, an assumption that p58C 272-464 has abnormal physical and functional properties. To address this controversy, a new p58C 266-464 construct containing all residues was crystallized under the conditions previously used for crystallizing p58C 272-464 , and the solution structures of both constructs were assessed using circular dichroism and NMR spectroscopy. In the new crystal structure, p58C 266-464 exhibits the same elements of secondary structure near the DNA binding site as observed in the crystal structure of p58C 272-464 . Moreover, in solution, circular dichroism and 15 N, 1 H-heteronuclear single quantum coherence (HSQC) NMR spectra show there are no significant differences in the distribution of secondary structures or in the tertiary structure or the two constructs. To validate that the two constructs have the same functional properties, binding of a primed DNA template was measured using a fluorescence-based DNA binding assay, and the affinities for this substrate were the same (3.4 ± 0.5 μM and 2.7 ± 0.3 μM, respectively). The electrochemical properties of p58C 266-464 were also measured and this p58C construct was able to engage in redox switching on DNA with the same efficiency as p58C 272-464 . Together, these results show that although p58C can be stabilized in different conformations in the crystalline state, in solution there is effectively no difference in the structure and functional properties of p58C constructs of different lengths.

59 BASIC BIOLOGICAL SCIENCES↗

Assessment of small mechanical wastewater treatment plants: Relative life cycle environmental impacts of construction and operations

Many slow growing and shrinking rural communities struggle with aging or inadequate wastewater treatment plants (WWTPs), and face challenges in constructing and operating such facilities. Although existing literature has provided insight into the environmental sustainability of large facilities, including both the construction and operational phases, these studies have not examined small, rural facilities treating less than 7,000 m 3 /d (1.8 MGD) of wastewater in adequate depth and breadth. In this study, a detailed inventory of the construction and operational data for 16 case studies of small WWTPs was developed to elucidate their environmental life cycle impacts. Conventional LCA framework was followed. The results show that the environmental impacts of both the construction and operational phases are considerable. Operational impacts are highly related to energy usage. Improving energy efficiency of a plant may reduce the environmental impacts related to operations. Construction impacts can vary considerably between facilities. Process-related factors (e.g., concrete and reinforcing steel used in basins) are typically sized using the design flow; thus much of the variability in construction impacts among plants stems from the non-process related infrastructure. Multiple regression analysis was used as an exploratory tool to identify which non-process related plant aspects contribute to the variable environmental impact of small WWTPs. These factors include aluminum, cast iron, and the capacity utilization ratio (defined as the ratio of average flow to design flow). Furthermore, industry practitioners should consider these factors when aiming to reduce the environmental impacts of a small WWTP related to construction. Scenario sensitivity analyses found that the environmental impact of construction became smaller with longer design life, and the end-of-life consideration does not heavily influence the environmental sustainability of a WWTP.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simulation of wellbore construction in offshore unconsolidated methane hydrate-bearing formation

The unconsolidated nature of offshore methane hydrate-bearing formation poses concerns for sustainable methane gas production as the weak formation is susceptible to disturbance during wellbore construction. Furthermore, this could contribute to loss of well integrity which could manifest as sand production and error in the interpretation of downhole tests such as mini-frac tests. In this study, a simulation methodology of wellbore construction process is proposed. A finite element model adopting this methodology is developed in order to assess the effect of wellbore construction process on the integrity of the unconsolidated methane hydrate-bearing formation in the Nankai Trough, Japan. The primary objectives are (i) to develop a modelling methodology of well construction process for numerical simulations, (ii) to assess the zone and magnitude of well construction-induced stress/strain disturbance in the formation and (iii) to evaluate relative impact of each well construction stage on the integrity of the formation. The results from this study show that the zone of horizontal stress disturbance from the geostatic state due to wellbore construction could extend to more than three times the radius of the wellbore. Following the wellbore construction, the deviator stress is concentrated in the hydrate reservoir sublayers with high hydrate saturation while plastic deviatoric strain has accumulated in the sublayers with low hydrate saturation. The results also show that modelling of cement shrinkage process is crucial in predicting the concentration of deviator stress in the high hydrate saturation layers.

03 NATURAL GAS↗

Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

Objectives: This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, “whereas progress has been made in safety and health, the construction industry is still a high risk sector.” Methods: Small- and medium-sized enterprises (SMEs) employ about 80% of the world’s construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk ‘bands’, identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB ‘toolbox’ approach for use by SMEs in construction trades. Results: This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk ‘band’ for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

60 APPLIED LIFE SCIENCES↗

Design and Construction of a Loess-Cement Cushion as an Integral Component of an SL-LILW Repository - 16077

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for short-lived low and intermediate level radioactive waste, the National Disposal Facility (NDF), adjacent to the Kozloduy Nuclear Power Plant (KNPP). The NDF will be constructed as a reinforced concrete vault-type repository system, where prefabricated cubic waste packages (2 m on a side) will be emplaced in large reinforced concrete disposal cells. Waste emplacement operations will be conducted in three phases over a total of 60 years of operations. After the last waste packages have been disposed, an engineered multilayer cover will be installed over the site to further isolate the waste from the accessible environment. The Radiana Site where the NDF will be constructed is a sloping area located between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. The unsaturated zone at the location selected for waste disposal ranges from 13 m to 16 m in thickness. After construction, the unsaturated zone will consist of a 5 m thick, engineered loess-cement cushion installed over naturally occurring Pliocene clays and sandy clayey sediments of the Brusarci Formation with a thickness above the top of groundwater ranging from 8 m to 11 m. The loess-cement cushion is a key component of the 'engineered fill' barrier as identified in the Intermediate Safety Assessment Report (ISAR) for the NDF. This barrier consists of engineered fill both below the disposal cells, i.e., the loess-cement cushion, and above the disposal cells, i.e. the final multilayer cover to be installed at closure of the facility. The loess-cement cushion component of this barrier will act to provide a geo-technically stable foundation for the disposal system. In addition, the barrier will raise the base of the disposal cells and increases the unsaturated zone thickness above the top of the groundwater table, as well as to serve as a chemical barrier that will act to sorb radionuclides thereby retarding their migration to the underlying groundwater. In addition to its assigned barrier functions the loess cement cushion also houses key embedded components required as part of the overall NDF safety concept, including systems necessary for operational and post-closure performance monitoring as well as the support foundation structures required for the mobile roofs, which are designed to handle and protect the waste during emplacement operations. The post-closure monitoring period, i.e., the period of institutional control, is given by as 300 years. While similar although less massive cushions have been previously constructed as foundations for various structures at the KNPP, the loess-cement cushion planned for construction at the NDF including the embedded structures will represent a first of its kind construction in terms of both its physical dimensioning as well as its requirements for long-term performance. This paper describes the design of the cushion, its functions and its construction as planned for the NDF as an integral component of the site safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Monitoring Data for Evaluating Constructed Emergent Sandbar Habitat in the Missouri River Mainstem 2004-2009

The U.S. Army Corps of Engineers (Corps) provides the primary operational management of the Missouri River Main Stem Reservoir System. Management of the Missouri River has generally reduced peak river flows that form and maintain emergent sandbar habitat. Emergent sandbars provide non-vegetated nesting habitat for the endangered interior least tern (Sternula antillarum athalassos) and the threatened Northern Great Plains piping plover (Charadrius melodus). Since 2000, piping plover nesting habitat within the Gavins Point Reach, Garrison Reach, Lake Oahe, and Lake Sakakawea has fledged the majority of piping plovers produced along the Missouri River system. Habitats within Lewis and Clark Lake have also recently become important plover production areas. Mechanical construction of emergent sandbar habitat (ESH) within some of these reaches within the Missouri River began in 2004. Through 2009, 11 sandbar complexes had been constructed (10 in Gavins Point Reach, 1 in Lewis and Clarke Lake) totaling about 543 ac of piping plover and interior least tern nesting habitat. ESH Construction has resulted in a net gain of tern and plover nesting habitat. Both terns and plovers successfully nest and fledge young on constructed sandbars, and constructed habitats were preferred over natural habitats. Natural processes may limit the viability of constructed sandbars as nesting habitat. Continued research is needed to identify if changes in constructed sandbar engineering and management increase the length of time constructed habitats effectively function as nesting habitat. However, the transfer of information from researchers to planners through technical research reports may not be timely enough to effectively foster the feedback mechanisms of an adaptive management strategy.

54 ENVIRONMENTAL SCIENCES↗

Scaling up the 454 Titanium Library Construction and Pooling of Barcoded Libraries

We have been developing a high throughput 454 library construction process at the Joint Genome Institute to meet the needs of de novo sequencing a large number of microbial and eukaryote genomes, EST, and metagenome projects. We have been focusing efforts in three areas: (1) modifying the current process to allow the construction of 454 standard libraries on a 96-well format; (2) developing a robotic platform to perform the 454 library construction; and (3) designing molecular barcodes to allow pooling and sorting of many different samples. In the development of a high throughput process to scale up the number of libraries by adapting the process to a 96-well plate format, the key process change involves the replacement of gel electrophoresis for size selection with Solid Phase Reversible Immobilization (SPRI) beads. Although the standard deviation of the insert sizes increases, the overall quality sequence and distribution of the reads in the genome has not changed. The manual process of constructing 454 shotgun libraries on 96-well plates is a time-consuming, labor-intensive, and ergonomically hazardous process; we have been experimenting to program a BioMek robot to perform the library construction. This will not only enable library construction to be completed in a single day, but will also minimize any ergonomic risk. In addition, we have implemented a set of molecular barcodes (AKA Multiple Identifiers or MID) and a pooling process that allows us to sequence many targets simultaneously. Here we will present the testing of pooling a set of selected fosmids derived from the endomycorrhizal fungus Glomus intraradices. By combining the robotic library construction process and the use of molecular barcodes, it is now possible to sequence hundreds of fosmids that represent a minimal tiling path of this genome. Here we present the progress and the challenges of developing these scaled-up processes.

454, Titanium library construction↗

Metal accumulation in dragonfly nymphs and crayfish as indicators of constructed wetland effectiveness

Constructed wetland effectiveness is often assessed by measuring reductions of contaminant concentrations in influent versus departing effluent, but this can be complicated by fluctuations in contaminant content/chemistry and hydrology. We assessed effectiveness of a constructed wetland at protecting downstream biota from accumulating elevated metal concentrations—particularly copper and zinc in effluents from a nuclear materials processing facility. Contaminants distributed throughout a constructed wetland system and two reference wetlands were assessed using six dragonfly nymph genera (Anax, Erythemis, Libellula, Pachydiplax, Tramea, and Plathemis) as biomonitors. Additionally, the crayfish, Cambarus latimanus, were analyzed from the receiving and two reference streams. Concentrations of Cu, Zn, Pb, Mn, Cr, Cd, and Al were evaluated in 597 dragonfly nymph and 149 crayfish whole-body composite samples. Dragonfly genera varied substantially in metal accumulation and the ability to identify elevated metal levels throughout components of the constructed wetland. Genera more closely associated with bottom sediments tended to accumulate higher levels of metals with Libellula, Pachydiplax, and Erythemis often accumulating highest concentrations and differing most among sites. This, combined with their abundance and broad distributions make the latter two species suitable candidates as biomonitors for constructed wetlands. As expected, dragonfly nymphs accumulated higher metal concentrations in the constructed wetland than reference sites. However, dragonfly nymphs often accumulated as high of metal concentrations downstream as upstream of the water treatment cells. Moreover, crayfish from the receiving stream near the constructed wetland accumulated substantially higher Cu concentrations than from downstream locations or reference streams. Despite reducing metal concentrations at base flow and maintaining regulatory compliance, metal fluxes from the wetland were sufficient to increase accumulation in downstream biota. Future work should evaluate the causes of downstream accumulation as the next step necessary to develop plans to improve the metal sequestering efficiency of the wetland under variable flow regimes.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Wind Energy and Wildlife Pre- and Post-Construction Project at Pantex Plant

From 2009-2017, we conducted pre- and post-construction monitoring of wildlife at the Pantex Plant before and after construction of five wind turbines on the plant in 2014-2015. Pre-construction acoustic monitoring for bats was conducted at five sites on Pantex. Acoustic (here after Anabat) files were downloaded 30 times with Anabat files recorded from 6/21/2010 through 1/17/2014. The resulting data include over 3,000,000 files and we hope to analyze them in the future. We were never successful recording acoustic data after 2014 (post-construction). This is despite numerous attempts to trouble shoot our acoustic monitors. Wind damage to cables going from the body of the monitor to their microphones could not be repaired or replaced while towers were standing. Sampling of breeding birds was accomplished through point counts conducted at sites selected for turbine construction and others selected as control sites. Precipitation varied greatly over the course of the study, from a low of 17.81 cm (7.01 inches) during 2011 to a high of 87.96 cm (34.63 inches) during 2015. The pre-construction portion of the project was characterized by fairly extreme drought starting in 2011. Total precipitation for 2011 and 2012 was just 49.12 cm (19.34 inches), less than 50% of the average for a two-year period. The impact of this drought on nesting grassland birds manifest as low nesting species richness and abundance. In 2011 and 2012, 20 and 17 species were documented during point counts, respectively. Post-construction sampling followed the wet year of 2015 (87.96 cm, 34.63 inches). Species richness of nesting birds in 2016 and 2017 was considerably higher than during the drought, 40 and 37 species, respectively. We suspect changes in resource availability associated with relief from drought starting after 2015 was responsible for the recovery/increase in species detected during the breeding season; less importantly any changes from installation of turbines or changes in surface management (e.g., row-crop type).

54 ENVIRONMENTAL SCIENCES↗

Heating and Cooling Energy Modeling of 3D-Printed Concrete Construction of Residential Buildings [Slides]

3D printed concrete construction (C3DP) is an emerging technology that comes with the associated benefits of high thermal mass walls. We investigated using BEopt software the heating and cooling energy use of a single story C3DP-constructed house. We then compared the heating/cooling energy use of the C3DP house against the corresponding energy use in a traditional timber (wood) frame construction (WFC), as well as a concrete masonry unit (CMU) construction. Both peak energy use for heating and cooling (Btu), as well as base energy use for both heating and cooling (MMBtu/yr) of the C3DP design were compared against the WFC and CMU baseline construction of identical geometries and orientations across all eight climate zones defined in the International Energy Conservation Code (IECC). The BEopt models for all three constructions (C3DP, WFC, and CMU) were built to comply with the 2018 IECC code. Results indicate that C3DP construction has significant heating and cooling energy benefits in certain climate zones, with the highest peak cooling energy savings (9% compared to WFC, and 5% compared to CMU) in the IECC Climate Zone 1 in the month of July. The peak heating and cooling energy demand reduction of C3DP were found to be more significant than the base heating and cooling energy demand in all IECC climate zones. The 2018 IECC compliance-related U-Factor adjustments of all models also resulted in more peak energy savings of the C3DP design in the cooling-dominated climate zones (climate zones 1 and 2), moderate energy savings in moderate climate zones (climate zones 3, 4, and 6), and little to no change in energy savings in very cold climates (climate zones 7 and 8).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗