Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Building inspection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Sedimentological Investigations of the Martian Surface using the Mars 2001 Robotic Arm Camera and MECA Optical Microscope

The first microscopic sedimentological studies of the Martian surface will commence with the landing of the Mars Polar Lander (MPL) December 3, 1999. The Robotic Arm Camera (RAC) has a resolution of 25 um/p which will permit detailed micromorphological analysis of surface and subsurface materials. The Robotic Ann will be able to dig up to 50 cm below the surface. The walls of the trench will also be inspected by RAC to look for evidence of stratigraphic and / or sedimentological relationships. The 2001 Mars Lander will build upon and expand the sedimentological research begun by the RAC on MPL. This will be accomplished by: (1) Macroscopic (dm to cm): Descent Imager, Pancam, RAC; (2) Microscopic (mm to um RAC, MECA Optical Microscope (Figure 2), AFM This paper will focus on investigations that can be conducted by the RAC and MECA Optical Microscope.

Rice, J. W., Jr.↗

A Real-Time Microwave Camera at 24 GHz (K-Band}

The objective is to design and build a real-time microwave imaging system (i.e., camera) Microwave imaging offers tremendous potential in many applications: a) Inspection of low-loss composites, radomes, etc.; b) Detection and evaluation of corrosion under paint; c) Security, contraband detection. Raster scanning is slow and requires bulky mechanical systems. A real-time and portable imaging system can be extremely useful for rapid nondestructive testing of large structures.

Ghasr, M. T.↗

Classifying Seyfert Galaxies with Deep Learning

The traditional classification for a subclass of the Seyfert galaxies is visual inspection or using a quantity defined as a flux ratio between the Balmer line and forbidden line. One algorithm of deep learning is the convolution neural network (CNN), which has shown successful classification results. We build a one-dimensional CNN model to distinguish Seyfert 1.9 spectra from Seyfert 2 galaxies. We find that our model can recognize Seyfert 1.9 and Seyfert 2 spectra with an accuracy of over 80% and pick out an additional Seyfert 1.9 sample that was missed by visual inspection. We use the new Seyfert 1.9 sample to improve the performance of our model and obtain a 91% precision of Seyfert 1.9. These results indicate that our model can pick out Seyfert 1.9 spectra among Seyfert 2 spectra. We decompose the Hα emission line of our Seyfert 1.9 galaxies by fitting two Gaussian components and derive the line width and flux. We find that the velocity distribution of the broad Hα component of the new Seyfert 1.9 sample has an extending tail toward the higher end, and the luminosity of the new Seyfert 1.9 sample is slightly weaker than the original Seyfert 1.9 sample. This result indicates that our model can pick out the sources that have a relatively weak broad Hα component. In addition, we check the distributions of the host galaxy morphology of our Seyfert 1.9 samples and find that the distribution of the host galaxy morphology is dominated by a large bulge galaxy. In the end, we present an online catalog of 1297 Seyfert 1.9 galaxies with measurements of the Hα emission line.

79 ASTRONOMY AND ASTROPHYSICS↗

Vision-based inspection of prefabricated components using camera poses: Addressing inherent limitations of image-based 3D reconstruction

Modular construction can lead to additional cost overruns and delays when a defect is found on the construction site and is not easily repairable. Researchers have developed various methods that use image-based 3D reconstruction for quality assessment, but they have inherent limitations, such as inconsistency and dealing with surfaces with reflectivity and limited visual features. Therefore, this paper presents a vision-based quality assessment method using cameras for prefabricated components by addressing these limitations. Specifically, this paper proposes a novel quality inspection method with sub-millimeter accuracy using cameras focused on leveraging camera poses (as opposed to 3D point clouds that are often not consistent in quality) from the image-based 3D reconstruction. The 3D point estimation by computing triangulation was used for achieving accurate measurement. The proposed method is validated using six different variances and two case studies – an aluminum pipe with a reflective surface and a fabricated concrete column. Furthermore, the results demonstrate the accuracy and effectiveness of the proposed method.

42 ENGINEERING↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

STS-114: Crew Training Clip from JSC

STS-114 Discovery crew is shown in various training exercises at Johnson Space Center. The crew consists of Eileen Collins, Commander; James Kelley, Pilot; Charles Camarda, Mission Specialist; Wendy Lawrence, Mission Specialist; Soichi Noguchi, Mission Specialist; Steve Robinson, Mission Specialist; and Andy Thomas, Mission Specialist. The exercises include: 1) EVA training in the VR lab; 2) Neutral Buoyancy Laboratory (NBL) EVA Training; 3) Walk to Motion Base Simulator; 4) EVA Preparations in ISS Airlock; and 7) Emergency Egress from Crew Compartment Trainer (CCT). A crew photo session is also presented. Footage of The Space Shuttle Atlantis inside the Kennedy Space Center Vehicle Assembly Building (VAB) after its demating from the Solid Rocket Booster and External Tank is shown. The video ends with techniques for inspecting and repairing Thermal Protection System tiles, a video of external tank production at the Michoud Assembly Facility (MAF) and redesign of the foam from the bipod ramp at Michoud Assembly Facility (MAF).

Source record↗

More Efficient Precipitation Rate Data Acquisition with the STORM Swath-Based Analysis Tool

A multitude of locations exist for acquiring satellite-derived precipitation rate data. Because the volume of data exceeds what can reasonably be analyzed manually, online tools have been developed to help researchers make more informed data acquisition decisions. Some interfaces provide sample images generated from prioritized variables to enable efficient visual inspection, while others include the ability to subset geographically to reduce the volume of the data to the area of interest. Building upon such value-added services is the STORM (the NASA Precipitation Processing System (PPS) data product ordering system) Swath-Based Analysis Tool (https://storm.pps.eosdis.nasa.gov/storm/Analysis.jsp). With it, users can compare overflights of multiple precipitation satellites simultaneously and from this make determinations about which swaths will best serve their research. They can preview these overflights with two distinct visualization tools. Finally, they can then download geographically subset swaths that have precipitation rate characteristics matching their research needs. A user starts by making up to six selections. They then select their date range of interest going back to 1997. Finally, they select a geographical region either by inputting latitude-longitude corners of a rectangle or drawing that rectangle on an interactive map. The system processes each file, determining aggregate statistics about the precipitation rates within the selected region as observed by each instrument. These statistical values are added to a time series graph as a "time remaining" counter is continuously updated. The chart is fully interactive, with detailed values displayed upon mouseover, and numerous options available upon clicking each point. Since the user is likely to need the relevant files for their own research, they can generate an order from their request. All files are geographically subset to the region of interest, and the user can use the statistical values to limit which files are added to the order. This flexibility helps to ensure researchers are only downloading the files they need for their work, making for a more efficient process both from a time-consumption and a storage perspective. This paper will introduce the Swath-Based Analysis Tool and explore its numerous features. It will discuss several use cases for precipitation scientists.

remote sensing↗

NDE Development for Inspection of the Ares I Crew Launch Vehicle

NASA is designing a new crewed launch vehicle called Ares I to replace the Space Shuttle after its scheduled retirement in 2010. This new launch vehicle will build on the Shuttle technology in many ways including using a first stage based upon the Space Shuttle Solid Rocket Booster, advanced aluminum alloys for the second stage tanks, and friction stir welding to assemble the second stage. Friction stir welding uses a spinning pin that is inserted in the joint between two panels that are to be welded. The pin mechanically mixes the metal together below the melting temperature to form the weld. Friction stir welding allows high strength joints in metals that would otherwise lose much of their strength as they are melted during the fusion welding process. One significant change from the Space Shuttle that impacts NDE is the implementation of self-reacting friction stir welding for non-linear welds on the primary metallic structure. The self-reacting technique differs from the conventional technique because the load of the pin tool pressing down on the metal being joined is reacted by a nut on the end of the tool rather than an anvil behind the part. No spacecraft has ever flown with a self-reacting friction stir weld, so this is a major advancement in the manufacturing process, bringing with it a whole new set of challenges for NDE to overcome. Another impact is the proposed usage of an aluminum face sheet, phenolic honeycomb sandwich structure for a common bulkhead between the fuel and oxidizer tanks. This design was used on the second stage of Saturn IB and the second and third stages of Saturn V, but both the manufacturing and subsequent inspection were very costly and time consuming so a more efficient inspection method is sought. The current state of development of these inspections will be presented, along with other information pertinent to NDE of the Ares I.

Richter, Joel↗

TWF Waste Container Receipt, Inspection and Transfer to Storage

This procedure provides instructions for the receipt, inspection, and transfer to storage of Transuranic (TRU) Waste Containers and Pipe Overpack Containers (POC) within the Transuranic Waste Facility (TWF) (Waste Storage Buildings [WSBs] and Characterization and Waste Storage Building [CWSB]). Performance of this procedure meets the requirements of AC 5.8.9, AC 5.8.13 2nd Bullet, SAC 5.9.1, SAC 5.9.3, SR 4.2.1.1, 4.2.1.2, 4.2.1.5, 4.2.1.6, 4.2.2.1, 4.2.2.2, 4.2.2.3, 4.2.2.4, 4.2.3.1, 4.2.3.2, 4.2.3.3, 4.3.4.1, 4.4.1.1, 4.4.1.2 and 4.4.1.3.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bitsy Thinks Big

AeroAstro, of Herndon, Virginia, developed a nanospacecraft core module capable of developing recyclable spacecraft designs using standard interfaces. From this core module, known as the Bitsy(TM) kernel, custom spacecraft are able to connect mission-specific instruments and subsystems for variation in mission usage. The nanospacecraft core module may be used in conjunction with an existing microsatellite bus or customized to meet specific requirements. Building on this premise, AeroAstro has developed a line of satellite communications equipment, sun sensors, and Lithium-Ion batteries which are all incorporated in its complete line of mission-specific nanospacecraft. The Bitsy technology is also a key component in AeroAstro#s satellite inspection products and orbital transfer services. In the future, AeroAstro plans to market an even less expensive version of the Bitsy technology. The plan, which is targeted to universities, markets a sort of "satellite in a kit," for less than $1 million. This technology would allow universities to build true space hardware for a fraction of the cost of launching a regular satellite.

Source record↗

Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage

NASA is designing a new crewed launch vehicle called Ares I to replace the Space Shuttle after its scheduled retirement in 2010. This new launch vehicle will build on the Shuttle technology in many ways including using a first stage based upon the Space Shuttle Solid Rocket Booster, advanced aluminum alloys for the second stage tanks, and friction stir welding to assemble the second stage. Friction stir welding uses a spinning pin that is inserted in the joint between two panels that are to be welded. The pin mechanically mixes the metal together below the melting temperature to form the weld. Friction stir welding allows high strength joints in metals that would otherwise lose much of their strength as they are melted during the fusion welding process. One significant change from the Space Shuttle that impacts NDE is the implementation of self-reacting friction stir welding for non-linear welds on the primary metallic structure. The self-reacting technique differs from the conventional technique because the load of the pin tool pressing down on the metal being joined is reacted by a nut on the end of the tool rather than an anvil behind the part. No spacecraft has ever flown with a self-reacting friction stir weld, so this is a major advancement in the manufacturing process, bringing with it a whole new set of challenges for NDE to overcome. The metal microstructure and possible defects are different from other weld processes. Friction plug welds will be used to close out the hole remaining in the radial welds when friction stir welded. This plug welding also has unique challenges in inspection. The current state of development of these inspections will be presented, along with other information pertinent to NDE of the Ares I.

Russell, Sam↗

System and method for inspecting parts using dynamic response function

A system and method for the non-destructive testing of additively manufactured parts. An input mechanism excites with an excitation force (e.g., a vibration) an additive manufacturing build structure, which includes a part on a build platform, to induce a dynamic response in the part. An output mechanism (e.g., a non-contact transducer) senses the induced dynamic response in the part. A processor determines and examines the relationship between the response and excitation to identify an indication of a defect in the part, and communicates an alert if the indication is identified. The processor may compare the phase, magnitude, coherence, or time delay of the relationship to a reference relationship and/or may compare the modal frequency or the modal damping to a reference to identify a deviation greater than a pre-established threshold.

Hartwig, Troy Juan↗

Contaminant Migration Modeling to Support the In Situ Decommissioning of Hardened Nuclear Facilities - 20215

The decommissioning of hardened nuclear facilities provides a unique challenge in balancing current worker dose with exposure to future receptors and media. In situ decommissioning (ISD) is a cost-effective and safe option for the closure of such facilities but requires a detailed understanding of the threat that radioactive and hazardous constituents remaining in the facilities pose to groundwater and surrounding surface water. The Savannah River Site (SRS) extensively employs contaminant migration models within the decommissioning process to develop site-specific removal, grouting, and monitoring strategies in support of safe and effective final end states of nuclear facilities. This work discusses the use of contaminant migration modeling in the ISD process at SRS, including specific examples from the closure of P-Reactor and R-Reactor, Building 235-F, F-Canyon and F/H Laboratory Complex. Migration models developed during the closure of P-Reactor and R-Reactor were divided into four source areas: the reactor vessel, the process area, the disassembly basin, and the purification wing. Each source area was assigned a specific inventory and migration pathway and was then subject to varying hypothetical removal, capping, and grouting schemes. Modeling indicated that groundwater Maximum Concentration Limits (MCLs) might be exceeded if no action was taken for eleven and ten constituents of concern (COCs) at P-Reactor and R-Reactor, respectively. These exceedances could occur in as few as 200 to 500 years. Alternatively, the migration modeling demonstrated that the selected ISD actions reduced contaminant mobility which allowed for significant radioactive decay and resulted in fewer predicted exceedances of groundwater MCLs (five COCs for P-Reactor; eight COCs for R-Reactor). In response to the modeling results for P-Reactor and R-Reactor, effectiveness monitoring programs were developed to target contaminants, specific to each reactor, that may migrate to groundwater. Contaminant migration modeling also revealed that roof collapse was a large factor in the release of COCs to the environment, giving rise to roof improvements, and an inspection and vegetation control program to ensure roof stability over time. Contaminant migration modeling is also aiding in the closure planning for hardened facilities in F Area. Building 235-F housed the Actinide Billet Line, which produced Np-237 billets for irradiation in SRS reactors, and the Plutonium Fuel Form (PuFF) facility that produced Pu-238 heat sources for the space program. As a result of these missions, areas within Building 235-F contain considerable residual amounts of both Pu-238 and Np-237. Contaminant migration modeling of Building 235-F was originally performed in 2012 to identify the feasibility of ISD and the amount of radioactive material removal required to prevent the exceedance of groundwater MCLs. The original model indicated that a 60% reduction in the PuFF facility Pu-238 inventory could keep groundwater concentrations below standards, while Np-237 did not pose a threat to groundwater. However, updates to the model with an emphasis on source impact pathways revealed that, due to the orientation of the source areas relative to groundwater flow, no amount of reasonable removal of Pu-238 would keep groundwater concentrations below MCLs and that Np-237 could be a large contributor to localized MCL exceedances. With this insight, the refined 2019 model is being used to assist in the development of grouting plans specific to each facility source area, where bentonite may be utilized to slow the migration of Pu-238 and its daughter products from the PuFF facility and a reducing grout may decrease Np-237 transport by ensuring the nuclide remains in the less mobile +IV oxidation state. The beginning phases of contaminant migration modeling are underway for F-Canyon and associated facilities using lessons learned from the Reactors and Building 235-F. A contaminant migration pathway, similar to the pathway used for the reactor vessels, is being developed for the hot and warm canyons. The F-Canyon inventories are being spatially refined to identify specific and localized source zones, comparable to Building 235-F, that may impact groundwater. Contaminant migration modeling provides vital input within the ISD process, from facility investigation to post closure effectiveness monitoring, making it a valuable tool in the development of safe and effective end states for hardened nuclear facilities at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in Scaling Analysis from Coupons to Elements in 3D Woven Composites for a Launch Vehicle End-Ring Structure

The limitations of structural design with 3D woven composites based on homogenized material models characterized using coupon test data, representative unit cell analysis, or a combination of the two are discussed in the context of a space launch system (SLS)-scale end ring. Selected building block test configurations at the coupon, element, and subcomponent scales are described in detail. Highly instrumented tests and X-ray computed tomography inspections are used to characterize the structural behavior and associated damage progression with increasing load. It is shown that a single homogenized material constitutive relationship, applied at coupon and element scale, is not sufficient to model the structural response observed in both tests. In fact, substantially different stress-strain laws are required to predict the response of the coupon and element scale specimens, despite similar loading conditions. A model with discrete representation of the binder tows and cohesive interfaces to model matrix cracking shows much better agreement with the test data at the two length scales. Thus, evidence is provided showing that predictive structural analysis of 3D woven composites requires discrete representation of the tows, matrix cracking morphology, and their interactions in the structural configuration. With accurate knowledge of the element scale behavior, engineering approximations readily enable analysis scale-up to the subcomponent level.

Andrew C Bergan↗

AI-Enabled Robots for Automated Nondestructive Evaluation and Repair of Power Plant Boilers. Final Report

Boiler failure could cause loss of life and safety issues, cost hundreds of thousands of dollars in equipment repairs, property damage and production losses, and drive up the cost of electric power. Boiler maintenance is challenging and risky for inspectors working on scaffolding in confined hazardous spaces inside of a boiler and sometimes the space is hard to access. The operation is also time-consuming due to the large area of vertical structures for inspection and the tremendous effort needed for scaffolding. Recently, the use of robotics (e.g., drones and crawlers) in power plants for maintenance is growing rapidly. However, the existing robotics solutions show two notable technological gaps: no live repair capability, and no Artificial Intelligence (AI) for smart autonomy. The objective of this project is to develop an integrated autonomous robotic platform that is equipped with compact non-destructive evaluation (NDE) sensors to perform live inspection, operates onboard repair devices to perform live repair, and uses AI for intelligent data fusion and predictive analysis for automated and smart spatiotemporal inspection, analysis and repair of the furnace walls in coal-fired boilers. The approach to achieve the objective includes developing NDE sensors with signal processing techniques, designing and evaluating repair devices for robots based on fusion and solid-state technologies, and an autonomous robotic platform that can attach to and navigate on boiler furnace walls using magnetic drive tracks. The robot is also powered by AI to automate data gathering (e.g., 3D mapping and damage localization) and predictive analysis. This project has advanced the state-of-the-art by providing technological breakthroughs including compact NDE and repair tools for robots, AI capabilities for smart autonomy, and a robotic platform for automated boiler maintenance. This project has great potential to result in significant benefits including limiting or eliminating the need to send operators to assess difficult-to-access or hazardous areas, enabling automated live inspection and repair, avoiding time consuming scaffolding (especially for partial maintenance during unplanned outage), collecting comprehensive and well-organized data smartly, and avoiding or limiting the need for onsite or remote piloting technicians. The impacts can be tremendous in terms of the time and cost savings, reducing the risk for human operators, and increasing boiler reliability, usability, and efficiency. In addition, by developing the new technologies on the autonomous inspection and repair robot, by involving multiple undergraduate and graduate students working together with the faculty members on this project, and by generating knowledge and building up collaborations with industrial partners, this effort will significantly update the education capabilities, support long-term fundamental research, and maintain the leadership of Colorado School of Mines and Michigan State University in energy fields.

20 FOSSIL-FUELED POWER PLANTS↗

Overview od STS ground operations/orbiter turnaround STS-1 through STS-7

A review of STS-1 processing is presented as a reference for Shuttle processing time and the magnitude of the associated modifications, discrepancies, technical requirements, and ground systems activities. STS-1 processing provided the basis from which a plan to perform operational turnaround was established. Turnaround processing for Launch and Landing are treated separately to depict more clearly the progress made to reduce turnaround time and manhours expended. Turnaround time was reduced from 187 days for STS-2 to 60 days for STS-7 and landing turnaround was reduced from 14 days to 5 days. Modifications were reduced from 114 to 51. Requirements changes for launch readiness verification were reduced from 536 to 107. Special tests or inspections were reduced from 292 to 52. Anomalies resolved concurrent with processing were reduced from 13,000 to 4,000. Integration in the Vehicle Assembly Building (VAB) is about 10 percent of the flow, and Launch Pad operations comprise 40 percent of the turnaround. The work force has matured and has demonstrated the capability to perform planned and contingency operations. The turnaround program is fast approaching the goal of becoming operational.

Schwartz, R.↗

Solid Rocket Booster (SRB) - Evolution and Lessons Learned During the Shuttle Program

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Obsolescence issues occasionally required component recertification. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. Assembly and integration of the booster subsystems was a unique process and acceptance testing of reused hardware components was required for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Kanner, Howard S.↗

Solid Rocket Booster (SRB) Flight System Integration at Its Best

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads, environments and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. However, the in-flight data and postflight assessment process revealed the hardware was affected much more strongly than originally anticipated. Assembly and integration of the booster subsystems required acceptance testing of reused hardware components for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges and technical issues, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Wood, T. David↗