Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Boiler plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Assessment of NuScale SMR Steam Heat Augmentation for Chemical Plant Decarbonization

Nearly 50% of the total energy consumed by the industrial sector in the United States is used to produce process steam with natural gas and coal-fired boilers1 . This project conducts a technoeconomic assessment of a NuScale Small Modular Reactor (SMR) coupled with a chemical plant as an Integrated Energy System (IES) where nuclear produces steam and electric power to meet the requirements of a large chemical plant. In a 2020 study, ORNL evaluated the feasibility of using advanced SMRs, including the NuScale design, to supply energy to the Eastman Chemical Plant. However, since that report was published, NuScale received NRC approval for its uprated 77 MWe design with 56% more power and has also introduced a high-temperature, high pressure, steam heat-augmentation system, a key focus of the new study. The new study also benefits from revised capital costs, a 10-day refueling outage time, reduced plant staffing, higher capacity factors, and a site boundary Emergency Planning Zone methodology. The study consists of a techno-economic assessment of two possible energy sources (nuclear and natural gas) in a number of steam and power generation configurations (NuScale Power Modules (NPMs), boilers and combinations of both) to satisfy the steam and power demand with the most reliable and cost competitive system. A total of 2,947.3 klb/hr of steam and 72.5 MWe of electricity are required for the demonstration case. A range of scenarios and solutions are explored, from a 12-NPM plant (3,000 MWth)—with excess capacity and redundancy, capable of supplying a significant amount of extra power to the grid—to a 4-NPM (1,000 MWth) plant—supplemented with existing boilers or grid power for redundancy. The study uses historical steam and power data from a chemical plant and examines the sensitivity to natural gas and grid power cost variations. Scenarios with up to two times gas and electricity costs were considered. Profitability in a 60-year time horizon was analyzed, consistent with NuScale’s design life specification. A steady-state site integration and reliability analysis was performed, and trade-offs were identified.

20 FOSSIL-FUELED POWER PLANTS↗

Mitigation of Aerosol Impacts of Ash Deposition and Emissions from Coal Combustion (Final Technical Report)

This project was selected under FOA-0001989 Area of Interest (AOI) 2 – Power Plant Component Improvement. The objective of this AOI was to test and validate technologies and methodologies that can improve the efficiency, reliability, and/or flexibility of individual power plant components in existing plants. The aerosol mitigation technology comprises injection of sorbent into the boiler through injection lances using a positive-pressure blower. The injected sorbent interacts with flame-vaporized aerosolforming components produced during combustion reducing the abundance of sub-micrometer (< 1 micron) particles and fireside ash deposits in the boiler. The primary objective of this project was to validate a sorbent-based technology for mitigating fireside heat transfer surface fouling-related challenges in a full-scale coal-fired power generation facility, thereby, improving plant performance and reliability.

01 COAL, LIGNITE, AND PEAT↗

Atikokan Digital Twin: Machine learning in a biomass energy system

The Atikokan Generating Station, operated by Ontario Power Generation, has a 200 MW, biomass-fired tower boiler that operates on a dispatch schedule with a five-minute cycle. The boiler is generally operated in the range of 40–100 MW using two of five burner levels. In order to optimize boiler performance, we propose the implementation of a unique digital twin. Our digital twin abstraction couples Bayesian inference from science-based models and from observations (machine learning) with decision theory to predict operating-variable set points that optimize the physical asset (the boiler) in the presence of uncertainty (artificial intelligence). We focus this paper on the continuous Bayesian machine learning part of the Atikokan Digital Twin; we discuss decision theory in a companion paper. We identify and learn about 12 operational, model, and measured-output parameters and their uncertainties from high-fidelity, science-based simulations of the Atikokan boiler and from the observed measurements at the power plant. Since the goal of the Atikokan Digital Twin is to implement it online in real time, we require fast function evaluations for the quantities of interest extracted from the simulations in the Bayesian analysis. We use Gaussian process regression/interpolation to create accurate, robust surrogate models. We define the Bayesian priors and likelihood function and solve for the posterior distributions of the 12 parameters. Here we then propagate these distributions (i.e., parameters with uncertainty) into the predicted distributions of 790 quantities of interest to learn about the relative importance of various sources of error including experimental, model, and operating-parameter errors.

09 BIOMASS FUELS↗

Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 1: Executive summary

A data base for the comparison of advanced energy conversion systems for utility applications using coal or coal-derived fuels was developed. Estimates of power plant performance (efficiency), capital cost, cost of electricity, natural resource requirements, and environmental intrusion characteristics were made for ten advanced conversion systems. Emphasis was on the energy conversion system in the context of a base loaded utility power plant. All power plant concepts were premised on meeting emission standard requirements. A steam power plant (3500 psig, 1000 F) with a conventional coal-burning furnace-boiler was analyzed as a basis for comparison. Combined cycle gas/steam turbine system results indicated competitive efficiency and a lower cost of electricity compared to the reference steam plant. The Open-Cycle MHD system results indicated the potential for significantly higher efficiency than the reference steam plant but with a higher cost of electricity.

Corman, J. C.↗

Advanced nuclear reactor integration opportunities for the pulp and paper industry in the U.S. context: Technical perspectives, gap analysis, and preliminary technoeconomic assessment

Pulp and paper (P&P) manufacturing requires a large amount of low-pressure (LP) steam to digest, wash wood fibers and dry pulp into paper. Most of the LP steam is extracted from backpressure turbines that produce power from high-pressure (HP) steam. This HP steam is generated from burning wood waste material; bark is burned in hog boilers, and lignin is boiled in a black liquor recovery boiler. In a typical integrated P&P mill, 50–100% of the steam is produced from these sources, while additional steam is produced in natural gas (NG), fuel oil, or coal boilers. The other energy-intensive process in the plant is the chemical-recovery section (e.g., lime kiln), which requires high-temperature processing from NG combustion to retrieve and recirculate spent chemicals. This paper assesses the energy and heat demand and material balances of a typical generic kraft pulp mill, along with the nuclear heat, steam, and power integration opportunities to replace conventional combustion systems. The paper also addresses steam and electricity generation through a comprehensive technical and engineering gap analysis of five different nuclear-integration opportunities and their process economics, thus enabling the lignin and bark to be further processed into biobased chemicals or fuels, as well as the potential to reduce overall emissions from kraft pulping. Preliminary findings have shown that the P&P industry could achieve technological benefits by integrating their current manufacturing process with small modular nuclear reactors (SMNRs) on a national level. This research aims to set the path forward for a cleaner and more resilient P&P industry.

Advanced nuclear reactor↗

Experimental study of flow distribution with circumferential manifolds

Water flow test results on fluid flow distribution and pressure loss in curved manifolds with tangential or radial entry are reported. Manifolds were studied both as inlet and outlet manifolds. Manifolds can be used for boilers and/or heat exchangers for advanced space electric power plants.

Dittrich, R. T.↗

Hybrid Analytics Solution for Power Plant Operations

Expert Microsystems, Inc., MapEx Software Inc. and XMPLR Energy LLC have teamed to submit a proposal to the US Department of Energy’s Office of Fossil Energy to improve the efficiency, reliability and flexibility of existing coal-based power plants. The project, titled Hybrid Analytics Solution to Improve Coal Power Plant Operations (the “Hybrid Analytics” project), will develop, demonstrate and commercialize a novel approach that integrates two proven real-time monitoring techniques. The Hybrid Analytics approach integrates into a single, integrated solution: a) an established, advanced data-driven analytics solution that includes artificial intelligence, advanced pattern recognition and machine-learning techniques and b) a well-proven, first principle thermal heat balance model solution. The future role of coal plants will depend on the ability to cycle and follow loads to meet marginal power demands, accommodate renewables and support the grid. Essential to success in this new role is a plant’s ability to maintain high reliability, efficiency and flexibility. However, these changing operational demands put significant stresses on power plant components that directly impact the ability to deliver these requirements. In the past, plants have independently monitored performance using physics-based solutions (heat rate, boiler losses, etc.) and reliability using data-driven analytics (advanced pattern recognition). The Hybrid Analytics solution integrates both approaches to enhance fault detection, provide automated diagnostics and estimates of remaining time to act, and provide critical, enhanced and accurate real-time information to coal plant operators. As a result, coal plants can improve efficiency, reliability, and flexibility and can cost-effectively maintain their key role in the power delivery system.

01 COAL, LIGNITE, AND PEAT↗

A MHD channel study for the ETF conceptual design

The procedures and computations used to identify an MHD channel for a 540 mW(I) EFT-scale plant are presented. Under the assumed constraints of maximum E(x), E(y), J(y) and Beta; results show the best plant performance is obtained for active length, L is approximately 12 M, whereas in the initial ETF studies, L is approximately 16 M. As MHD channel length is reduced from 16 M, the channel enthalpy extraction falls off, slowly. This tends to reduce the MHD power output; however, the shorter channels result in lower heat losses to the MHD channel cooling water which allows for the incorporation of more low pressure boiler feedwater heaters into the system and an increase in steam plant efficiency. The net result of these changes is a net increase in the over all MHD/steam plant efficiency. In addition to the sensitivity of various channel parameters, the trade-offs between the level of oxygen enrichment and the electrical stress on the channel are also discussed.

Wang, S. Y.↗

Measurements and Prediction of Ash Deposition in a Cyclone-Fired Boiler Operating under Variable Load Conditions

Measurements of ash deposition rates were made between the secondary superheater and reheater sections of a 450 MW cyclone-fired lignite boiler as the operational load varied from 33 to 100%. Significant reductions in deposition rates with a decrease in operational load were observed. To uncover the causative mechanisms behind these observations, operational data from the power plant were used to carry out computational fluid dynamic (CFD) simulations of the boiler. After ascertaining that the gas temperatures and velocities at various sections within the boiler were being represented adequately, decoupled simulations of the ash deposition process on the deposit probe were carried out using a finely resolved boundary layer mesh. Fly ash particle size distribution (PSD) and its concentration for the decoupled calculations were determined from stand-alone cyclone barrel simulations. The ash partitioning (mass %) between the fly ash and slag was found to be ~50:50, which was in line with previous field observations, and it did not vary significantly across different cyclone loads. The predicted PSD of the deposit ash was concentrated in the size range 10–30 microns, which was in agreement with cross-sectional images of the deposit obtained from the measurements. At lower loads, sharp variations in the deposition rates were predicted in the gas temperature range 950–1150 K. The particle kinetic energy—particle viscosity-based capture methodology utilized in this study in conjunction with appropriate ash compositions, ash viscosity models and gas temperature estimates can help estimate slagging propensities at different loads reasonably well in these systems.

Krishnamoorthy, Gautham (ORCID:0000000255205092)↗

Data Driven Approach to Analyzing The Impact of Power Plant Cycling on Air Preheater Degradation and Remaining Useful Life

Due to the increased penetration of renewable energy generation sources, and fluctuations of the oil and gas prices, modern coal burning power plants deal with increased variability in the demand for power generation. These varying demands result in their intermittent under-capacity operation (cycling). Periodical ramping down and back up to follow the daily power demands causes damages to the plant components reducing its operational life. In this paper we analyze the impact of cycling on a rotary Ljungstrom air preheater (APH) unit installed at a coal fire power plant in the US. An inefficient air preheater can significantly impact boiler performance. Due to the repeated boiler’s hot-cold start, the APH experiences fluctuating operating conditions that result in accelerated degradation mechanisms, such as dew-point corrosion, fouling/deposition plugging, and air heater leakage. The analysis in this paper utilizes field data related to APH basket replacement, and the number of cycles experienced by the boiler to model the life expectancy of the baskets. The data-driven model enables preventive maintenance strategies for the APH by predicting how long the APH baskets will last in a probabilistic sense. Furthermore, the analysis showed that an increase in cycling for a fixed operation time can reduce the APH basket remaining useful life by about 30%.

20 FOSSIL-FUELED POWER PLANTS↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Coal gasification systems engineering and analysis. Appendix B: Medium B+U gas design

A four module, 20,000 TPD, based on KT coal gasification technology was designed. The plant processes Kentucky No. 9 coal with provisions for up to five percent North Alabama coal. Medium BTU gas with heat content of 305 BTU/SCF and not more than 200 ppm sulfur is the primary plant product. Sulfur is recovered for scale as prilled sulfur. Ash disposal is on site. The plant is designed for zero water discharge. Trade studies provided the basis for not using boiler produced steam to drive prime movers. Thus process derived steam in excess of process requirements in superheated for power use in prime movers. Electricity from the TVA grid is used to supply the balance of the plant prime mover power requirements. A study of the effect of mine mouth coal cleaning showed that coal cleaning is not an economically preferred route. The design procedure involved defining available processes to meet the requirements of each system, technical/economic trade studies to select the preferred processes, and engineering design and flow sheet development for each module. Cost studies assumed a staggered construction schedule for the four modules beginning spring 1981 and a 90% on stream factor.

Source record↗

Retrofit Energy Analysis and Central Thermal modeling (REACT) v1.0

REACT is a website designed to simplify the analysis and decision-making process for retrofitting existing central plant heating and cooling systems with advanced heat pump technologies. The tool evaluates the technical and economic viability of replacing traditional boilers with various options including water-to-water or air-to-water heat pumps, which can provide efficient and lower-cost heating and cooling. It allows users to compare current central plant configurations with retrofit scenarios, assessing energy consumption, life-cycle costs, and environmental impact. Retrofitting traditional boiler and chiller systems with water-to-water or air-to-water heat pumps can significantly reduce energy consumption and lower lifecycle costs. The REACT provides: User-Friendly Tools: A user friendly web interface for quick, intuitive analysis accessible to non-experts. Advanced Modeling: A Python-powered engine for detailed parametric studies, optimization, and research applications. Comprehensive Analysis: Lifecycle cost evaluation, energy consumption modeling, and environmental impact assessment. Visual Insights: A variety of plots to visualize system performance and design trade-offs. The engine for the website (REACT) bases on several Python libraries, and the website will be hosted on an ETA server.

Kim, Donghun [Lawrence Berkeley National Laborator↗

Economic Analysis of Condition-Monitoring-Based Predictive Maintenance in Power Plants under Market Elasticity

Condition-monitoring-based predictive maintenance can increase the power plant availability by preventing forced outages. However, the actual on-stream time depends on market elasticity and dynamics, which are affected by cost and penetration of other power generation technologies. This paper develops a systematic approach for the economic analysis of investment in condition monitoring technologies with due consideration of market elasticity. Focus is on corrosion monitoring in coal-fired power plants (CFFPs) since corrosion in high-temperature coal-fired boilers is a leading cause of equipment failure. Investment in sensor networks for measuring corrosion and operating conditions like metal temperature and concentrations of O 2 and SO 2 is investigated. The unscented Kalman filter is used to estimate corrosion in the waterwall section of the boiler under multiple sensor networks. Electricity produced by CFPPs in the future in the U.S. due to changes in availability under market elasticity is studied. Sensitivity of the incremental net present value to factors like the number, type, and cost of sensors is analyzed.

Electrochemistry↗

DATA DRIVEN APPROACH TO ANALYZING THE IMPACT OF POWER PLANT CYCLING ON AIR PREHEATER DEGRADATION AND REMAINING USEFUL LIFE

Due to the increased penetration of renewable energy generation sources, and fluctuations of the oil and gas prices, modern coal burning power plants deal with increased variability in the demand for power generation. These varying demands result in their intermittent under-capacity operation (cycling). Periodical ramping down and back up to follow the daily power demands causes damages to the plant components reducing its operational life. In this paper we analyze the impact of cycling on a rotary Ljungstrom air preheater (APH) unit installed at a coal fire power plant in the US. An inefficient air preheater can significantly impact boiler performance. Due to the repeated boiler’s hot-cold start, the APH experiences fluctuating operating conditions that result in accelerated degradation mechanisms, such as dew-point corrosion, fouling/deposition plugging, and air heater leakage.The analysis in this paper utilizes field data related to APH basket replacement, and the number of cycles experienced by the boiler to model the life expectancy of the baskets. The data-driven model enables preventive maintenance strategies for the APH by predicting how long the APH baskets will last in a probabilistic sense. The analysis showed that an increase in cycling for a fixed operation time can reduce the APH basket remaining useful life by about 30%.

Sharma, Himanshu↗

Development of Miniaturized High-Temperature Multi-Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings.

20 FOSSIL-FUELED POWER PLANTS↗

Evaluation of Doped-LaCrO3 ceramics for high temperature sensor applications

The main objective of this work was to investigate the applicability of the doped-LaCrO3 system for electrical interconnects and sensor applications at temperatures >800°C. Various A- and B-site doping strategies were investigated, and the effect on their electrical conductivity, Seebeck coefficient, and thermal coefficient of expansion were characterized up to 1500ºC. Solid-state, co-precipitation and sol gel methods were used to synthesize the compositions, and the chemical/thermal stability, microstructural evolution, sintering and grain growth kinetics were investigated for these compositions by XRD, SEM and Rietveld methods. The materials showing the greatest promise were included within thick film thermistor and thermocouple sensor designs that were tested to 1500ºC in various gas environments (various pO2 concentrations).

20 FOSSIL-FUELED POWER PLANTS↗

Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 7: Metal vapor Rankine topping-steam bottoming cycles

Adding a metal vapor Rankine topper to a steam cycle was studied as a way to increase the mean temperature at which heat is added to the cycle to raise the efficiency of an electric power plant. Potassium and cesium topping fluids were considered. Pressurized fluidized bed or pressurized (with an integrated low-Btu gasifier) boilers were assumed. Included in the cycles was a pressurizing gas turbine with its associated recuperator, and a gas economizer and feedwater heater. One of the ternary systems studied shows plant efficiency of 42.3% with a plant capitalization of $66.7/kW and a cost of electricity of 8.19 mills/MJ (29.5 mills/kWh).

Deegan, P. B.↗