Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Boiler”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Evaluating alternative steam generation pathways in the food industry

Steam generation in the food sector requires substantial energy and cost expenditures, requiring nearly half of its energy intake. Here, we used life cycle assessment and life cycle cost assessment to investigate the cost and energy impacts of steam generating alternatives: NG, biomass and hydrogen boilers and grid-supplied and self-generated electric steam generation systems (electric boilers, renewable thermal energy storage and industrial heat pumps). The analysis starts with a set of average U.S. conditions, where biomass boilers are the most cost-competitive alternative to NG. In a series of scenarios beyond average conditions, the analysis shows energy procurement costs dominate the total life cycle cost for all technologies and, unfortunately, are highly variable geographically and temporally, significantly affecting the viability of the alternatives. Results show that site-energy consumption ranges from 0.3 MMBtu/klb for industrial heat pumps to 1.6 MMBtu/klb for biomass boilers, with heat pumps achieving up to 78% lower energy use compared to natural gas systems. For the steam costs, the results show a range between $\$$8 and $\$$50/klb for NG, with biomass following closely ($\$$11 – $\$$44/klb) and grey hydrogen and IHP next ($\$$13 – $\$$33/klb and $\$$6 - $\$$78/klb), with cost reductions if IHP's cooling is utilized. Factors like operating hours, the need for cooling, and the ability to negotiate utility rates complicate the decision, making site-specific analyses critical. Therefore, we present a decision-making matrix to help manufacturers identify which steam generating technology is the best business decision for their situation. Overall, these results highlight the importance of steam generation for the facility's organizational goals, as well as the criticality of conducting individual site analyses.

Biomass boilers↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Nuclear Thermal Energy Storage Configurations for Industrial Combined Heat and Power Supply: Conceptual Study and Engineering Designs

The industries examined in this report primarily rely on moderate-temperature heat provided by gas- or coal-fired boilers and combined heat and power (CHP) plants, delivered through standard process steam systems. High-temperature energy demands are often industry-specific and typically exceed the capabilities of high-temperature gas-cooled reactors (HTGRs). While it is technically feasible to replace process steam from fossil-based heat sources with nuclear energy, certain industries, such as methanol production and pulp and paper, face technoeconomic challenges in integrating nuclear energy without major changes or a technological shift. This is mainly due to the limited external energy demand remaining after the use of internal byproducts, waste heat recovery, and simple efficiency improvements. Achieving full decarbonization of these processes with nuclear energy would require significant technological advancements, involving experimental technology and substantial investments, making widespread adoption in existing industrial plants unlikely in the near term. This study reviews TES options in the context of enabling a flexible CHP supply while maintaining a steady nuclear heat input. Heat storage systems that interface between the reactor primary fluid and the CHP system offer superior performance and flexibility. Specifically, steam extraction downstream of the reheater with a two-tank molten-salt TES appears as the best solution regarding thermodynamic system benefits and system drawbacks. Using selected system configurations, a conceptual design of an industrial energy park was developed for industries with varying energy demands, such as steel production plants utilizing electric arc furnaces (EAFs) and chemical plants, as well as for those with constant energy demands, like petroleum refineries. This design highlights the capabilities of TES and explores its potential business cases. The study also conceptually develops the potential for integrating additional energy sources with nuclear systems through the implementation of TES. The potential of the HTGR-TES-CHP system was also evaluated considering key uncertainties such as industrial demand profiles, external grid access availability, and eligible tax credit levels, using the Holistic Energy Resource Optimization Network. Sensitivity of net present value to these uncertainties was analyzed to determine the optimal number of nuclear reactors (and CHP systems) and the suitable TES capacity. The results were interpreted from a decision-maker’s perspective, focusing on three key areas: deployment strategy (oversized units vs. undersized units with TES support), industrial process characteristics (thermal-intensive single profiles vs. electricity-intensive combined profiles), and operational goals (maximizing profits vs. minimizing natural gas (NG) consumption or external grid dependence). The optimization results indicate that the HTGR-TES-CHP system significantly reduces reliance on NG boilers for individual industrial processes by 9-60% (in NG capacity factor), with an average reduction of 38%, compared to standalone NG boiler operation case (Business As Usual [BAU]). For combined industrial processes, the reduction ranges from 37-77%, with an average of 60%. Additionally, the system greatly reduces dependence on external grids. In meeting industrial electrical demands, a 33-100% self-sufficient internal electricity supply is achieved for single industrial process, with an average of 74%, compared to the BAU scenario, where 100% of electricity is imported. For combined processes, 35-100% of internal electricity demands are met by the reactor, with an average of 73%. At last, the relative NG price levels at which the proposed HTGR-TES-CHP system can cost-effectively enter the market currently dominated by existing NG boilers were estimated. For a moderate HTGR CAPEX level ($\$$2500/kWth, $\$$6329/kWe), the analysis suggests that NG prices must be 2.5 to 7 times higher than HTGR variable operating and maintenance costs for single industrial process, and 5.5 to 9.5 times higher for a combined process scenario. Tax credit modeling shows that the Investment Tax Credit significantly reduces the price threshold needed to break even, making the system competitive with NG boilers in certain cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost analysis of alternative large-scale high-temperature solid oxide electrolysis hydrogen production facilities

We extend our past cost analysis of gigawatt-scale solid oxide electrolysis (SOE) facilities that produce high purity hydrogen gas from water by estimating construction and operating costs for three new alternative design cases: (1) offsite feed steam generation; (2) near-atmospheric pressure (NAP) stack; and (3) onsite electric boiler feed steam generation. Pressure effects on hydrogen electrode-(cathode-)supported SOE cell (SOEC) stack performance are estimated for the same assumed cell and stack construction and used to determine facility-wide stack capital costs for achieving a fixed H2 production at different pressures. Modular balance of plant (BOP) process equipment capital costs are estimated for each new alternative design case using our past equipment sizing, design, and cost data and scaling relationships. Furthermore, we update BOP equipment sizing and design for the NAP case using Aspen®. Vendor quotes for electric boilers are used to estimate costs for the electric boiler design case. Factory and onsite assembly and installation costs for SOEC stacks and BOP equipment are calculated using our past simplified first-principles approach. First-of-a-kind (FOAK) and N th -of-a-kind (NOAK) production maturity cost estimates are included for all results. The case with NAP stacks offers the lowest facility total capital cost (TCC, ~23% lower than base) while use of small electric boilers requires the highest TCC (~3% higher than base). H 2 production prices decrease from the base of ~$\$2.17$ /kgH 2 to ~$\$1.92$/kgH 2 for 1 GW e DC SIP facilities utilizing NAP stacks supplied by offsites steam situated in large modules and blocks for $\$0.030$/kWh e and $0.009/kWh t prices for electricity and thermal energy, respectively. We report all costs in 2021 US dollars.

Balance of plant (BOP) process equipment↗

Development of novel dynamic machine learning-based optimization of a coal-fired power plant

The increasing fraction of intermittent renewable energy in the electrical grid is resulting in coal-fired boilers now routinely ramp up and down. The current state-of-the-art operation for such boilers is to apply steady-state, neural network-based optimization to make control decisions in real-time, and this report demonstrates the feasibility of extending this to dynamic, neural network-based optimization using a long short-term memory neural network. A simplified numerical simulation of a t-fired coal boiler and supporting equipment is used to represent a real plant subjected to both steady-state, neural network-based optimization and dynamic, neural network-based optimization. Using the same intervals and a particle swarm optimization algorithm, the dynamic optimization outperforms the steady-state optimization and realizes up to 4.58% improvement in thermal efficiency. Dynamic optimization with a long short-term memory neural network is shown to both be feasible and beneficial for operation of a coal-fired boiler under changing load.

42 ENGINEERING↗

Optimal operation of multi-plant steam district heating systems for enhanced efficiency and sustainability

Despite their crucial role in supplying heat and power to universities, industries, and healthcare facilities, many steam-based district heating systems rely on outdated control methods. Among these, multi-central plant districts are particularly challenging due to the complexities of coordinating multiple plants, optimizing load distributions, and managing system downtime. In response, new operational strategies are developed to enhance the efficiency and sustainability of steam districts while utilizing existing resources. These strategies include reducing plant operational pressure without compromising the reliable supply to buildings and optimizing load allocation across multiple plants. The load allocation considers boiler part-load efficiency, runtime, network losses, and building pressure set points, and is compared with traditional multi-boiler controls. To support this exploration, new dynamic Modelica models are developed. In addition, methods to reduce modeling complexities are incorporated, enhancing their suitability for practical applications. A holistic district-wide analysis using a real university case study demonstrates a 4.7% fuel savings by lowering boiler operational pressure from 900 kPa to 600 kPa, along with a 13.3% reduction in condensation losses across the distribution network. Furthermore, the load allocation approach results in a 13.1% reduction in fuel consumption during peak winter periods and 15.3% during shoulder periods, with corresponding decreases in carbon emissions and fuel costs. This approach can also save maintenance costs by reducing the boiler runtime by 49.6%. In conclusion, this research underscores the benefits of retrofitting aging steam district heating systems, offering immediate operational improvements by enhancing efficiency, meeting regulatory compliance, and extending infrastructure lifespans while delaying costly overhauls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improving Coal-Fired Plant Performance Through Integrated Predictive and Condition-Based Monitoring Tools

The project demonstrated the ability to improve boiler performance and reliability through the integrated use of condition-based monitoring (CBM) and predictions of the impacts of coal quality on boiler operations at a full-scale coal-fired power plant. The advanced tool developed actively monitors and manages coal quality and overall boiler conditions that maximizes availability and maintains generating capacity while reducing cost. The tool is used to forecast and alert plant operators and engineers about poor boiler conditions which may occur as a result of incoming coal and/or current power plant operating conditions. The Combustion System Performance Indices (CSPI) and CoalTracker (CT) programs predicts fireside performance of the plant including slagging, fouling, erosion, slag flow, strength development (sintering/densification), and slag layer thickness based on the composition of delivered coal. CT program is tailored for each plant and is used to track the coal from the point of delivery to the burner. The most successful application of the CSPI-CT has been at plants where the coal composition is determined through the use of a full stream elemental analyzers based on prompt gamma neutron analysis (PGNAA). The CSPI-CT program information is used by coal procurement, coal mining and plant operations personnel to select and blend coal properties for the best plant performance.

01 COAL, LIGNITE, AND PEAT↗

Oxy-fuel combustion and power generation system

Integration of an oxyfuel combustion boiler at elevated pressures and a heat exchanger is achieved to produce carbon dioxide by feeding flue gas comprising carbon dioxide and water from the oxyfuel combustion boiler to a direct contact cooler column wherein water is condensed at a temperature of 0 to 10° C. lower than its dew point; feeding a portion of the condensed water from the direct contact cooler column to the oxyfuel combustion boiler; feeding a portion of the carbon dioxide from the direct contact cooler column to the oxyfuel combustion boiler; and recovering a portion of the carbon dioxide from the direct contact cooler column.

Alekseev, Alexander↗

Waste heat recovery lube oil management

A waste heat recovery system comprising a thermal circuit. The thermal circuit includes a boiler and an expander fluidly coupled to the boiler. The thermal circuit further includes a power transfer system integrated to the expander. The power transfer system is configured to receive mechanical energy from the expander. The thermal circuit further includes an ejector fluidly coupled to the boiler and to the power transfer system. The ejector is configured to receive a motive flow of working fluid from the boiler. The ejector is further configured to receive a suction flow of working fluid from the power transfer system. The ejector is further configured to combine the motive flow of working fluid and the suction flow of working fluid.

Ernst, Timothy C.↗

Regional suitability of heating tower heat pumps based on technical and economic performance maps

The heating tower heat pump (HTHP) technology is evolving rapidly due to its high performance in summer and frost-free characteristic in winter. However, lacking comprehensive comparisons between the HTHP and conventional methods, such as air-source heat pump (ASHP), and chiller and boiler, greatly limits its applications. To address this problem, this paper carries out technological and economic performance analyses of the three systems in 353 locations over China by the processes of building load calculation, system sizing, annual simulation, performance comparison, and demonstration. Energy saving principle and potential of the HTHP are presented and explained. Based on that, economic performance comparison is conducted by considering the energy conversion efficiency and prices. The results show that the HTHP has advantage over the ASHP in most locations in China. The improvement in annual coefficient of performance (COP) is about 10% to 20%. For the locations in southwest China like Chongqing, the improvement is also less than 10% due to the large regeneration penalization in winter and small difference between dry-bulb and wet-bulb temperature in summer. The annual COP of the HTHP is 10% to 23% higher than that of the chiller and boiler in hot summer and cold winter zone, and cold zone. However, the HTHP shows no advantage over the chiller and boiler in severe cold zone because of the low efficiency of heat pump in winter, neither in hot summer and warm winter zone due to the small heating load. Based on the results, technical and economic performance maps are developed to guide the application of the HTHP in different climate regions.

heating tower heat pump, air-source heat pump, chi↗

Optimizing Hydronic Heating for Comfort and Performance in Multifamily Housing

Inefficient control settings in multifamily boilers often lead to substantial energy and cost penalties. To address this, a Fault Detection and Diagnostic (FDD) tool was developed to automate data analysis and identify operational faults such as suboptimal outdoor temperature sensor placement, misconfigured outdoor air reset (OAR) curves, excess boiler cycling, and domestic hot water (DHW) setpoint errors. By comparing pre- and post-implementation periods and applying engineering models, the tool quantifies energy savings and reduces manual analysis time by over 90%. Testing on over 100 monitored sites and a targeted subset of 12 buildings showed an average 11% energy savings from remote optimization; further validation across 19 OAR curve changes confirmed the tool’s accuracy, predicting actual savings within ±5% for most cases. Simple payback can be under three years for many multifamily buildings, though rising hardware, labor, and fuel costs create uncertainties, and decarbonization goals increasingly shift focus to electrification. The FDD tool remains invaluable for optimizing existing boilers, enhancing future electrification measures, and adapting to new technologies by refining building load estimates. In doing so, it supports both near-term efficiency and long-term transitions to low-carbon alternatives, ensuring buildings achieve substantial cost and energy benefits throughout their system lifecycles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced nuclear reactor integration opportunities for the pulp and paper industry in the U.S. context: Technical perspectives, gap analysis, and preliminary technoeconomic assessment

Pulp and paper (P&P) manufacturing requires a large amount of low-pressure (LP) steam to digest, wash wood fibers and dry pulp into paper. Most of the LP steam is extracted from backpressure turbines that produce power from high-pressure (HP) steam. This HP steam is generated from burning wood waste material; bark is burned in hog boilers, and lignin is boiled in a black liquor recovery boiler. In a typical integrated P&P mill, 50–100% of the steam is produced from these sources, while additional steam is produced in natural gas (NG), fuel oil, or coal boilers. The other energy-intensive process in the plant is the chemical-recovery section (e.g., lime kiln), which requires high-temperature processing from NG combustion to retrieve and recirculate spent chemicals. This paper assesses the energy and heat demand and material balances of a typical generic kraft pulp mill, along with the nuclear heat, steam, and power integration opportunities to replace conventional combustion systems. The paper also addresses steam and electricity generation through a comprehensive technical and engineering gap analysis of five different nuclear-integration opportunities and their process economics, thus enabling the lignin and bark to be further processed into biobased chemicals or fuels, as well as the potential to reduce overall emissions from kraft pulping. Preliminary findings have shown that the P&P industry could achieve technological benefits by integrating their current manufacturing process with small modular nuclear reactors (SMNRs) on a national level. This research aims to set the path forward for a cleaner and more resilient P&P industry.

Advanced nuclear reactor↗

Optimization of Operating Profit for the FEED of the PZAS Process for CO 2 Capture on a 460 MW NGCC

A rating model of PZAS (Piperazine with the Advanced Stripper) for a 460 MW natural gas combined cycle was developed from vendor-provided equipment performance data. Surrogate rating models were built and used to optimize variable profit of the system subject to natural gas and electricity price at a fixed value for CO 2 of $\$80$/tonne. Several process constraints were considered between ambient temperatures of 4.4 and 40.5 °C. Lower lean loading resulted in lower reboiler heat duty of about 2.2 GJ/tonne. Lean loading at 0.2 mol/equiv N was sufficient at an ambient temperature of 4.4 °C to maximize variable profit. Solvent precipitation was avoided even at low lean loading (0.18 mol/mol) in the absence of a trim cooler for the lean solvent between the absorber and the cold cross exchanger. Optimal CO 2 removal was always higher than the design case removal of 90% and achieved a peak of 93.6% for 4.4 ºC ambient temperature. Lean solvent rate was a significant driver of profitability. The maximum capacity of the compressor was a significant constraint on profitability. Increasing compressor capacity by 20–30% could increase variable profit by about 21% in the case of 0.18 lean loading at 4.4 °C ambient temperature. Furthermore, this increase in profit was lower at higher ambient temperature and higher lean loading. The breakeven gas price was $\$4.6$/MMBtu at high lean loading of 0.22 mol/mol. Below this value, profit was maximized by increasing the boiler heat rate. Above this value, profit could not be increased by burning additional natural gas, requiring a reduction in boiler heat rate and consequently, specific heat duty. At lower lean loading (0.2, 0.18 mol/mol), this transition in heat duty was not observed due to the lower heat duty. As the ambient temperature increased, a similar trend in heat duty was observed at 0.22 lean loading, but the transition to lower heat duty occurred earlier at $\$4$/MMBtu. This was because of the lower CO 2 production at higher ambient temperature, making the process unprofitable at a gas price higher than $\$3$/MMBtu unless the heat duty of the stripper and natural gas boiler is steeply decreased.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Data Driven Approach to Analyzing The Impact of Power Plant Cycling on Air Preheater Degradation and Remaining Useful Life

Due to the increased penetration of renewable energy generation sources, and fluctuations of the oil and gas prices, modern coal burning power plants deal with increased variability in the demand for power generation. These varying demands result in their intermittent under-capacity operation (cycling). Periodical ramping down and back up to follow the daily power demands causes damages to the plant components reducing its operational life. In this paper we analyze the impact of cycling on a rotary Ljungstrom air preheater (APH) unit installed at a coal fire power plant in the US. An inefficient air preheater can significantly impact boiler performance. Due to the repeated boiler’s hot-cold start, the APH experiences fluctuating operating conditions that result in accelerated degradation mechanisms, such as dew-point corrosion, fouling/deposition plugging, and air heater leakage. The analysis in this paper utilizes field data related to APH basket replacement, and the number of cycles experienced by the boiler to model the life expectancy of the baskets. The data-driven model enables preventive maintenance strategies for the APH by predicting how long the APH baskets will last in a probabilistic sense. Furthermore, the analysis showed that an increase in cycling for a fixed operation time can reduce the APH basket remaining useful life by about 30%.

20 FOSSIL-FUELED POWER PLANTS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Characterizing Impacts of Dry Coal Feeding in High Pressure Oxy-Coal Combustion Systems

Reaction Engineering International (REI) has managed a team of experts from the University of Utah, Southeast University (SEU) in Nanjing, China, Electric Power Research Institute (EPRI), Corrosion Management Ltd. (C-M), Praxair, and Brigham Young University (BYU) to investigate dry pulverized coal feeding for pressurized oxy-coal combustion. Dry feed firing systems for entrained flow, pressurized, oxy-coal combustors have not been well developed, although related technologies have been used in the Shell Gasification Process and for pressurized fluid bed combustion. DOE-funded research recently completed at REI and the University of Utah focused on characterizing impacts of high temperatures and pressures in oxy-coal combustion systems. For high pressure combustion, that research used a coal slurry feed into a 17 bar pressurized combustor. As a consequence of that research, it was identified that fuel feeding and firing system flexibility are challenges that require attention. Based on that experience, the approach of using a coal slurry feed system leads to challenges in producing consistent atomization of the slurry, which causes burnout problems, especially at high pressures. In addition, slurry atomization processes may be difficult to scale to sizes appropriate for practical commercial use. Dry pressurized coal burner systems, on the other hand, have the potential to yield efficiency gains, improve flexibility and facilitate applications at larger scales. Experimental work was conducted at the University of Utah Industrial Combustion and Gasification Research Facility as well as the 100 kW pressurized oxy-coal combustor (POC) facility at Brigham Young University. Mechanism development and CFD-based combustion and dense-phase flow modeling were performed at REI. Successful completion of the project objectives has resulted in the following key deliverables: 1) Design and prototype of a pressurized pulverized coal feeding and oxy-firing system 2) Data from a 100kW, pressurized (15 bar) entrained flow reactor with a dry feeding delivery and burner system that describes flame characteristics, radiative heat flux profiles, carbon burnout, along with characteristics of ash aerosols, fouling, and slagging. 3) Validated and transportable models that describe the relevant conditions in pressurized oxy-combustion systems and that can be used for scale-up and optimization. 4) Principles to guide design of high pressure, pilot-scale and full-scale coal oxy-firing systems. 5) Assessment of pressurized oxy-combustion impacts on key parameters relevant to oxy-coal fired utility boilers such as coal devolatilization, char oxidation, mineral matter transformation, deposition, and corrosion. The experimental data, pressurized oxy-firing system principles, and process mechanisms provided by this work can be used by electric utilities, boiler OEMs, equipment suppliers, design firms, software vendors, consultants and government agencies to assess the use of high temperature and high pressure oxy-combustion in current research and to guide development of new oxy-coal boiler designs.

01 COAL, LIGNITE, AND PEAT↗

Characterizing Impacts of Dry Coal Feeding in High Pressure Oxy-Coal Combustion Systems

Reaction Engineering International (REI) has managed a team of experts from the University of Utah, Southeast University (SEU) in Nanjing, China, Electric Power Research Institute (EPRI), Corrosion Management Ltd. (C-M), Praxair, and Brigham Young University (BYU) to investigate dry pulverized coal feeding for pressurized oxy-coal combustion. Dry feed firing systems for entrained flow, pressurized, oxy-coal combustors have not been well developed, although related technologies have been used in the Shell Gasification Process and for pressurized fluid bed combustion. DOE-funded research recently completed at REI and the University of Utah focused on characterizing impacts of high temperatures and pressures in oxy-coal combustion systems. For high pressure combustion, that research used a coal slurry feed into a 17 bar pressurized combustor. As a consequence of that research, it was identified that fuel feeding and firing system flexibility are challenges that require attention. Based on that experience, the approach of using a coal slurry feed system leads to challenges in producing consistent atomization of the slurry, which causes burnout problems, especially at high pressures. In addition, slurry atomization processes may be difficult to scale to sizes appropriate for practical commercial use. Dry pressurized coal burner systems, on the other hand, have the potential to yield efficiency gains, improve flexibility and facilitate applications at larger scales. Experimental work was conducted at the University of Utah Industrial Combustion and Gasification Research Facility as well as the 100 kW pressurized oxy-coal combustor (POC) facility at Brigham Young University. Mechanism development and CFD-based combustion and dense-phase flow modeling were performed at REI. Successful completion of the project objectives has resulted in the following key deliverables: 1) Design and prototype of a pressurized pulverized coal feeding and oxy-firing system 2) Data from a 100kW, pressurized (15 bar) entrained flow reactor with a dry feeding delivery and burner system that describes flame characteristics, radiative heat flux profiles, carbon burnout, along with characteristics of ash aerosols, fouling, and slagging. 3) Validated and transportable models that describe the relevant conditions in pressurized oxy-combustion systems and that can be used for scale-up and optimization. 4) Principles to guide design of high pressure, pilot-scale and full-scale coal oxy-firing systems. 5) Assessment of pressurized oxy-combustion impacts on key parameters relevant to oxy-coal fired utility boilers such as coal devolatilization, char oxidation, mineral matter transformation, deposition, and corrosion. The experimental data, pressurized oxy-firing system principles, and process mechanisms provided by this work can be used by electric utilities, boiler OEMs, equipment suppliers, design firms, software vendors, consultants and government agencies to assess the use of high temperature and high pressure oxy-combustion in current research and to guide development of new oxy-coal boiler designs.

pressurized oxy-coal combustion, sub-micron ash ae↗