Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Army”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Edward Teller and the Missing Swimming Trunks

I and my co-authors of Critical Assembly, Lilian Hoddeson, Paul Henriksen, and Catherine Westfall had the unparalleled opportunity to interview several of our wartime luminaries including Norman Ramsay, Emilio Segre, Hans Bethe, and Edward Teller. We also had the privilege of hosting each of them for lunch, usually at the Hilltop House Restaurant, a converted Army chapel directly across the street from the old LANL Archives.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Small arms suppression project (LLNL final report)

US Special Operations Command (USSOCOM) was seeking a technological leap in small firearms weapon suppressor technology, because anticipated enemy capabilities are requiring the operators to have smaller detection cross sections to ensure the safe execution of missions. Suppressors have been developed almost exclusively through trial-and-error methods since the time of the original design by Hiram Maxim over one hundred years ago. Consequently USSOCOM deemed it prudent to perform a physicsbased study of weapon suppression to understand performance limits and possibly identify breakthrough technologies. Lawrence Livermore National Laboratory’s (LLNL’s) high performance production level computational tool called ALE3D (Arbitrary Lagrangian-Eulerian 3D and 2D) has unique physics models and numerical algorithms for modeling suppressor dynamics. The flexible and extendable code framework supports fully integrated hydrodynamics, heat transfer, solid and fluid dynamics, and chemistry that can be applied to simulating propellant-driven motion of a bullet down a gun barrel, the transfer of heat from the burning propellant to the barrel and suppressor, the chemistry of muzzle flash, and the shock/acoustic/optical signatures in the near-field. LLNL’s originally anticipated role was to augment ALE3D for this task, by developing the software and analysis methodologies specific to the simulation of blast and muzzle flash phenomena. It was believed that insights provided by our ALE3D simulations in tandem with a coordinated experimental component by our other team members from Oak Ridge National Laboratory (ORNL) and the U. S. Army Armament, Research, Development and Engineering Center (ARDEC), would have excellent prospects of yielding useful suppressor design improvements that could be transitioned to industry and utilized by US Special Operations Command. The three year effort has come to fruition with the development of revolutionary suppressor designs that far outperform any previous or current design by anyone outside this multi-lab team.

42 ENGINEERING↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗

V31 Test Report

The V31 containment vessel was procured by the US Army Recovered Chemical Materiel Directorate (RCMD) as a third-generation EDS containment vessel. It is the fifth EDS vessel to be fabricated under Code Case 2564 of the 2019 ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel, based on the code case, is twenty-four (24) pounds TNT-equivalent for up to 1092 detonations. This report documents the results of explosive tests that were performed on the vessel at Sandia National Laboratories in Albuquerque, New Mexico to qualify the vessel for field operations use. There were three design basis configurations for qualification testing. Qualification test (1) consisted of a simulated M55 rocket motor and warhead assembly of 24lbs of Composition C-4 (30 lb TNT equivalent). This test was considered the maximum load case, based on modeling and simulation methods performed by Sandia prior to the vessel design phase. Qualification test (2) consisted of a regular, right circular cylinder, unitary charge, located central to the vessel interior of 19.2 lb of Composition C-4 (24 lb TNT equivalent). Qualification test (3) consisted of a 12-pack of regular, right circular cylinders of 2 lb each, distributed evenly inside the vessel (totaling 19.2 lb of C-4, or 24 lb TNT equivalent). All vessel acceptance criteria were met .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feature Based Qualification (FBQ) of Wire Arc Additively Manufactured (WAAM) 17-4PH Martensitic Stainless Steels

The Department of Defense (DOD) programs of records desire to reduce the time and cost of the development and delivery loop in metal additive manufacturing (AM), including establishing forwarded AM capabilities. The success of these efforts relies on a robust and qualified process. To achieve this, the United States Army Combat Capabilities Development Command Ground Vehicle Systems Center Materials Engineering (GVME) needs to be able to quickly evaluate, test, and develop feedstocks, processes, and parts. This report is directed towards demonstrating the need for a framework for metal AM processes, defining and exploring geometries for metal AM process qualification, testing resultant deposition, and delivering actionable data.

36 MATERIALS SCIENCE↗

Electric Vehicles as Mobile Power

Electric vehicles as mobile power (EV-AMP) can allow Texas Army National Guard and others to leverage as few as four electric vehicles (EVs) to provide emergency energy storage for 24 hours by installing bidirectional chargers and associated dark-start equipment. The presence of four or more EVs operating within a regional context creates a more resilient network than a single diesel generator or BESS, and the fleet of vehicles can travel to one of several locations equipped with bidirectional chargers for the service of critical loads.

25 ENERGY STORAGE↗

Wetland Re-Evaluation and Delineation Report for the Los Alamos National Laboratories Wetlands Project, Los Alamos County, New Mexico

In March of 2005, the Department of Energy (DOE), National Nuclear Security Administration (NNSA), Los Alamos Site office (LASO) requested the U.S. Army Corps of Engineers Albuquerque District (USACE) to identify and delineate wetlands at Los Alamos National Laboratory (LANL). The results of this study were intended to support the preparation of the Supplemental Site-Wide Environmental Impact Statement (EIS) and various mitigative measures that would become part of the National Environmental Policy Act (NEPA) compliance process for LANL. The term “wetland” will be used throughout the report to refer to the potential wetlands listed in Table 1. Many of these potential "wetlands” were not determined to be wetlands based on 2025 data.

60 APPLIED LIFE SCIENCES↗

Floating Photovoltaics in Hydropower Reservoirs in the United States

This report presents a comprehensive analysis of the feasibility of floating photovoltaics (FPV) in federally regulated reservoirs within the continental United States (CONUS) and to present a methodology for capturing the true costs of deployment, potential environmental impacts, and regulatory pathways for open-loop hydropower reservoirs. It is intended for stakeholders who may not be solar industry experts but who are interested in exploring the potential for FPV in their reservoirs. While there are promising opportunities, particularly in enhancing dissolved oxygen (DO) levels and potentially improving compliance with existing hydropower licenses, the current capital costs of FPV are not yet competitive with traditional land-based solar installations at the utility-scale when comparing the LCOE results. A competitive financial outlook is achievable when applying a 30% Investment Tax Credit (ITC) and considering a 5% reduction from the baseline capital expenditures (CapEx) at the Tuckertown Reservoir in North Carolina case study. The study is structured around three key pillars of research: technical potential, environmental impacts and regulatory considerations, and technoeconomic analysis. This report provides a nationwide assessment of the opportunities for FPV in terms of capacity, measured in direct current megawatts (MWDC), in reservoirs managed by the U.S. Bureau of Reclamation (USBR), the U.S. Army Corps of Engineers (USACE), and the Federal Energy Regulatory Commission (FERC). Additionally, the report introduces a heuristic model for estimating the CapEx of utility-scale FPV projects (1–100 MW), offering a baseline cost estimate for stakeholders. Finally, the report applies these models to a case study of a hydropower reservoir in North Carolina to present site-specific results.

13 - HYDRO ENERGY↗

High-Head Bypass Fish Passage Investigations: Year One (Final Report)

The goal of this first year study is to investigate the effects of downstream passage on fish health by comparing two methods: downstream fish passage at a high head dam through a bypass system, and downstream fish passage at a collection facility with vehicle conveyance to understand which method best supports achieving biological performance metrics, and what structural design or operational changes can be implemented to reduce stress and mortality in juvenile Chinook salmon. This study will occur at Green Peter Dam (or Green Peter). To achieve this goal, we will evaluate stress, injury, and mortality rates of downstream migrating juveniles after passage through a bypass system compared to holding fish in a collection facility and vehicle conveyance (trap and haul). This study will be conducted by researchers from Pacific Northwest National Laboratory (PNNL) in collaboration with researchers from Oregon State University (OSU). Results from this study will be used to inform the U.S. Army Corps of Engineers (USACE) Product Delivery Teams (PDTs) charged with designing improvements for downstream juvenile fish passage at high head dams in the Willamette River basin. The broader intent is to support management decisions on long-term measures and operations to rebuild populations of Upper Willamette River spring Chinook salmon listed as threatened under the Endangered Species Act.

13 HYDRO ENERGY↗

History of the Chemical Stockpile Emergency Preparedness Program – Volume 2: Lessons Learned (Final Report 2026)

The CSEP Program involved multiple federal agencies, multiple states, and numerous local units of government. The involvement of diverse agencies at different levels of government led to conflict and difficulty in resolving issues. That, in turn, led to slow progress in achieving program goals. Program management was criticized repeatedly by the U.S. General Accounting Office (GAO). After other mechanisms for interagency coordination had failed to give the desired results, FEMA and the Army agreed to form site-specific and national-level IPTs. The IPTs worked well to break the logjam and accelerate implementation of the program. Key elements of the IPTs’ success included constant interagency communication, solving problems at the lowest level, and obtaining buy-in from higher authority. The IPT technique could be applied to other emergency management and homeland security programs that require interagency coordination.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Performance contracting centers of expertise: a framework for federal implementation

This report examines the establishment and operation of Energy Performance Contracting (EPC) Centers of Expertise (COEs) within the federal government. EPCs, including Energy Savings Performance Contracts (ESPCs) and Utility Energy Service Contracts (UESCs), are critical mechanisms for advancing energy efficiency, resilience, and infrastructure modernization without the need for significant upfront appropriations. However, EPCs require specialized knowledge in project development, contracting, financing, legal parameters and technical project oversight. Currently federal agencies have varying levels of expertise and institutionalized policy to effectively and consistently use congressionally authorized EPCs which have decades of proven and impactful use. To address these challenges, several federal agencies have created COEs to centralize expertise, standardize practices, and streamline implementation. This report reviews statutory and policy drivers, highlights the benefits and challenges and presents case studies from the General Services Administration (GSA), the Department of Veterans Affairs (VA) and the U.S. Army Engineering and Support Center Huntsville (HNC). Recommendations are also provided for agencies considering the establishment of EPC COEs, which will bring much needed structure, consistency and lead to implementation of these energy and infrastructure building projects to save costs for U.S. taxpayers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Section 3 Reporting: Preserve America

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory with seven Nobel Prize-winning discoveries, 37 R&D 100 Awards, and countless advances in science and technology. For over 75 years, the Laboratory has played a leading role in the Department of Energy (DOE) Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. The Laboratory is operated and managed by Brookhaven Science Associates (BSA), which was founded by the Research Foundation for the State University of New York on behalf of Stony Brook University, and Battelle, a non-profit applied science and technology organization. BNL is committed to longstanding partnerships with researchers, academic institutions, industry, students, teachers, and the surrounding community. BNL is located near the center of Suffolk County on Long Island, New York within Brookhaven Township, about 60 miles east of New York City. Most of BNL’s principal facilities are located near the center of the 5,265-acre (8.23 square mile) site (Figure 1). The developed area encompasses approximately 1,820 acres, consisting of: ▪ 500 acres originally developed by the Army (as part of WW II Camp Upton) and still used for offices and other operational buildings. ▪ 200 acres occupied by large, specialized research facilities. ▪ 520 acres occupied by outlying facilities, such as the Sewage Treatment Plant, research agricultural fields, housing facilities, and fire breaks. ▪ 400 acres of roads, parking lots, and connecting areas. ▪ 200 acres developed for the Long Island Solar Farm. The balance of the site, approximately 3,400 acres, is largely wooded and represents a native pine barrens ecosystem. In November 2000, DOE set aside 530 acres of undeveloped land at BNL as the Upton Ecological and Research Reserve. The Upton Reserve preserves this portion of the pine barrens ecosystem and provides an area for ecological research and education activities.

99 GENERAL AND MISCELLANEOUS↗

AquaPV: Foundational Analysis and Industry Guidance on Floating PV Results

This dataset contains results of the technical potential analysis of floating photovoltaics (FPV) on federally owned or permitted reservoirs in the United States. Estimates of the area of reservoirs that is technically feasible for FPV development are provided for reservoirs that are owned by the US Army Corps of Engineers or the US Bureau of Reclamation, or are associated with hydropower dams licensed by the Federal Energy Regulatory Commission. Other associated data are included, such as estimates of the potential evaporative losses of FPV development, and whether the waterbody is associated with an energy community or disadvantaged community that could qualify it for investment or production tax credits. Data is provided both as a spreadsheet and in a geospatial format including the waterbody geometries. Please read the included readme for more detailed field definitions.

area↗

Point Cloud Based Mapping of Understory Shrub Fuel Distribution, Estimation of Fuel Consumption and Relationship to Pyrolysis Gas Emissions on Experimental Prescribed Burns

Forest fires spread via production and combustion of pyrolysis gases in the understory. The goal of the present paper is to understand the spatial location, distribution, and fraction (relative to the overstory) of understory plants, in this case, sparkleberry shrub, namely its degree of understory consumption upon burn, and to search for correlations between the degree of shrub consumption to the composition of emitted pyrolysis gases. Data were collected in situ at seven small experimental prescribed burns at Ft. Jackson, an army base in South Carolina, USA. Using airborne laser scanning (ALS) to map overstory tree crowns and terrestrial laser scanning (TLS) to characterize understory shrub fuel density, both pre- and postburn estimates of sparkleberry coverage were obtained. Sparkleberry clump polygons were manually digitized from a UAV-derived orthoimage of the understory and intersected with the TLS point cloud-derived rasters of pre- and postburn shrub fuel bulk density; these were compared in relation to overstory crown cover as well as to ground truth. Shrub fuel consumption was estimated from the digitized images; sparkleberry clump distributions were generally found to not correlate well to the overstory tree crowns, suggesting it is shade-tolerant. Moreover, no relationship was found between the magnitude of the fuel consumption and the chemical composition of pyrolysis gases, even though mixing ratios of 25 individual gases were measured.

54 ENVIRONMENTAL SCIENCES↗

Median bed-material sediment particle size across rivers in the contiguous US

Abstract. Bed-material sediment particle size data, particularly the median sediment particle size (D50), are critical for understanding and modeling riverine sediment transport. However, sediment particle size observations are primarily available at individual sites. Large-scale modeling and assessment of riverine sediment transport are limited by the lack of continuous regional maps of bed-material sediment particle size. We hence present a map of D50 over the contiguous US in a vector format that corresponds to approximately 2.7 million river segments (i.e., flowlines) in the National Hydrography Dataset Plus (NHDPlus) dataset. We develop the map in four steps: (1) collect and process the observed D50 data from 2577 U.S. Geological Survey stations or U.S. Army Corps of Engineers sampling locations; (2) collocate these data with the NHDPlus flowlines based on their geographic locations, resulting in 1691 flowlines with collocated D50 values; (3) develop a predictive model using the eXtreme Gradient Boosting (XGBoost) machine learning method based on the observed D50 data and the corresponding climate, hydrology, geology, and other attributes retrieved from the NHDPlus dataset; and (4) estimate the D50 values for flowlines without observations using the XGBoost predictive model. We expect this map to be useful for various purposes, such as research in large-scale river sediment transport using model- and data-driven approaches, teaching environmental and earth system sciences, planning and managing floodplain zones, etc. The map is available at https://doi.org/10.5281/zenodo.4921987 (Li et al., 2021a).

54 ENVIRONMENTAL SCIENCES↗

Emergency Diesel Generator Backup Power Systems for Military Bases

Backup power systems on military installations must provide reliable power during a grid outage. The risks of blackouts and loss of electric power are not new. Outages of just a few hours are well known, but longer duration outages are becoming more frequent. The U.S. Army, Navy, and Air Force now require backup power from one to two weeks. For multiday outages, the reliability of emergency diesel generators will have a significant impact on the installation’s backup power system’s ability to provide power for critical missions.

backup power↗

Energy Master Planning for Resilient Public Communities—Best Practices from U.S. Military Installations

Until recently, most planners at military installations addressed energy systems for new facilities on an individual facility basis without consideration of community-wide goals relevant to energy sources, renewables, storage, or future energy generation needs. Building retrofits of public buildings typically do not address energy needs beyond the minimum code requirements making it difficult, if not impossible, to achieve community-level targets on a building-by-building basis. Planning on the basis of cost and general reliability may also fail to deliver community-level resilience. For example, many building code requirements focus on hardening to specific threats, but in a multi-building community, only a few of these buildings may be mission-critical. Over the past two decades, the frequency and duration of regional power outages and water utility disruptions from weather, man-made events, and aging infrastructure have increased. Major disruptions of electric and thermal energy have degraded critical mission capabilities and caused significant economic impacts. In 2016, the U.S. Department of Defense issued guidance that each Service (Army, Navy, Air Force, Marines) complete comprehensive energy plans for the installations that consumed 75% of total building energy. Guidance was updated in 2017 to include metrics for energy resilience, and in some cases, water. This paper describes how community level quantitative and qualitative resilience analysis and metrics have been incorporated into community energy and water planning best practices for military installations in three geographically diverse locations. It is based on research performed under the International Energy Agency’s “Energy in Buildings and Communities Program Annex 73,” focusing on development of guidelines and tools that support the planning of Net Zero Energy Resilient Public Communities as well as research performed under the Department of Defense Environmental Security Technology Certification Program project EW18-D1- 5281, “Technologies Integration to Achieve Resilient, Low- Energy Military Installations.” The first case study reviews progress made on an energy and water planning study conducted at Fort Bliss, Texas. The second and third describes planning conducted at Fort Bragg, North Carolina and the Joint Region Marianas, Guam, respectively, under the updated guidance from 2017 regarding energy and water resilience. Analysis methods, key metrics, and key infrastructure and operational constraints are described, as well as technical, economic and business concepts used during the planning process.

Urban, Angela B.↗