Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Apollo Docking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

The Partnership: a History of the Apollo-Soyuz Test Project

Correspondance, interviews, official documents, and other published materials were used to trace the evolution of the Apollo Soyuz Test Project from the initial proposal for international cooperation in space use and exploration until the successful completion of the joint Soviet-American mission. Conceptual drawings of proposed docking modules and mechanisms are presented and dicussed. Black and white photographs taken during mission planning and in-flight activities are included with color photographs of the earth taken during the mission. Joint meetings are summarized and the scientific experiments and launch vehicles are discussed in the appendices.

Ezell, E. C.↗

Design, building, and testing of the post landing systems for the assured crew return vehicle

The design, building, and testing of the post landing support systems for a water landing Assured Crew Return Vehicle (ACRV) are presented. One ACRV will be permanently docked to Space Station Freedom, fulfilling NASA's commitment to Assured Crew Return Capability in the event of an accident or illness. The configuration of the ACRV is based on an Apollo Command Module (ACM) derivative. The 1990 to 91 effort concentrated on the design, building, and testing of a 1/5 scale model of the egress and stabilization systems. The objective was to determine the feasibility of: (1) stabilizing the ACM out of the range of motions which cause sea sickness; and (2) the safe and rapid removal of a sick or injured crewmember from the ACRV. The ACRV model construction is presented along with a discussion of the water test facility. The rapid egress system is also presented along with a discussion of the ACRV stabilization control systems. Results are given and discussed in detail.

Anderson, Loren A.↗

Design, building, and testing of the postlanding systems for the assured crew return vehicle

The design, building, and testing of the postlanding support systems for a water-landing Assured Crew Return Vehicle (ACRV) are presented. One ACRV will be permanently docked to Space Station Freedom, fulfilling NASA's commitment to Assured Crew Return Capability in the event of an accident or illness. The configuration of the ACRV is based on an Apollo Command Module (ACM) derivative. The 1990-1991 effort concentrated on the design, building, and testing of a one-fifth scale model of the egress and stabilization systems. The objective was to determine the feasibility of (1) stabilizing the ACM out of the range of motions that cause seasickness and (2) the safe and rapid removal of a sick or injured crew member from the ACRV. The development of the ACRV postlanding systems model was performed at the University of Central Florida with guidance from the Kennedy Space Center ACRV program managers. Emphasis was placed on four major areas. First was design and construction of a one-fifth scale model of the ACM derivative to accommodate the egress and stabilization systems for testing. Second was the identification of a water test facility suitable for testing the model in all possible configurations. Third was the construction of the rapid egress mechanism designed in the previous academic year for incorporation into the ACRV model. The fourth area was construction and motion response testing of the attitude ring and underwater parachute systems.

Hosterman, Kenneth C.↗

Postlanding optimum designs for the assured crew return vehicle

The optimized preliminary engineering design concepts for postlanding operations of a water-landing Assured Crew Return Vehicle (ACRV) during a medical rescue mission are presented. Two ACRVs will be permanently docked to Space Station Freedom, fulfilling NASA's commitment to Assured Crew Return Capability in the event of an accident or illness. The optimized configuration of the ACRV is based on an Apollo command module (ACM) derivative. The scenario assumes landing a sick or injured crewmember on water with the possibility of a delayed rescue. Design emphasis is placed on four major areas. First is the design of a mechanism that provides a safe and time-critical means of removing the sick or injured crewmember from the ACRV. Support to the assisting rescue personnel is also provided. Second is the design of a system that orients and stabilizes the craft after landing so as to cause no further injury or discomfort to the already ill or injured crewmember. Third is the design of a system that provides full medical support to a sick or injured crewmember aboard the ACRV from the time of separation from the space station to rescue by recovery forces. Last is the design of a system that provides for the comfort and safety of the entire crew after splashdown up to the point of rescue. The four systems are conceptually integrated into the ACRV.

Hosterman, Kenneth C.↗

Lunar transfer vehicle studies

Lunar transportation architectures exist for several different mission scenarios. Direct flights from Earth are possible, as the Apollo program clearly demonstrated. Alternatively, a space transfer vehicle could be constructed in space by using the Space Station as a base of operations, or multiple vehicles could be launched from Earth and dock in LEO without using a space station for support. Similarly, returning personnel could proceed directly to Earth or rendezvous at the Space Station for a ride back home on the Space Shuttle. Multiple design concepts exist which are compatible with these scenarios and which can support requirements of cargo, personnel, and mission objectives. Regardless of the ultimate mission selected, some technologies will certainly play a key role in the design and operation of advanced lunar transfer vehicles. Current technologies are capable of delivering astronauts to the lunar surface, but improvements are needed to affordably transfer the material and equipment that will be needed for establishing a lunar base. Materials and structures advances, in particular, will enable the development of more capable cryogenic fluid management and propulsion systems, improved structures, and more efficient vehicle assembly, servicing and processing.

Keeley, Joseph T.↗

Apollo 13 Facts

Footage is seen of the Earth from the Apollo 13 spacecraft as it travels towards the Moon. The crew, James Lovell, Jr., John Swigert, Jr., and Fred Haise, Jr., are shown performing various on-orbit activities. The Lunar Module rendezvous and docking, tunnel repressurization, and S4-B separation are also seen.

Source record↗

On the Shoulders of Titans: A History of Project Gemini

Gemini was the intermediate manned space flight program between America's first steps into space with Mercury and the manned lunar expeditions of Apollo. Because of its position between these two other efforts, Gemini is probably less remembered. Still, it more than had its place in man's progress into this new frontier. Gemini accomplishments were manyfold. They included many firsts: first astronaut-controlled maneuvering in space; first rendezvous in space of one spacecraft with another; first docking of one spacecraft with a propulsive stage and use of that stage to transfer man to high altitude; first traverse of man into the earth's radiation belts; first extended manned flights of a week or more in duration; first extended stays of man outside his spacecraft; first controlled reentry and precision landing; and many more. These achievements were significant in ways one cannot truly evaluate even today, but two things stand out: (1) it was the time when America caught up and surpassed the Soviet Union in manned space flight, and (2) these demonstrations of capability were an absolute prerequisite to the phenomenal Apollo accomplishments then yet to come.

Hacker, B. C.↗

Apollo 16 Press Kit

The Apollo 16 spacecraft is scheduled for launch on Apr. 16, 1972 from Complex 39A at the Kennedy Space Center, Florida by the Saturn V launch vehicle. Crewmen are mission commander John W. Young, command module pilot Thomas K. Mattingly II and lunar module pilot Charles M. Duke Jr. Objectives of the mission, to last up to 12 days, as outlined by NASA: to perform selenological inspection, survey and sampling of materials in a preselected region of Descartes using a lunar roving' vehicle; deploy and activate Apollo surface experiments; develop man's capability to work in the lunar environment; obtain photographs of candidate exploration sites; and toconduct inflight experiments and photographic tasks in lunar orbit. Following launch, the spacecraft will reach Earth Parking Orbit and remain in orbit for about two and one-half revolutions prior to Translunar Injection. Next, the Command and Service Module docks with the Lunar Module and the spacecraft "coasts" to the moon. In orbit around the moon, the Command and Service Module/Lunar Module combination will descend to within 50,000 feet of the lunar surface before undocking. The Lunar Module will continue to descend while the Command and Service Module returns to an orbit approximately 60 miles high. Stay time on the lunar surface is scheduled for approximately 73 hours. The ascent stage of the Lunar Module then lifts the astronauts back into lunar orbit where they will dock with the Command/Service Module. The Lunar Module is jettisoned and Transearth Injection follows. Just prior to reentry into the earth's atmosphere, the Service Module is jettisoned, and the astronauts in the Command Module splashdown in the Pacific Ocean. The target point for end-of-mission splashdown is at 05 degrees 0 minutes north latitude and 158 degrees 40 minutes west longitude or approximately 985 nautical miles south of Honolulu, Hawaii. Splashdown is scheduled for Apr. 28, 1972 at 10:30 a.m. Hawaiian Standard Time (2:30 p.m. CST). Recovery forces for Apollo 16, stationed in both the Atlantic and Pacific Oceans, will consist of three ships, nine aircraft and nearly 1,700 personnel. CTF-130 (Manned Spacecraft Recovery Force, Pacific) forces will be stationed south of Hawaii. Three ships, eight helicopters and three Air Force HC-130H aircraft, and nearly 1,100 personnel, will take part. Task Force 140 (Manned Spacecraft Recovery Force, Atlantic), comprising one ship, six HC-130H aircraft, three helicopters and approximately 300 personnel, will be positioned for possible launch abort operations. Two ships in the Atlantic will also be used for acoustical testing. Other forces, primarily aircraft and personnel of the Air Force Aerospace Rescue and Recovery Service will be on alert around the world for contingency recovery support.

Source record↗

Reuse International Space Station (ISS) Modules as Lunar Habitat

NASA currently projects ending the ISS mission in approximately 2016, due primarily to the expense of re-boost and re-supply. Lunar outposts are expected to be in place in the same timeframe. In support of these mission goals, a scheme to reuse ISS modules on the moon has been identified. These modules could function as pressurized volumes for human habitation in a lunar vacuum as they have done in low-earth orbit. The ISS hull is structurally capable of withstanding a lunar landing because there is no atmospheric turbulence or friction. A compelling reason to send ISS modules to the moon is their large mass; a large portion of the ISS would survive re-entry if allowed to de-orbit to Earth. ISS debris could pose a serious risk to people or structures on Earth unless a controlled re-entry is performed. If a propulsive unit is devised to be attached to the ISS and control re-entry, a propulsion system could be used to propel the modules to the moon and land them there. ISS modules on the lunar surface would not require re-boost. Radiation protection can be attained by burying the module in lunar regolith. Power and a heat removal system would be required for the lunar modules which would need little support structure other than the lunar surface. With planetary mass surrounding the module, heat flux may be controlled by conductance. The remaining requirement is the re-supply of life-support expendables. There are raw materials on the moon to supplement these vital resources. The lunar maria is known to contain approximately 40% oxygen by mass in inorganic mineral compounds. Chemical conversion of moon rocks to release gaseous oxygen is known science. Recycling and cleaning of air and water are currently planned to be accomplished with ISS Environmental Control & Life Support Systems (ECLSS). By developing a Propulsion and Landing Module (PLM) to dock to the Common Berthing Mechanism (CBM), several identical PLMs could be produced to rescue and transfer the ISS modules to the lunar surface, one by one. The propulsion does not need to be as swift as Apollo, nor would the modules need to be manned during transportation to the moon. The trajectory from low-Earth to lunar orbit would avoid or quickly pass through the Van Allen belts to minimize radiation exposure to electronics onboard. A landing technology similar to Apollo's could be utilized to land an ISS module on the moon. Since the mission will be unmanned, system redundancy could be minimized to keep the cost down. If the mission failed and a module crashed landed on the moon, the risk of debris landing on Earth would be avoided and the raw materials could be used in future lunar missions.

Miernik, Janie↗

High Leverage Space Transportation System Technologies for Human Exploration Missions to the Moon and Beyond

The feasibility of returning humans to the Moon by 2004, the 35th anniversary of the Apollo 11 landing, is examined assuming the use of existing launch vehicles (the Space Shuttle and Titan 4B), a near term, advanced technology space transportation system, and extraterrestrial propellant--specifically 'lunar-derived' liquid oxygen or LUNOX. The lunar transportation system (LTS) elements consist of an expendable, nuclear thermal rocket (NTR)-powered translunar injection (TLI) stage and a combination lunar lander/Earth return vehicle (LERV) using cryogenic liquid oxygen and hydrogen (LOX/LH2) chemical propulsion. The 'wet' LERV, carrying a crew of 2, is configured to fit within the Shuttle orbiter cargo bay and requires only modest assembly in low Earth orbit. After Earth orbit rendezvous and docking of the LERV with the Titan 4B-launched NTR TLI stage, the initial mass in low Earth orbit (IMLEO) is approx. 40 t. To maximize mission performance at minimum mass, the LERV carries no return LOX but uses approx. 7 t of LUNOX to 'reoxidize' itself for a 'direct return' flight to Earth followed by an 'Apollo-style' capsule recovery. Without LUNOX, mission capability is constrained and the total LTS mass approaches the combined Shuttle-Titan 4B IMLEO limit of approx. 45 t even with enhanced NTR and chemical engine performance. Key technologies are discussed, lunar mission scenarios described, and LTS vehicle designs and characteristics are presented. Mission versatility provided by using a small 'all LH2' NTR engine or a 'LOX-augmented' derivative, either individually or in clusters, for outer planet robotic orbiter, small Mars cargo, lunar 'commuter', and human Mars exploration class missions is also briefly discussed.

Borowski, Stanley K.↗

Space-Proven Medical Monitor: The Total Patient-Care Package

The primary objective of the Gemini Program was to develop techniques that would allow for advanced, long-duration space travel, a prerequisite of the ensuing Apollo Program that would put man safely on the Moon before the end of the decade. In order to carry out this objective, NASA worked with a variety of innovative companies to develop propulsion systems, onboard computers, and docking capabilities that were critical to the health of Gemini spacecraft, as well as life-support systems and physiological-monitoring devices that were critical to the health of Gemini astronauts. One of these companies was Spacelabs Medical, Inc., the pioneer of what is commonly known today as medical telemetry. Spacelabs Medical helped NASA better understand man s reaction to space through a series of bioinstrumentation devices that, for the first time ever, were capable of monitoring orbiting astronauts physical conditions in real time, from Earth. The company went on to further expand its knowledge of monitoring and maintaining health in space, and then brought it down to Earth, to dramatically change the course of patient monitoring in the field of health care.

Source record↗

Skylab: The Second Manned Mission. A Scientific Harvest

Covers the Skylab launch activities and docking with unmanned SL-1 workshop. Includes observations of student experiments (the Minchmog minnows and Arabella, the spider), observations of student experiments, exercise routines, and the enabling of the Earth Resources Experiments Package. Shows planet Earth documentation, manned operation of the Apollo Telescope Mount for observations of the Sun and beyond, outside EVA activity, testing of the Astronaut Maneuvering Unit, experiments to explore industrial uses of space, and the Skylab living routine.

AV Corporation↗

2006 NASA Seal/Secondary Air System Workshop; Volume 1

The 2006 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of NASA s new fundamental aeronautics technology project; (iii) Overview of NASA Glenn Research Center s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakages as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed seal technologies employed by the Apollo command module that serve as an excellent basis for seals for NASA s new Crew Exploration Vehicle (CEV).

Steinetz, Bruce, M.↗

Apollo 11 Highlights

This video recounts the Apollo 11 Mission which took ten years of preparation and the work of over a half a million people, culminating in the first manned lunar landing on July 20, 1969. Historical footage is accompanied by a narrated account of the mission. The footage includes preparation for launch, takeoff, stage separation, docking in space the Eagle Lunar Lander, shots of the Earth and Moon from space, Michael Collins orbiting the Moon in the Columbia Orbiter, Edwin Aldrin and Neil Armstrong walking on the Moon, setting up a Solar Wind experiment, collecting lunar samples, shots aboard the U.S.S. Hornet, retrieval of the astronauts after splashdown, and the parade given in honor of the astronauts.

Source record↗

Apollo-Soyuz Doppler-tracking experiment MA-089

The Doppler tracking experiment was designed to test the feasibility of improved mapping of the earth's gravity field by the low-low satellite-to-satellite tracking method and to observe variations in the electron density of the ionosphere between the two spacecraft. Data were taken between 1:01 and 14:37 GMT on July 24, 1975. Baseline data taken earlier, while the docking module was still attached to the command and service module, indicated that the equipment operated satisfactorily. The ionospheric data contained in the difference between the Doppler signals at the two frequencies are of excellent quality, resulting in valuable satellite-to-satellite observations, never made before, of wave phenomena in the ionosphere. The gravity data were corrupted by an unexpectedly high noise level of as-yet-undetermined origin, with periods greater than 150 seconds, that prevented unambiguous identification of gravity-anomaly signatures.

Weiffenbach, G. C.↗

Gemini Summary Conference

The Gemini Summary Conference was held on February 1 and 2, 1967, at the NASA Manned Spacecraft Center, Houston, Tex. The conference emphasized the highlights of the Gemini Program and especially the flight results of the last five missions. This report contains the 21 technical papers presented at the conference as well as an introduction by George E. Mueller and concluding remarks by George M. Low. The technical papers are divided into five sections: the first describes the rendezvous, docking, and tethered-vehicle operations involving the spacecraft and a target vehicle; the second presents various aspects of extravehicular activity; the third concerns the operational support of the missions ; the fourth cover the experiments conducted during the missions; and the fifth compares the astronaut flight and simulation experiences and relates the Gemini results to the Apollo Program.

structural integrity↗

Feasibility study of the solar scientific instruments for Spacelab/Orbiter

The feasibility and economics of mounting and operating a set of solar scientific instruments in the backup Skylab Apollo Telescope Mount (ATM) hardware was evaluated. The instruments used as the study test payload and integrated into the ATM were: the Solar EUV Telescope/Spectrometer; the Solar Active Region Observing Telescope; and the Lyman Alpha White Light Coronagraph. The backup ATM hardware consists of a central cruciform structure, called the "SPAR', a "Sun End Canister' and a "Multiple Docking Adapter End Canister'. Basically, the ATM hardware and software provides a structural interface for the instruments; a closely controlled thermal environment; and a very accurate attitude and pointing control capability. The hardware is an identical set to the hardware that flow on Skylab.

Leritz, J.↗

Performance capabilities of a Phase One Automatic Rendezvous and Capture System

This paper presents an analysis of the performance of the existing 'Phase One' AR&C system developed at the C.S. Draper Laboratory for both the rendezvous and proximity operations mission phases. This material has been developed as a result of Draper Laboratory involvement through NASA's Johnson Space Center in the development of the flight proven IGN&C rendezvous systems for Apollo, Skylab, and Shuttle. The development of these systems using Draper computer simulations has required automation of all crew inputs to the IGN&C system and thus provided the unique opportunity to develop and test those system capabilities required for AR&C. This paper expands upon the material in the papers presented by the authors at the NASA Autonomous Rendezvous and Docking Conference held at JSC on August 15-16, 1991.

Kachmar, Peter M.↗