Evaluation of actuator energy storage and power sources for spacecraft applications

The objective of this evaluation is to determine an optimum energy storage/power source combination for electrical actuation systems for existing (Solid Rocket Booster (SRB), Shuttle) and future (Advanced Launch System (ALS), Shuttle Derivative) vehicles. Characteristic of these applications is the requirement for high power pulses (50-200 kW) for short times (milliseconds to seconds), coupled with longer-term base or 'housekeeping' requirements (5-16 kW). Specific study parameters (e.g., weight, volume, etc.) as stated in the proposal and specified in the Statement of Work (SOW) are included.

Simon, William E.↗

Advanced Launch Development Program status

The Advanced Launch System is a joint NASA - Air Force program originally directed to define the concept for a modular family of launch vehicles, to continue development programs and preliminary design activities focused primarily on low cost to orbit, and to offer maturing technologies to existing systems. The program was restructed in the spring of 1990 as a result of funding reductions and renamed the Advanced Launch Development Program. This paper addresses the program's status following that restructuring and as NASA and the Air Force commence a period of deliberation over future space launch needs and the budgetary resources available to meet those needs. The program is currently poised to protect a full-scale development decision in the mid-1990's through the appropriate application of program resources. These resources are concentrated upon maintaining the phase II system contractor teams, continuing the Space Transportation Engine development activity, and refocusing the Advanced Development Program demonstrated activities.

Colgrove, Roger↗

A Personnel Launch System for safe and efficient manned operations

Several Conceptual designs for a simple, rugged Personnel Launch System (PLS) are presented. This system could transport people to and from Low Earth Orbit (LEO) starting in the late 1990's using a new modular Advanced Launch System (ALS) developed for the Space Exploration Initiative (SEI). The PLS is designed to be one element of a new space transportation architecture including heavy-lift cargo vehicles, lunar transfer vehicles, and multiple-role spcecraft such as the current Space Shuttle. The primary role of the PLS would be to deliver crews embarking on lunar or planetary missions to the Space Station, but it would also be used for earth-orbit sortie missions, space rescue missions, and some satellite servicing missions. The PLS design takes advantage of emerging electronic and structures technologies to offer a robust vehicle with autonomous operating and quick turnaround capabilities. Key features include an intact abort capability anywhere in the operating envelope, and elimination of all toxic propellants to streamline ground operations.

Petro, Andrew J.↗

Artificial intelligent decision support for low-cost launch vehicle integrated mission operations

The feasibility, benefits, and risks associated with Artificial Intelligence (AI) Expert Systems applied to low cost space expendable launch vehicle systems are reviewed. This study is in support of the joint USAF/NASA effort to define the next generation of a heavy-lift Advanced Launch System (ALS) which will provide economical and routine access to space. The significant technical goals of the ALS program include: a 10 fold reduction in cost per pound to orbit, launch processing in under 3 weeks, and higher reliability and safety standards than current expendables. Knowledge-based system techniques are being explored for the purpose of automating decision support processes in onboard and ground systems for pre-launch checkout and in-flight operations. Issues such as: satisfying real-time requirements, providing safety validation, hardware and Data Base Management System (DBMS) interfacing, system synergistic effects, human interfaces, and ease of maintainability, have an effect on the viability of expert systems as a useful tool.

Szatkowski, Gerard P.↗

Aerospace induction motor actuators driven from a 20-kHz power link

Aerospace electromechanical actuators utilizing induction motors are under development in sizes up to 40 kW. While these actuators have immediate application to the Advanced Launch System (ALS) program, several potential applications are currently under study including the Advanced Aircraft Program. Several recent advances developed for the Space Station Freedom have allowed induction motors to be selected as a first choice for such applications. Among these technologies are bi-directional electronics and high frequency power distribution techniques. Each of these technologies are discussed with emphasis on their impact upon induction motor operation.

Hansen, Irving G.↗

An Earth Orbiting Satellite Service and Repair Facility

A conceptual design was produced for the Geosynchronous Satellite Servicing Platform (GSSP), an orbital facility capable of repairing and servicing satellites in geosynchronous orbit. The GSSP is a man-tended platform, which consists of a habitation module, operations module, service bay and truss assembly. This design review includes an analysis of life support systems, thermal and power requirements, robotic and automated systems, control methods and navigation, and communications systems. The GSSP will utilize existing technology available at the time of construction, focusing mainly on modifying and integrating existing systems. The entire facility, along with two satellite retrieval vehicles (SRV), will be placed in geosynchronous orbit by the Advanced Launch System. The SRV will be used to ferry satellites to and from the GSSP. Technicians will be transferred from Earth to the GSSP and back in an Apollo-derived Crew Transfer Capsule (CTC). These missions will use advanced telerobotic equipment to inspect and service satellites. Four of these missions are tentatively scheduled per year. At this rate, the GSSP will service over 650 satelites during the projected 25 year lifespan.

Berndt, Andrew↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Volume 1: Executive summary

The feasibility of replacing the Space Transportation System (STS) Solid Rocket Boosters (SRBs) with Liquid Rocket Boosters (LRBs) was studied. Feasibility required acceptable technical risk, program costs, and a program plan which supports STS requirements. Three major goals were identified to direct booster design and operation: increased STS safety and reliability; STS/LRB integration with minimum impact; and increased STS performance. Two booster engine designs were studied. The first engine design was a turbopump-fed engine with state-of-the-art design, and the second was a pressure-fed engine which might provide a lower cost alternative to the pump-fed concept. Both booster concepts were carried through to completion of conceptual design and all system impacts and program costs were identified. Applications for LRB use in the Advanced Launch System (ALS) program were studied using the pump-fed LRB baseline concept and variations on the baseline concept. Support for the Pressure-Fed Booster Test Bed (PFBTB) included test program planning and costs and technical support.

Source record↗

The propulsion system is the key to airline-like operation of ETO vehicles

The topics covered include the following: (1) Advanced Launch System (ALS); (2) life cycle cost/lb payload; (3) current operational cost; (4) major cost driver; (5) fully automated operations; (6) technology impacts on vehicle dry mass efficiency; (7) single stage to orbit (SSTO) approach; and (8) efficient SSTO propulsion system operations.

Obrien, Charles J.↗

Advances in robust flight design

Current launch vehicle trajectory design philosophies, generally based on maximizing payload capability, result in an expensive and time-consuming iteration in trajectory design for each mission. However, for a launch system that is not performance-driven, a flight design that is robust to variations in missions and provides single-engine-out capability can be highly cost-effective. This philosophy has led to the development of two flight design concepts to reduce recurring costs: standard trajectories and command multiplier steering. Preliminary analyses of these two concepts had proven the feasibility and showed encouraging results in applications to an Advanced Launch System vehicle. Recent progress has demonstrated the effective and efficient integration of the two concepts with minimal payload penalty.

Wong, Kelvin K.↗

Study on advanced information processing system

Issues related to the reliability of a redundant system with large main memory are addressed. In particular, the Fault-Tolerant Processor (FTP) for Advanced Launch System (ALS) is used as a basis for our presentation. When the system is free of latent faults, the probability of system crash due to nearly-coincident channel faults is shown to be insignificant even when the outputs of computing channels are infrequently voted on. In particular, using channel error maskers (CEMs) is shown to improve reliability more effectively than increasing the number of channels for applications with long mission times. Even without using a voter, most memory errors can be immediately corrected by CEMs implemented with conventional coding techniques. In addition to their ability to enhance system reliability, CEMs--with a low hardware overhead--can be used to reduce not only the need of memory realignment, but also the time required to realign channel memories in case, albeit rare, such a need arises. Using CEMs, we have developed two schemes, called Scheme 1 and Scheme 2, to solve the memory realignment problem. In both schemes, most errors are corrected by CEMs, and the remaining errors are masked by a voter.

Shin, Kang G.↗

ALS engine propellant effector system

This report summarizes analysis, design, and experimental testing done on the propellant effector (valve plus electromechanical actuator) for the Advanced Launch System (ALS) main engine.

Faulkner, Colin↗

Rocket combustion chamber life-enhancing design concepts

NASA continues to pursue technologies which can lead to an increase in life and reduce the costs of fabrication of the Space Shuttle Main Engine. The joint NASA/Air Force Advanced Launch System Program has set its prime objectives to be high reliability and low cost for their new advanced booster engine. In order to meet these objectives, NASA will utilize the results of several ongoing programs to provide the required technologies. An overview is presented of those programs which address life enhancing design concepts for the combustion chamber. Seven different design concepts, which reduce the thermal strain and/or increase the material strength of the combustion chamber liner wall are discussed. Subscale rocket test results are presented, where available, for life enhancing design concepts. Two techniques for reducing chamber fabrication costs are discussed, as well as issues relating to hydrocarbon fuels/combustion chamber liner materials compatibility.

Quentmeyer, Richard J.↗

Rocket combustion chamber life-enhancing design concepts

NASA continues to pursue technologies which can lead to an increase in life and reduce the costs of fabrication of the Space Shuttle Main Engine. The joint NASA/Air Force Advanced Launch System Program has set its prime objectives to be high reliability and low cost for their new advanced booster engine. In order to meet these objectives, NASA will utilize the results of several ongoing programs to provide the required technologies. An overview is presented of those programs which address life enhancing design concepts for the combustion chamber. Seven different design concepts, which reduce the thermal strain and/or increase the material strength of the combustion chamber liner wall are discussed. Subscale rocket test results are presented, where available, for life enhancing design concepts. Two techniques for reducing chamber fabrication costs are discussed, as well as issues relating to hydrocarbon fuels/combustion chamber liner materials compatibility.

Quentmeyer, R. J.↗

Magnetic levitation systems for future aeronautics and space research and missions

The objectives, advantages, and research needs for several applications of superconducting magnetic levitation to aerodynamics research, testing, and space-launch are discussed. Applications include very large-scale magnetic balance and suspension systems for high alpha testing, support interference-free testing of slender hypersonic propulsion/airframe integrated vehicles, and hypersonic maglev. Current practice and concepts are outlined as part of a unified effort in high magnetic fields R&D within NASA. Recent advances in the design and construction of the proposed ground-based Holloman test track (rocket sled) that uses magnetic levitation are presented. It is protected that ground speeds of up to Mach 8 to 11 at sea-level are possible with such a system. This capability may enable supersonic combustor tests as well as ramjet-to-scramjet transition simulation to be performed in clean air. Finally a novel space launch concept (Maglifter) which uses magnetic levitation and propulsion for a re-usable 'first stage' and rocket or air-breathing combined-cycle propulsion for its second stage is discussed in detail. Performance of this concept is compared with conventional advanced launch systems and a preliminary concept for a subscale system demonstration is presented.

Blankson, Isaiah M.↗

Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study. Appendix F: Performance and trajectory for ALS/LRB launch vehicles

By simply combining two baseline pump-fed LOX/RP-1 Liquid Rocket Boosters (LRBs) with the Denver core, a launch vehicle (Option 1 Advanced Launch System (ALS)) is obtained that can perform both the 28.5 deg (ALS) mission and the polar orbit ALS mission. The Option 2 LRB was obtained by finding the optimum LOX/LH2 engine for the STS/LRB reference mission (70.5 K lb payload). Then this engine and booster were used to estimate ALS payload for the 28.5 deg inclination ALS mission. Previous studies indicated that the optimum number of STS/LRB engines is four. When the engine/booster sizing was performed, each engine had 478 K lb sea level thrust and the booster carried 625,000 lb of useable propellant. Two of these LRBs combined with the Denver core provided a launch vehicle that meets the payload requirements for both the ALS and STS reference missions. The Option 3 LRB uses common engines for the cores and boosters. The booster engines do not have the nozzle extension. These engines were sized as common ALS engines. An ALS launch vehicle that has six core engines and five engines per booster provides 109,100 lb payload for the 28.5 deg mission. Each of these LOX/LH2 LRBs carries 714,100 lb of useable propellant. It is estimated that the STS/LRB reference mission payload would be 75,900 lb.

Source record↗

Application of information technology to the National Launch System

The approach to the development of the Unified Information System (UNIS) to provide in a timely manner all the information required to manage, design, manufacture, integrate, test, launch, operate, and support the Advanced Launch System (NLS), as well as the current and planned capabilities are described. STESYM, the Space Transportation Main Engine (STME) development program, is comprised of a collection of data models which can be grouped into two primary models: the Engine Infrastructure Model (ENGIM) and the Engine Integrated Cast Model (ENGICOM). ENGIM is an end-to-end model of the infrastructure needed to perform the fabrication, assembly, and testing of the STEM program and its components. Together, UNIS and STESYM are to provide NLS managers and engineers with the ability to access various types and files of data quickly and use that data to assess the capabilities of the STEM program.

Mauldin, W. T.↗

The cost of unreliability in the avionics suite of a launch vehicle

The main objective of the Advanced Launch System (ALS) program is to realize a substantial reduction in recurring launch costs over present launch systems. A methodology is presented for assessing the impact of the reliability of the avionics suite on the recurring launch cost of the ALS. The methodology is illustrated by focusing on two architectures. The first is a distillation of a typical architecture for this type of application. The second is a simplified implementation of the Advanced Information Processing System (AIPS) technology developed at the Charles Stark Draper Laboratory, Inc. Both architectures utilize redundancy of hardware to tolerate faults. the key contributors to the cost of unreliability are identified and modeled utilizing Markov modeling techniques for each of the two architectures. The results are presented along with the more traditional costs for these avionics suites.

Rosch, Gene↗

Atmospheric statistics for aerospace vehicle operations

Statistical analysis of atmospheric variables was performed for the Shuttle Transportation System (STS) design trade studies and the establishment of launch commit criteria. Atmospheric constraint statistics have been developed for the NASP test flight, the Advanced Launch System, and the National Launch System. The concepts and analysis techniques discussed in the paper are applicable to the design and operations of any future aerospace vehicle.