Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Advanced Building Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

97 records · Page 6

Closeout Report of BNL LDRD 23-050 A Second EIC Detector: Physics Case and Conceptual Design

This document is the closeout report for LDRD 23-050, a type-A LDRD project awarded in FY2022 under the title “ A Second EIC Detector: Physics Case and Conceptual Design ”. The project was motivated by the strong interest within the EIC community in a second general-purpose detector and interaction region, and by the recognition that such a detector is essential to fully exploit the scientific potential of the EIC over its multi-decade lifetime. The key goals of the LDRD were to (i) strengthen the case for a second EIC detector, building on the arguments already articulated in the community Yellow Report, (ii) provide a realistic detector concept that is complementary to the current project detector, ePIC, in terms of physics reach, precision, and control of systematics, and (iii) broaden the overall physics program of the EIC facility. Since a possible second detector is expected to be realized with a delay of several years relative to the first detector, the project explicitly aimed at identifying technologies that are not yet sufficiently mature for ePIC but could be deployed on the later timescale of a second detector, thereby providing genuine complementarity and room for innovation. LDRD 23-050 provided support for two postdoctoral researchers and partial support for several BNL staff members, and the effort ramped up in mid-2023. Work was carried out in close collaboration with colleagues from the EIC project, the Cold QCD and STAR groups at BNL, and with substantial input from members of the EIC User Group and the ePIC Collaboration as reflected in the author list. Over the period from October 2022 through September 2025, this team developed and refined a physics program tailored to a second detector, translated the resulting physics requirements into detector-level performance targets, and explored multiple conceptual detector layouts capable of meeting these targets within the constraints of the second interaction region. The expected outcome, as stated in the original proposal, was a document detailing the physics potential and requirements of a second EIC detector, accompanied by a comprehensive conceptual detector design and an outline of the remaining R&D needed to bring the relevant technologies to maturity. The present report summarizes the progress that has been achieved toward these goals. It consolidates the physics studies, detector concepts, and technology assessments developed under this LDRD and places them in the broader context of worldwide detector R&D. While the evolving priorities of the EIC project and the substantial community effort required to design and construct ePIC naturally limited the scope of EIC-wide activities toward a second detector during this period, the work documented here is intended to provide a foundation and a point of reference for future efforts. Whatever form a second EIC detector may ultimately take, we hope that this report will serve as a useful guide for colleagues who continue to advance this program in the near- and mid-term future.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Innovative Advanced Hydrogen Mobile Fueler (Final Technical Report)

The US Department of Energy (DOE) funded a project to design, develop, deploy and analyze the economic viability of an innovative Advanced Hydrogen Mobile Fueler (AHMF). As part of the design activity the project team defined specifications based upon vehicle requirements and compliance with specific fueling performance criteria. The AHMF was originally designed to fuel 10-20 fuel cell vehicles (FCV) per day, consistent with the requirements of the H70 fueling category. The AHMF is able to operate without remote power connections, is modular for easy transport and deployment, and can provide expanded daily capacity and multi-day operations using delivered gaseous hydrogen. Toward the end of the project, due to request from the hydrogen industry and some necessary modifications of the AHMF, the system is now modified to fuel heavy duty vehicles. The project was conducted over two primary phases, each including several key tasks, subtasks, and project milestones. Phase 1 involved the design, development, and construction of the AHMF, moving from a conceptual design through to completion of assembly and testing. In addition to reviewing several different approaches, the team chose to take a conventional station design and modify it for mobile fueling. There were several innovative components included in the design. The high pressure storage was the first to achieve a US Department of Energy (DOE) Special Permit (SP 20391) to transport high pressure hydrogen (95 MPa) in a composite cylinder. The second novel system was a liquid nitrogen (LIN) cooling system with a compact heat exchanger. Without this change, the cooling system would not be able to fit into the AHMF. Phase 2 demonstrated the AHMF by fueling fuel cell buses at a fleet in Pomona, CA. The site was chosen because a temporary fueling solution was required while a fixed station was being installed. The existing permits for the fixed station and non-public access also was a determining factor. Over two months, the buses were fueled 320 times with over 5000 kg of hydrogen from tube trailers. Existing shore power was used, and the average electrical efficiency was 0.13 kWh/kg. The average liquid nitrogen (LIN) consumption was 90.68 scf/kg. The fueling and consumption data was provided to the National Renewable Energy Laboratory (NREL) for analysis. An economic analysis was performed and will be provided in a separate report. The project was successful, but not without challenges and lessons learned. The DOT special permit led the way for the use of high pressure, composite cylinders and is being by multiple other systems and applications. The pandemic along with time for the DOT special permit approval delayed the project for years. The team also believes that hydrogen mobile fueling has a use for the industry, especially during this upcoming phase of expansion. However, it does have its limitations due to high cost to build and operate, and the same permitting challenges as a fixed station. A fully capable system at the speeds and pressures of the AHMF may not be necessary for most applications and would help reduce the cost and increase storage capacity. The on-board generator can be easily replaced with shore power or the wide range of power generation solutions in the marketplace. One of the major results of the project was the development of new code language in National Fire Protection Agency (NFPA) 2 and the International Fire Code (IFC) for on-demand mobile fueling. This will provide guidance for Authorities Having Jurisdiction (AHJ) and user on how to permit temporary fueling sites across the nation.

08 HYDROGEN↗

Project Title: Demonstration High Temperature Superconducting NonPlanar Stellarator Magnet with Advanced Manufactured Assemblies

This is the final report for the project “Demonstration High Temperature Superconducting Non- Planar Stellarator Magnet with Advanced Manufactured Assemblies”, funded by DOE, and performed by Type One Energy from September, 2020, to March 2024 involving the Fusion Technology Institute at the University of Wisconsin–Madison, the Plasma Science and Fusion Center (PSFC) at the Massachusetts Institute of Technology (MIT) and Commonwealth Fusion Systems (CFS) to design and fabricate the first non-planar HTS (REBCO) coil for a high-field stellarator based on the SPARC tokamak’s VIPER cable concept. Stellarators at high fields make high-temperature superconducting magnets necessary for a compact fusion device. But the asymmetric and non-planar nature of its components, especially the magnets make it difficult for scalable producibility. To address these challenges, two promising technologies have emerged: advanced manufacturing (AM) for the supporting plates for forming the magnets, and high-temperature superconducting (HTS) cables inside the plates. AM has advanced enough to produce stellarator components with the necessary geometric complexity, size, and the precision, leading to potentially significant reductions in production time, cost, and waste. The cost of HTS tape has decreased dramatically, and progress in HTS planar magnet development has reached a point where it can be proposed for application to complex 3D non-planar magnets. The main objective of this project is to develop, demonstrate and pre-commercialize a novel, non-planar HTS coil shape that remains superconducting to achieve production scalable reductions in time and cost and performance. The proposed technology is based on the novel concept of a precision sub-scale HTS nonplanar coil assembly. This project focuses on the design, fabrication, material optimization of cable design, and validation and demonstration of the high current carrying capability of superconducting magnets and their support in a complex 3D shape needed for application to stellarator magnetic plasma confinement. The specific objectives of this research program include: (1) The successful application of metal AM to build a precision sub-scale HTS nonplanar coil, (2) An HTS cable and cross-section design that can conform to the required nonplanar coil shape (bend radii as tight as 10-cm) and remains superconducting at an engineering current density of 1.35 kA/cm 2 at 77 K and 1 tesla at the conductor (5 kA in the cable). To achieve the above challenging goals, we have formed a multidisciplinary research team consisting of members from Type One Energy and UW-Madison, MIT PSFC and CFS with complementary skills and strong facilities. The team worked collaboratively on fundamental and applied research on the following three major technical areas: (1) Design, fabrication, and optimization of non-planar HTS Cable The ultimate goal of the project is to determine if commercial REBCO tapes and additive manufacturing can be used to fabricate high field (≥ 10T) non-planar coils with tight bending radii (≃ 100mm) and with a degradation of the critical current (Ic) smaller than 20% with respect to the expected performance. We started with shorter length cable to evaluate the scalability of the production process and eventually reached multiple turns for higher magnetic fields. Our findings suggest that a stellarator coil system of a relevant size, characterized by its asymmetric and non-planar components, can be fabricated using a formed cable in plate method. This system can be simulated using a large-scale modeling approach. The use of hybrid modeling 3 techniques will be pivotal in reducing the complexity of the model and in assessing expected performance in designs. (2) Modeling and simulation of the non-planar HTS Cable Multiphysics simulations are performed using the commercial software and are carried out in self-field conditions, involving 2D and 3D models and twisted around one slot of twist-pitched VIPER cable. Multiphysics simulations are mainly focused on the coil for the critical current evaluation, the magnetic field map, self-Lorentz forces and mechanical, and magnetothermal behavior and the quench dynamics. The detailed model and prediction of the superconducting performance of a stellarator-relevant demonstration cable from numerical simulations supports the results from the actual testing backing the results. A detailed description and results are provided in the later sections. (3) Design, fabrication, and optimization of support for the non-planar HTS Cable The team developed an additive manufactured (AM) coil positioning plate that formed into the required non-planar geometry (with bend radii as tight as 10-cm) and to acceptable tolerances required for a stellarator magnet: (+0.25-mm from ideal on dimensions of coil positioning plates and up to +1-mm from ideal for position of wound coil). The plate materials is also included in this selection process from fabrication and 3D printing perspective and commensurate with eventual application to a fusion reactor. From the cost effectiveness point of view, the HTS coil and plate has the potential to cost less than that made in conventional methods with less waste (<75% waste) reducing time (<50%) and cost (<50%), especially as the AM field matures. The application of advanced manufacturing in the construction of the support plates will also lead to cost reduction, as the cables can be easily replaced, thereby making the assembly modular. With such high primary cost and time savings, high current densities and magnetic field, the funded R&D work has validated the designs, proven the feasibility, and characterized the performance of the HTS coil and plate assembly, paving the way for a relevant-size stellarator coil system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Powering Data Centers with Clean Energy: A Techno-Economic Case Study of Nuclear and Renewable Energy Dependability

Rising data demands from artificial intelligence (AI) and large language models (LLMs) generating images, videos, and text have prompted increased need for larger and more robust data centers in the United States. Major companies interested in these larger data centers face the choice of linking them to existing regional grids, building stand-alone power supplies onsite, or a combination of both. The request, review, and approval process for new transmission lines to grids in the United States, however, has grown in recent years to times spans rivaling those of new construction for nuclear power plants. Building an islanded power supply for each data center is therefore becoming a prominent option. In this case study, several technologies are modeled in techno-economic simulations for long-term system costs subject to fixed electricity demand from a singular data center. A 250 MWe data center is assumed with additional 50 MWe for resiliency. Techno-economic simulations are conducted using the Holistic Energy Resource Optimization Network (HERON) software, which is a part of the Framework for Optimization of Resources and Economics (FORCE) tool suite. Technologies considered include solar, wind, lithium-ion batteries, and several types of nuclear reactors: large-scale reactors, small modular reactors, and microreactors. A low- and high-cost estimate for each technology is assumed to develop a range of expected economic performance. Low-cost estimates included several clean energy production tax credits. Different combinations of renewable energy generators with nuclear reactors are considered, ranging from a fully renewable-powered data center to a fully nuclear-powered data center. Historic time series of wind and solar availability from the Texas grid are used to train a reduced order model; this model then generates unique time series with similar characteristics of the training dataset. Multiple scenarios of weather and subsequent operations are simulated for each renewable-nuclear combination to determine total costs throughout the project lifetime. Fully renewable-powered configurations required large amounts of installed capacity (GW scale) in the simulations to meet the fixed demand of the data center. This is due to some scenarios in the historical dataset which captured low-wind and low-solar days, requiring over-building of these technologies as well as batteries to compensate for the low amounts of electricity generation. Fully nuclear-powered configurations outperformed the fully renewable and mixed renewable-nuclear configurations in terms of cost, with ranges between $1B and $10B in 2023 USDs compared to $40B+ for fully renewable configurations. Of the nuclear technologies, small modular reactors performed better economically than large-scale nuclear models due to lower projected capital costs, and both performed better than the microreactor models. These results demonstrate the applicability of firm, dispatchable electricity resources from baseload generators like nuclear power plants for operating facilities that run at constant power without daily variability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗