Diamond diagnostics for synchrotrons, free-electron lasers and proton beams
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Tests were completed for window to “first disk” (actually a steel plate for these expariments) gaps of 20 mil as per design gap as well as 10 mil and 30 mil gaps to span the range of possible variations. With possible disk distortion in beam, another test with 0 gap was performed. Based on deflections measured during the pressure test, the 0 gap was most likely very near 3 mil.
LANSCE accelerator upgrades: Applications such as pRad desire higher proton beam energy. Material science at LANL will benefit from powerful directional high repetition rate X-ray sources. As it considers itself to be the NNSA accelerator laboratory, LANL should play role in developing compact accelerators for various national security missions.
The following technical note is prepared for distribution to external project collaborators. An inter-cell pumping section in the Scorpius linac contains a pumping grid with slots, bellows, and vacuum plenum. The beam coupling impedances of the inter-cell section are calculated with CST Studio. Important to note that all impedance values in the tech note below should be divided by a factor of 2 to obtain the beam coupling impedances in their standard definition; see reference for details.
The NorthStar pressed and sintered 29 mm diameter, 0.5 mm thick Mo-100 disks will be subjected to large temperature gradients when in beam during production. The beam preferentially heats the disk center, while the aggressive cooling by the helium keeps areas outside the beam spot relatively cool. The result is a temperature gradient of up to 900°C over the radial distance of 14.5 mm. To test the disk integrity with this high temperature gradient, a special holder for a single disk was made such that proper cooling can be applied as in the design target and the disk heating can be replicated with induction heating. NorthStar press and sintered disks were used for these tests.
As Northstar enters a stage of rapid progress in the construction and implementation of their accelerator based Mo99 production facility, LANL has been supporting the effort as requested. This support is often an assistance response to issues as they arise. This report will describe these issues and the LANL contribution in analysis, advice and experimentation.
As Northstar enters a stage of rapid progress in the construction and implementation of their accelerator based Mo99 production facility, LANL has been supporting the effort as requested. This support is often an assistance response to issues as they arise. This report will describe these issues and the LANL contribution in analysis, advice and experimentation.
Abstract not provided.
From the beginning of NNSA support to the NorthStar development of a production facility for the medical isotope Molybdenum-99 (Mo99), LANL has been responsible for the design and testing of a target and its cooling. The target is comprised of a stack of Mo100 disks separated by coolant flow gaps between the disks and between the first disk and a housing window, which separates the target and its coolant from the vacuum of the beam line. The target, and therefore its cooling requirements, evolved steadily over the years of system development
Design work for a 100 kW converter to produce a neutron flux via electron impact on a flowing stream of liquid metal lead-bismuth (LBE) was conducted in FY20. In FY21, the focus shifted to a 20 kW converter which was designed in collaboration with Niowave engineers. A flow visualization model is needed to validate model results for the 20 kW converter and ensure adequate coolant flow over containment structures. This work highlights the mockup that was made with quartz side plates by LANL.
The high brightness negative ion injector combines multiple individual low-duty-factor H- ion sources (multiplexing) in a manner that allows flexibility in final pulse format and beam duty factor up to CW and increases reliability by eliminating an otherwise single-point failure usually associated with using a single ion source. The multiplexing of multiple beams in new injector system also preserves the beam quality of each individual ion source, eliminating a significant source of beam quality degradation usually associated with combining beams.
Element6 has come out of a two year production pause (pre-COVID) with material that lacks their previous QC – some is excellent, but screening is needed. Applied Diamond can now make usable polycrystalline material, for applications not requiring absolute flux calibration. A large area possible (1cm 2 ). Great Lakes Crystal Technology has made great progress in two years, but still needs development to become a trusted supplier of single crystal material. LANL staff (Dongsung Kim) has developed proficient lithography and bonding expertise at CINT to make devices from vendor supplied material. LANL staff has continued and expanded capabilities for device testing at NSLS-II.
LW3D was used to explore the expected CSR from an undulator-based diagnostic using a first-principles approach. It was also used for comparison with an analytic Green-function approach. LW3D was extended to model transport systems involving dipoles and quadrupoles. It was used to explore the radiation produced in a 4-dipole bunch compressor. Radiation ahead of the electron bunch at the beamline exit was shown to be associated with wavefronts produced in upstream dipoles overtaking the bunch.
LANL provided support to Niowave Inc. on the design and analysis of the Mk. 4 and Mk. 5, 20 kW converter. The Mk. 4 converter design consisted of lead bismuth eutectic (LBE) flowing over a divider plate to create a waterfall. Niowave, with feedback from LANL, improved on the Mk.4 divider plate and “horn” region of the converter to create the Mk. 5 version of the converter.
The following is a summary of the status report: Oxygen concentration in liquid metal measurement; Literature search on oxygen control in liquid metal coolant in nuclear installation; Possible oxygen control in vacuum system are getter materials and cold trap; and, Initial ideas on implementation of these two methods
The 800-MeV proton linac at LANSCE consists of a drift-tube linac, which brings the beam to 100 MeV, followed by a coupled-cavity linac (CCL). Each of 44 CCL modules contain multiple tanks, and it is fed by a single 805-MHz klystron. CCL tanks are multi-cell blocks of identical re-entrant sidecoupled cavities, which are followed by drifts with magnetic quadrupole doublets. Bridge couplers – special cavities displaced from the beam axis – electromagnetically couple CCL tanks over such drifts. We have developed 3D CST models of CCL tanks of the LANSCE linac. Their electromagnetic analysis is performed using MicroWave Studio. Beam dynamics is modeled with Particle Studio for bunch trains with realistic beam distributions using the CST calculated RF fields and quadrupole magnetic fields to determine the output beam parameters.
The LANL Accelerator Strategy Office (ASO) requires the support of AOT-MDE to perform a trade study on the current manufacturing capabilities required to modernize the Los Alamos Neutron Science Center (LANSCE). The purpose of the study will be to identify and potentially minimize cost and schedule risks that could impact the LANSCE Modernization Project (LAMP).
This report presents the results of a market manufacturing survey performed for fabricating radiofrequency quadrupoles (RFQ) and Drift Tube Linear Accelerator (DTL) components needed for the Los Alamos Neutron Science Center (LANSCE) Modernization Project (LAMP). A review on existing RFQs and DTLs with their parameters, a summary of specific capabilities needed to manufacture them, the common issues during the fabrication process, their consequences, and resolutions to these problems is presented in this report. The goal of this study is to identify potential collaborators and companies capable of manufacturing the necessary accelerator equipment, while minimizing cost and schedule risks that could impact the future modernization of the LANSCE facility.