Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “AEP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

103 records · Page 6

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

LIF Testing of ETU-2 in VF-5

A visualization of the experimental setup for the Laser-Induced Fluorescence (LIF) diagnostic system applied to AEPS Engineering Test Unit 2 (ETU-2) in the Electric Propulsion and Power Laboratory's (EPPL) Vacuum Facility 5 (VF-5)

LIF↗

NASA Gateway Refueling Architecture and Concept of Operation

The Lunar Gateway is a deep space orbiting outpost being developed by NASA in partnership with ESA and other domestic and international partners. It is a critical component of NASA’s Artemis program supporting long-term human exploration of the moon and is designed to be refueled, requiring the on-orbit transfer of propellants. The first two modules of Gateway to be launched will be the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). The PPE contains the bipropellant chemical and electrical propulsion systems that will provide attitude control and orbit raising capability for Gateway. The reaction control system (RCS) utilizes monomethylhydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3) as the fuel and oxidizer, respectively. Helium is used as a pressurant. The Advanced Electric Propulsion Systems (AEPS) and Busek hall thrusters that comprise the solar electric propulsion (SEP) system use xenon as the propellent. The ESPRIT Refueling Module, provided by ESA, will supply the propellant refueling function to Gateway’s propulsion systems. On-orbit refueling is a complex, technically challenging operation that is key to enabling sustainable crewed Lunar and Martian exploration. Numerous systems may be involved in the refueling operation. Also numerous systems are required to enable the successful ability for Gateway to refuel such as, SEP, RCS, Structure & Mechanisms (S&M), Guidance, Navigation and Control (GNC), Thermal, Software, Vehicle System Manager (VSM), Flight Ops, Extra Vehicular Robotics (EVR), Communication and Tracking (C&T), Avionics, and more. This paper will detail the design architecture, concept of operations, and challenges associated with the Gateway refueling system. The methodologies used in Gateway will be compared to those implemented in OSAM-1 and the best practices documented by AIAA and CONFERS (Consortium For Execution Of Rendezvous And Servicing Operations).

Brandie L. Rhodes↗

12-kW Advanced Electric Propulsion System Hall Current Thruster Qualification and Production Status

The AEPS contract was awarded to AR in May of 2016 with the goal of developing a 12.5kW Hall Thruster System, including the Hall Current Thruster (HCT), Power Processor Unit (PPU) and Xenon Flow Controller (XFC). It was originally targeted to support the Asteroid Redirect Mission, which was cancelled early in the project. The project was subsequently restructured to support the Gateway PPE propulsion mission, with modified scope that consisted of the development, qualification and delivery of three 12kW flight thrusters. The PPU and XFC components were designed and development hardware fabricated with initial testing performed prior to being de-scoped from the contract. System level testing was performed by AR using these engineering components in early 2022 at the Aerospace Corporation’s EP-3 test facility.

Hall thruster↗

Lowering post‐construction yield assessment uncertainty through better wind plant power curves

Abstract Many operational analyses of wind power plants require a statistical relationship, which can be called the wind plant power curve, to be developed between wind plant energy production and concurrent atmospheric variables. Currently, a univariate linear regression at monthly resolution is the industry standard for post‐construction yield assessments. Here, we evaluate the benefits in augmenting this conventional approach by testing alternative regressions performed with multiple inputs, at a finer time resolution, and using nonlinear machine‐learning algorithms. We utilize the National Renewable Energy Laboratory's open‐source software package OpenOA to assess wind plant power curves for 10 wind plants. When a univariate generalized additive model at daily or hourly resolution is used, regression uncertainty is reduced, in absolute terms, by up to 1.0 % and 1.2 % (corresponding to a −59 % and −80 % relative change), respectively, compared to a univariate linear regression at monthly resolution; also, a more accurate assessment of the mean long‐term wind plant production is achieved. Additional input variables also reduce the regression uncertainty: when temperature is added as an input to the conventional monthly linear regression, the operational analysis uncertainty connected to regression is reduced, in absolute terms, by up to 0.5 % (−43 % relative change) for wind power plants with strong seasonal variability. Adding input variables to the machine‐learning model at daily resolution can further reduce regression uncertainty, with up to a −10 % relative change. Based on these results, we conclude that a multivariate nonlinear regression at daily or hourly resolution should be recommended for assessing wind plant power curves.

17 WIND ENERGY↗

Modular RivGen LCOE Content Model

The Modular RivGen LCOE Content Model contains estimates of levelized cost of energy (LCOE) for three array configurations operating in a theoretical river environment. The LCOE is distinguished by the CapEx, OpEx, and annual energy production and capture for each river environment.

16 TIDAL AND WAVE POWER↗

Tidal Currents in San Juan Archipelago, Washington

Re-analyzed acoustic Doppler current profiler (ADCP) data originally collected by NOAA CO-OPS (Center for Operational Oceanographic Products and Services) and equivalent point data from Pacific Northwest National Laboratory's FVCOM (Finite Volume Community Ocean Model) model of the region. Data are processed to products describing characteristics of tidal currents relevant to tidal turbines, as well as power output estimates for a notional turbine deployed from a surface platform or from the seabed at each location. These data underpin the results presented in their associated paper - see below.

16 TIDAL AND WAVE POWER↗

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Risk-Based Methodology for the Determination of Hall Thruster Performance Specifications

This work adapts manufacturing and metrology industry standards to create a risk-based approach for the determination of electric propulsion performance specifications. The developed process is applied to 208 total thrust measurements acquired using three different NASA Hall Effect Rocket with Magnet Shielding (HERMeS) Technology Demonstration Unit (TDU) 12.5-kW Hall thrusters in three different test facilities in order to generate thrust specifications at the 300 V/6.25 kW, 400 V/8.33 kW, 500 V/10.42 kW, and 600 V/12.5 kW operating conditions. These thrust specifications are used to perform a set of sample acceptance tests to illustrate the importance of adding additional conservatism using a parameter known of the Test Accuracy Ratio in order to control the risk to the thruster producer and consumer from false rejection and acceptance of thruster units.

HERMeS↗

Risk-based Methodology for the Determination of Hall Thruster Performance Specifications

This work adapts manufacturing and metrology industry standards to create a risk-based approach for the determination of electric propulsion performance specifications. The developed process is applied to 208 total thrust measurements acquired using three different NASA Hall Effect Rocket with Magnet Shielding (HERMeS) Technology Demonstration Unit (TDU) 12.5-kW Hall thrusters in three different test facilities in order to generate thrust specifications at the 300 V/6.25 kW, 400 V/8.33 kW, 500 V/10.42 kW, and 600 V/12.5 kW operating conditions. These thrust specifications are used to perform a set of sample acceptance tests to illustrate the importance of adding additional conservatism using a parameter known of the Test Accuracy Ratio in order to control the risk to the thruster producer and consumer from false rejection and acceptance of thruster units.

HERMeS↗