Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Hydrogen Transportation and Distributed Energy Systems Risk and Feasibility Assessment for Airport Facilities - CRADA 555 (Abstract)

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support PDX in performing a risk assessment for several hydrogen deployment scenarios. It is intended that the deployment of hydrogen at PDX could serve several roles, including decarbonizing its bus fleet and building out a distributed energy system which could also be used to facilitate emergency operations. PDX’s initial plans concern replacing their current fleet of 28 busses with FCEBs. To do so, PDX will need to deploy the hydrogen systems needed to support the buses. This includes hydrogen storage, production, delivery, filling, compression, and maintenance. PDX also has long range plans to build a distributed energy system to support normal and resilient operations. This study will investigate the risks of each plan individually, and a combined plan which serves both. Additionally, PDX is in an area with the potential for high seismic activity, as such this work will also include a seismic risk assessment. A detailed risk assessment using PDX as a test case is necessary to ensure the deployment of large-scale hydrogen is successful and to understand the benefits or drawbacks in contrast to electric only technologies. Many technologies have been proposed that claim to utilize hydrogen for both transportation and distributed energy systems; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for PDX will be analyzed, a risk assessment will be performed on the hydrogen infrastructure and distributed energy system. These assessments will be useful for understanding how each of these technologies would perform as applied to a large public facility and public safety. The results of this CRADA, and an impact of the DOE funding, will evaluate hydrogen as a key fuel for PDX and will accelerate by several years availability of hydrogen, fuel cells, and other low-carbon technologies.

08 HYDROGEN↗

Advanced Manufacturing of Cathode Materials for Lithium-ion Batteries

Original objectives (per the Statement of Project Objectives) centered on developing and translating a continuous pilot process for cathode materials production while targeting (i) a 29% manufacturing cost reduction, (ii) an 82% energy consumption reduction for cathode production, and (iii) a doubling of manufacturing productivity. Planned validation included characterization at appropriate analytical facilities and electrochemical performance evaluation progressing from half-cells to pouch-cell formats, with a pathway to kilogram-scale production of finished cathode materials for representative testing. Scope evolution: During execution, the project team identified that the surfactant-enabled chemistry offered high selectivity for lithium precipitation from brine sources. A formal scope revision shifted the final project year from cathode manufacturing development to direct lithium extraction/lithium recovery, while maintaining the overarching intent of cost reduction and process simplification relevant to the battery supply chain.

25 ENERGY STORAGE↗

The Deep Underground Neutrino Experiment (DUNE) Program

The Deep Underground Neutrino Experiment (DUNE) is a next-generation long-baseline neutrino oscillation experiment aimed at determining the neutrino mass hierarchy and the CP-violating phase. The DUNE physics program also includes the detection of astrophysical neutrinos and the search for signatures beyond the Standard Model, such as nucleon decays. DUNE consists of a near detector complex located at Fermilab and four 17 kton Liquid Argon Time Projection Chamber (LArTPC) far detector modules to be built 1.5 km underground at SURF, approximately 1300 km away. The detectors are exposed to a wideband neutrino beam generated by a 1.2 MW proton beam with a planned upgrade to $>$ 2 MW. Two 770 ton LArTPCs (ProtoDUNEs) have been operated at CERN for over 2 years as a testbed for DUNE far detectors and have been optimized to take new cosmic and test-beam data in 2024-2025. The DUNE and ProtoDUNE experiments and physics goals, as well as recent progress and results, are presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

In Cell Thermal Creep Frames for Demonstration Project Preparations

The thrust of advanced nuclear reactor demonstrations demands the accelerated qualification of in-core materials to enable licensing processes and developing the performance data. Due to the high-operating temperatures of such reactors, long-term mechanical behavior under constant load is essential to determine the geometrical and mechanical integrity of in-core components during operation and off-normal conditions. Therefore, the thermal creep behavior of neutron-irradiated advanced reactor materials must be determined. The feasibility of using subsize specimens for the irradiation campaigns and the limited available infrastructure challenge the assessment of thermal creep behavior of advanced reactor materials. Therefore, the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) National Reactor Innovation Center (NRIC) prioritizes the development of a thermal creep testing infrastructure for multiple subsize specimens to accelerate the demonstration and deployment of advanced reactor concepts. This report describes the activities for the construction of a thermal creep testing capability at Idaho National Laboratory (INL). The overall project consists of conceptual design, out-of-cell demonstration, and in-cell demonstration phases. During fiscal year (FY)-2021, the team finished the conceptual design of a thermal creep test facility that can test multiple subsize specimens. This conceptual design consisted of the determination of technical and functional requirements, the determination of the design space, and the preparation of the technical drawings. Technical and functional requirements were categorized as required and desired capabilities and the conceptual design was performed to meet all the required capabilities with the flexibility to achieve the desired capabilities. The design space identified the operational capacity of the creep frame for different advanced reactor relevant materials with the consideration of the feasible operation in the hotcell at the Fuels and Applied Science Building (FASB) at INL. Based on the requirements and design space, the multiple specimen creep frame was designed. The official INL engineering drawing process was started and the procurement of materials for construction was initiated. For FY-2022, the out-of-cell demonstration and final installation of the multiple creep frame is planned.

36 MATERIALS SCIENCE↗

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS↗

LLNL SFA OBER FY23 Program Management and Performance Report: BioGeoChemistry at Interfaces

The focus of the BioGeoChemistry at Interfaces SFA has been to identify and quantify the biogeochemical processes and the underlying mechanisms that control actinide mobility in an effort to reliably predict and control the cycling and migration of actinides in the environment. The research approach has included: (1) Field Studies that capture actinide behavior on the timescale of decades (Research Thrust 1), and (2) Fundamental Laboratory Studies that isolate specific biogeochemical processes observed in the field (Research Thrust 2). These Research Thrusts are underpinned by the unique capabilities and staff expertise at Lawrence Livermore National Laboratory, allowing the BioGeoChemistry at Interfaces SFA to advance our understanding of actinide migration behavior in the environment, and serve as a resource for environmental radiochemistry research internationally (Figure 1). In FY23, our SFA research focused on transient redox gradients across stratified waters, sediment-water interfaces, and mineral-water interfaces to address processes controlling cycling of redox-sensitive metals. Nevertheless, Research Thrusts 1 and 2 are guided by the following broad central hypotheses that were developed during our last program review held at the end of FY18: Thrust 1 Hypothesis: Biogeochemical processes occurring on the timescale of years to decades lead to greater actinide recalcitrance in sediments and limits their migration in surface and groundwater. Thrust 2 Hypothesis: Long-term biogeochemical processes include mineral and surface alteration, which leads to stabilization of actinide surface associations or incorporation into mineral precipitates. Our strategic goal is to use the knowledge gained from our Science Plan to advance our understanding of the behavior of actinides and other radionuclides (e.g. Cs) and provide DOE with the scientific basis for remediation and long-term stewardship of DOE’s legacy sites. More broadly, we are improving our understanding of transport phenomena in environmental systems sciences with a particular emphasis on environmentally relevant (long-term) timescales. While we retained some of our historical focus on actinide biogeochemistry this past fiscal year, biogeochemical processes occurring at unique Test Bed locations associated with this SFA provide fundamental information on abiotic and biotic redox processes that control the cycling of redox sensitive metals under dynamic and transient conditions. Furthermore, in collaboration with SFA teams at Argonne National Laboratory, our SFA has begun to transition away from the current research focus and develop a new research program in terrestrial wetland systems. The Terrestrial Wetland Function and Resilience SFA program plan will be delivered to the Environmental System Science (ESS) program within BER at the end of FY23.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Optimal Gas-Electric Energy System Decarbonization Planning

As energy utilities implement climate change mitigation policies, system planners require strategies for achieving affordable emissions reductions. Coordinated planning of electric power and natural gas systems will allow synergistic investments to address cross-sector operational constraints, competing uses for net-zero emissions fuels, and shifts in energy demands across energy carriers. In this study, we develop a novel optimization program that finds the cost-minimizing mix of infrastructure expansion or reduction across gas and electric systems to satisfy sector-specific emissions constraints. Alongside energy supply resources, our framework allows for central-planning of end-use equipment stocks to allow switching between gas and electric appliances upon failure or premature replacement. The proposed model is used to simulate case study scenarios for a benchmark 24-pipe gas network coupled to a 24-node power system test network. We find that electrification of greater than 80% of core gas demands is a component of the least-cost solution for modeled energy systems. Despite this substitution, the gas system is maintained to service difficult-to-electrify customers and to deliver net-zero emissions gas to electricity generators in times of peak electricity demand. Restricting electrification of gas appliances increases reliance on power- to-gas technologies and increases annual costs by 15% in 2040. Neglecting constraints on pipeline blending of hydrogen can produce a misleading result that relies on hydrogen blend fractions of greater than 50%. In all cases, we find the average costs of delivered gas increase nearly 5-fold across the decarbonization transition, highlighting the importance of future work investigating cost-allocation strategies for ensuring an equitable energy transition.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2022 Small Turbine Certification Awardee: Ryse Energy LLC - Americas

To meet the growing demands of the distributed wind market and comply with current U.S. standards, Ryse Energy LLC-Americas (Ryse Energy, formerly Primus Wind Power) plans to update all six products in its AIR Range family of micro wind turbines. A new, more cost-effective circuit board will be paired with other hardware upgrades, advanced control algorithms, and a Bluetooth function that allows users to more easily program and control the turbine. This Competitiveness Improvement Project (CIP) award will fund certification testing of the new circuit board to make sure it meets American National Standards Institute/American Clean Power Association (ANSI/ACP) and UL Federal Communications Commission (FCC) safety and quality standards. Primus Wind Power developed the prototype for the new circuit board with an earlier round of CIP funding, and Primus has received CIP awards supporting other certification and optimization projects.

CIP↗

An agentic artificially intelligent X-ray scientist

Executing experimental tasks in both normal research laboratories and large-scale scientific facilities often requires extensive human supervision and remains a key challenge on the path to fully autonomous, artificial intelligence (AI)-driven science. Here we demonstrate a large language model-driven agent that autonomously performs X-ray sample alignment on a synchrotron beamline by planning actions, executing instrumental commands, interpreting observations and iterating towards experimental goals. Based on existing large language models with structured tool-use via the model context protocol, our AI X-ray scientist was guided and tested using an in-house-built virtual experimental setup that mirrors a six-circle diffractometer at an operational synchrotron beamline. The agentic workflow developed in the virtual environment was directly deployed on a real beamline, where it correctly identified reference reflections and determined the orientation matrix, an essential first step in any type of single-crystal scattering experiment. Our AI X-ray scientist responded effectively to unexpected experimental conditions, demonstrating adaptive problem-solving and readiness for addressing practical experimental situations. Our study provides a step towards autonomous operation across diverse experimental environments at large-scale scattering facilities.

Chen, Zhantao (ORCID:0000000319543868)↗

A study of sacrificial mirrors for use prior to a laser wakefield accelerator driven by the Z-Petawatt laser

Many experiments at Sandia’s Z Pulsed Power Facility require x-ray backlighting diagnostics to understand experiment performance. Due to limitations in present-day source/detection modalities, most x-ray diagnostics at Z are restricted to photon energies <20 keV, ultimately limiting the density, amount, and atomic number of targets diagnosable in experiments. These limitations force the use of low-Z materials like Beryllium, and they prevent acquisition of important backlighting data for materials/densities that are opaque to soft x-rays and where background emission from the Z load and transmission lines overwhelm diagnostics. In this LDRD project, we have investigated the design and development of a laser wakefield acceleration platform driven by the Z-Petawatt laser – a platform that would enable the generation of a pulsed, collimated beam of high energy x-rays up to 100 keV. Geometrical considerations for implementation on the Z Machine require the use of sacrificial mirrors, which have been tested in offline experiments in the Chama target chamber in building 983. Our results suggest the use of sacrificial mirrors would not necessarily inhibit the laser wakefield x-ray process, particularly with the benefits stemming from planned laser upgrades. These conclusions support the continuation of laser wakefield source research and the development of the necessary infrastructure to deliver the Z-Petawatt laser to the Z center section along the appropriate lines of sight. Ultimately, this new capability will provide unprecedented views through dense states of matter, enabling the use of previously incompatible target materials/designs, and uncovering a new set of observables accessible through diffraction and spectroscopy in the hard x-ray regime. These will amplify the data return on precious Z shots and enhance Sandia’s ability to investigate fundamental physics in support of national security.

43 PARTICLE ACCELERATORS↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa Nevada National Security Site, Nevada (Rev. 1)

This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for the Central and Western Pahute Mesa (PM) Corrective Action Units (CAUs) 101 and 102. Corrective action is needed because underground radioactive contamination exists in these areas resulting from historic underground nuclear testing. The PM CAUs are located in the northwestern portion of the Nevada National Security Site and comprise 82 corrective action sites. A total of 85 underground nuclear detonations took place within the area covered by the PM CAUs between 1965 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities.

54 ENVIRONMENTAL SCIENCES↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Portable Rabies Virus Sequencing in Canine Rabies Endemic Countries Using the Oxford Nanopore MinION

As countries with endemic canine rabies progress towards elimination by 2030, it will become necessary to employ techniques to help plan, monitor, and confirm canine rabies elimination. Sequencing can provide critical information to inform control and vaccination strategies by identifying genetically distinct virus variants that may have different host reservoir species or geographic distributions. However, many rabies testing laboratories lack the resources or expertise for sequencing, especially in remote or rural areas where human rabies deaths are highest. We developed a low-cost, high throughput rabies virus sequencing method using the Oxford Nanopore MinION portable sequencer. A total of 259 sequences were generated from diverse rabies virus isolates in public health laboratories lacking rabies virus sequencing capacity in Guatemala, India, Kenya, and Vietnam. Phylogenetic analysis provided valuable insight into rabies virus diversity and distribution in these countries and identified a new rabies virus lineage in Kenya, the first published canine rabies virus sequence from Guatemala, evidence of rabies spread across an international border in Vietnam, and importation of a rabid dog into a state working to become rabies-free in India. Taken together, our evaluation highlights the MinION’s potential for low-cost, high volume sequencing of pathogens in locations with limited resources.

59 BASIC BIOLOGICAL SCIENCES↗

The Dark Energy Spectrographic Instrument (DESI) Guide-Focus Assembly

The specific research of the DESI project is to study in detail the expansion history of the Universe over the past 10 billion years. In order to do this, the project designed, fabricated, tested and commissioned the DESI instrument which has been deployed at the Mayall Telescope at the Kitt Peak National Observatory near Tucson, Arizona. The DESI project was conducted by approximately 30 US and foreign national laboratories. Our CRADA with the The Institut de Física d’Altes Energies (IFAE) in Barcelona (Spain) involved both research planning for eventual observing on the DESI telescope; and in providing hardware jointly designed by LBNL and IFAE; ten guide and focus sensor systems (GFAs) that either provide feedback to the Mayall telescope tracking system or provide focus position information to the DESI corrector hexapod. The key major goals of this CRADA were achieved.For survey planning, Drs. Fernandez, Fosalba, Garcia-Bellido, and Gaztañaga were all important contributors to the working groups to which they were assigned. Their application of redshift techniques, development of simulations to support target selection, exploration of the use of alternative observables to extract cosmological information like AP and void statistics, and the use of PAU data to assist in the optimization of targeting selections have been vital in the early planning for targets during commissioning. The major role in the project involved Drs. Castander, Miquel, Padilla, and Sànchez. They were all directly involved with the development of the Guide-Focus Assembly (GFA) hardware, software and filter validation. In order to accomplish the goals of the DESI Project, the Mayall telescope must track DESI targeted galaxies for up to 15 minutes and the DESI corrector must be repositioned on its hexapod system for different telescope orientations. The guide and focus assemblies (GFA) provide in this information. There are ten GFA modules on the focal plane, six providing tracking information and four providing focus information. A common GFA design supports both functions by a simple switching of its operating mode. IFAE designed, fabricated, tested and delivered twelve GFAs. Once received at LBNL, the GFAs were integrated with the focal plane. This was an iterative process as the GFA’s were delivered as they were made. Our working relationship with the IFAE scientists and engineers was remarkable given the distance and time zone issues. The GFAs have performed extremely well during the commissioning phase of the instrument.

79 ASTRONOMY AND ASTROPHYSICS↗

Mixed-Mechanism Stimulation Enabled Enhanced Geothermal Systems (CRADA FP00007509 Final Report)

In this project, we aimed to develop a robust, novel EGS design that would enable broad deployment of geothermal energy at costs competitive with other sources of renewable energy. The technical objectives included developing reservoir models for synthetic geothermal systems that meet target reservoir performance characteristics, performing a quantitative assessment of selection criteria for candidate geothermal sites, perform proppant studies under relevant geothermal conditions, and complete an induced seismicity risk analysis for potential geothermal development sites. The project team made significant progress towards these objectives. Specifically, we developed a prioritization to rank candidate sites for suitability of our technology based on 10 separate technical, operational, logistic, regulatory, and commercial criteria. The team performed laboratory testing at Lawrence Berkeley National Laboratory to characterize the functionality of several different types of proppant materials at temperatures of up to 200 C for durations of up to 9 weeks. We also created an Induced Seismicity Mitigation Plan for the top two sites selected for our future field demonstrations.

58 GEOSCIENCES↗

Letter of Intent: Muonium R&D/Physics Program at the MTA

With the planned turn-on of the PIP-II 800 MeV superconducting proton linac, Fermilab will potentially become the world's best laboratory at which to carry out fundamental muon measurements, sensitive searches for symmetry violation, and precision tests of theory. In preparation, we propose to develop the techniques that will be needed. An R&D and physics program is proposed at the Fermilab MeV Test Area to use the existing 400 MeV Linac to demonstrate the efficient production of a slow muonium beam using $\mu^+$ stopped in a ~100 $\mu$m-thick layer of superfluid helium, and to use that beam to measure muonium gravity.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗